the right team to secure operational and engineering excellence...

15
Engineering Solutions The Right Team to Secure Operational and Engineering Excellence Volume 1

Upload: others

Post on 12-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

EngineeringSolutions

The Right Team to

Secure Operational and

Engineering Excellence

Volume 1

Page 2: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Engineering Solutions to Improve Plant Performance

Our Mission:To provide the best engineering resources to deliver safe, world-class project performance, total cost certainty, and a partner committed to excellence in engineering projects.

Did you know … AREVA off ers a diverse team of engineering resources as an extension of your team? And we understand that the real success is in an ongoing relationship — one where we work together to make the right decisions for your plant.

We combine a unique blend of engineering expertise with equipment and system knowledge, rigorous project management experience and regulatory expertise —all driven to reduce risk while saving time and money. The combination of nuclear steam supply systemOEM engineering and fi eld service capabilities with secondary-side expertise allows AREVA to deliver atotal-plant perspective.

With customer-focused innovation, AREVA can deploy the technology and resources to lower your total costs and improve your facility’s performance. We pledge uncompromising support for the long haul as you realize your vision for highly reliable, high-quality and safe nuclear power.

Page 3: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Did you know … AREVA, through joint ventures, has the ability to perform both small and large engineering, procurement, construction (EPC) projects for utilities across the United States? AREVA, coupled with key strategic partnerships, has the experience and capability to drive the project to successful completion with quality and predictability.

As utilities strive to meet safety, cost, schedule and operational and engineering excellence goals, AREVA is providing innovative options for U.S. nuclear sites facing major projects and plant upgrades. AREVA’s engineering teams are prepared to meet your challenges for plant modifi cation and specialty engineering projects — nowand in the future. Let us show you our unique approach and why we have become a major, competitive playerin engineering.

Major Projects & Plant Upgrades

Mark MichaelsEPC Business Line Manager

Experience:

Manager Major Projects EPC (AEP FLEX), Principal Project Manager Major Projects (Bellefonte), Senior Project Manager FPL EPUs, Senior Project Manager (Several Heavy Component Design / Fab / Install)

Page 4: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Fariba GartlandDeputy Vice President, Major Projects / Plant Upgrades

Experience:

Valve Engineering, Major Projects and Plant Upgrades, PWR and BWR Engineering

Did you know … AREVA is delivering fl exible engineering options to help utilities facing major projects and plant upgrades meet safety, cost, schedule and performance goals?

AREVA brings complementary balance of plant and nuclear steam supply system engineering capabilities together through Engineer of Choice partnerships, proven joint venture organizations and dedicated people — with expertise across every aspect of your nuclear fuel cycle.

As your single point of accountability, AREVA combines unmatched engineering expertise with the right equipment and system knowledge, rigorous project management experience and regulatory expertise into one integrated solution to reduce risk while saving you time and money.

Engineer of Choice

Page 5: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

David KipleyProduct ManagerFire Protection

Experience:

Project Manager/Technical Lead for Plant Fire Alarm System Replacements, New Fire Suppression (Gaseous & Water Based) & Fire Water System Installations

Did you know … AREVA’s committed and highly experienced Fire Protection Group has provided engineering services to the nuclear power industry for more than 25 years, bringing experience and global capabilities to the majority of the U.S. nuclear power plant fl eet?

AREVA’s Fire Protection Group has the expertise to support the nuclear fl eet in resolving issues associated with all aspects of their license-based Fire Protection Program, whether they retain the prescriptive 10CFR 50 Appendix R, or transitioned to the 10CFR 50.48.c NFPA 805 performance-based programs. AREVA has supported plants with their deterministic safe shutdown analyses as well as the development of their programs for transition, implementation and maintenance of NFPA 805performance-based programs. AREVA has also supported plants that have retained their prescriptive-based programs in the development and implementation of Fire Probabilistic Risk Assessment programs in accordance with Regulatory Guide 1.189.

