themis fdmo review pre-launch preparations update − 1 october 5, 2004 pre-launch preparations...
TRANSCRIPT
THEMIS FDMO Review Pre-Launch Preparations Update − 1 October 5, 2004
Pre-Launch Preparations Update
Mark Lewis
THEMIS FDMO Review Pre-Launch Preparations Update − 2 October 5, 2004
Pre-Launch Preparations Update
Overview• MOC Development• Flight Control Systems• End-to-end Data Flows• Mission Simulations• FOT Training• IT Security
THEMIS FDMO Review Pre-Launch Preparations Update − 3 October 5, 2004
Mission Operations Center
BGS Antenna, Equipment Racks and FOT Workstations at the Mission Operations Center
THEMIS FDMO Review Pre-Launch Preparations Update − 4 October 5, 2004
Expanded MOC
THEMIS FDMO Review Pre-Launch Preparations Update − 5 October 5, 2004
MOC Console Assignment
Mission Operations• THEMIS (OPS 1-9)
• STEREO (OPS 10)
• CHIPS (OPS 11-13)
• RHESSI (OPS 14-17)
• FAST (OPS 18-19)
Flight Dynamics• Maneuver Planning, Orbit & Attitude Determination (FD 1-2)
• Automated Product Generation (FD 3-4)
Mission Planning• Command Load Generation (MPS 1-2)
Spacecraft Emergency Response System• Spacecraft State-of-health Monitoring (SERS 1-2)
THEMIS FDMO Review Pre-Launch Preparations Update − 6 October 5, 2004
MOC Expansion Tasks
MOC Expansion for THEMIS Support• Relocation of Flight Controller Office (Completed)
• Cardkey Entry and Alarm System Extension (Completed)
• NASA Security Audit (Completed for Current Configuration)
• Structural Modification (Doorway & Electrical Outlets Completed)
• Furniture Installation (Completed)
• Relocation of FAST and RHESSI Operations (Completed)
• Ground Station Equipment Upgrades (Almost Completed)
• Purchase of Additional Computer Workstations
• Software Installation and Firewall Upgrade
• Configuration of Operations Consoles
• Initial End-to-end Data Flows Between MOC and Probe I&T Area
• Minimum Impact to Currently Operating Missions
• All To Be Completed by End of CY 2004
THEMIS FDMO Review Pre-Launch Preparations Update − 7 October 5, 2004
Overview of Software Tools
Tool Developer Function Platform CommentsGTDS GSFC Ephemeris Generation, Mission
Design, Orbit DeterminationSolaris In Operation at MOC Already
GMAN GSFC Maneuver Planning Solaris In Operation at MOC Already
FreeFlyer AI Solutions Maneuver Planning Windows XP Alternate Commercial Solution
SatTrack BTS Orbit Analysis, Pass Scheduling, Product Generation, Networking, 3-D Visualization, Ground Station Control
Solaris, Linux In Operation at MOC Already
MSASS GSFC Attitude Determination Solaris, Windows XP
In Operation at MOC Already, Upgrades To Be Provided by GSFC
MTASS GSFC Attitude Determination Solaris, Windows XP
To Be Provided by GSFC
ITOS Hammers Probe Command and Control, Telemetry Monitoring, Limit Checking
Solaris, Linux In Operation at MOC Already
VirtualSat Hammers Probe Simulation Windows XP To Be Supplied with FlatSat
MPS GSFC Command Load Generation Solaris In Operation at MOC Already
BEARS UCB Emergency Response System Solaris Under Development at SSL as Replacement for SERS
BTAPS UCB Probe Bus and Instrument Trend Analysis
Solaris Under Development at SSL for MOC and SOC
APGEN JPL Task and Event Scheduling Solaris In Operation at MOC Already
TeamTrack TeamShare Anomaly Tracking Windows XP Currently Used by Hammers
THEMIS FDMO Review Pre-Launch Preparations Update − 8 October 5, 2004
In-house Software Development
Berkeley Emergency & Anomaly Response System (BEARS)• New In-house Solution as Replacement for SERS
Berkeley Trending and Plotting System (BTAPS)• New In-house Solution for Data Trending and Plotting• Based on MySQL Database• Database Population Via ITOS Telemetry Decommutation• Web Based Interface for Data Access and Plotting• Developed as Student Project
Modification of MPS• Adapt FAST Version of MPS to THEMIS
