the spires phase 2 - structure plan report part one
TRANSCRIPT
SPIRES ESTATE (PHASE 2) LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
Our Ref: S:\Word\CD+P 2017\SpgBd\Structure Plan\3. Correspondence & Reports\R60 LSP Amendments\170530 SPIRES ESTATE LSP
(Master)_v17 (update to Mods Page).docx PAGE | 1
SPIRES ESTATE LOCAL STRUCTURE PLANLOTS 312 & 313 FIFTY ROAD, LOTS 2, 4, 7, 8 EIGHTY ROAD, LOT 5 BALDIVIS ROAD, BALDIVIS
March 2014
PREPARED BY
SPIRES ESTATE (PHASE 2) LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
Our Ref: S:\Word\CD+P 2017\SpgBd\Structure Plan\3. Correspondence & Reports\R60 LSP Amendments\170530 SPIRES ESTATE LSP (Master)_v17 (update to Mods
Page).docx
Table of Amendments
Amendment
No.
Description of Change or Departure Amendment
Type
Date Approved by
WAPC
1 Inclusion of Lot 774 Fifty Road, Baldivis into
the Structure Plan area and for the purpose of
residential development.
(BDG Ref: 141028_SPIRES ESTATE LSP (PART
ONE ONLY)_UPDATED TO INCLUDE LOT 774)
Minor Does not require WAPC
endorsement under
Clause 4.2.7 of TPS2
2 Update the POS Schedule Fifty within Part Two (relevant to Lots 312 & 313 Fifty Road, Lots 2, 4, 7, 8 Eighty Road, and Lot 5 Baldivis Road, Baldivis).
Minor Does not require WAPC
endorsement under
Clause 4.2.7 of TPS2
3 Update the road network by replacing the cul-de-sac with a through road between land coded R40 and the northern portion of the land zoned Commercial and delete the nib road abutting the southern most area of land between R60 coded land and the public open space reserve.
Minor Does not require WAPC
endorsement under
Clause 4.2.7 of TPS2
4 The inclusion of R100 Residential Density Coded land surrounding the Neighbourhood Centre.
Major 3rd February 2017
5 Increase of Density from R40 to R60 Grouped Housing Lot (Cnr Nairn Drive and Amazon Drive)
Minor 19th May 2017
Document Status
VERSION COMMENT REVIEWER REVIEW DATE APPROVED BY ISSUE DATE
12 WAPC Schedule of Modifications ‒ 12 March 2014 MS 03.06.14 JAH 29.07.14
13 WAPC Schedule of Modifications (additional comments)
August 2014 MS 21.08.14 JAH 25.09.14
14 Minor Modification to include Lot 774 (Burgess Design Group) BDG 28.10.14 BDG 28.10.14
15 Minor Modification to update POS Schedule. TV ( CD+P) 22.08.15 KB (CD+P) 22.08.15
16 Major R100 Modification TV 15.02.17 KB 15.02.17
17 Minor R60 Modification TV 22.03.17 KB 22.03.17
Disclaimer and Copyright
This document was commissioned by and prepared for the exclusive use of Spatial Property Group. It is subject to and issued in accordance with the agreement between Spatial Property Group and CD+P.
CD+P acts in all professional matters as a faithful advisor to its clients and exercises all reasonable skill and care in the provision of professional services. The information presented herein has been compiled from a number of sources using a variety of methods. Except where expressly stated, CD+P does not attempt to verify the accuracy, validity or comprehensiveness of this document, or the misapplication or misinterpretation by third parties of its contents.
This document cannot be copied or reproduced in whole or part for any purpose without the prior written consent of CD+P.