AREVA also has extensive experience in developing classical fi re protection system analysis/design/implementation as well as onsite support services. With the advent of EPU, NFPA 805 risk reduction and License Renewal requirements, AREVA’s Fire Protection Group has supported plants in developing/implementing modifi cations to protect new transformer installations, plant fi re alarm system replacement and incipient detection designs to address the program commitments in a cost eff ective manner. Now that’s a commitment you can count on.

Fire Protection

Page 6: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Did you know … AREVA can fully support you as you address post-Fukushima requirements for your facility?

With a global presence, AREVA maintains very close working relationships with virtually every nuclear utility in the world. These relationships, combined with safety experience as an operator of its own nuclear industrial facilities, give AREVA a perspective unique among industry suppliers. From its front-line vantage point, the company has structured its Safety Alliance framework for analyzing and addressing safety issues following Fukushima.

This framework is structured around three imperatives: resistance to major hazards, robustness of cooling capability, and prevention of environmental damage. Expertise on all reactor designs and a depth of engineering and project management bench strength make the company well-positioned not only to respond to FLEX requirements, but to deploy a comprehensive package of solutions to help utilities to prepare, preserve and protect their communities and fl eets — now and for years to come.

Post-Fukushima Solutions

Jeremy PicardManager, Post-Fukushima Engineering

Experience:

New Builds Safety Analysis (Site Characteristics and Parameters), Radiological and Environmental Analysis, Floodingand Seismic Assessments, Decommissioning

Page 7: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Jen ButlerProject Manager Risk-Informed Engineering and Seismic Evaluations

Experience:

Probabilistic Risk Assessment, including Seismic, and Severe Accident Analysis

Did you know … AREVA’s department of Probabilistic Risk Assessment (PRA) and Risk-Informed Engineering Applications professionals have extensive experience in PRA updates for Regulatory Guide 1.200 compliance, PRA model maintenance, containment analysis, external hazards including high winds and external fl ooding, digital I&C PRA, volunteer (Tech Spec) and regulatory-driven (STP, maintenance rule) risk-informed applications, recent regulatory issues such as seismic PRAs, as well as new plant PRA applications?

Our best risk solutions quite often lead to plant improvements, and AREVA’s design teams are very experienced in cost-eff ective modifi cations. AREVA off ers the best long-term, risk-informed solutions for our customers.

AREVA’s all-around knowledge, which includes the nuclear steam supply system and balance of plant, greatly supports risk-informed engineering and applications in a balanced manner. This synergy helps to ensure the best and most cost-eff ective, long-term solutions.

Probabilistic Risk Assessment

Page 8: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Did you know … AREVA can off er cradle-to-grave solutions for your electrical and mechanical component obsolescence challenges?

Aging and obsolescence of electrical components, such as control switches, relays, breakers, solenoid valves, motor operated valves, air operated valves, EDG hoses, and electronic modules continues to become a major concern in the United States. To avoid costly down time, AREVA can work with your Procurement and System Engineering organization to identify critical-to-generation components that are no longer available and have no spares in stock.

Our engineers can identify the critical characteristics for the obsolete components and recommend suitable replacements from our Nuclear Parts Center as well as other suppliers. We also have the in-house capability to re-engineer electronic modules, if needed. Our Commercial Grade Dedication engineers can qualify the recommended replacement components, and our new Technical Solutions Center allows us to do our own qualifi cation testing in-house, saving time and money while ensuring quality.

Integrated Procurement Solutions

Bob ColeManager, Integrated Procurement Solutions

Experience:

Outage Management, NDE Services, Business Improvement Management and Global NDE Sales

Page 9: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Erik DormanManager,Cybersecurity Solutions

Experience:

Outage Services Project Management, Computer Engineering - Software and Hardware Design, Information Management

Did you know … Each day, cybersecurity threats grow in sophistication, breadth and speed?

Protecting our nation’s energy infrastructure is vital to our national security. AREVA provides best-in-class security solutions to the energy sector to meet that need. We provide the most effi cient and eff ective means to safeguard energy facilities and achieve regulatory compliance.