Additional Scripts for Interfacing Major Tools• Miscellaneous Shell Scripts for Telemetry Data Processing and
Validation• Systems Automation
THEMIS FDMO Review Pre-Launch Preparations Update − 9 October 5, 2004
Workspace Configuration
Several Workspaces• Generic Top Level THEMIS Workspace: themisws
– Holds Common Software and Configuration Files– BEARS, BTAPS, MPS, APGEN – ITOS Pages and Procs Directories Common to All Probes
• Each Probe Will Have a Dedicated Workspace: e.g. themisa– Holds Databases and Configuration Files Specific to Each Probe
– ITOS Telemetry and Command Databases– Configuration Files for BEARS, BTAPS, MPS
– ITOS Pages and Procs Specific to Each Probe– Page Header Files
THEMIS FDMO Review Pre-Launch Preparations Update − 10 October 5, 2004
Workspace Configuration themisws | | ----------------------------------------------------------------------------------------------------- | | | | | | | | | | |cfg Codemgr_wsdata deleted_files idl include itos_resource plmod shellfunc src SunOS.5.9 linux | | | | | | | | backup ------- | ---------------------------------------------------------------- | | | | | | | | | | | SCCS src | archive config docs idlUtil include itos_resource OpsUtil SCCS | | | | | ----------------------------------- | | | | | | | | | | | | | cfgmon pages procs themis[a-f] SCCS | | | | | ----------------------------------- | | | | | | | | | | | | | | | cfgmon dbx pages procs tcvol2 SCCS | | -------------------------------------------------------------------------------------------- | | | | | | | | | | | | | | | | | | | | <itosVersion#> cfgmon pages procs themisa themisb themisc themisd themise themisf | | | | | | | | | | | | | | | | | | ------------- | --------------- | | | | | | | | | | | | | | | | | odb pdb tcvol2 | ground inst scbus | | | ------------------------------- | | | | | | | | | | | | | ground include inst prints scbus | | | --------------------------------------------- | | | | | | | | | | | | | | <itosVersion#> cfgmon odb pages pdb procs tcvol2 | | | | | | ------------- | --------------- | | | | | | | | | | | | | | odb pdb tcvol2 | ground inst scbus | | ------------------------------- | | | | | | | | | | ground include inst prints scbus
THEMIS FDMO Review Pre-Launch Preparations Update − 11 October 5, 2004
Configuration Control
Software Configuration Control• Each Workspace is Under SCCS Configuration Control
– Continue to Use for Software Already Under Configuration Control– ITOS, MPS, APGEN
• Also Use SCCS for Configuration Control of New Tools– BEARS, BTAPS
Probe Configuration Control File• Each Probe Will Have a Configuration File Under
SCCS– Includes Physical Configuration
– Deploy Status of Booms, Fuel Remaining, etc.– Known Hardware Failures or Anomalous Behaviors– Expected Clock Drift
– Software Configuration– Onboard FSW Version and Patch Level– Probe Specific Telemetry and Command Database Versions
THEMIS FDMO Review Pre-Launch Preparations Update − 12 October 5, 2004
Configuration Control
Software Test and Development Environment• Provide Workspace for Off-line Testing
– Demilitarized Zone (DMZ)– Developers Have Their Own Copy of Workspaces Allowing for
Simultaneous Development and Testing• Virtual Network Computing (VNC) Environment
– VNC Protocol Runs on Detached X-Server– Client/Server Environment
• Configuration Control Board (CCB)– Approves Software Before Moving to Secure Operations Net– Approves Hardware Changes to MOC Equipment
• Probe Bus and IDPU TLM/CMD Databases– Probe Bus Configuration Control at Swales until L-60– Transfers to Berkeley at L-60– IDPU Configuration Control at UCB– Master Database Compiled at UCB and Swales
THEMIS FDMO Review Pre-Launch Preparations Update − 13 October 5, 2004
ITOS Requirements
General ITOS Requirements• THEMIS Will Be Using the Commercial Version of ITOS
– Same as I&T System• Similar to FAST and RHESSI
– See ITOS Standard Documentation