SPIRES ESTATE (PHASE 2) LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
Our Ref: S:\Word\CD+P 2017\SpgBd\Structure Plan\3. Correspondence & Reports\R60 LSP Amendments\170530 SPIRES ESTATE LSP (Master)_v17 (update to Mods
Page).docx
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
SPIRES ESTATE LOCAL STRUCTURE PLAN Lots 312 & 313 Fifty Road; Lots 2, 4, 7 & 8 Eighty Road and Lot 5 Baldivis Road, Baldivis
MARCH 2014
Prepared for: Spatial Property Group Unit 1/896 Canning Highway
APPLECROSS WA 6153
T: 6555 2000 E: [email protected]
Prepared by: Development Planning Strategies 28 Brown Street
EAST PERTH WA 6004
T: 9268 7900 F: 9268 7999 E: [email protected]
In collaboration with: Coterra Environment Suite 19, 336 Churchill Avenue
SUBIACO WA 6008
T: 9381 5513 F: 9381 5514 E: [email protected]
Development Engineering Consultants Suite 3, 123A Colin Street
WEST PERTH WA 6005
T: 9481 1900 F: 9481 1700
Emerge Associates Suite 4, 6 Centro Ave
SUBIACO WA 6008
T: 9380 4988 F: 9380 9636 E: [email protected]
Transcore Traffic Engineering & Transport Planning 61 York Street
SUBIACO WA 6904
T: 9382 4199 E: [email protected]
Bushfire Safety Consulting Pty Ltd PO Box 84
STONEVILLE WA 6081
T: 0429 949 262 E: [email protected]
Strategen Environmental Consultants Pty Ltd PO Box 287
BUNBURY WA 6231
T: 9792 4797 E: [email protected]
Herring Storer Acoustics PO Box 219
COMO WA 6952
T: 9367 6200 E: [email protected]
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
EXECUTIVE SUMMARY
The Spires Estate Local Structure Plan has been prepared to guide the subdivision and development of some 54.57 hectares of land on Lots 312 & 313 Fifty Road; Lots 2, 4, 7 & 8 Eighty Road and Lot 5 Baldivis Road, Baldivis within the
City of Rockingham municipality.
The Structure Plan has been prepared for the Spatial Property Group (project manager) on behalf of various landowners
by the following specialist consultant team:
Development Planning Strategies ‒ urban design, town planning
Cotterra ‒ environmental and urban water management
Emerge Landscaping ‒ landscaping design
Development Engineering Consultants ‒ engineering and servicing
Transcore Traffic Engineering and Transport Planning- traffic and transport analysis
Bushfire Safety Pty Ltd- bushfire hazard assessment
Strategen Environmental Consultants ‒ fire management plan
Herring Storer Acoustics ‒ acoustic assessment
Purpose
This Structure Plan provides an overarching planning framework to guide and facilitate the development of 54.57
Hectares of land at Baldivis for urban purposes, and has been prepared in accordance with the provisions of Part 4 of
the City of Rockingham Town Planning Scheme No. 2.
The plan provides for an integrated and coordinated approach to a mix of land uses and infrastructure, necessary to
create a strong and vibrant community, whilst delivering triple bottom line sustainability outcomes.
Design Approach
The design approach has been a rigorous multidisciplinary process with continuous reflection upon the purpose of
the Structure Plan. Design principles and considerations which have informed the design approach include:
Public Open Space allocation and community creation
Urban structure
Movement systems and connectivity
Leading built form
Landform and environment
Project Overview
The Structure Plan will create a framework for the future urban subdivision and development of an anticipated 800+
dwellings, which will ultimately house a new community in the vicinity of 2,240+ people and the provision for a
Neighbourhood Activity Centre.
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
Executive Summary Table
Item Data Section Reference
Gross Structure Plan Area 54.57 ha
Zones
Nett Residential (excl roads & POS)
Commercial
‘Other Regional Roads’ (Nairn Drive)
~ 31.36 ha
~ 2.8 ha
~1.01 ha
Estimated lot yield ~ 600+ lots
Part 2 ‒ Section 5.3
Estimated number of dwellings ~ 800+ dwellings
Estimated residential site density ~ 25 Dwellings /site hectare 1
~ 15 Dwellings/gross urban zone 2
Estimated population ~ 2,240+ @ 2.8pp/dwelling
Number of Secondary Schools 0
Number of Primary Schools 0
Public Open Space
Total Green Space
Credited Open Space
o Restricted
~5.933ha (12%)
~4.997ha (10%)
~0.7481ha (1.5%)
Part 2 ‒ Section 5.8
Composition of Public Open Space
Neighbourhood Parks
Local Parks
9 sites
~5.8ha (98%)
~0.133ha (2%)
Notes: 1 ‘Residential Site Hectare’ refers to the definition under Element 1 of WAPC’s Liveable Neighbourhoods. 2 ‘Gross Urban Zone’ refers to the definition under WAPC’s Directions 2031 and supporting documents.
