the time reversal experiment with kaons (trek) at j-parc

19
The Time Reversal Experiment with Kaons (TREK) at J-PARC Hampton University, Hampton, VA, USA & Jefferson Lab, Newport News, VA, USA Michael Kohl <[email protected]> OLYMPUS Collaboration Meeting, DESY, April 6-7, 2009

Upload: amory

Post on 29-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Hampton University, Hampton, VA, USA & Jefferson Lab, Newport News, VA, USA. The Time Reversal Experiment with Kaons (TREK) at J-PARC. OLYMPUS Collaboration Meeting, DESY, April 6-7, 2009. Michael Kohl . TREK/E06. T ime R eversal violation E xperiment with K aons: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: The Time Reversal Experiment with Kaons (TREK) at J-PARC

The Time Reversal Experimentwith Kaons (TREK) at J-PARC

Hampton University, Hampton, VA, USA &

Jefferson Lab, Newport News, VA, USA

Michael Kohl <[email protected]>

OLYMPUS Collaboration Meeting, DESY, April 6-7, 2009

Page 2: The Time Reversal Experiment with Kaons (TREK) at J-PARC

2

TREK/E06

http://trek.kek.jpNew official website:

Time Reversal violation Experiment with Kaons:

Search for New Physics beyond the Standard Model by Measurement of T-violating

Transverse Muon Polarization in K+ μ+π0 νμ Decays

Page 3: The Time Reversal Experiment with Kaons (TREK) at J-PARC

3

20 Institutions from 6 Countries

CANADAUniversity of Saskatchewan Department of Physics and EngineeringUniversity of British ColumbiaDepartment of Physics and AstronomyTRIUMFUniversite de MontrealLaboratoire de Physique Nucleaire

USAMassachusetts Institute of Technology (MIT) Laboratory for Nucl. Science & Bates Lin. Acc. CenterUniversity of South CarolinaDepartment of Physics and AstronomyIowa State UniversityCollege of Liberal Arts & SciencesHampton UniversityDepartment of PhysicsJefferson Laboratory

RUSSIARussian Academy of Sciences (RAS)Institute for Nuclear Research (INR)

JAPANOsaka UniversityDepartment of PhysicsNational Defense AcademyDepartment of Applied PhysicsTohoku UniversityLaboratory of Nuclear ScienceHigh Energy Accel. Research Org. (KEK) Institute of Particle and Nuclear StudiesInstitute of Material Structure ScienceAccelerator LaboratoryKyoto University, Department of PhysicsTokyo Institute of Technology (TiTech) Department of Physics

VIETNAMUniversity of Natural Sciences

THAILANDKasetsart University

Page 4: The Time Reversal Experiment with Kaons (TREK) at J-PARC

4

TREK/E06

90%CL.90%CL.

Page 5: The Time Reversal Experiment with Kaons (TREK) at J-PARC

5

KEK-E246:PT = - 0.0017 ± 0.0023(stat) ± 0.0011(sys) ( |PT | < 0.0050 : 90% C.L. )

● K+ ➙π0μ+νDecay at restT-odd correlation

PT≠0 ⇒ T violation(CPT theorem) CP violation⇒

Transverse muon polarization

M. Abe et al., PRL83 (1999) 4253

M. Abe et al., PRL93 (2004) 131601

M. Abe et al., PRD72 (2006) 072005

Page 6: The Time Reversal Experiment with Kaons (TREK) at J-PARC

6

Stopped K+ decay at K5 Superconducting Toroidal Spectrometer

KEK-PS E246 experiment: K+→π0μ+ν (Kμ3)

