PROJECT ABSTRACT California is currently experiencing an extreme weather condition, a drought. Despite being surrounded by an ocean, this drought is causing a water crisis in both urban and suburban areas of the Bay Area. San Francisco has a large prosperous population of 758,000, which is demands 44 million gallons of water for daily use. Developing a new water re- source is becoming an urgent issue for people’s survival. However, the environmental conditions of the San Francisco Bay provide a rich resource which has not been tapped yet into new water system for San Francisco. “The Swell” provides a way to combine desalination facility with California style as an artificial landscape in San Francisco. In the middle of 19th cen- tury to early 20th century, a California lifestyle is a dream for many people 06_ Thesis Project_ THE SWELL: An artificial wave park with desalination facility INFORMATION Location_ Pier #76, San Francisco, CA 94107, USA Site Area_ 934,293 sq ft Project Size_ 533,269 gross sq ft Project Year_ 2016 Program_ Artificial wave pools, artificial park, desalination facility Structure_ Artificial wave pools—Concrete Artificial park—Concrete & Steel Desalination facility— Concrete & Steel ,and the “Golden State” is an ideal resort destination. The weather is sunny and dry in all year with easy access to the ocean and mountains. The image of Californians as: laid-back, healthy beach-goers holds some truth. This thesis project proposes both a “Surfing Park” and a desalination facility. This new hybrid architecture encourages people to generate the fresh water through surfing. The Surfing Park is a combination of three parts: a surfing pool, an artificial landscape, and a desalination system. The water comes from the bay into the surfing pool, and the pool water goes through to the desalination process within the artificial landscape. The fresh water becomes a water resource for the irrigation of landscapes, human use, and public green spaces within an artificial landscape (park) at Pier #76 in San Francisco. PROJECT 6 PAGE 160 COURSE Thesis Project TITLE The Swell: An artificial wave park with desalination facility PAGE 161

Upload: messer-yang

Post on 16-Jan-2017

25 views

Category:

Documents


1 download

TRANSCRIPT

  • PROJECT ABSTRACT

    California is currently experiencing an extreme weather condition, a

    drought. Despite being surrounded by an ocean, this drought is causing

    a water crisis in both urban and suburban areas of the Bay Area. San

    Francisco has a large prosperous population of 758,000, which is demands

    44 million gallons of water for daily use. Developing a new water re-

    source is becoming an urgent issue for peoples survival. However, the

    environmental conditions of the San Francisco Bay provide a rich resource

    which has not been tapped yet into new water system for San Francisco.

    The Swell provides a way to combine desalination facility with California

    style as an artificial landscape in San Francisco. In the middle of 19th cen-

    tury to early 20th century, a California lifestyle is a dream for many people

    06_

    Thesis Project_

    THE SWELL:An artificial wave park withdesalination facility

    INFORMATION

    Location_

    Pier #76, San Francisco,

    CA 94107, USA

    Site Area_

    934,293 sq ft

    Project Size_

    533,269 gross sq ft

    Project Year_

    2016

    Program_

    Artificial wave pools, artificial

    park, desalination facility

    Structure_

    Artificial wave poolsConcrete

    Artificial parkConcrete & Steel

    Desalination facility

    Concrete & Steel

    ,and

    the Golden State is an ideal resort destination. The

    weather is sunny and dry in all year with easy access

    to the ocean and mountains. The image of Californians

    as: laid-back, healthy beach-goers holds some truth.

    This thesis project proposes both a Surfing Park and

    a desalination facility. This new hybrid architecture

    encourages people to generate the fresh water

    through surfing.

    The Surfing Park is a combination of three parts: a

    surfing pool, an artificial landscape, and a desalination

    system. The water comes from the bay into the

    surfing pool, and the pool water goes through to the

    desalination process within the artificial landscape.

    The fresh water becomes a water resource for the

    irrigation of landscapes, human use, and public

    green spaces within an artificial landscape (park)

    at Pier #76 in San Francisco.

