thermax-b&hgroup corporatepresentation (version feb-2010 pdfversion
TRANSCRIPT
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 1/62
Thermax Limited
February 4, 2010
Corporate PresentationCorporate Presentation
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 2/62
Thermax Limited 2
Introduction toIntroduction to
Thermax LimitedThermax Limited
Sustainable Solutions in Energy and Environment Sustainable Solutions in Energy and Environment
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 3/62
Thermax Limited 3
Thermax VisionThermax VisionTo be a globally
respected,high-performanceorganization
offeringsustainable
solutions
in energy andenvironment.
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 4/62
Thermax Limited 4
ThermaxThermax – – FactFact--sheetsheet Founded in 1966
Leading engineering company in the areas of
energy and environment
Annual Group turnover: US$ 800 Million
Group manpower strength: 4,950
10 offices in India, 15 overseas
Customer base: 25,000+ across globe
Rated by Forbes as one of the “Best Under
1US$ Billion Companies in Asia”
National award - Most innovative product in
2006 and 2007
“Gold Award” from Greentech Foundation for
outstanding performance and achievement insafety management systems for the year 2008
“Golden Peacock Award” for occupationalhealth & safety for the year 2009
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 5/62
Thermax Limited 5
Global FootprintGlobal Footprint
Thermax operations are backedby a network of subsidiaries
and sales & service offices in16 countries around the world:
• India• Bangladesh
• Sri Lanka• China• Indonesia• Malaysia• Thailand
• Philippines• Kenya
• Saudi Arabia
• UAE
• Russia• Belgium• UK• USA• Brazil
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 6/62
Thermax Limited 6
Sustaining ValuesSustaining Values
• Integrity - always doing what is right andethical in all our personal and professional
dealings• Respect - no differentiation on the basis of
gender, caste, ideology or belief
• Fairness - be committed to all ourstakeholders; always do what is fair and just
• Excellence - put in our best to accomplisheverything with close attention to detail
• Commitment - delivering what we promiseand standing by our word
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 7/62
Thermax Limited 7
Brand AttributesBrand Attributes
• Transparent
• Trusted
• Customer focused
• Entrepreneurial
• Innovative
• Socially responsible
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 8/62
Thermax Limited 8
Thermax OrganizationThermax Organization
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 9/62
Thermax Limited 9
Our Core BusinessOur Core Business
Boilers & Heaters(30 – 3,200 tons/hr)
•Package boilers•Large capacityPower boilers
•Thermal oil / Water
heaters•Energy recoverysystems
Cooling & Heating
Cooling(10 - 3150 TR)•Steam fired chillers•Hot water fired chillers•Direct fired chillers
Heating(1 – 30 tons/hr)•Packaged shell and coil boilers
Power GenerationCaptive Power(upto 135 MW)
•Small power plants•Medium power plants•Large power plants
Chemicals & Water
Chemicals•Ion exchange resins•Cooling water chemicals•Fireside chemicals•Polyelectrolyte
Water and wastewater•Wastewater & Effluentwater treatment systems•Water recycling•Waste management
Air Pollution Control
•ESP (upto 800 MW)•Bag filters•Scrubbers•Dust collectors•Gas coolers
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 10/62
Thermax Limited 10
Single Window SolutionsSingle Window Solutions
RawRaw
MaterialMaterial
DesiredDesired
ProductsProducts
HeatingHeating CoolingCoolingPowerPower WaterWater ChemicalsChemicals
Hazardous Waste TreatmentHazardous Waste Treatment Waste Water TreatmentWaste Water Treatment Air Pollution ControlAir Pollution Control
UtilitiesUtilities
Waste ProductsWaste Products
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 11/62
Thermax Limited 11
Reliable Support for IndustryReliable Support for Industry
Our business-to-business solutionshelp a broad groupof 44 industries to
be energy-efficientand eco-friendly
Oil & Gas Steel Automobile
