The Rise of Federal EA Law
• Key Influences – U.S. National Environmental Policy Act (1969), James Bay Project, Berger Inquiry
• Environmental Assessment and Review Process Guidelines Order (EARPGO)
• Rafferty-Alameda and Entrenching Federal EA Law
• CEAA 1995
![Page 3: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/3.jpg)
Why a Law?
• Regulatory agencies already examine environmental effects
• Legal requirements limit discretion of governments to balance issues and respond appropriately to circumstances
• Delays good projects
![Page 4: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/4.jpg)
Key Influences on Canadian EA Law Development 1970s to1990s
• National Environmental Policy Act of 1969 (United States)
• LaGrande Project and James Bay and Northern Quebec Agreement
• Berger Inquiry Mackenzie Gas Project• Successes of Environmental groups in
Rafferty-Alameda and Oldman cases
![Page 5: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/5.jpg)
National Environmental Policy Act of 1969 (U.S.)
• Legislative response to community opposition to interstate highway construction and Santa Barbara oil spill
• Purpose - ensure that environmental factors are weighted equally with other factors in federal decision-making, including a multidisciplinary approach to considering environmental effects
![Page 6: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/6.jpg)
NEPA
• No public hearings • No criminal or civil sanctions • Enforcement through judicial remedies
sought by communities, proponents etc
![Page 7: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/7.jpg)
Environmental Assessment and Review Process Guidelines Order
• Charles Caccia appointed Environment Minister in 1983, pressed for federal EA statute
• Order in Council in June 1984 (final Trudeau government decision) reflected internal government conflict on issue of legally binding EA rules
![Page 8: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/8.jpg)
EARPGO
• Similar to NEPA• If initial assessment determines that
proposal has adverse environmental effects that are insignificant or mitigable, proposal may proceed
• If initial assessment finds significant adverse effects, proposal referred to Environment Minister for detailed review
![Page 9: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/9.jpg)
EARPGO
• EARPGO provides for public review by a panel, with public hearings as well as public input and comment on EIS prepared by proponent
• Conventional wisdom - EARPGO not mandatory. Why else would term “Guidelines” be used?
![Page 10: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/10.jpg)
James Bay Hydro Project
• James Bay Hydroelectric Project (La Grande) proposed in April 1971 without consultation with Cree and Inuit of northern Quebec
• 1973 Quebec Superior Court injunction blocking development overturned by Quebec Court of Appeal
• James Bay and Northern Quebec Agreement (November 1975) includes EA regime for new development in Cree and Inuit regions
![Page 11: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/11.jpg)
James Bay and Northern Quebec Agreement (JBNQA) and EA
• Established governance framework for social, economic development, environmental protection
• Environmental assessment process for Cree traditional territory – s. 22
• Separate process for federal or provincial assessment of projects depending on constitutional jurisdiction within which project falls
![Page 12: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/12.jpg)
Mackenzie Valley Pipeline InquiryKey Features
• “(T)his inquiry is not just about a gas pipeline; it relates to the whole future of the North”
• Addressed a wide range of issues not just biophysical impacts
• Held preliminary hearings seeking input on process and scope
• Travelled to all 35 communities to hear evidence from residents in own languages
f
![Page 13: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/13.jpg)
Mackenzie Valley Pipeline InquiryTake Home Messages
• Public participation matters• Local residents have important
knowledge to offer • Canada must settle aboriginal claims
in northern Canada (Inuvialuit, Dene, Inuit, Yukon First Nations)
• Balance “Northern Frontier” against “Northern Homeland”
• Set the stage for federal environmental assessment processes for decades
f
![Page 14: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/14.jpg)
Rafferty – Alameda – Legal Entrenchment of Federal EA
![Page 15: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/15.jpg)
Rafferty – Alameda – Legal Entrenchment of Federal EA
![Page 16: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/16.jpg)
Rafferty – Alameda Project
• February 1986 – Rafferty-Alameda project proposed
• Two dams in Souris River basin to control floods
• Souris river is international waterway, flowing south into North Dakota, looping back north into Manitoba
![Page 17: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/17.jpg)
Rafferty – Alameda Project Federal Decision Making
• Boundary Waters Treaty• International Rivers Improvement Act • Fisheries Act • Navigable Waters Protection Act• Souris Basin Development Authority and
Saskatchewan attempted to shut feds out of review process