Page 7: The Time Reversal Experiment with Kaons (TREK) at J-PARC

7

E246: Superconducting toroidal magnet

Page 8: The Time Reversal Experiment with Kaons (TREK) at J-PARC

8

• 20 cm active length• 6 mm ring counters

• 9 cm diameter• 256 fibers 5x5 mm2

E246: Active target and CsI calorimeter

• 768 CsI crystals, 75%4 sr• 12 muon gaps

• 25 cm length• PIN diode readout

Page 9: The Time Reversal Experiment with Kaons (TREK) at J-PARC

9

Time Reversal Experiment with Kaons TREK/E06: Upgrade of E246 setup

Reduce systematic errors by factor ~>10

- alignment with data

- correction of systematics

Decrease statistical error by factor ~>20

- 20x higher K+ intensity at J-PARC

- 10x larger polarimeter acceptance

- >1.6x higher polarimeter sensitivity

New proposal of PT (K3) at J-PARC

10-4

10-4

Page 10: The Time Reversal Experiment with Kaons (TREK) at J-PARC

10

Upgrade proposal

• Charged tracking: – Addition of a new element C1 between C2 and TGT/RNG– Replacement of previous C1 chamber by cylindrical GEM – Finer segmentation of TGT fiber; use of helium bags

Readout: MPPC (SiPMT) or MA-PMT

• π0 detection:– New, faster readout of CsI(Tl): APD, MAPD– Operation of wave form analysis by FADC

• Muon polarimeter :– Active polarimeter– New magnet with a parallel field

Page 11: The Time Reversal Experiment with Kaons (TREK) at J-PARC

Light guide :lBicron 692 WLS orlKuraray Y11 WLS orlClear optical fiber

Readout:SiPMT (HPK MPPC) orMA-PMT

Estimated hits in the photon sensor:

~ 7 x107 particles/year

3 x 3 mm492 fibers

c.f. E246 Ring counters PSI FAST target

Cross section

Timing counters

One element

Active fiber target: Baseline design

11

70 – 150 cm

Page 12: The Time Reversal Experiment with Kaons (TREK) at J-PARC

12

Active Muon Polarimeter

10 times more acceptance Full angular acceptance for positrons Improved field alignment

Page 13: The Time Reversal Experiment with Kaons (TREK) at J-PARC

13

TREK/E06 Tracking Upgrade

Planar GEMs (C1) between CsI and C2 Cylindrical GEM (C0) in replacement of former C1

70 µm

140 µm

GEM technology:In collaboration with Hampton U., MIT, and Jefferson Lab

Page 14: The Time Reversal Experiment with Kaons (TREK) at J-PARC

14

C0 Cylindrical GEM for TREK

300 mm14

0 m

m

160

mm

Vertex tracking near target, δ < 0.1 mm Very high rate capability 25 kHz/mm2 (COMPASS) Radiation-hardness 4 x1010 MIPs/mm2 (COMPASS)

TREK: Rates <250 Hz/mm2 (halo <5 Hz/mm2), total dose: 7 x107 particles

Page 15: The Time Reversal Experiment with Kaons (TREK) at J-PARC

15

Tracking upgrade: Geant4

Target/C0

C1C2

GOALS: Realistic geometry of upgraded TREK apparatus Realistic tracking performance

Obtain design criteria for Sizes and locations of new elements Intrinsic resolutions for C0 and C1 Angular and spatial resolution of tracks Optimization of material budget

Geant4 studies initiatedin summer 2008

Page 16: The Time Reversal Experiment with Kaons (TREK) at J-PARC

16

Location of J-PARC

Page 17: The Time Reversal Experiment with Kaons (TREK) at J-PARC

February 22, 2008 Shin'ya Sawada @ TREK Meeting, KEK

17

MLSF

RCS

LI

NA

50GeV-PS

HdBird’s eye photo in Nov. 2006

Page 18: The Time Reversal Experiment with Kaons (TREK) at J-PARC

18

Beam Dump

T1 target

K1.8

K1.8BR

K1.1S-type

KL

K0.8C-type

30~50 GeV primary beam

Productiontarget (T1)

Hadron Experimental Hall

Page 19: The Time Reversal Experiment with Kaons (TREK) at J-PARC

19

Feb 2005: New collaboration formed (Japan, Canada, USA, Russia and Vietnam)

April 2006: Proposal submission

July 2006: Review by PAC → “stage-1” (scientific) approval

Feb 2009: First beam in Hadron Facility

2007-2009: R&D and experiment design phase J-PARC PS and HF start operating

2010-2011: Kaon 0.8 beamline, experiment upgrade and commissioning

2011-2012: Start of experiment (1 year)

2012-2013: Analysis and results

Timeline