Structure Plan Disclaimer:
The Spiers Estate Local Structure Plan includes reference to the draft Structure Plan design for Lot 311 Fifty Road,
Baldivis; the Lot 311 Structure Plan subject to final endorsement by the City of Rockingham and approval of the WAPC.
Acknowledging the timing of preparation of specialist reports contained in Part 3 of the Spires Estate Local Structure
Plan, the most recent Lot 311 Structure Plan design is not accurately referenced in the specialist reports; namely a
north-south road connection between Lots 312 and 311.
Notwithstanding the above, Part 1 and Part 2 of the Spires Estate Local Structure Plan has been updated to correspond
with the current Lot 311 Structure Plan design. Furthermore, construction of this road connection will be undertaken
as part of future subdivision and engineering works for the two respective lots.
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
CERTIFICATION OF AGREED LOCAL STRUCTURE PLAN
IT IS CERTIFIED THAT THIS STRUCTURE PLAN
WAS APPROVED BY RESOLUTION OF
THE WESTERN AUSTRALIAN PLANNING COMMISSION ON:
............................................................. Date
Signed for and on behalf of the Western Australian Planning Commission
.....................................................................................................
An officer of the Commission duly authorised by the Commission pursuant to section 16 of the
Planning and Development Act 2005 for that purpose, in the presence of:
..............................................................Witness
AND ADOPTED BY
RESOLUTION OF THE COUNCIL OF THE CITY OF ROCKINGHAM ON:
............................................................................................ Date
.....................................................................................................
Director, Planning & Development Services
Signed under Delegated Authority for and on behalf of the Council of the City of Rockingham
This Structure Plan was prepared under the provisions of the
City of Rockingham Town Planning Scheme No.2
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
TABLE OF CONTENTS PART ONE ‒ STATUTORY SECTION
1 STRUCTURE PLAN AREA ............................................................................................................................................................................................ 1
2 STRUCTURE PLAN CONTENT .................................................................................................................................................................................. 1
3 INTERPRETATION AND RELATIONSHIP WITH TOWN PLANNING SCHEME NO. 2. ..................................................................... 1
4 OPERATION ...................................................................................................................................................................................................................... 2
5 LAND USE .......................................................................................................................................................................................................................... 2
6 GENERAL SUBDIVISION AND DEVELOPMENT REQUIREMENTS ........................................................................................................... 2
7 STRUCTURE PLAN MAP (PLAN 1) ......................................................................................................................................................................... 5
PART TWO ‒ EXPLANATORY SECTION
1 INTRODUCTION ............................................................................................................................................................................................................. 8
1.1 Purpose .............................................................................................................................................................................................................. 8
1.2 Background ...................................................................................................................................................................................................... 8
1.3 Land Description ........................................................................................................................................................................................... 8
1.3.1 Location ............................................................................................................................................................................................. 8
1.3.2 Ownership, Area and Legal Description........................................................................................................................... 9
1.3.3 Land Use ............................................................................................................................................................................................ 9
2 STATUTORY, STRATEGIC AND POLICY CONSIDERATIONS .................................................................................................................. 12
2.1 Zoning and Reservations ....................................................................................................................................................................... 13
2.1.1 Metropolitan Region Scheme ............................................................................................................................................. 14
2.1.2 City of Rockingham Town Planning Scheme No.2 ................................................................................................. 17
2.1.3 Baldivis (North) District Structure Plan ........................................................................................................................... 24
2.2 Government Strategies and Policies ............................................................................................................................................... 47
2.2.1 Directions 2031 ‒ Spatial Planning Framework for Perth and Peel ............................................................... 48
2.2.2 State Planning Policy 4.3 ‒ Poultry Farms .................................................................................................................... 60
2.2.3 Planning Bulletin No.63 ‒ Policy for Dealing with Potential Conflicts between Residential
Subdivision and Markets Gardens in East Wanneroo ............................................................................................ 71
2.2.4 Planning Bulletin No.87 ‒ High Pressure Gas Transmission Pipelines in the Perth Metropolitan
Region .......................................................................................................................................................................................... 90