Food Cement Chemicals
Refineries &Petrochemical
Power
Generation
Textile
Hotels &Commercialcomplexes
Pharma
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 12/62
Thermax Limited 12
Technology Partnerships forTechnology Partnerships for
Power EquipmentPower Equipment
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 13/62
Thermax Limited 13
Providing Solutions toProviding Solutions to
Global MajorsGlobal MajorsThermax is the preferred partner for over 30 international EPC firms and
end users around the world
• Balcke Durr GmbH• Georgia Pacific
• Bechtel
• UHDE
• KPG• Jacobs H&G• Lurgi• Snamprogetti
• JGC
• MHI• Technip• Abener
• Black & Veatch• Kellog Brown
• Sumitomo
• Mitsubishi
• Hitachi• Kawasaki• Mitsui• Hyundai
• Daelim
• EIL• TCS• Toyo
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 14/62
Thermax Limited 14
Manufacturing ExcellenceManufacturing Excellence
Thermax hasthree world-class, state-of-
the-artmanufacturingfacilities in India
and China
New facility in
Jiaxing, China
Thermax facility,
in Pune, India
New facility inSavli, India
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 15/62
Thermax Limited 15
Quality Assured ManufacturingQuality Assured Manufacturing
Thermax manufactures tostringent international
standards and codes:• ISO 9001: 2000, ISO:14001and OSHAS 18000 certified
• Conforms to international
codes - ASME, BS, DIN, API,GOST, CE
• AQSEQ code for China; IBRcode for India
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 16/62
Thermax Limited 16
Quality Checks and CustomerQuality Checks and Customer
Inspections by ReputedInspections by ReputedAgenciesAgencies
• Lloyd’s Register (UK)
• TUV (Germany)• DNV (Denmark)
• Bureau Veritas (France)
• UDT (Poland)
• Societe Generale deSurveilance (Switzerland)
• ABS (USA)
• Intertek Testing Services
(USA)• OMIC (Japan)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 17/62
Thermax Limited 17
A Tradition of CustomerA Tradition of Customer
Focused R&DFocused R&D
• Customised R&D to
suit the variedrequirements ofcustomer applicationsin energy-environmentareas
• A new Research,Technology &Innovation Centre with
Centers of Excellenceto add value tocustomer support
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 18/62
Thermax Limited 18
Business Tempered by SocialBusiness Tempered by Social
ResponsibilityResponsibility
• Thermax sets aside 1% of itsprofits to support community
work
• In association with PuneMunicipal Corporation, Thermaxruns 2 schools for children fromunderprivileged backgrounds
• Thermax also supports schoolsrun by Akanksha, an NGO, forchildren from deprived sectionsof society
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 19/62
Thermax Limited 19
ThermaxThermax – – FinancialsFinancials
Financial Year 2008-09
(Sales Revenue)
Thermax : Rs. 3,164 Crore(US$ 690 Million)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 20/62
Thermax Limited 20
Boilers & Fired HeatersBoilers & Fired Heaters
Energy House
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 21/62
Thermax Limited 21
Boilers & Fired HeatersBoilers & Fired HeatersIndustry Segments Served
Refining
Petrochemical Power
Ferrous metals
Non-ferrous metals
Cement
Sugar
Distillery
Chemical Fertiliser
Pulp & Paper
Textile
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 22/62
Thermax Limited 22
Technology BaseTechnology BaseBoilers Offered under TechnicalCollaboration with Babcock &Wilcox, USA
HRSG
Utility boiler upto 800 MW
Packaged boiler (FM/HCFM/PFM)
Single-drum site-erected “Radiant” boiler
Circulating fluidised bed boiler
Atmospheric fluidised bed boiler
Boilers Offered with In-houseTechnology
Waste heat recovery boiler
Waste gas fired boiler
Travelling grate boiler
Bi-drum solid fuel-fired boiler
Spentwash boiler
MSW/RDF fired boiler
Solar Steam Generator
Fired heaters (API type)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 23/62
Thermax Limited 23
Offerings forOfferings for
Refinery SegmentRefinery SegmentThermax Offerings Inside Battery Limit• In Hydrogen Plant -
• Reformed Gas Boilers / Process
Gas Boilers. , Flue Gas Boilers.DHDS Heaters etc.