![Page 18: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/18.jpg)
Rafferty – Alameda Project Federal Engagement
• January 1988 - SBDA applies for International Rivers Improvement Act licence
• Canadian Wildlife Federation calls for federal EARPGO environmental assessment
• June 1988 - Environment Minister refuses to apply EARGO, issues licence
• Elizabeth May resigns
![Page 19: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/19.jpg)
Canadian Wildlife Federation Cases (Rafferty No. 1)
• November 1988 - CWF files application for judicial review in Federal Court seeking certiorari and mandamus against federal Environment Minister
![Page 20: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/20.jpg)
Canadian Wildlife Federation Cases (Rafferty No. 1)
• Federal Court Trial Division quashed Iicence under International Rivers Improvement Act, issued certiorari and mandamus order that EARPGO be applied
• Federal Court of Appeal upheld Trial Division ruling
![Page 21: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/21.jpg)
Outcomes from Rafferty-Alameda
• Hundreds of judicial review applications (including Oldman) follow based on decision that EARPGO is legally binding
• Federal government commits to federal statute, and introduces Bill C-78 in June 1990
• Resources and authority of FEARO increase dramatically
![Page 22: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/22.jpg)
Legislating CEAA
• EARPGO widely considered within federal bureaucracy to be inadequate as a law:– “Proposal” too broad – applied to policies,
programs– EAs not linked to decision-making– Agency no legal “oversight” authority – No legal requirement to provide convenient
public access to EA information• Process to enact CEAA took five years (1987
– 1992)
![Page 23: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/23.jpg)
Legislating CEAA: Lessons
• First, get their attention (Rafferty-Alameda and Oldman cases)
• Identify clear problem for government requiring legislation as key policy solution
• Work closely with inside champions• Build public support and line up allies• Neutralize bureaucratic and provincial
opposition
![Page 24: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/24.jpg)
Key Features of CEAA 1995
• All federally triggered projects legally required to be assessed unless excluded
• All biophysical environmental effects assessed as well as directly related health and social effects
• Federal departments carried out screenings (self-assessment), Agency carried out panel reviews, comprehensive studies
• Evolution towards sustainability assessment
![Page 25: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/25.jpg)
Environmental Assessment Aboriginal Claims Agreements
• Claims agreements and federal laws entrench environmental assessment:– Northern Quebec– Inuvialuit Settlement Region– Mackenzie Valley– Nunavut– Yukon– Northern Labrador
• Excludes CEAA 2012 unless national interest determination
![Page 26: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/26.jpg)
Mackenzie Valley Resource Management Act
• Enacted in 1998 following completion of land claims agreements with Gwich’in, Sahtu Dene, later Tlicho Dene
• Establish Review Board as main EA instrument
• Process includes:– Preliminary Screening– Environmental Assessment– Environmental Impact Review
![Page 27: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/27.jpg)
MVRMA Guiding Principles
• Timely and expeditious• Have regard to:
– protection of environment from significant adverse impacts of developments
– protection of social, cultural and economic well-being of residents and communities
– importance of conservation to well-being and way of life of aboriginal people
![Page 28: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/28.jpg)
Yukon Environmental and Socio-economic Assessment Act
Purposes• Provide a comprehensive, neutrally conducted
assessment process • Require consideration of environmental, socio-
economic effects before projects undertaken • Ensure projects are undertaken in accordance
with principles that foster beneficial socio-economic change without undermining ecological/social systems on which communities, residents, and societies in general, depend
![Page 29: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/29.jpg)
Trends in Aboriginal Claims EA
• EA regimes co-managed with aboriginal communities
• Assessing sustainability, nor just environmental effects
• CEAA doesn’t apply except for large, transboundary projects in “national interest”
![Page 30: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/30.jpg)
The Fall Of Federal EA Law
• Bill C-38 Omnibus Budget Bill introduced House of Commons March 2012, enacted June 2012
• Perfunctory Environment Committee hearings in late 2011
• House Finance Committee hearings on C-38 in May-June 2012
• Government accepted not a single amendment to Bill C-38
![Page 31: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/31.jpg)
CEAA 2012 Key Features • No legal requirement to undertake EAs• Dramatic reduction in number of EAs• Narrowed scope• Constraints on public participation• Centralization of Federal EA
Administration • Legislated timelines • Substitution by provincial EA processes • Equivalency (exemption)