Implementation of New Features (Descoped)• Decompression of THEMIS Telemetry Data in Real-time
– May Be Enabled or Disabled, Depending on Instrument Data Type• Desirable Features for Constellation Operations
– Telemetry Server for Distribution of Data Streams to Multiple ITOS Clients
– Status Displays for Telemetry Points Across Multiple Probes– ITOS Telemetry Server
THEMIS FDMO Review Pre-Launch Preparations Update − 14 October 5, 2004
ITOS Configuration
Dedicated Workstations• Basic Configuration Is One Dedicated ITOS System per Probe
– Same Workstation will Always Support Each Probe– Back-up Workstation Used in Case of Problem with Primary
Flexibility Built Into System for Dynamic Allocation of Workstations • Capability to Route Telemetry to Multiple Workstations
– Allows Many Engineers to Monitor Probes During LEO Operations– Command Only Enabled on Primary Workstation
• Multiple Hot Back-up Systems
Upgrade Path To More Complex Future Missions• ITOS Connects to SatTrack Gateway Server (SGS)
– ITOS Specifies Mission (e.g. THEMIS) and Leaves Individual Object and Facility Unspecified
– SGS Assigns Individual ITOS System to a Particular Pass Support– Routing of Telemetry and Command Connections Via
FrameRouter Software Matrix Switch– ITOS in Turn Loads TLM/CMD Databases and Supports Pass
THEMIS FDMO Review Pre-Launch Preparations Update − 15 October 5, 2004
ITOS Page Layout
Standard Features in ITOS Page Template• Uniform Page Header and Page Layout• Probe Identifiers: Probe Bus and Constellation ID• UTC and Probe System Time• Sub-headers, Data Columns, Grouping of Parameters• SI Units: V, A, s, m, kg, C, K, N, Pa, T• Rules for Java Based Graphics
THEMIS FDMO Review Pre-Launch Preparations Update − 16 October 5, 2004
Mission Control Network
Network ArchitectureAll Ground Stations and I&T Systems Connect to Dedicated Ports on Primary IP Router to Establish TLM and CMD Socket Connections
Router Switches TLM and CMD Socket Connections Through to Multiple ITOS Systems
Process Controlled by Automated Scheduling System
THEMIS FDMO Review Pre-Launch Preparations Update − 17 October 5, 2004
Mission Control Network
Secure Network TopologyCheckPoint Firewall at MOC Controls Network Traffic Between Four Secure Subnets:
1. Isolated Operations Network (ION) Hosts ITOS Workstations and Flight Dynamics Systems
2. Berkeley Ground Station (BGS) Subnet Hosts All Ground Station Systems
3. NASA Open/Closed IONet Access Via T-1 Line
4. THEMIS I&T Subnet Via VPN Tunnel Across Open Internet
Firewall Rules Configured to Only Allow Very Restricted Access Between Subnets, Ensuring Proper Security On All Network Segments
ITOS Workstations Configured and Tested During I&T − No Change for On-orbit Operations Required
THEMIS FDMO Review Pre-Launch Preparations Update − 18 October 5, 2004
TLM & CMD Data Routing
Telemetry & Command Routing Scheme• FrameRouter Acts as Server and Provide Matrix Switching
Capability• Incoming Connections from Ground Stations and ITOS Clients• Port Assignment
– Ground Stations: Each Has Dedicated Ports for TLM & CMD– I&T Systems: Probes and FlatSat – ITOS Clients: Can Connect to Any Ground Station by Selecting
Appropriate TLM and CMD Ports– Science Data Tool (SDT): Connects to Secondary Router– Standard Frame Format with EDOS Header for All Data Flows
– I&T End-to-end Tests– Ground Stations
• FrameRouter Establishes Connections Based on Scheduling Information from Gateway Server
THEMIS FDMO Review Pre-Launch Preparations Update − 19 October 5, 2004
Telemetry Data Format
Virtual Channel Priority Data Type Data Source
VC0 0 Real-time Probe State-of-health Data (BAU)
VC1 1 Playback Probe State-of-health Data (BAU)
VC2 2 Real-time Instrument Data (IDPU)
VC3 3 Playback Instrument Data (IDPU)
VC4 N/A Not Used
VC5 N/A Not Used
VC6 4 Playback Probe Bus Events (BAU)
VC7 5 Fill Data Generated Fill Data (CIM)