• In SRU Plant -• Claus Boiler & Incinerator WHRB in
SRU.• In FCCU Plant -
• Flue gas cooler on down stream ofFCCU• FCCU Charge Heater
• In Catalytic Crackers -• Out Board steam Generators in
Coker.• CDU / VDU Plants
• Fired Heaters• Coker Unit
• Fired Heaters
Thermax Offerings Outside Battery Limit
• FM/HCFM/PFM
• RB - Radiant Boilers
• SPB -Sterling Power Boiler
• HRSG - Heat Recovery SteamGenerators
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 24/62
Thermax Limited 24
Bi-drum packaged/site erected
boilers available in the following
range:
• Capacity range: 30TPH to 360TPH
• Pressure: 10 to 110 Kg/cm2g
• Temperature: Saturated to 560°C
• Efficiency: 93% on NCV
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: At Port/At site
• Fuels: #2oil, #6 oil, Heavy fuel oil,
Residue oil, HSD, Naphtha, Naturalgas, Blast furnace gas, Hydrogen
Gas, Bio Gas, Waste gases
Galaxy Project(FZCO for Burrup Fertilisers
Pty. Ltd, Australia)1 x 150 TPH, 46 Kg/cm2(g), 388+5°C,
Natural Gas Fired HCFM Boiler
FM / HCFM / PFM Packaged BoilerFM / HCFM / PFM Packaged Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 25/62
Thermax Limited 25
4 x 275 TPH Aux. Boilers at4 x 275 TPH Aux. Boilers at
Reliance Industries LimitedReliance Industries Limited
((JamnagarJamnagar, Gujarat), Gujarat)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 26/62
Thermax Limited 26
2 x 146 TPH Natural Gas Boilers at2 x 146 TPH Natural Gas Boilers at
PDHPDH AlfaselAlfasel (Through(Through LurgiLurgi, Germany), Germany)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 27/62
Thermax Limited 27
SABIC A/c Petrokemya, Saudi Arabia
2 x 150 TPH, 110 kg/cm2g,520°C Natural Gas / Wash o il / Pyrolsis Oil / Ethene
Gas / Reference Gas / Benzene off gas fired HCFM boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 28/62
Thermax Limited 28
Single drum boilers with/without
Supplementary Firing used on Gas
Turbine exhaust gases, available inthe following range:
• Capacity range: Gas turbine size
5MW to 320 MW
• Pressure: 10 to 150 Kg/cm2g
• Temperature: Saturated to 567°C
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: Supplied in assembled
modules for site assembly• Supplementary Fuels: #2oil, HSD,
Naphtha, Natural gas
Aban Power Limited,
Tamilnadu- 1 X 168 TPH, 110Kg/Cm2g, 542°c Frame 6 FA +Supplementary Firing HRSG(Year Of Order -2003)
Heat Recovery Steam GeneratorHeat Recovery Steam Generator
(HRSG)(HRSG)
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 29/62
Thermax Limited 29
Bi-drum/ Single drum
packaged/site erected boilers
available in the following range:
• Capacity: 10 TPH to 300 TPH
• Pressure: 10 to 100 Kg/cm2g
• Temperature: Saturated to 560°C
• Efficiency: 89% on NCV
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: At site
• Fuels: Blast furnace gas, Coke oven
gas, Corex gas
JSW Steel Ltd, Bellary, India, 1 x
200 TPH, 94 Kg/cm2(g), 540°C,BFG and corex fired Boiler
BFGBFG--Fired BoilerFired Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 30/62
Thermax Limited 30
Single drum Radiant Site-erected boilers
available in the following range:
• Capacity range: 60 TPH to 500 TPH
• Pressure: 60 to 160 Kg/cm2g
• Temperature: upto 560°C
• Efficiency: 93% on NCV
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: Supplied in assembled
modules for site assembly
• Fuel: #2oil, #6 oil, Heavy fuel oil, Residue
oil, HSD, Naphtha, Natural gas, Blast
furnace gas, Hydrogen Gas, Bio Gas,
Waste gases, Pulverised Coal
Reliance Industries Ltd,Jamnagar, 2 X 125 TPH, 115
Kg/Cm2(g), 510°C, Oil FiredRadiant Boiler (year Of Order -
2003)
Radiant BoilerRadiant Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 31/62
Thermax Limited 31
Sterling Power Boiler available in the
