the tmn and oss programme in eurescom
DESCRIPTION
The TMN and OSS programme in EURESCOM. Luc Mathan EURESCOM [email protected]. A long time ago, CN and TN decided they must live together CN assures TN he is moving soon to a posh new address: OSI ! TN diligently starts the long journey to OSI and almost gets there - PowerPoint PPT PresentationTRANSCRIPT
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
The TMN and OSS programme in EURESCOM
Luc Mathan
EURESCOM
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Once upon a time ...
• A long time ago, CN and TN decided they must live together• CN assures TN he is moving soon to a posh new address: OSI !• TN diligently starts the long journey to OSI and almost gets there• In reality CN could not afford to live in such an expensive place
and moved to another, cheaper, place: SNMP• TN moves in with CN but dreams of OSI and is fundamentally
unhappy, even after CN’s attempts to renovate SNMP• After some time CN starts thinking about moving again, to a new
promising address: CORBA !• TN diligently starts again the long journey to CORBA • Meanwhile CN makes other plans, because he really wants to live
in a lot of nice places at the same time: JAVA, DCOM, etc...• ...• Not an easy love story, but CN and TN stay together !
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Projects from 1991 to 1994 : Shaping TMN
Projects from 1994 to 1998 : Implementing TMN
Projects from 1998 onwards : Building OSS
Programme history
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
FINAL RESULTS
FIRST RESULTS
Projects from 1991 to 1994 : Shaping TMN
Projects from 1994 to 1998 : Implementing TMN
Projects from 1998 onwards : Building OSS
Prague workshop Objectives
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
• General assembly agrees on a project focusing on a problem to be solved, with usually a clearly identified customer
• A number of member companies commit manpower to form the project consortium
• Requirements are identified/collected by the project
• Solutions are proposed and sometimes experimented by the project
• Final results are disseminated to all member companies, and in most cases made available outside
The way we work
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Aim: Technically support TMN implementations in EUROPE
Using OSI model and TMN concepts already standardised or stabilised
Produced for inter-operator (X) mgnt interfaces :
1) Specifications
2) Prototypes implementations and field trials
3) Methodology and guidelines for spec. and implem.
Projects 94-98
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
OS
MDOS
NE
WS
NE
F
Q
XX
“Xcoop”between
two
service providers or networkoperators
“Xuser”between 1) a service provider or anetwork operator
and 2) a customer
TMN
The X interface
G
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
• X i/f specs: freephone service (P406), billing accounting & charging (P407), SDH-METRAN (P408, P707) , ATM-JAMES (P408, P708), trouble ticketing (P612), TMN security (P710)
• X i/f experiments in PET-Lab: P408, P612, P707, P708
• Support to X i/f exp. (TRS + E-MOL): P414, P609
• Mostly network level mgnt
• Based on GDMO, ASN.1, CMIP
• DCN: X.25, ISDN, then IP
Projects 94-98
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Pan-European TMN Laboratory
Platforms in use :
HP OpenView
HP/Vertel
IBM TMN 600
Bull ISM
SNI Protos
Sun Solstice
etc.
Lannion (FT,1,2)
Aveiro (PT,2)
Oulu (TF,1,2)
Madrid (TE,1)Torino (IT,1,3)
Trier (DT,2)
Darmstadt (DT,1)
Martlesham (BT,1,3)
Malmö (ST,2,3)
Brussels (RB,1)
Copenhagen (DK,2)
Berlin (DT,3)
Dublin (TI,3)
(key: 1=ATM 2=SDH 3=Trouble Ticketing)
Athens (OG,1)
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
GlossaryEnsembles
TRS and E-MOL
MFsMOs Guidelines
http://www.eurescom.de/~public-web-deliverables/p600-series/P609/emolgate.htm
E-MOL
TRS quality procedure: Technical Review Session
publicly accessible web library: EURESCOM Managed Object and Information Library
Information Model produced by an EURESCOM Project is
• reviewed against a list of criteria by TRS experts external to the Project,
• amended by the Project,
• included in E-MOL if endorsed by the TRS experts
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
bilateral agreements, joint ventures, alliances
METRAN MoU METRAN OA
P408 P707
timefault, config perf, admin, resourcing, etc
(through ETSI)
P107
P710
security
P109
Progress of SDH X interface in Europe
now
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Progress of ATM X interface in Europe
NMF
ATM Pilot
JAMES
P408 P708
timeconfig
fault
perf, usage mtr
(through ETSI)
P612
P710
trouble ticketing
security
P105
EASI+P813ETNO WG
P813
now
ITU-T
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
• Contributed to reorganisations in all Telcos and standards bodies
• Complexity means time and effort on methodology
• TMN boundaries are moving and fuzzy (attempts to include other models than OSI)
• Magnitude of investments means “legacy” still there a long time but moving fast to internet based solutions
• Not just network mgnt, more and more emphasis to service and business mgnt
N&S management today
The development and multiplication of issues involving TMN and non-TMN solutions in last
10 years has had many consequences
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Aim: Technically support harmonised deployment of OSS in EUROPE
Taking account of the impact two crucial factors have on N&S management :
1) Deregulation (= more regulations to observe!)
2) Technological progress (= more solutions to offer!)
Projects 98-beyond
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Reference framework for OSS interconnection (P811)
• number portability and accounting across telcos
TMN Evolution and SP needs (P812)
• other architectures (OMG, TINA, etc), distributed technologies (DPE, CORBA, Java, etc.), methodology (OMT, UML, IDL, etc.), protocols (IP, IIOP, HTTP, etc.)
Managed ATM service introduction (P813)
• deployment of X i/f, IP-based protocols, total security
OSS Interconnection products evaluation (P908)
• vendors and SPs, number portability, capacity ordering, carrier pre-selection
Projects 98-beyond
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Prague workshop
No official panels, but enough time per Project for interactive presentations !
Special session 23 March 14h45 to 16h00 devoted to demonstrations !
We value your opinion on how we run the workshop, fill the blue questionnaire !
ITU-T S4www.eurescom.de
Inter-Operator TMN & OSS Workshop
Prague, 23-24 March 1999
Enjoy the Workshop !
Remember our web site for Deliverables and information on Projects - www.eurescom.de