Telemetry Data Format• CCSDS V1 Frame Format
– Telemetry Data Routed by Virtual Channels• Annotated Channel Access Data Units (CADUs): 1274 Bytes
– Telemetry Frame Delivery Header: 10 bytes(Attached at Ground Station)
– Attached Synchronization Marker: 4 bytes– Virtual Channel Data Unit: 1100 bytes– Reed-Solomon Code Trailer: 160 bytes
THEMIS FDMO Review Pre-Launch Preparations Update − 20 October 5, 2004
Telemetry Data Delivery
Data Routing Transfer Medium Virtual Channels Maximum Data Rate
BGS to MOC Secure Local Area Network(100 Mbps) VC0, VC1, VC2, VC6 1048.576 kbps
NASA/GN to MOCSecure, Shared TCP/IP
Network Connection(T1 Line, 1 Mbps)
VC0, VC2, VC6 65.536 kbps
HBK to MOC Dial-Up ISDN Line (9.6 kbps) VC0 8.192 kbps
WDISC to MOCSecure, Shared TCP/IP
Network Connection(T1 Line, 1 Mbps)
VC0 4.096 kbps
I&T to MOC Secure TCP/IP Connection via VPN
VC0, VC1, VC2, VC3, VC6 Limited by Open Internet
Delivery of Real-time Telemetry Data• TCP/IP Network Socket Connection (BGS/GN/SN)• Dial-up ISDN Line (HBK)• Initiated by Ground Station
THEMIS FDMO Review Pre-Launch Preparations Update − 21 October 5, 2004
Command Data Routing
Command Data Format• CCSDS V1 Frame Format
– Command Data Routed by Virtual Channels– VC1: Commands Decoded and Executed in Software
– BAU Switched Service Commands– IDPU Commands– FSW Commands– Table Load Commands– Data
– VC2: Commands Decoded and Executed in Hardware– Processor Resets and Others
• Command Link Transmission Units (CLTUs): Variable Length– Command Delivery Header: 24 bytes
(Stripped at Ground Station)– Acquisition Sequence: 18 bytes– Start Sequence: 2 bytes– Telecommand Codeblocks: 37 x 8 bytes (Maximum)– Tail Sequence: 8 bytes
THEMIS FDMO Review Pre-Launch Preparations Update − 22 October 5, 2004
Constellation Status Monitoring
SatTrack Interface to ITOS Data Point Server (DPS)• SatTrack DPS Client Program Connects to SatTrack Gateway Server• One Instance of DPS Client Can Handle Multiple Probes
Simultaneously• Receives Pass Schedule Information in Real-time• Connects/Disconnects to/from ITOS Supporting a Pass for a Given
Probe• Connects/Disconnects Can Be Interleaved for Multiple ITOS Systems• Polls Values for List of Mnemonics and Saves Values in Local
Database (One File for Each Probe)– Mnemonic: Status String
• Periodically Generates Web Page with Constellation Status– Top Level Constellation Overview– Contact Schedule Summary– Probe Bus Status– Instrument Status
• Performs Yellow and Red Limit Checking with FOT Notification
THEMIS FDMO Review Pre-Launch Preparations Update − 23 October 5, 2004
Constellation Status Monitoring
THEMIS FDMO Review Pre-Launch Preparations Update − 24 October 5, 2004
Constellation Status Monitoring
THEMIS FDMO Review Pre-Launch Preparations Update − 25 October 5, 2004
Maneuver Command Loads
Maneuver Command Sequence• Maneuver Preparation
– Configure Telemetry Filter Table for Thrust Mode– May Require Several Commands
• First Attitude Maneuver– Catalyst Bed Heater On (for 60 min)– Catalyst Bed Heater Off (Just Prior to Thrusting)– Enable Thrusters– Select Thruster Mode– Set Thrust Phase Angle, Pulse Width and Number of Pulses
– May Be Repeated Up to 10 Times
– Set Thrust Start and Stop Times– May Be Repeated Up to 10 Times
– Disable Thrusters
THEMIS FDMO Review Pre-Launch Preparations Update − 26 October 5, 2004
Maneuver Command Loads
Maneuver Command Sequence• Orbit Maneuver
– Catalyst Bed Heater On (for 60 min)– Catalyst Bed Heater Off (Just Prior to Thrusting)– Enable Thrusters– Select Thruster Mode– Set Thrust Phase Angle, Pulse Width and Number of Pulses
(for Pulse Thrusting of Tangential Thrusters)– Set Thrust Start and Stop Times– Disable Thrusters
• Second Attitude Maneuver– Same as First Attitude Maneuver
• Shutdown– Configure Telemetry Filter Table for Normal Mode
– May Require Several Commands