following range:
• Capacity range: 50 TPH to 500 TPH
• Pressure: Upto 100 Kg/cm2g• Temperature: Upto 560°C
• Efficiency: 91% on NCV
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: Supplied in assembled
modules for site assembly
• Fuel: Pulverised Coal, #2oil, #6 oil,
Heavy fuel oil, Residue oil, HSD,
Naphtha, Natural gas, Blast furnace
gas, Hydrogen Gas, Bio Gas, Waste
gases,
Sterling Power BoilerSterling Power Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 32/62
Thermax Limited 32
Single drum/Bi drum Site erected boilers
available in the following range:• Capacity range: 30 TPH to 300 TPH
• Pressure: 10 to 140 Kg/cm2g
• Temperature: Saturated to 560°C
• Efficiency: 89% on NCV• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
• Assembly: At site
• Fuel: Coal, Petcoke, Lignite, Rice Husk,Pith, Agricultural waste, Biomass
Atmospheric Fluid Bed Boilers
Nav Bharat Ferro Alloys, Polancha, AP
1 X 110 TPH, 93 kg/cm2(g), 530°CIndian Coal fired AFBC boiler
AtmosphericAtmospheric FluidisedFluidised Bed CombustionBed Combustion
(AFBC) Boiler(AFBC) Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 33/62
Thermax Limited 33
CFBC boilers available in the
following range:
• Capacity range: 70 TPH to 680
TPH
• Pressure: 60 to 140 Kg/cm2g
• Temperature: Saturated to 560°C
• Efficiency: 91% on NCV• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
Assembly: At site
• Fuel: Coal, Lignite, Petroleum
Coke, Sludge, Oil pitches,
Biomass
Circulating Fluid Bed Boilers
BILT Ltd., Chandrapur, 1 X 160 TPH,
65 Kg/Cm2(g), 495°C Coal Fired Boiler
CirculatingCirculating FluidisedFluidised Bed CombustionBed Combustion
(CFBC) Boiler(CFBC) Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 34/62
Thermax Limited 34
Single drum/Bi drum Site erected boilers
available in the following range:
• Capacity range: 30 TPH to 300 TPH
• Pressure: 10 to 140 Kg/cm2g
• Temperature: Saturated to 560°C
• Efficiency: 80% on NCV
• Design codes:
ASME/ISO/IBR/AGA/GOST/PED
Assembly: At site
• Fuel: Coal, Lignite, Bagasse, Rice Husk,
Biomass• Grates: Travelling, Dumping, Pinhole
Bannari Amman Sugars Ltd,Nanjangud
1 X 120 TPH, 67 KG/CM2G, 485°C,
Bagasse/ Biomass fired TG boiler
GrateGrate--Fired BoilerFired Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 35/62
Thermax Limited 35
DhampurDhampur Sugar Ltd., Uttar PradeshSugar Ltd., Uttar Pradesh
2 X 170 TPH, 105 ata, 540°C, Rice Husk & Coal fired Travelling Grate Boiler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 36/62
Thermax Limited 36
Exhaust Gas Boiler downstream of
• Diesel Gen-set
• Gas Turbine• Furnace and Kiln
• Incinerator
Capacity ranges: 0.5 TPH to 20 TPH
Pressure: Upto 35 Bar
Temperature: Upto 3000C
(Offered in smoke tube as well as
water tube design)
Karpagambal Mills, Tamil Nadu 1.5 TPH, 10.5Kg/Cm2g, Sat. Temp.
Exhaust Gas BoilerExhaust Gas Boiler
W t H t R B il /Waste Heat Recovery Boiler /
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 37/62
Thermax Limited 37
• WHRB in Sponge IronPlant After Abc
• Coke Oven Whrb
• WHRB - Non Ferrous• Incinerator WHRB
• Out Board SteamGenerators
• WHR Boiler in CementPlant (Preheater, Calciner& Clinker Cooler
• Reformed Gas Boiler & FlueGas Boiler In Hydrogen Plant
• WHR Boiler Downstream OfFCCU
• Claus Boiler & IncineratorWHR Boiler In SRU
• Process Integrated Boiler inSulphuric Acid Plant
• Process Integrated Boiler inCaprolactum Plant
WHRB/PIB offered for following applications
(Steam Generation upto 200 TPH, Pressure upto 160Kg/Cm2 &Superheated Temperature upto 540 Deg C )
Waste Heat Recovery Boiler /Waste Heat Recovery Boiler /
Process Integrated BoilerProcess Integrated Boiler
Waste Heat Recovery Boiler /Waste Heat Recovery Boiler /
