Page 1: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

THE TITAN GARDEN SHEDSNSD-C Owner’s Manual

Page 2: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

BEFORE YOU START

TOOLS MAY REQUIRED

PLAN AHEAD

Owner’s Manual

Prior to installation, it is important that you contact your local government authority to determine if build-ing approval is required. Study and understand this owner’s manual. Important information and helpful tips will make your construction easier and more enjoyable.

Assembly Instructions

Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin. During assembly, follow the step sequence carefully for correct results.

Parts

Check to be sure that you have all the necessary parts for the building. Separate contents of the carton by the part number while reviewing parts list. Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.

It requires two people 2-3 hours to complete installation

Use heavy duty gloves when handling steel sheets and flashings

1

Watch the weather:

Please be sure the day you select for installation is dry and calm. DO NOT attempt to assemble your shed in windy weather because of risk of damage to panels, or personal injury. Be careful of wet or muddy ground.

Teamwork:

Whenever possible,, two or more people should work together to assemble the building. One person can position parts or panels while the other is able to handle the fasteners and the tools.

Page 3: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

PARTS LIST

2

Page 4: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

3

OVERALL LAYOUT

Page 5: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

4

BASE ASSEMBLY

Assemble base bars from (1) to (4R) with (F1) screws.Place the entrance taper rail (5) on top of the (3L) and (3R) bars.Secure with (F1) screws to the foundation.Make sure the base bars are assembled in a perfect square.

Page 6: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

5

SIDE WALL ASSEMBLY

Place the wall panel (P2) and (P6) on the base bar (3L, 3R, 4L and 4R) as shown above.Line up the holes on side walls with base bar.Secure with (F1) screws. Please place washers from outside.

Page 7: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

6

SIDE WALL ASSEMBLY

Assemble the strengthening bars (22, 23, 24L and 24R) around the side walls from inside.Secure them with (F1) screws and washers.

Page 8: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

7

DOOR FRAME ASSEMBLY

Insert the 2 pieces of top slider (G2) into the sliding rail (8). Make sure the holes on (G2) facing inside.Assemble door bar (6) between front wall panel (P6).Place sliding rail (7 and 8) on top of front wall panels from inside.Line up the holes with wall panels’.Use (F1) screws with washers to secure.

Page 9: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

8

TOP FRAME ASSEMBLY

Place the bars (9, 10L, 10R and 11) on top of the wall panels.Line up the holes with wall panels’ and fix with (F1) screws.Place the wall panels (P1, P2, P3 and P5) between the base bars and top bars.Secure them with (F1) screws and washers.

Page 10: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Place the left door frame (25L) on top of the base bar (3L).Insert it into the wall panels, then secure the frame (25L) with (F1) screws. Repeat the above for the right door frame (25R).

9

DOOR FRAME ASSEMBLY

Page 11: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Place four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R).Align the holes and secure with (F1) screws from inside.Join the two gable panels (21L and 21R) together with connector(B3).Assemble the supportive bars (B1 and B2).Secure them with (F2) bolt and nut.

10

GABLE PANEL ASSEMBLY

Page 12: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Join the two roof supports (13 and 14) together.Fix the four sets of roof structure into the gable panels (21L and 21R).Align the holes and secure with (F2) bolt and nut.

11

BEAM ASSEMBLY

Page 13: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Place the roof boards (P4L and P4R) on top of the gable panels (21L and 21R).Line up the holes and secure with (F1) screws with washers.Place the roof boards (P7 and P9) and secure with (F1) screws and washers.

12

ROOF ASSEMBLY

Page 14: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Place the roof boards (P4L and P4R) on top of the gable panels (21L and 21R).Line up the holes and secure with (F1) screws with washers.Place the roof boards (P7 and P9) and secure with (F1) screws and washers.

13

ROOF FRAME ASSEMBLY

Page 15: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

Assemble the roof flashing (15, 16, 17 and 18) onto roof panels.Secure with (F1) screws and washers.Place the corner holders (GC) on the roof flashing joints and se-cure with (F1) screws and washers.

14

FLASHING ASSEMBLY

Page 16: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

15

RIDGE COVER ASSEMBLY

Place the ridge covers (19) on top of the central roof panel joints.Line up the holes and secure with (F1) screws and washers.Install the end caps (GE) on the front and back, secure with (F1) screws and washers.

Page 17: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

16

DOOR ASSEMBLY

Assemble the door frame (20) to the door panels (D1and D2), and join them with (27). Assemble the bottom slider (GD) to the door frame (20) on both sides. Secure them with (F2) screws and washers.

Page 18: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

17

DOOR HANDLE ASSEMBLY

Install door handle (D2) onto doors from inside with (F2) bolts and nuts

Page 19: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

18

DOOR INSTALLATION

Slide the doors into the base bar (3L).Make sure the bottom slider (GD) is inside the base bar (3L).Fix the doors on the top slider (G2) with (F3) screws.

Page 20: THE TITAN GARDEN SHED - · PDF filePlace four gable panels piece ( 2 x 21L and 2 x 21R) on top of the sliding rail (7 and 8) and top bars (10L and 10R). Align the holes and secure

The installer is responsible for ensuring the slab or concrete squares are sufficient to support the shed and sustain wind loading. Do not directly anchor your shed to pavers.

Warning: The Manufacturer accepts no responsibility for damage to person or property resulting from the inadequate anchoring of the shed whether installed by the Manufacturer,their Agents or by any other person.

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush. Wash it and apply touch-up paint.

Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts to snow on roof can damage building, making it unsafe to enter.

Doors: Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily. Lubricate door track annually with furniture polish or sili-cone spray. Keep doors closed to prevent wind damage.

Fasteners: Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws. Regularly check your building for loose screws, bolts, nuts, etc. and retighten them as necessary.

Moisture: Aplastic sheet(vapour barrier) placed under the entire floor area with good ventilation will reduce condensation.

Other tips...

Wash off inked part numbers on coated panels with soap and water.

Silicone caulking may be used for watertight seals throughout the building.

Do not store swimming pool chemicals in your building. Combus-tibles and corrosives must be stored in air tight approved contain-ers.

19

SECURE THE SHED

CARE AND MAINTENANCE