2.2.5 Planning for Bushfire Protection Guidelines ............................................................................................................. 112
2.2.6 City of Rockingham Urban Growth Programme (2009) ..................................................................................... 125
3 SITE CONDITIONS AND ENVIRONMENT ..................................................................................................................................................... 130
3.1 Flora and Vegetation Assessments ............................................................................................................................................... 148
3.2 Fauna Assessments ................................................................................................................................................................................ 204
3.3 Landform and Soils ................................................................................................................................................................................ 215
3.4 Acid Sulfate Soils ..................................................................................................................................................................................... 227
3.5 Groundwater ............................................................................................................................................................................................. 236
3.6 Heritage ........................................................................................................................................................................................................ 242
3.7 Adjacent Bush Forever Site ............................................................................................................................................................... 246
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
3.8 Poultry Farm and Market Garden ................................................................................................................................................... 251
3.9 Parmelia Gas Pipeline ........................................................................................................................................................................... 264
4 CONTEXT ANALYSIS .............................................................................................................................................................................................. 275
4.1 Surrounding Land Use ......................................................................................................................................................................... 278
4.2 Movement Networks ............................................................................................................................................................................ 289
4.3 Activity Centres and Employment Nodes ................................................................................................................................. 299
4.4 Education .................................................................................................................................................................................................... 316
4.5 Regional Open Space ........................................................................................................................................................................... 337
5 LOCAL STRUCTURE PLAN ................................................................................................................................................................................... 347
5.1 Design Philosophy ................................................................................................................................................................................. 347
5.2 External Design Influences ................................................................................................................................................................ 347
5.2.1 Planning for Bushfire Protection...................................................................................................................................... 347
5.2.2 Noise Mitigation ....................................................................................................................................................................... 348
5.3 Residential Densities and Dwelling Forecasts ........................................................................................................................ 349
5.3.1 Dwelling Forecasts- Directions 2031 ............................................................................................................................. 349
5.3.2 Dwelling Forecasts- Liveable Neighbourhoods ...................................................................................................... 349
5.4 Streetscape and Built Form Environment ................................................................................................................................. 350
5.4.1 Density ........................................................................................................................................................................................ 350
5.4.2 Housing Typologies ................................................................................................................................................................ 350
5.4.3 Public Open Space Interface ............................................................................................................................................. 351
5.4.4 Solar Orientation ...................................................................................................................................................................... 351
5.4.5 Variations to Residential Design Codes ....................................................................................................................... 351
5.5 Detailed Area Plans ................................................................................................................................................................................ 353
5.6 Neighbourhood Activity Centre ..................................................................................................................................................... 354
5.7 Movement Network .............................................................................................................................................................................. 355