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 38/62
Thermax Limited 38
Metals Sector – Waste Heat Recovery Boiler in Sponge Iron Plant (650 TPD)
– Waste Heat Recovery Boiler in Coke Oven/Coke Dry Quenching Plantupto 75 TPH
– Waste Heat Recovery Boiler in Non-Ferrous Industry upto 100 TPH
Cement Sector – Waste Heat Recovery Boiler in Cement Plant (upto 10,000 TPD of
clinker production)
Refinery Sector – Waste Heat Recovery Boiler in Refinery & Petrochemical Plant upto 200
TPH
– Waste Heat Recovery Boiler in Hydrogen Plant
– Waste Heat Recovery Boiler in Sulphur Recovery Plant
Others – Exhaust Gas Boiler installed on gensets upto 50 MW
– Waste Heat Recovery Boiler in Chemical Plant (4500 TPD Sulfuric Acid
production)
Waste Heat Recovery Boiler /Waste Heat Recovery Boiler /
Process Integrated BoilerProcess Integrated Boiler
Flue Gas CoolerFlue Gas Cooler
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 39/62
Thermax Limited 39
Flue Gas CoolerFlue Gas Cooler
((Foster Wheeler Energy A/cFoster Wheeler Energy A/c SamrefSamref, Saudi Arabia), Saudi Arabia)
1 X 140 TPH, 43.9 ata, 399°C WHRB in Refinery Indus try at FCCU Plant
W t H t R B il t C t Pl tWaste Heat Recovery Boiler at Cement Plant
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 40/62
Thermax Limited 40
Waste Heat Recovery Boiler at Cement PlantWaste Heat Recovery Boiler at Cement Plant --
J K Cement (J K Cement (NimbaheraNimbahera , Rajasthan), Rajasthan)
5 x 72 TPH( Total Steam Generation), 17 kg/cm2g, 325 Deg.C WHRB
HooghlyHooghly MetcokeMetcoke & Iron Ltd& Iron Ltd
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 41/62
Thermax Limited 4112 x 24.5 TPH, 96 kg/cm2g, 540 Deg.C WHRB
HooghlyHooghly MetcokeMetcoke & Iron Ltd. ,& Iron Ltd. ,
HaldiaHaldia, West Bengal, West Bengal
Fi d HFi d H t
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 42/62
Thermax Limited 42
Type of Heaters
• Liquid Phase
• Vapor Phase
Industry Segment
• Process Industry
• Crackers
• Upstream anddownstream segments inOil & Gas Indusry
Fired HeaterFired Heater
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 43/62
Thermax Limited 43
1 x 25.08 MMKcal/hr Cabin
(single cell horizontal tubes) Vacuum Heater
BPCL Kochi Refinery, Kerala
Fi d H t (API T )Fi d H t (API T )
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 44/62
Thermax Limited 44
Fired Heaters (API Type)Fired Heaters (API Type)Type of Heater Capacity Range
1 Dowtherm
Vaporisers
2MMKcal/Hr to
25MMKcal/Hr
2 Hot Oil Units (All type
of Mineral Oils /
Synthetic Oil /Moltensalt Heater)
0.5MMKcal/Hr to
100MMKcal/Hr
3 Crackers ( e.g.
Ethelene Di Chloride
in PVC Plant, Acetic
Acid)
2MMKcal/Hr to
30MMKcal/Hr
4 Start Up Heaters 2MMKcal/Hr to
25MMKcal/Hr
5 Fluid Cataalytic
Cracking Unit
(FCCU)
10MMKcal/Hr to
100MMKcal/Hr
6 Diesel Hyddro
Desulfurisation
Section (DHDS)
10MMKcal/Hr to
100MMKcal/Hr
7 Water Glycol Heater 5MMKcal/Hr to
40MMKcal/Hr
8 Hot Oil / Water
Glycol Heat
Recovery Coil
1MMKcal/Hr to
40MMKcal/Hr
R ti & M d i tiR ti & M d i ti
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 45/62
Thermax Limited 45
• Condition Assessment & RemainingLife Analysis and EngineeringStudies of Steam Generators
• Fuel Conversions and Firing Systemupgrades
• Performance EnhancementSolutions
• Pressure Part Replacement &Upgrades
• Utility Boiler Revamps
Renovation & ModernizationRenovation & Modernization
Innovation Track RecordInnovation Track Record
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 46/62
Thermax Limited 46
• Spent-wash / spent-grain fired boiler for distilleries
–Helps dispose effluent discharge of distilleries in safe and
environmentally sound way; customer gets process steam and
electric power as a bonus!
