The Survey of the Power Supply Reliability at SSRF Ming GU , Rui LI , Zhihao CHEN , Lixin YIN Shanghai Institute of Applied Physics I joined in the accelerator technology since 1997, study control system for beam line (1997-2000); klystro n-modulator system for lianc (2001-2003), pulsed magne t system for injection and extraction (2004-2008), cont roller for SR insert devices (undulator) (2009-2010). N ow engaged on SSRF maintenance and improvement and deve lopment of FEL facility and proton therapy. April 13, 2011

Upload: marek

Post on 05-Jan-2016

26 views

Category:

Documents


0 download

DESCRIPTION

The Survey of the Power Supply Reliability at SSRF. Ming GU , Rui LI , Zhihao CHEN , Lixin YIN Shanghai Institute of Applied Physics - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Survey of the Power Supply Reliability at SSRF

The Survey of the Power Supply Reliability at SSRF

Ming GU , Rui LI , Zhihao CHEN , Lixin YIN

Shanghai Institute of Applied Physics

I joined in the accelerator technology since 1997, study control system for beam line (1997-2000); klystron-modulator system for lianc (2001-2003), pulsed magnet system for injection and extraction (2004-2008), controller for SR insert devices (undulator) (2009-2010). Now engaged on SSRF maintenance and improvement and development of FEL facility and proton therapy.

April 13, 2011

Page 2: The Survey of the Power Supply Reliability at SSRF

Introduction

There are total 715 magnet power supplies for Shanghai Synchrotron Radiation Facility (SSRF) .

699 DC magnets power supplies 。 538 PS for SR magnets, 112 PS for booster ring magnets; 49 PS for linac magnets

15 pulsed power supplies for injection and extraction system 。 SR injection: 4 kicker, 2 septa Booster extraction: 3 septa, 1 quick kicker, 3 slow kicker Booster injection: 1 septum, 1 quick kicker,

All the power supplies were installed before the end of 2007 and have been operating for more than 3 years.

Page 3: The Survey of the Power Supply Reliability at SSRF

Magnet Power Supplies

PS Type:

1. middle power converter (<2kW), 482 sets DC Steer magnets, Linac magnets , Transport line magnets 2. Large power supplies, 17 sets , DC Ramping magnets of booster ring, Dipole magnets and sextupole magnets of storage ring 3. Chopper power supplies, 200 sets, DC Storage Ring Q magnets. 4. Pulse power supplies.

Page 4: The Survey of the Power Supply Reliability at SSRF

DC Power Supplies DC Power Supplies

PS TypeQuantit

y

Fault timesRepair time ( hours )

MTBF ( hours )

communication

failure*(hours)

2009 2010 2009 2010 2009 2010 2009 2010

Middle PS 482 27 18 13 4.5 277 402 5 25

SR Q PS 200 19 8 20 6 394 905 24 15

Large PS 17 7 6 9 16 1068 1206 6 1

Total (average)

699 53 32 42 26.5 141 226 35 41

Statistical List of SSRF DC Magnet Power Supplies Failure

Page 5: The Survey of the Power Supply Reliability at SSRF

Middle power supplies

One of the main reason of the middle power supplies shut down is the cooling fans fault.

The fan should gives a series of pulse to interlock circuit when it running. the pulse series come to unusual due to mechanical abrasion, so lead to shut down the power supply. Now the plug and play structure has made for replacing the faulted fan quickly. More improvement are in process.

control cards7%

power converter13%

parameter mi smatch22%

temperature protectrel ay13%

cool i ng fans45%

Page 6: The Survey of the Power Supply Reliability at SSRF

SR Quadrupole magnet power supplies The quadrupole PS are chopper power supplies. The main reason are br

oken link of the communication between digital control cards and controller (IOC). Electronic components of the cards invalidate and EMI disturb causes the communication fail.

The failure of IGBT driver was caused by temperature. It is a design bug. A resister with lower power rating which operating under high-power so to increase resistance too much that the circuit loss its normal operating point.

control cards51%

DCCT power4%

DC bus fuse4%

24VDC power modul e4%

DCCT4%

I GBT dri ver25%

DC bus spark4%

Cool i ng water pi pel i ne4%

Page 7: The Survey of the Power Supply Reliability at SSRF

Large power supplies Dipole power supply consists of two branches,

which are connected in parallel. Each branch consists of two AC/DC converters and two cascaded 2Q choppers. The peak power output was about 1MW.

The severe EMI strike inside the chest results hardware failure.

currenttransducer, 3,

23%

DC powermodul e, 1, 8%

ci rcui tbreaker, 3, 23%

DCCT fai l ure,1, 8%

control cards,1, 8%

fi bi er dri ver,4, 30%

The break of the breaker handle was unreasonable, the manufactory can’t give a reasonable explain.

The design fault of fiber driver cause triggering uncertainty.

Page 8: The Survey of the Power Supply Reliability at SSRF

Statistic of failure for pulsed power supplies ( SR operating at decay mode )

No. Date Cause Repair time (h)

12009-02-04

SR kicker-4 Pulser no operation (fuse burn out due to a fire of high voltage cable )

4

2 2009-06-28 Thyristor of septum-2 pulser broken 12.5

3 2009-07-02 Thyristor of septum-1 pulser broken 20

42009-07-05

SR kicker-1 controller failed; +24Vdc power module broken

3.5

52009-11-13

Booster extraction kicker pulser shut down a current meter was out of commission.

1

62010-09-23

Booster injection kicker Pulser fail. a high voltage capacitor turn to dc short.

3

The break of thyristor ware due to the higher dI/dt ratio. Since all pulsed power supplies ware installed in accelerator tunnel so that repair work take longer time.

Page 9: The Survey of the Power Supply Reliability at SSRF

Conclusion

Continuing efforts to increase the reliability and availability of power supply system are ongoing at SSRF. Investigation and solution for the problem will be gone on. Several problems have been indentified and resolved. The advanced design and components will be adopted to improve the performance of power supply system.