5.7.1 Structure Plan Access ............................................................................................................................................................ 355
5.7.2 Road Configuration and Hierarchy ................................................................................................................................ 356
5.7.3 Pedestrian and Cycle Network ......................................................................................................................................... 362
5.7.4 Public Transport ........................................................................................................................................................................ 362
5.8 Public Open Space ................................................................................................................................................................................. 365
5.8.1 Overview ....................................................................................................................................................................................... 365
5.8.2 Design and Drainage Rationale ....................................................................................................................................... 365
5.9 Urban Water Management ............................................................................................................................................................... 369
6 INFRASTRUCTURE CO-ORDINATION, SERVICING AND STAGING ................................................................................................. 370
6.1 Road works ................................................................................................................................................................................................. 370
6.2 Water ............................................................................................................................................................................................................. 370
6.3 Sewerage ..................................................................................................................................................................................................... 371
6.4 Power ............................................................................................................................................................................................................ 371
6.5 Telephone and Gas ................................................................................................................................................................................ 371
7 IMPLEMENTATION .................................................................................................................................................................................................. 372
7.1 Earthworks and Retaining Walls ..................................................................................................................................................... 372
7.2 Staging .......................................................................................................................................................................................................... 372
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
LIST OF PLANS Plan 1 ‒ Spires Estate Local Structure Plan Map
Plan 2 ‒ Location Plan
Plan 3 ‒ Site Plan and Orthophoto
Plan 4 ‒ Opportunities and Constraints Plan
Plan 5 ‒ Regional Context Plan
Plan 6 ‒ Internal Road Hierarchy
Plan 7 ‒ Indicative Path Network
Plan 8 ‒ Preferred Bus Routes
Plan 9 ‒ Public Open Space Concept Plan
Plan 10 ‒ Public Open Space
Plan 11 ‒ Indicative Staging
LIST OF FIGURES Figure 1 ‒ Metropolitan Region Scheme Zoning Map
Figure 2 ‒ City of Rockingham Town Planning Scheme No. 2 Zoning Map
Figure 3 ‒ Approved Baldivis (North) District Structure Plan Map
Figure 4 ‒ Approved modification- Baldivis (North) District Structure Plan Map
Figure 5 ‒ Outer Metropolitan Perth and Peel Sub-Regional Strategy
APPENDICES (PART 3) Appendix 1 ‒ Environmental Assessment Report (Coterra Environment);
Lot 5 Botanical Assessment (Bennett Environmental Consulting); and
Poultry Odour Assessment (Odour Unit)
Appendix 2 ‒ Servicing Report (Development Engineering Consultants)
Appendix 3 ‒ Land Owner Agreement ‒ Commercial Zoned land
Appendix 4 ‒ Fire Management Plan (Strategen)
Appendix 5 ‒ Local Water Management Strategy (Coterra Environment)
Appendix 6 ‒ Transport Assessment (Transcore )
Appendix 7 ‒ Indicative Lot Levels (Development Engineering Consultants)
Appendix 8 ‒ Certificates of Title
Appendix 9 ‒ Acoustic Assessment (Herring Storer Acoustics)
Appendix 10 ‒ Planning Bulletin No.87
Appendix 11 ‒ EPA Ministerial Statement No.580
Appendix 12 ‒ Minor Amendment to include Lot 774 Fifty Road, Baldivis (Burgess Design Group)
Appendix 13 Major Amendment for R100
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
ABBREVIATIONS AAMGL Annual Average Maximum Groundwater Levels
AHD Australian Height Datum
ARI Average Recurrence Interval
ASS Acid Sulfate Soils
BAL Bushfire Attack Level
BEST Baldivis East Stakeholder Team
BPZ Building Protection Zone
CGL Controlled Ground Levels
DAP Detailed Area Plan
DEC Department of Environment and Conservation; Development Engineering Consultants (as applicable)
DIA Department of Indigenous Affairs
DoW Department of Water
DSEWPaC Department of Sustainability, Environment, Water, Population and Communities
DSP District Structure Plan
EPA [Western Australian] Environmental Protection Authority
EPBC Act Environmental Protection and Biodiversity Conservation Act 1999
FMP Fire Management Plan
LWMS Local Water Management Strategy
MRS Metropolitan Region Scheme
NAC Neighbourhood Activity Centre
NCB Neighbourhood Connector B (Liveable Neighbourhoods)
OMSRS Outer Metropolitan Perth and Peel, Sub-Regional Strategy
PASS Potential Acid Sulfate Soils
PMD Peel Main Drain
POS Public Open Space
PSI Preliminary Site Investigation
PTA Public Transport Authority
SPP Statement of Planning Policy
TPS Town Planning Scheme
WAPC Western Australian Planning Commission
WWPS Waste Water Pumping Station
WWTP Waste Water Treatment Plant
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
PART ONE ‒
STATUTORY SECTION
SPIRES ESTATE
LOCAL STRUCTURE PLAN
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
This page has been left blank intentionally
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
PAGE | 1
PART ONE ‒ STATUTORY SECTION
1 STRUCTURE PLAN AREA This Structure Plan shall apply to Lots 312 and 313 Fifty Road, Lots 2, 4, 7, 8 Eighty Road and Lot 5 Baldivis Road, Baldivis
being the land contained within the inner edge of the line denoting the Structure Plan boundary on the Structure Plan
Map (Plan 1).