• MSW fired boiler for urban bodies/municipalities
–Better alternative to present practice of making landfills from
garbage collected by municipal bodies all over the country;
electricity generated in the process is like icing on cake
• Waste heat recovery boiler for cement plants
–Helps cement plants meet 30-40% of their electricity requirement
from their own process by tapping low-grade waste gases being
emitted in process
Innovation Track RecordInnovation Track Record
(Last Two Years)(Last Two Years)
23 4 TPH23 4 TPH S t hSpentwash B il tBoiler at
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 47/62
Thermax Limited 47
23.4 TPH23.4 TPH SpentwashSpentwash Boiler atBoiler at
BannariBannari AmmanAmman
Engineering FacilitiesEngineering Facilities
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 48/62
Thermax Limited 48
CAD Facility• B&W’s computer programs for:• Boiler thermal performance• Circulation Analysis• Membrane wall temperature/stress distribution• Buckstay design• Furnace exit gas temperature prediction.
• Computerized design packages :• Piping stress analysis- CEASAR II 4.5• Structural analysis- STAAD PRO 2008• Gas flow modelling- CFX 5.7.1• Stack, staircase, venturi- INTERNAL• Structural/Thermal Analysis-ANSYS 9• P&ID Diagrams- Smart Plant P&ID
• Logic diagrams- Logsim• 3D modelling software- Proe wild fire 2• Steel -3D modeling & detailing- Tekla structure (X
Steel)10.2• 3D and 2D modeling & detailing- Solidworks 2005• Thermal Performance & Circulation for waste heat
recovery – KED• Thermal Performance of Fired Heater – FNC (HTRI)
• More than 70 B&W engineering manuals containing
engineering know-how
• Engineers trained at B&W
Engineering FacilitiesEngineering Facilities
Resources:
• Inhouse manhours capability of
300,000 per annum• Outsourcing manhours available
are 300,000 per annum
Manufacturing CapabilityManufacturing Capability
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 49/62
Thermax Limited 49
• Projection welding machine- fin to tube resistance welding
• Tube to tube plate saw weldingmachine
• Flange butt welding machine
- tube to tube resistance butt welding
• Stud welding machine
• In-house physical, chemical & non-destructive testing facilities.
• In-house/home welding trainingschool.
• In-house manufacturing of steamdrums, fire tube boilers, headers,membrane walls, pressure vessels,
tube bending & all types,economisers, superheaters
• CNC - Coordinate drilling/ Millingmachines horizontal boring with multi
spindle drilling head.
Manufacturing CapabilityManufacturing Capability
Existing Manufacturing FacilitiesExisting Manufacturing Facilities
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 50/62
Thermax Limited 50
•Thermax plant at Chinchwad isaccredited by the ASME with S, U, & Rstamp
• Total covered area of 31,000 sq. mtrs
•Total production capacity of 1.35 millionmanhours per annum + 800,000manhours for outsourcing of pressureparts
Existing Manufacturing FacilitiesExisting Manufacturing Facilities
•Thermax plant at Savli is accredited bythe ASME with S, U, & R stamp
•Total plot size: 100 acres
•Total covered area of 38,000 sq. mtrs
•Total production capacity of 1 millionmanhours per annum
Assembly Facility atAssembly Facility at MundraMundra PortPort
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 51/62
Thermax Limited 51
Assembly yard 6 Kms from Mundra Port, Kutch region of
Gujarat
• Total area: 13,652 sq mtr
• Factory & office: 1,285 sq mtr
• Storage & Warehousing: 11,715 sq. mtr
Equipment:Air compressor( screw)- 200 cfm – 1 no.DG set - 250 KVA – 1 no.Pan-Refractory Mixer – 1 no.Hydraulic crane- 14 tons – 1 no.Hydro test pump-350 – 1 no.
