the utah communications agency network experiences and lessons learned 2002 olympic winter games...
TRANSCRIPT
![Page 1: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/1.jpg)
The Utah Communications Agency Network
Experiences and Lessons Learned
2002 Olympic Winter GamesSalt Lake City Utah
![Page 2: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/2.jpg)
Olympic Statistics
• Cauldron 5M BTU/hrCelebrities 18,000Visa Spending up 31%70,000Visitors/day1946 Frequency Apps1825 miles/fiber19,350 miles/copper7 Sonnet rings100 total Venues (Comp and non-Competition5300 PC’s
• 11,000 Cell phones7000 radios (SLOC)4000 Televisions375 cell sites55 Radio SitesPaper=28,000 Books35 Health Clinics11,575 cases: (flu,cough,sprains)
• Highest Beret price $900
![Page 3: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/3.jpg)
History and Background
• Governor TF 1993• Build 800Mhz system
Legislative Bill 96 & 97 passed in 1997
• Local Gov’t Input !!!• Management Board• RFP Process• Promote with Users
• First Staff 1999• Contract for construction• 36 Months to Build• 43 UCAN/20 Olympic
sites• 16 E-9-1-1 Centers
interconnected• 95% In-building
![Page 4: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/4.jpg)
Political Issues
• THE UCAN SYSTEM SERVES 91AGENCIES
Challenges Addressed:• Turf Issues, Wait and See, What are the costs?• Shared Vision: What will it look like?• Timing: Build and serve at the same time• Technology Obsolescence: Build or Wait• How to Communicate with those who don’t
participate
![Page 5: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/5.jpg)
UCAN Funding
• Bonded for the Infrastructure/user fees
• Several Federal Grants
• SLOC Equipment procured under contract with the DOD—UCAN was the Contractor
• Operational costs 3.5 M annually at current system size
![Page 6: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/6.jpg)
Interoperability
• System to System patch thru consoles• PSWN provided BIM to BIM patch
FED/state/local• Unit to Unit Simplex—State and National• Stand-alone Repeaters• Operations channels Trunked• Regional Channels--Trunked (county wide)• Events Channels--Trunked (system wide)
![Page 7: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/7.jpg)
Radio System Call Volumes/Olympics
• Call Volumes: (includes PS and Venue Calls/17 days)
• Highest Day total Calls (24 Hours) 580,000
• Average Day total Calls 503,974
• Total SLOC Venue Calls 2,823,290
• Total PS Calls 5,744,281
• Total System Calls Processed 8,567,571• Total busies 38,595
• Percent busies (1 second or less) .045
![Page 8: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/8.jpg)
Radio System Call Volumes/Paralympics
• Call Volumes (includes PS and Venues 9 days• Highest Day Total Calls (24 hours) 212,500• Average Day total Calls 179,000• Total SLOC Venue Calls 240,000
• Total PS Calls 1,750,300• Total Busies (1 Sec or less) 479• Percent Busies .000026
![Page 9: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/9.jpg)
Lessons Learned
• The hard work and planning paid dividends• Site Preparation, back-up power, generators, UPS
were worth the expense• The coverage was as designed• The BIM to BIM Patches provided the
interconnect between agencies on other systems• Manage the Talk Groups to Distribute System
Loading• This system will handle large scale events
![Page 10: The Utah Communications Agency Network Experiences and Lessons Learned 2002 Olympic Winter Games Salt Lake City Utah](https://reader035.vdocument.in/reader035/viewer/2022072005/56649ce35503460f949af77c/html5/thumbnails/10.jpg)
Lessons Cont’d
• Event Channels provided necessary agency interoperability
• UCAN was surprised all radios did not have interoperability channels
• ON GOING TRAINING is a MUST• System watch, alarms were vital to system management• UCAN provided not only “outside the fence but inside
the fence communications”• During the Games only 28 tickets were filed at the
SLOC TCC