The Structure Plan is identified as the Spires Estate Local Structure Plan.
2 STRUCTURE PLAN CONTENT The Structure Plan comprises the following sections:
i. Part One ‒ Statutory Section, includes the Structure Plan Map (Plan 1) and any textual provisions, standards
or requirements that require statutory effect.
ii. Part Two ‒ Explanatory Section (Non Statutory), is to provide the planning context and justification for the
Structure Plan Map (Plan 1) and the textual provisions, standards or requirements contained in Part One of the
Structure Plan.
iii. Part Three ‒ Appendices, includes all specialist consultant reports and documentation used in the
preparation of and to support the land use outcomes of the Structure Plan.
3 INTERPRETATION AND RELATIONSHIP WITH TOWN
PLANNING SCHEME NO. 2.
3.1 Terms and
Interpretations
Unless otherwise specified in this part, the words and expressions used in this Structure Plan
shall have the respective meanings given to them in the City of Rockingham Town Planning
Scheme No. 2 ('Scheme') including any amendments gazetted thereto.
3.2 Relationship of the
Structure Plan with
Town Planning
Scheme No.2
This Structure Plan has been prepared under Clause 4.2 of the Scheme as the subject land is
zoned ‘Development’ and contained within Development Areas No. 9 and 22 which is shown
on the Scheme Map and contained within Schedule No. 9.
The Structure Plan Map (Plan 1) outlines the Zones and Reserves applicable within the
Structure Plan Area. The Zones and Reserves designated under this Structure Plan apply to the
land within it as if the Zones and Reserves were incorporated into the Scheme.
3.3 Provisions,
Standards or
Requirements
Pursuant to Clause 4.2.9.4 of the Scheme, the provisions, standards or requirements specified
under Part One of this Structure Plan shall have the same force and effect as if it were a
provision, standard or requirement of the Scheme.
In the case of any inconsistency between the Scheme and any provisions, standards or
requirements specified under Part One of this Structure Plan, the Scheme prevails to the extent
of any inconsistency.
3.4 Land Use
Permissibility Land use permissibility within the Structure Plan Area shall be in accordance with the
corresponding Zone under the Scheme.
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
PAGE | 2
4 OPERATION This Structure Plan commences operation on the date it is adopted by Council pursuant to Clause 4.2.6.15 of the
Scheme.
Changes or Departure from the Structure Plan may be undertaken by the Proponent and adopted by Council in
accordance with Clause 4.2.7 of the Scheme.
5 LAND USE 5.1 Structure Plan Map The subdivision and development of land is to generally be in accordance with the Structure
Plan and any associated provisions contained in Schedule No. 9.
5.2 Residential Density Residential densities applicable to the Structure Plan Area shall be those residential densities
shown on the Structure Plan Map (Plan 1).
6 GENERAL SUBDIVISION AND DEVELOPMENT REQUIREMENTS
6.1 Notifications on Title
In respect of applications for the subdivision of land the Council shall recommend to the
Western Australian Planning Commission that a condition be imposed on the grant of
subdivision approval for a notification to be placed on the Certificate(s) of Title(s) to advise of
the following:
a) The lot being situated in the vicinity of the Nairn Drive and Baldivis Road, with the
potential to be affected by transport noise as identified in the Acoustic Assessment
under Part Three ‒ Appendix 9;
b) Construction standards to achieve higher noise standards in accordance with State
Planning Policy 5.4 Road and Rail Transportation Noise and Freight Considerations in Land Use Planning (as amended) as identified in the Acoustic Assessment under Part Three ‒ Appendix 9;;
c) Lots within the 100m Poultry Farm buffer and deemed to be affected by an odour
impact as identified in Appendix F of the accompanying Environmental Assessment
under Part Three ‒ Appendix 1;
d) Lots within the 300m buffer of market gardens, as prescribed by the WAPC Planning
Bulletin 63 Policy for Dealing with Potential conflicts between Residential Subdivision and Market Gardens in East Wanneroo.