Tube Expanding Machine – 6 nos.Welding rectifier-Memco make – 6 nos.Scissors Lift – 1 no.Container – 1 no.Hydraulic Jack-100 tons – 2 nos.Scaffolding pipes – 1 lotMiscellaneous items – 1 lot
• No. of workers: ~ 100• No. of qualified welders: ~ 15• Production capacity: 5 assemblies at a time
Assembly Facility atAssembly Facility at MundraMundra PortPort
Largest Steam Drum Rolling Machine in IndiaLargest Steam Drum Rolling Machine in India
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 52/62
Thermax Limited 52
– – Installed at ThermaxInstalled at Thermax’’s New 100s New 100--AcreAcre
Manufacturing Facility atManufacturing Facility at SavliSavli, Baroda (Gujarat), Baroda (Gujarat)
Recent Major OrdersRecent Major OrdersRecent Major Orders
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 53/62
Thermax Limited 53
• Meenakshi Energy – 2 x 495 TPH (2 x 150 MW) CFBC boilers with
reheat at 139 kg/cm2 (g) pressure and 540 deg cel. temperature
• Jaiprakash Associates – 4 x 250 TPH (4 x 60 MW) CFBC boilers with
109 kg/cm2 pressure and 540 deg. Cel. temperature
• Lanco Infratech Ltd. - 3 pressure level + reheat unfired HRSG on GE
Frame 9FA gas turbine for CCGT power project in Andhra Pradesh
• Orascom Industries, Egypt – 1 x 175 TPH single drum site erected oil
fired “ Radiant” boiler at 114 kg/cm2 (g) pressure and 510 deg. Celsius
temperature
• Jacobs Netherlands BV (Schoonebeek Oilfield Redevelopment Project,
Netherlands) – 1 x 408 TPH, 83 kg/cm2 (g), 310±5 Deg.C
supplementary fired HRSG with fresh air firing application behind GE
Frame 9E gas turbine
Recent Major OrdersRecent Major OrdersRecent Major Orders
Manufacturing Accreditation with Chinese AuthoritiesManufacturing Accreditation with Chinese Authorities
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 54/62
Thermax Limited 54
Manufacturing Accreditation with Chinese AuthoritiesManufacturing Accreditation with Chinese Authorities
OHSAS 18001OHSAS 18001
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 55/62
Thermax Limited 55
OHSAS 18001OHSAS 18001
ISO 9001ISO 9001
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 56/62
Thermax Limited 56
ISO 9001ISO 9001
DNV: Pressure VesselsDNV: Pressure Vessels
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 57/62
Thermax Limited 57
DNV: Pressure VesselsDNV: Pressure Vessels
ASMEASME ‘‘SS’’ && ‘‘UU’’ StampsStamps –– ChinchwadChinchwad WorksWorks
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 58/62
Thermax Limited 58
ASMEASME SS && UU StampsStamps – ChinchwadChinchwad WorksWorks
ASMEASME ‘‘SS’’ && ‘‘UU’’ StampsStamps
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 59/62
Thermax Limited 59
– – SavliSavli WorksWorks
Experience with EPC ContractorsExperience with EPC Contractors
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 60/62
Thermax Limited 60
Japanese EPC Contractors:
• NKK, Mitsui Engineering & Shipbuilding Co, Sumitomo Chemical Engineering
Co, Mitsubishi Heavy Industries, Toyo Engineering Co,
JGC Corporation, Toshiba Plant Kensetsu
Korean EPC Contractors:
• Samsung Engg., Hyundai Engineering Co,. Daelim Engineering Co,
European EPC Contractors:
• Snamprogetti, Krebbs, Bechtel, Technip-Coflexip, Tessag- Edeleanu, Tuma
Turbomach, Lurgi, KvaernerAmerican EPC Contractors:
• Ebasco, Black & Veatch, KBR, Bechtel
Canadian EPC Contractors:
• SNC LavalinThailand EPC Contractors:• Toyo-Thai Corporation LtdIndian Contractors:
• Larsen & Toubro Ltd, BSES
Experience with EPC ContractorsExperience with EPC Contractors
AfterAfter--Sales ServiceSales Service
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 61/62
Thermax Limited 61
Services on call:
• Prompt response to any customer call/complaint and deputation of engineer as
required
Preventive / Predictive Service:
• Annual Service Contract package comprising of site visits for performance
monitoring & optimization, annual shutdown and emergencies
Condition Assessment & Remaining Life -Analysis Studies-
• Review & survey using special testing equipment & patented methods
• In-situ examination & analysis of pressure parts for present condition & remaining
life
• In accordance with Central Boiler Board IBR regulation 391A
Boiler Performance Optimization:
• Studies & engineering solutions to bring back the unit to optimum performance• Fuel conversions, capacity enhancement and technology upgrades
Test facilities-
• In-house test facilities encompass proven NDT & metallurgical testing
AfterAfter Sales ServiceSales Service
8/19/2019 Thermax-B&HGroup CorporatePresentation (Version FEB-2010 PDFVersion
http://slidepdf.com/reader/full/thermax-bhgroup-corporatepresentation-version-feb-2010-pdfversion 62/62
Thermax Limited 62
Thank Youwww.thermaxindia.com
For more information, please e-mail us at:[email protected]
or write to us at:D-2 Block, Plot No. 38 & 39, M.I.D.C.,Chinchwad, Pune 411 019