![Page 32: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/32.jpg)
NO LEGAL REQUIREMENT TO UNDERTAKE EAs (ALMOST)
• Only projects designated by regulation or Ministerial order (and NEB/CNSC projects) subject to EA
• Designated projects not necessarily assessed: Agency has discretion to decide no EA is required
• NEB/CNSC projects must be assessed • Result: politicization of decision-making
on triggering EAs
![Page 33: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/33.jpg)
DRAMATIC REDUCTION IN NUMBER OF FEDERAL EAs
• Number of federal EAs carried out has fallen dramatically – 5000 screenings, comprehensive studies
and panel review under CEAA (2008) – 28 standard EAs, zero panels initiated
under CEAA 2012 between July 6, 2012 and July 6, 2013
![Page 34: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/34.jpg)
Narrowed Scope
S.5.(1) Definition of environmental effects narrowed
• (1)(a) components of the earth include fish, aquatic species at risk, migratory birds, other component on Schedule 2
• (1)(b) “a change that may be caused to the environment that would occur (i) on federal lands” (ii) another province or (iii) outside Canada
![Page 35: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/35.jpg)
Narrowed Scope
• (2) Other environmental effects to be taken into account where federal authority required “to exercise a power or perform a duty or function conferred on it” under another statute
• (a) a change “that is directly linked or necessarily incidental to a federal authority’s exercise of a duty or function” permitting the carrying out of that physical activity
![Page 36: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/36.jpg)
Constraints On Public Participation
• Public participation narrowed to "interested parties", persons "directly affected by the carrying out of the Project" or having "relevant information or expertise“
• “Interested party” determinations to be made by CEAA panels, NEB, CNSC
• Result: limited uneven public participation, law suits
![Page 37: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/37.jpg)
Centralization Of Administration
• “Self-assessment” approach by federal departments abandoned
• Federal EAs to be carried out by:– CEA Agency– National Energy Board (pipeline projects,
offshore oil and gas development)– Canadian Nuclear Safety Commission
(nuclear power projects)• Result: Streamlining
![Page 38: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/38.jpg)
Legislated Timelines
• Legislated timelines (defined through regulation) for federal EAs where the Agency is responsible authority and for all review panels
• Environment Minister may terminate review panel if timelines not being met; Agency then completes review
![Page 39: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/39.jpg)
Substitution By Provincial EA Processes
• Mandatory if province requests substitution, Minister of opinion process is “appropriate substitute” (s. 32, 34)– Include consideration of s. 19(1) factors– Public has opportunity to participate– Public has access to records to allow
meaningful participation – Report submitted to RA and publicly
available
![Page 40: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/40.jpg)
Substitution By Provincial EA Processes
• Individual or class of designated projects
• Not for panel or NEB/CNSC reviews• Approved process deemed to meet
CEAA 2012 EA requirements• RA/Minister makes project decision
based on substitute process report
![Page 41: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/41.jpg)
Exemption Of Substituted Projects (Equivalency)
• Cabinet may exempt a designated project from CEAA 2012 if provincial process is equivalent (s.37)
• Provincial process must first be approved for substitution
• Province must identify significant adverse effects, ensure mitigation
• But no link to federal decision-making—leading to duplication?
![Page 42: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/42.jpg)
CEAA 2012 Process
![Page 43: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/43.jpg)
Implications
• Federal EA process politicized• Federal EA activity reduced by several
orders of magnitude (5000 to 28) • Opportunities to influence federal
environmental assessment process expanded
• Substitution and exemption features further weaken federal EA role, and fragment EA across Canada
![Page 44: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/44.jpg)
CEAA 2012 – Constitutional?
• CEAA 2012 abandons the constitutional support provided in Oldman decision
• Valid criminal law under s. 91 of Constitution Act (S. 6 and 7 Prohibitions, SS. 89 – 102 Administration, Enforcement powers)?
• Valid under peace, order and good government clause of s. 91?
![Page 45: THE RISE AND FALL OF FEDERAL ENVIRONMENTAL ASSESSMENT LAW NOVEMBER 11, 2013 Stephen Hazell](https://reader035.vdocument.in/reader035/viewer/2022062716/56649e0d5503460f94af61f3/html5/thumbnails/45.jpg)
EA Law – Rise Again?
• Have environmental issues related to development projects been resolved?
• A new paradigm perhaps? • Sustainability assessment rather than
environmental assessment? • Move away from project assessment to
planning-based, ecologically grounded approaches?