AREVA delivers a holistic perspective (engineering, regulatory/compliance, cyber/physical), a pragmatic approach through fully leveraging existing protections, a comprehensive suite of solutions, and additional technology via strategic relationships. Our programs are designed to fully leverage and integrate into existing plant programs, processes, and procedures. This will ensure adequate protection, meet the regulatory requirements most effi ciently, and provide opportunities to reduce theon-going operational program costs.

Cybersecurity SolutionsThe Threat is Real, the Solution is Clear

Page 10: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

Todd HeavnerDirector, Nuclear Parts Center

Experience:

Design Engineering, New Plants Design, Stearns Roger Services, PWR Services and the Nuclear Parts Center

Did you know … AREVA has a full-service Nuclear Parts Center (NPC) in Lynchburg, Va.?

The NPC features a Customer Inquiry System (www.us.areva.com/cisweb), where utilities can connect with AREVA 24/7/365 — for access to its extensive spare parts inventory, guaranteed stocking programs, supply chain management and technical support. As an OEM and utility-based distributor, AREVA’s NPC has a clear understanding of the drivers for the industry.

The NPC maintains a vast stock of spare parts including nuclear-rated valves and actuators, electrical components such as breakers, control relays and switches, reactor coolant pump seal parts, valve components, ion-exchange resins, Nuclear Grade Air Traps, nuclear steam supply system and ASME code parts and nuclear cartridge fi lters. For reliable, effi cient inventory management, AREVA has combined the Hardware Modernizations with the Nuclear Parts Center to bring together all of our off erings and help you manage obsolescence — with confi dence.

Nuclear Parts Center

Page 11: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

COMPONENT REPAIR &REPLACEMENT• Contingency Plans & Procedures• Equipment Recovery Plans• Reactor Vessel Head Repairs• Safe End Welding• Nozzle Repairs• Alloy 600 Support• Steam Dryer Repairs• Laser Scanning

ELECTRICAL/I&C ENGINEERING• AC/DC System Design & Analysis• Voltage Regulation• I&C System Design• Electrical Load Management• Plant Process Computer

Replacements• Digital Upgrades• Security Replacements &

Upgrades• Design Studies – Conceptual Design – Feasibility Studies – Cost/Benefi t Analysis – Planning • Modifi cation Package

Development – 10CFR50.59 Evaluations – Drawings & Database Inputs – Installation Instructions – Implementation & Testing Support – Procedure Support – Installation & Startup Support – Licensing Support • Specifi cations• Power Systems Modeling (ETAP,

etc.)• Calculation Conversions• Electrical Calculations – Power Systems – Setpoint

– Cable Ampacity• I&C Calculations – Instrument Loop Analysis – Instrument Setpoint Analysis• Human Factors Engineering• Control Room Design• Single Point Vulnerability• Environmental Qualifi cation• Software Verifi cation and

Validation (V&V) • Software Quality Assurance (SQA)

Plans and Procedures • Digital I&C System Analyses:

Setpoint, FMEA, Reliability, Response Time Uncertainty

• Cybersecurity• Interface Management• Licensing Support• Requirements Specifi cation

Development• Diesel Generator Engineering

FIRE PROTECTION ENGINEERING• Detection/Suppression/Water

Supply System Design• Fire Barrier Testing and

Qualifi cation• Plant Fire Protection Program

Support• Fire Safe Shutdown Analysis • NFPA 805 Post Transition Support

CONTINGENCY PLANNINGSERVICES• Emergency Preparedness

Planning• Radiology Drill & Exercise

Planning• Contingency Plan Drill & Exercises

NDE SERVICES • NDE Training & Certifi cation• In-Service Inspections• Phased Array Inspections• Reactor Vessel Internal

Inspections• Reactor Head Inspections• Section XI

HARDWARE MODERNIZATIONS• Human System Interface (I)• TELEPERM™ XS Safety-Related

Digital Control Platform• Digital I&C System Installation,

Commissioning, and Testing• Field Testing Installation and

Commissioning• After Sales Support • Training• Safety and Reactor I&C Systems – Reactor Protection – Neutron Flux Monitoring – Nuclear Steam Supply System –