THEMIS FDMO Review Pre-Launch Preparations Update − 27 October 5, 2004
Software Verification Plan
Tool Heritage Function Method of Verification
ITOS FAST, RHESSI Real-time Telemetry Acquisition Data Flow Tests from Ground Stations and TDRSS
Post-pass Telemetry Playback Testing During I&T
Telemetry Decoding Testing During I&T
Limit Checking Testing During I&T
Real-time Command Transmission
Data Flow Tests to Ground Stations and TDRSS
Real-time Commanding Testing During I&T
Table Load Uplink Testing During I&T
MPS FAST, RHESSI ATS Load Generation Testing at MOC, Testing on FlatSat, Using THEMIS Products
Generation of Integrated Prints Testing at MOC, Using THEMIS Products
BEARS None Limit Violation Checking FlatSat Data, FAST/RHESSI Data
Persistent Paging Two-Way Alpha Numeric Pagers
Anomaly Reports, Web Access Test Using FAST/RHESSI Data,Test During I&T
BTAPS None Data Ingest to Databases Test Using RHESSI Data, I&T
Plot Creation Test Using RHESSI Data, I&T
Web Access Test Using RHESSI Data, I&T
THEMIS FDMO Review Pre-Launch Preparations Update − 28 October 5, 2004
Anomaly Tracking System
TeamTrack• Provided by TeamShare• Used by Hammers to Track ITOS Bugs• May Be Linked to Microsoft Access Database Used by Swales
to Track Spacecraft Problems• Option for Status and Anomaly Tracking at Berkeley MOC
– UCB Team Already Has Two Accounts
THEMIS FDMO Review Pre-Launch Preparations Update − 29 October 5, 2004
Pre-launch Operations
Pre-launch Operations• Procedure Testing and Validation
– Launch & Early Orbit, Normal Operations and Contingencies• End-to-End Data Flow Tests with All Ground System Elements
– Ground Stations, TDRSS, FlatSat and Flight Dynamics to MOC• Launch and Mission Simulations with Green Card Exercises
– Practice of Contingency Detection and Recovery• Dress Rehearsals
– Multiple Cycles of Launch Readiness Testing
FOT Training• Participation as Test Conductors in Mission I&T• Extensive Flight Simulator Training• Training on Usage of Various Software Tools• Classroom Sessions Given by Subsystems Engineers• Team Member Certification
THEMIS FDMO Review Pre-Launch Preparations Update − 30 October 5, 2004
Ground System Testing
Remote Access to I&T Facilities• Passive Remote Monitoring• Active Remote Operation• Procedure Development and Verification• Simulations• End-to-end Data Flow Testing
THEMIS FDMO Review Pre-Launch Preparations Update − 31 October 5, 2004
End-to-End Data Flows
SwalesI&T Facility
Berkeley Mission Operations Center
White SandsComplex(WDISC)
Compatibility Test Van
GSFC NMC
Wallops Ground Station
Different Routes for End-to-End Data Flows Between Probes and GDS Elements
BerkeleyGround Station
THEMISProbe
SecureIntranet
TDRS
Secure VPN Tunnel Via Open Internet
ClosedIONet
Restricted IONet
Hartebeesthoek Ground Station
Dial-up ISDN Line
Santiago Ground Station
Merritt IslandGround Station
THEMIS FDMO Review Pre-Launch Preparations Update − 32 October 5, 2004
FlatSat Environment
FlatSat• Swales Building Mission Simulator (FlatSat)
– ColdFire CPU– Communications Card– Power Card– Load/Dev PC– VirtualSat (Spacecraft Dynamics and IDPU)– ACS Sensors/Actuator
• Remote Access Available for SSL– Primarily After Swales Day Shift
• Used Extensively for Testing Flight Software and Operations• FlatSat Will Move to SSL After Completion of I&T
– Facilitate Launch and Contingency Simulations– Post-launch Testing of Flight Software Patches and New
Procedures– On-going FOT Proficiency Testing
THEMIS FDMO Review Pre-Launch Preparations Update − 33 October 5, 2004
FlatSat Environment
FlatSat
* COTS for A/D-D/A conversion and IDPU I/F
Ethernet
ITOSS/C Command and Telemetry
Realtime Control
ITOSS/C Command and Telemetry
Realtime Control
ACSActuator/Sensor I/O*
ACSActuator/Sensor I/O*
Hard-lineUp-Down link
Berkley Ground Data System
Connected ViaSecure InternetSerial I/F
Serial I/F Serial I/F
SpacecraftProcessorColdFire-5802
