THE ZUIDTANGENT THE ZUIDTANGENT THE ZUIDTANGENT THE ZUIDTANGENT - - - EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE AMSTERDAM REGION AMSTERDAM REGION AMSTERDAM REGION AMSTERDAM REGION David van der Spek David van der Spek Public Transport Policy Advisor Public Transport Policy Advisor Stadsregio Amsterdam Stadsregio Amsterdam 5 5 5 a a a Jornada Jornada Jornada Jornada AMTU AMTU AMTU AMTU Vic, 4th March 2009 Vic, 4th March 2009 Vic, 4th March 2009 Vic, 4th March 2009

Upload: amtu

Post on 02-Jul-2015

794 views

Category:

Education


1 download

DESCRIPTION

Sr. David van der Spek, Consultor de Transport Públic. Autoritat Regional d'Amsterdam. Resum ponència: Al 2002 la Regió d’Amsterdam inaugurà un BRT de 42km. El ponent ens presentarà les principals característiques del projecte, considerada com una experiència reeixida; ens explicarà els seus avantatges així com els problemes sorgits en el seu desenvolupament, i les lliçons a extreure’n.

TRANSCRIPT

Page 1: The Zuidtangent - Experiences with BRT in the Amsterdam Region

THE ZUIDTANGENT THE ZUIDTANGENT THE ZUIDTANGENT THE ZUIDTANGENT ----EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE EXPERIENCES WITH BRT IN THE

AMSTERDAM REGIONAMSTERDAM REGIONAMSTERDAM REGIONAMSTERDAM REGION

David van der SpekDavid van der SpekPublic Transport Policy AdvisorPublic Transport Policy Advisor

Stadsregio AmsterdamStadsregio Amsterdam

5555aaaa JornadaJornadaJornadaJornada AMTUAMTUAMTUAMTUVic, 4th March 2009Vic, 4th March 2009Vic, 4th March 2009Vic, 4th March 2009

Page 2: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Inhoud

• Background

• History

• System characteristics

• Bus lane and bus way

• Vehicles and stops

• Identity

• Patronage

• Problems

• 2nd route

• Future developments

• Conclusions

Agenda

Page 3: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Inhoud

• Shift in town planning: new housing and office sites in suburban areas

• Increasing congestion on roads

• Major international airport (5th busiest in Europe)

• Priority to accessibility of this area for economical reasons

• Existing rail orientated towards Amsterdam

• Insufficient quality of existing orbital PT

• Major flower exhibition in summer 2002

• Urgent need for high quality orbital link

• Estimated demand insufficient for light rail

Background

Page 4: The Zuidtangent - Experiences with BRT in the Amsterdam Region

1st Zuidtangent route

743.000 743.000 743.000 743.000 inhinhinhinh....

(incl. (incl. (incl. (incl. ZuidZuidZuidZuid----OostOostOostOost))))

78.000 78.000 78.000 78.000 inhinhinhinh....

79.000 79.000 79.000 79.000 inhinhinhinh....70.000 70.000 70.000 70.000 inhinhinhinh....

147.000 147.000 147.000 147.000 inhinhinhinh....

SchipholSchipholSchipholSchiphol AirportAirportAirportAirport

30.000 30.000 30.000 30.000 inhinhinhinh....

Page 5: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Inhoud

• 1987 first study

• 1994-2001 construction

• Ownership and responsibilities shared by 3 regional and local authorities

• Total investment 270 million Euro (95-100% funded by national government)

• January 2002: start of 1st route

• Contract awarded to incumbent operator Connexxion

• 2007: Connexxion (Transdev) wins tender

• December 2007: start of 2nd stage: 2nd route, new buses, new 8 year contract

History

Page 6: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Inhoud

• Ambition: high quality public transport

• Fill the gap between regular buses and light rail

• 1st route: total length 41 km, core section 24 km

• In core section bus lanes and independent bus ways

• Elsewhere bus lanes where possible

• High flexibility: adapts to space constraints in historictown centre of Haarlem

• Several connections to heavy rail network

System characteristics (1)

Page 7: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Inhoud

• High service frequency (8-10 buses/h on weekdays)

• From December 2007 operational 24/7

• High commercial speed (>35 km/h)

• Long average distance between stops (1.9 km)

• Consistent identity (vehicles, stops, publicity)

• ITS:– priority at traffic signals

– dynamic passenger information system

• Short dwell times:– minimal horizontal and vertical gap

– no ticket inspection when boarding

System characteristics (2)

Page 8: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Bus lane and bus way

• No technical guidance system

• Fully accessible to conventional buses,mixed operation possible

• Designed and built to enable future conversion to light rail

• Concrete surface

• Several elevated sections

• 1,8km tunnel section

Page 9: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Vehicles and stops

• Stop and bus floor at the same level (30 cm)

• Dedicated fleet of 100% articulated low floor buses

• 2nd generation: 45 Mercedes Citaro buses, Euro 5-emission level, capacity 46+55

• From regular production: no second hand market risk, no expensive peculiarities

• Horizontal gap at stops minimized using profiled kerbstones

Page 10: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Identity

• Buses in striking red livery

• Designer stops along core section

• Uncompromised identity: none of the design elements repeated elsewhere

Page 11: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Patronage (1st route)

• 40.000 passengers per day (March 2008)

• Every year 10-15% more passengers

• Heaviest loadings in Hoofddorp: almost 13.000 passengers per day (both directions)

• Patronage up to 99% higher than estimated

• Eastern section below estimates

• Use of PT increased since Zuidtangent operating (up to 47% in 3 years)

Page 12: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Knelpunten

• Subsidence of bus way: physical guidance at some stops blocked

• Concrete surface less comfortable than asphalt

• Weather protection at stops not satisfactory

• Roofs at stops removed after problems during storm

• Slippery surface at stops

• Fare evasion

• Implementation of ITS took a long time

• Congestion on motorway section

Problems

Page 13: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Knelpunten

• Concept of 1st route not fully applied

• Northern section:– no new infrastructure built

– service unreliable due to congestion on motorway

– limited demand because of parallel railway

• Southern section:– no new design for stops available

– stops without BRT identity

– bus way opened after delay

• Patronage so far disappointing

• Service on northern section to be cut

2nd route

Page 14: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Knelpunten

• Stops to be improved

• Upgrading of eastern section: more bus lanes

• New branches and extension planned (but longer route is risk to reliability!)

• Possibly tunnel in Haarlem city centre

• Conversion to light rail depending on patronage

• Tangential high quality bus routes to be introduced in other areas

Future developments

Page 15: The Zuidtangent - Experiences with BRT in the Amsterdam Region
Page 16: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Knelpunten

• Successful concept: high commercial speed, high service frequency, high flexibility, high reliability

• Result: patronage higher than estimated• Lessons:

– BRT only works if uncompromised– Stops: functionality more important than design– More attention to quality of infrastructure needed– Maintaining high quality means continuous effort from all

parties

• BRT is able to increase the share of public transport• The choice for BRT with proven technology has been

the right one!

Conclusions

Page 17: The Zuidtangent - Experiences with BRT in the Amsterdam Region

Thank you very much for your Thank you very much for your Thank you very much for your Thank you very much for your attentionattentionattentionattention