Building setbacks and construction standards required to achieve a Bushfire Attack Level -29
or lower in accordance with Australian Standards (AS3959-2009): Construction of buildings in
bushfire prone areas as identified in the Fire Management Plan under Part Three ‒ Appendix
4
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
PAGE | 3
6.2 Detailed Area Plans
Detailed Area Plans (DAPs), pursuant to Clause 4.23 of the Scheme, are to inform applications
for subdivision and development in regard to the following:
a) Lots with rear-loaded garage access;
b) Lots with direct boundary frontage (primary or secondary) to an area of Public Open
Space;
c) Lots with a direct boundary frontage (primary or secondary) to Fifty Road and Nairn
Drive;
d) Land zoned Commercial;
e) Lots impacted by Nairn Drive and Baldivis Road in respect of noise mitigation; and
f) Lots deemed to be affected by a recognised Bush Fire Hazard.
Notes:
With reference to (e), affected lots are identified spatially in Appendix E of the accompanying
Acoustic Assessment, under Part Three ‒ Appendix 9 of the Structure Plan.
With reference to (f), affected lots are identified spatially in Figure 9a and 9b of the
accompanying Fire Management Plan, under Part Three ‒ Appendix 4 of the Structure Plan.
6.3 Variations to
Residential Design
Codes
The following variations to the Residential Design Codes shall apply:
Table 1 ‒ 6. Open Space (min total % of site)
Current R-Codes Provision (2013) Proposed Structure Plan Variation
R25 ‒ minimum 50%
R30 ‒ minimum 45%
R40 ‒ minimum 45%
R25 ‒ minimum 45%
R30 ‒ minimum 40%
R40 ‒ minimum 40%
Table 1 ‒ 7. Minimum Setbacks (Primary Street)
Current R-Codes Provision (2013) Proposed Structure Plan Variation
R25 ‒ 6m R25 ‒ 4m
6.4 Other
This Structure Plan is supported by a Bushfire Hazard Assessment (BFHA) and a Bushfire
Management Plan (BMP), contained under Part Three ‒ Appendix 4. Any land falling with
100m of a bushfire hazard identified in the BFHA/BMP is designated as a Bushfire Prone Area
for the purpose of the Building Code of Australia.
A Pipeline Risk Management Plan is required pursuant to the WAPC’s Planning Bulletin 87 ‘High Pressure Gas Transmission Pipelines in the Perth Metropolitan Region’ and in accordance with the Environmental Protection Authority’s Ministerial Statement No. 580. The preparation of a Risk Management Plan will be imposed as a condition of subdivision approval.
Development is not to occur within the 100m Poultry Farm Buffer, as identified on the
Structure Plan Map (Plan 1) and within the Odour Impact Assessment (Part Three - Appendix
1), until the activity ceases operation.
SPIRES ESTATE LOCAL STRUCTURE PLAN SPATIAL PROPERTY GROUP
PAGE | 4
This page has been left blank intentionally
PLAN 1 - Spires Estate Structure Plan (Phase 2)Various Lots Fifty and Eighty Road, BALD1VISfor: Spatial Property GroupROCK/2016/...
A 28 Brown St, East Perth-WA 6004
P (08) 9325 0200
W creativedp.com.au
NOTE: Lots within 100m of classified egetation Identified by Bushflre Management Plan (BMP),require a detaile BAL assessment at Building License stage.
LEGEND: RESERVES
ZO ES
Spires Estate LocalStructure Plan Boundary 11 Public Open Space
| Road Reserve1 1 R25 Residential
ELEMENTS WHICH INFORM THEi i R30 Residential STRUCTURE PLANrm R40 Residential Priority Controlled Interseaions
i i R60 Residential -j 100m Poultry Farm Buffer
i i R100 Residential III 1 Gas Pipeline Corridor
Commercial | Trees to be retained
Remnant Vegetation to be* Retained Subject to Engineering
and Detailed Design