512KB E2PROM 512KB RAM
SpacecraftProcessorColdFire-5802
512KB E2PROM 512KB RAM
COMMCard
COMMCardPower
Card
PowerCard
Load/DevPCLoad/DevPC
Bus Avionics Unit (BAU)
VirtualSatPRO
(S/C DynamicsIDPU Simulation)
VirtualSatPRO
(S/C DynamicsIDPU Simulation)
1-Hz Pulse
Digital & Analog
Interfaces
THEMIS FDMO Review Pre-Launch Preparations Update − 34 October 5, 2004
Green Card Exercises
Examples of Green Card Exercises• Launch Related Anomalies
– No Separation from Probe Carrier– High Probability of Re-contact Due to Off-nominal Probe
Separation• Communications
– Negative Telemetry Acquisition Via Ground Station or TDRSS– Multiple Probes Radiating, Causing Interference at Ground
Station– Loss of TDRSS Contact– Command Uplink Carrier Down
• Command and Data Handling– Commands Not Verified
• State-of-health Limit Violations– Battery State-of-charge High or Low– Over-current or Under-voltage Conditions Detected– Temperature Sensors Indicate High or Low Limit Violation
THEMIS FDMO Review Pre-Launch Preparations Update − 35 October 5, 2004
Green Card Exercises – Cont.
Examples of Green Card Exercises - Continued• Processors, Memory and Flight Software
– BAU or IDPU Reset– SSR Full at Beginning of Contact
• Attitude Control System– Probe Attitude Off-nominal – Probe Spin Rate Out of Limits
• Reaction Control System– Only One Latch Valve Can Be Opened– Thruster Appears to Be Leaking– Pressure Transducer Fails
• Maneuver Execution– Maneuver Sequencing Not Executed On-board– Attitude Maneuver Halted by FDC Because of Detection of High
Angular Rates– Thruster Pulse Firing Sequence Indicates Incorrect Phase Angle– Real-time Doppler Data Deviate from Predicted Track
THEMIS FDMO Review Pre-Launch Preparations Update − 36 October 5, 2004
Green Card Exercises – Cont.
Examples of Green Card Exercises - Continued• Instrument Power-on
– Unsuccessful IDPU or Instrument Power-on– High-voltage Arcing in ESA or SST
• Boom Deploy– Unsuccessful Magnetometer Boom Deploy– Radial or Axial Boom Deploy Procedure Not Executed On-board– Radial Boom Deploys Partially Only
• Constellation Related Problems– Early Orbit Timeline Halted Because of Probe Anomaly– Probe Anomaly Requires Re-scheduling of Pass Sequence– FSW Bug Detected on One Probe with Potential to Occur on Other
Probes– Simultaneous Anomaly on Two Probes
• Space Environment– Major Solar Storm – Potentially Affecting All Probes
THEMIS FDMO Review Pre-Launch Preparations Update − 37 October 5, 2004
Green Card Exercises – Cont.
Examples of Green Card Exercises - Continued• Ground Systems
– Ground Station Down– Pass Missed Because of Network Outage– Command Workstation Failure During Contact
• Flight Dynamics– Misidentification of Probes After Separation– Critical Ground Station Does Not Deliver Doppler Tracking Data– Two-way Doppler Data from Ground Station Are Noisy– Orbit Determination Run Does Not Converge– Orbit Determination Shows Bias Due to Wrong Site Coordinates– Orbit Determination Yields Large Discrepancy Between Previous
and New State Vectors– Attitude Determination Provides Erroneous Results
• Staff Related Problems– ACS Engineer Missing During Maneuver Contact
THEMIS FDMO Review Pre-Launch Preparations Update − 38 October 5, 2004
Network Plan & IT Security
NASA Network Security Requirements Driven by NPG 2810.1, Security of Information Technology• GSFC IT Security Outlined in Document 290-004,
IONet Access Protection Policy and Requirements• Establishes IT Network Systems Security Measures and
Controls for Access to Critical NASA Resources
Documentation Requirements• Information Technology Security, Risk Management and
Contingency Plans
Closed IONet Security Compliance• Required for TDRSS Access• New Option Is Restricted IONet Between WDISC and MOC• Configuration Control by System Administrator• Network Certification and Scanning• Personnel Screening