    PROJECT 6

    PAGE 1 60

    COURSE Thesis Project TITLE The Swell: An artificial wave park with desalination facility

    PAGE 1 6 1

  • RESEARCH

    The Ongoing California Water Crisis &

    An Extensive Water System

    Abnormal Drought

    Modernate Drought

    Severe Drought

    Extreme Drought

    Exceptional Drought

    In-stream / River

    Canal / Pipeline

    Bay Area Water System

    PROJECT 6

    PAGE 1 62

    COURSE Thesis Project

    PAGE 1 63

    TITLE The Swell: An artificial wave park with desalination facility

  • San Francisco Water

    Distribution System

    SAN FRANCISCO BAY

    SAN FRANCISCO BAY

    PACIFIC OCEAN

    THE PRESIDIO

    GOLDEN GATE PARK

    PACIFIC OCEAN

    SUTRORESERVOIR

    SUNSETRESERVOIR

    MERCED MANOR RESERVOIR

    CITY AND COUNTY OF SAN FRANCISCO

    SAN MATEO COUNTY

    SAN MATEO COUNTY

    LAKE MERCED

    UNIVERSITY MOUNDRESERVOIR

    SAN FRANCISCO BAY

    SAN FRANCISCO BAY

    PACIFIC OCEAN

    THE PRESIDIO

    GOLDEN GATE PARK

    PACIFIC OCEAN

    SUTRORESERVOIR

    SUNSETRESERVOIR

    MERCED MANOR RESERVOIR

    CITY AND COUNTY OF SAN FRANCISCO

    SAN MATEO COUNTY

    SAN MATEO COUNTY

    LAKE MERCED

    UNIVERSITY MOUNDRESERVOIR

    PROJECT 6

    PAGE 1 64

    COURSE Thesis Project

    PAGE 1 65

    TITLE The Swell: An artificial wave park with desalination facility

  • The Bay Area has 7.5 million people, and San Francisco has 852,469 people

    in the city. The Swell provides three functions in the site, desalination

    facility, park, surfing pool. The desalination facility provides technology

    and education functions for laboratory technician and students. The

    park provides public events and leisure activities for citizens, dog walkers,

    exercisers. The surfing pool provides surfing for surfers and exercisers.

    USER GROUP

    Expenditure per visit (mean)

    Distance Traveled (one way, niles)

    LA County

    LA County

    Santa Cruz

    Orange County

    $70

    $53

    $35

    $18

    $0

    16

    12

    8

    4

    0

    SF Bay Area San Diego County

    LA County

    Santa Cruz

    Orange County

    Ventura

    Ventura

    SF Bay Area San Diego County

    SantaCruz

    Orange County

    SF Bay Area

    San DiegoCounty

    LA County Orange County

    SF Bay Area

    San DiegoCounty

    SantaCruz

    Expenditure per visit (mean)

    Distance Traveled (one way, niles)

    LA County

    LA County

    Santa Cruz

    Orange County

    $70

    $53

    $35

    $18

    $0

    16

    12

    8

    4

    0

    SF Bay Area San Diego County

    LA County

    Santa Cruz

    Orange County

    Ventura

    Ventura

    SF Bay Area San Diego County

    SantaCruz

    Orange County

    SF Bay Area

    San DiegoCounty

    LA County Orange County

    SF Bay Area

    San DiegoCounty

    SantaCruz

    SEX & AGE

    MALE

    FEMALE

    UNDER 5 YEARS

    5 TO 17 YEAR

    18 TO 64 YEARS

    65 YEARS AND ABOVE

    MEDIAN AGE

    432,202

    420,267

    37,509

    76,722

    622,275

    115,936

    38.6

    DEMOGRAPHIC INFORMATION, SAN FRANCISCO, CALIFORNIA(2016)

    50.7%

    49.3%

    4.4%

    9.0%

    73%

    13.6%Left_

    California Surfing:

    Cost Per Each Surf Outing

    (Per Person)