Reactor Controls and Limitation – Control Rod Position Indication – Diesel Controls – PAMS/RG1.97 Indication• Monitoring Systems and

Miscellaneous – Loose Parts Monitoring – Leakage Monitoring • Safety Features Actuation System• Integrated Control System• Emergency Feedwater Initiation

and Control System• Digital Control Rod Drive Control

System (DCRDCS)• Electronic Equipment Restoration

(EER)

• Reactivity Measurement and Analysis System (RMAS)

• Rod Drop Testing System• Humidity Leak Detection System

(FLUS)• Traversing Incore Probe System

and Detectors (TIP)• Commercial Grade Dedication

Engineering and Test Plan Development

• Commercial Grade Dedication Testing

• QA Data Package• Supplier/Vendor Surveillance• Seismic and Environmental

Testing• Cutler Hammer Electrical Products • Cybersecurity• Spent Fuel Pool Monitoring• Motors• Variable Frequency Drives (VFDs)

LICENSE RENEWAL &REGULATORY PROJECTS• Initial Plant Life Extension

Analyses • Assessment of Plant CLB, DB,

Programs & Tech. Support Doc. • SSC Scoping, Screens, Aging

Management• Time Limited License Aging

Analysis• License Renewal Application

Support• Plant Condition Assessments• Plant Financial Modeling/Analyses• NRC Inspection Review Support• LR Site Implementation Plan• Improved Tech Spec (ITS)• Design Basis Documentation

(DBD)

What can we do for you?

Page 12: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

MECHANICAL ENGINEERING• Mechanical Component

Engineering• Mechanical Systems Engineering• Engineering Studies/Cost-Benefi t

Analysis• Plant Modifi cations and Plant

Design Modifi cation Packages• Thermal-Hydraulic Analysis

Including CFD Modeling• System Water Hammer Evaluation• Flow Modeling & Hydraulic

Analysis• HVAC Design & Analysis• ALWR Design• Suction Strainer/Containment

Sump Hydraulic Analysis• BWR Hydrogen Water Chemistry

Design• System Assessments –SSFIs,

SSEIs• System Monitoring/EPRI• 10CFR50.71(e) USAR Updating• USAR Program Development/

Evaluation/Enhancement• Design Basis Upgrades• Raw Water Intake Solutions

NUCLEAR ANALYSIS & FUELMANAGEMENT• Alternative Source Term• Containment & High Energy Line

Break Analysis• Control Room Habitability• Criticality Analysis• Dose Assessment• Fluid Transient – Hydrodynamic

Pipe Loads• Fuel Fabrication Process

Inspection• Fuel Mechanical Design Reviews• Fuel Performance & Reliability

Evaluations

• Fuel Management & Economic Analysis

• GOTHIC Analysis• MCNP, DORT, SCALE, Heating

Analysis• Meteorological & Atmospheric

Dispersion Analysis• PSA Support Services• Radiation Accident & Safety

Analysis• Radiation Effl uents & Waste

Management• Radiation Environmental

Monitoring Program Support• Radiation Shielding & Equipment

Qualifi cation• Risk-Based Technical

Specifi cation Optimization• Risk-Informed In-Service

Inspection• Risk-Informed Procurement• Spent Fuel Characterization• Spent Fuel Pool Thermal-Hydraulic

Analysis• Transient /LOCA Safety Analysis

What can we do for you?

