The Scheme of Slow Control System in BESIII. Xie Xiaoxi Gao Cuishan 2002.9.17. Ⅰ . The general prospect of the slow control and Environmental Monitoring in BES. Both slow control system and environmental monitoring are very important and indispensable in the new BES system. - PowerPoint PPT PresentationTRANSCRIPT
The Scheme of Slow Control The Scheme of Slow Control System in BESIIISystem in BESIII
Xie Xiaoxi Gao Cuishan
2002.9.17
ⅠⅠ. The general prospect of the . The general prospect of the slow control and Environmental slow control and Environmental
Monitoring in BESMonitoring in BES
Both slow control system and environmental monitoring are very important and indispensable in the new BES system.
The slow control system must meet the high-level demands of the overall design, overall environment and management in the new BES.
The slow control system , which is numerous and complicated, is mainly applied in experiment area and sub-detectors in BESⅢ. It will play an important role during the operational period of DAQ in the future.
This system is composed of 3 main systems
temperature and humidity monitoring
gas system monitoring
controlling high-voltage system.
There are more than 14 kinds of physical parameters and 3000 channels of signals need to be collected and measured. Important parameters related both to the physics analysis and operation of BESⅢ will be stored in the operational database.
Parts of these parameters will be sent to online computer system via network communication to be stored in permanent media.
ⅡⅡ. The main objects . The main objects and Functions of and Functions of
the BES the BESⅢⅢ monitors monitors and controls for and controls for
slow control system slow control system
The main objects include temperature
humidity
monitor and control of the mass flow meter for gas providing systemsystem
control and monitor for HV
DC
AC
magnet and magnetic field
dangerous gas
radiation monitor
T-H control and monitor of hall and control room
safety interlock and so on.
ⅢⅢ.The place of slow control .The place of slow control system in online system system in online system
Event Display Histogram Display
Slow Control
1 100M Switch
Farm Supervisor
1000M Switch
Online
Run Control
IV.Overview of the task architecture of the slow IV.Overview of the task architecture of the slow control system for BEScontrol system for BESⅢⅢ
HVControl
DatabaseEditor
SubDetectorControl
ErrorLogger
SubDetecto
rMonito
r
running running running running
Slow Control Devices and Sensors (about 3000 channels)
running
GasSystem
Tem HumControl
Radiation Monitor
running running
Displays
Files
Slow Control Database
DAQ Data Stream
ⅤⅤ.Two kinds of bus scheme .Two kinds of bus scheme of data acquisitionof data acquisition
The primitive bus scheme of
data acquisition is
USB/one wire bus
Lab window/PXI
The USB/one wire bus scheme can be applied in all the special facilities that can convert the physical parameters to voltage or electric current.
Those facilities which appended with one of these bus interface: such as GPIB 、 VME 、 VXI 、 RS232 、 CAMAC and so on can adopt the Labwindow/CVI software and NI multichannel card which is plugged in PC.
VI.The block diagram of slow control system architectureVI.The block diagram of slow control system architecture Sensor Detector
Patrol meter
HUB
PC
100M SWITCH
P C
SCXI
Gas
H VCAEN SY1527
HUB
H V CAEN SY1527
H V CAEN SY1527
PXI
On Line
SC1 hardware
SC2 DAQ
SC3 Software
SC4 on lineon line
USB USBUSB
PC
VII.Client-Server diagram VII.Client-Server diagram
VIII.Some results have been obtainedVIII.Some results have been obtained
The research of “one wire bus”
About 70% of the 3000 channels of signal could be resolved by “one wire bus” scheme in BES Ⅲslow control system.
we have implemented temperature/humidity monitoring system with 84 nodes for temperature and 4 nodes for humidity in BESⅡ.
Design for hardware and software of USB interface device.we have finished the design for hardware of USB/CAMAC crate controller, programmed drivers based on USB1.1 of CCU-USB and application program of USB-PC, using C51/VC++6.0/VB6.0.CCU-USB have been successfully used in the check system of shower counter of BES
and scintillation counter hodoscope for tⅡesting BESⅢ muon detecter.
The scheme of monitoring of gas system in The scheme of monitoring of gas system in BES slow control systemⅢBES slow control systemⅢ
Primary scheme of high-voltage monitoring Primary scheme of high-voltage monitoring and control systemand control system
All high-voltage modules will adopt SY1527 of CAEN
The modules can be connected with PCI interface card in PC via cables
Software of slow control system will adopt the program language of C++
Use one independent PC
The block diagram of high-voltage monitor The block diagram of high-voltage monitor system in slow control system system in slow control system