OUTAGE SERVICES• Planning & Scheduling• Outage Optimization• PWR & BWR Refueling Services• Outage Equipment• Outage Risk Assessment• Refueling SRO and Personnel

Training• Pool-to-Pad Services• Liner Leak Detection and Repairs• Feedwater Heater Services and

Tube Sleeving/Repairs• Refuel Equipment Replacements

and Upgrades• Refuel Equipment Preventative

Maintenance• AOV/MOV/Check Valve Programs• AOV/MOV Capability Evaluation

Software

REFUELING BRIDGEENGINEERING• Bridge Equipment Reliability

Studies • Modifi cations• Outage Support

RELIABILITY IMPROVEMENT• Equipment Reliability Studies • Life Cycle Management• Corrective Action Program• Operating Experience Program• Root Cause Analysis/Support• Human Performance Trending• Plant Restart Support• Plant Maintenance Optimization

(PMO)• Plant Maintenance Living Program

(PMLP)

• Predictive & Preventative Program Assessments

• Reliability Engineering• MOV/Equipment Testing• ISI/IST• Flow-Accelerated Corrosion (FAC)• Single-Point Vulnerability

Evaluations• MOV/AOV Programs

NUCLEAR FUEL SERVICES• Fuel Sipping• Fuel Reconstitution• Fuel Ultrasonic Cleaning

SPENT FUEL MANAGEMENT• Feasibility Studies, Specifi cation

Development• Project Management., Licensing,

Security System, Quality Assurance

• Plant Mods & ISFSI Implementation

• Turnkey Services (Engineering, Construction, Operations)

• ISFSI Fabrication Oversight Support

STEAM GENERATOR SERVICES • Eddy Current Testing• FOSAR• Secondary Side Inspections• Water Lance• Upper Bundle Flush• Tube Plugging and Repair• Tube Sleeving• SG Engineering Support• Tube Integrity Engineering• Sludge Analysis

Page 13: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

PUMP & MOTOR SERVICES• RCP / RRP (Primary) Motor

Refurbishments• RCP Refurbishments• Replacement Stators• Vibration Analysis• On-Site Primary Pumpset Outage

Service• RCP & Motor On-Site Changeouts• RCP Seal On-Site Service /

Changeouts• Spare and Replacement Parts• Replacement (New) RCPs and

Motors

CHEMISTRY AND MATERIALS• BWR & PWR Advisement

and Consultation for Primary, Secondary, and Auxiliary Systems Including Makeup Water Quality, Dose Reduction and Radwaste

• Chemistry/Corrosion Modeling Using Industry and AREVA Specialty Tools

• Process Development/ Qualifi cation for First-of-a-KindChemistry Treatments/Applications

• Consumable Material Control, Including Analyses and Testing

• Fuel Chemistry Reliability, Including Crud/Corrosion Risk Assessments and/or Evaluations and Fuel Crud Characterization

• SG Reliability Optimization

Including Sludge Sample Characterization/Evaluations, Maintenance, and Chemistry Optimization

• Chemistry Training on PWR and/or BWR Chemistry and/or Dose Reduction

• Chemical Cleaning and Decontamination Services

• Chemistry & Materials Analysis and Testing for Clean and/or Radiological Contaminated Samples/Processes Including:

– Gamma Spectroscopy & Liquid Scintillation Analyses

– Root Cause and Failure Analysis – SEM/EDS Analysis – ICP-MS Analysis – Total Organics – IC Analysis – AA Spectroscopy (Flame &

Furnace) – Corrosion Testing (Static &

Recirculating Autoclaves) – Resin Testing & Analysis – XRD & XRF Analysis – FTIR Analysis

What can we do for you?

SAFETY ANALYSIS• Licensing Support• Transient Analysis• Accident Analysis• Containment Analysis• Radiological and Environmental

Analysis• Radiation Shielding• Site Dose Models• Probabilistic Risk Analysis (PRA) –

Including Fire, Seismic• Lost Parts Analysis• Equipment Out of Service (EOOS)

Evaluations• Security Modifi cations• Justifi cation for Continued

Operation (JCOs)

STRUCTURAL & ENGINEERINGMECHANICS• Piping & Suspended Systems• Fluid Transient Load Evaluations• Structural Analysis & Design• Finite Element Analysis • Equipment & Component

Qualifi cation• Continuing Operation of

Equipment• Materials, Fracture Mechanical &

Specifi cation Analysis• Seismic/Dynamic Evaluation• Crane Assessments• High Energy Line Break (HELB)• Vibration Analysis• Flaw Handbooks for Vessel

Internals

UNIQUE BWR CAPABILITIES• Vessel Internal Repairs – Hardware Design – Tooling Design and Qualifi cation – Flange Repairs – Underwater Laser Scanning• Jet Pump Analysis

ADDITIONAL BALANCE OFPLANT SERVICES• Balance of Plant Projects • Balance of Plant Engineering,

Design, Analysis, Procurement, Construction

• Plant Upgrades• Major Plant Component

Replacements• Power Uprates• Decommissioning• Design Change Packages• General Construction

Management Projects• Task Management and Craft

Labor• Engineering Field Support• Specialized Machining, Welding

and Precision Measurements• Radiological, Valve and

Condenser Services• Electrical and I&C Services and

Products — Digital Upgrades• Field Engineering• Complete Procurement Services• Work Planning & Packages• Testing and Turnover

Page 14: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

U.S. TECHNICAL CENTER &COMMERCIAL GRADE DEDICATION• Metallurgical Laboratory• Chemistry and Materials Center• Testing for Research and

Development• Chemistry Lab w/Scanning

Electron Microscope• Materials Lab – Hardness Testing – Corrosion Testing —

Three Autoclaves – Metallography — Cutting,

Mounting, Grinding, Polishing, Etching, Microscopic Examination

– Two Universal Testing Machines — Tension & Compression — 135,000 lbs. max.

– Water Testing & Moisture Analysis

– Metallographic Analysis Using the Innovex Alloy Analyzer

• Accelerated Aging Chambers• Environmental Test Chamber (-15°

to 150° C, 0 to 95% humidity)• Seismic Shake Table (tri-axial,

5 ton payload, 7g, 100 Hz)

NUCLEAR PARTS CENTER• Anderson Greenwood Crosby

(Yarway) Valves• ASCO Solenoid Valves (Nuclear &

Commercial)• ASCO Hydramotor® Actuators

and Parts• ASCO Pressure/Temperature

Switches• Cartridge Filters • CRDMs for B&W and

Westinghouse Plants• EMPATH (Motor Diagnostics) • Jeumont Electric, Reliance and

Siemens Electric Motors• LATTY Fluid Sealing Products• Limitorque Actuators, Parts, and

Motors• Meggitt Containment Atmosphere

Monitoring Systems (CAMS) Spare Parts

• Nuclear Steam Supply System Parts and ASME Code Components

• Pressurizer Heaters• RCP, Seal, and Motor Parts • Specialty Cable Assemblies • Stearns Roger Fuel Handling

Equipment• UltraCheck Valve Diagnostics

(A, C, L, M, RV, and SPT)• Velan Valves

What can we do for you?

Page 15: The Right Team to Secure Operational and Engineering Excellence …us.areva.com/home/liblocal/docs/Solutions/literature/ANP_U_460_V1… · Technical Lead for Plant Fire Alarm System

AREVA provides its customers with solutions for low-carbon power generation in North America and all over the world.

As the leader in nuclear energy and a significant, growing player in the renewable energies sector, AREVA combines U.S. and Canadian leadership, access to worldwide expertise and a proven track record of performance. Sustainable development is a core component of AREVA’s strategy.

Nearly 5,000 U.S. and Canadian employees work every day to make AREVA a responsible industrial player

helping to supply ever cleaner, safer and more economical energy to the greatest number

of people.

us.areva.com

For more information contact:

Your VP Key Accounts7207 IBM DriveCharlotte, NC 28262Tel: 704 805 2410Email: [email protected]

us.areva.com/engineering

Visit our website to learn more:us.areva.com/engineering

© 2

014

AR

EVA

Inc.

All

Rig

hts

Res

erve

d. P

hoto

s by

War

ren

Wrig

ht a

nd A

RE

VA.

The

data

con

tain

ed h

erei

n ar

e so

lely

for y

our i

nfor

mat

ion

and

are

not t

o be

con

stru

ed a

s a

war

rant

y or

oth

er c

ontra

ctua

l obl

igat

ion.

AN

P-U

-460

-v1-

14-E

NG