    PROJECT 6

    PAGE 1 66

    COURSE Thesis Project

    PAGE 1 67

    TITLE The Swell: An artificial wave park with desalination facility

  • SITE ANALYSIS

    TRANSP

    ORTA

    TION

    MAP

    SITE O

    PTIO

    NS

    SHARK ATTA

    CK

    SURFIN

    G SPOT

    MODERATE RISKS RIP CURRENTS

    LOW

    RISKS RIP CURRENTS

    BART

    MUNI METRO

    CALT

    RAIN

    MUNI

    MED

    IAN H

    OUSE

    HOLD

    Inco

    me Map

    FAMILY INCOME O

    VER $1250

    00

    FAMILY INCOME $10

    0001~$1250

    00

    FAMILY INCOME $75

    001~$10

    0000

    FAMILY INCOME $50

    000~$

    75000

    FAMILY INCOME U

    NDER $50

    000

    POPULA

    TION

    Family

    Map

    OVER 80% FAMILIES

    61%

    ~80% FAMILIES

    40%~6

    0% FAMILIES

    UNDER 40% FAMILIES

    OVER 60000 PEOPLE

    UNDER 20000 PEOPLE

    40001~60000 PEOPLE

    20000~4

    0000 PEOPLE

    POPULA

    TION

    Peo

    ple Per Square Mile

    PROJECT 6

    PAGE 1 68

    COURSE Thesis Project

    PAGE 1 69

    TITLE The Swell: An artificial wave park with desalination facility

  • 1000 ft

    N

    GROUND CIRCULATION

    MUNI RAIL

    HOSPITAL

    COMMERCIAL AND MIXED USE

    SCHOOL

    RESIDENTIAL USE

    INDUSTRIAL USE

    Pier 70 Proposed Plan

    Site (Potrero Generating Station)

    Ship Repair (Historic Use)

    Open Space

    Historic Core

    Infilled Development Sites

    The site was a natural gas and diesel burning

    electricity generating station. It was owned

    by Mirant Power Plant Company, and now

    is own by NRG Company. The power station

    was shut down in January, 2011.

    PROJECT 6

    PAGE 1 70

    COURSE Thesis Project

    PAGE 1 7 1

    TITLE The Swell: An artificial wave park with desalination facility

  • Sun PathSite

    PROJECT 6

    PAGE 1 72

    COURSE Thesis Project

    PAGE 1 73

    TITLE The Swell: An artificial wave park with desalination facility

  • CONCEPT DEVELOPMENT

    The Swell activates and transforms abandoned indus-

    trial land in San Franciscos Mission Bay district into

    an artificial landscape between the bay and the citys

    edge. This landscape includes a desalinated water

    system, which will distribute clean water to the city of

    San Francisco, a surf-themed water park, and a large

    urban park. By working with the natural assets of the

    site, this project responds to the current drought

    crisis in California by taking back land previously con-

    taminated by industrial use and returning it to the

    city through the limited impact on the environment.

    The drought in California has established the need for

    a new water supply in San Francisco, ideally one that

    doesnt rely on intensive and harmful interventions to

    the surrounding environment. Because of San Francis-

    cos proximity to the ocean, desalination, which uses

    reverseosmosis technology to separate the minerals in

    seawater and transform it into fresh water, is a possi-

    ble solution. The fresh water created by the plant in

    this project will be stored in two water tanks on the

    site. These water tanks will supply fresh water to the

    citizens of San Francisco.

    The prevailing image of the California lifestyle includes

    the Beach Boys, sun, and surfing, which is the most

    popular sport on the California shoreline. The Swell

    contributes to this lifestyle by including two surfing

    pools that connect the Dogpatch waterfront area to the

    city. The projects artificial wave machines are set in 2

    concrete piers, transforming the traditional function of

    the piers into entertainment.

    Besides, the park, which is the most important part of

    the landscape, connects the local communities to the

    waterfront area and the bay, while making the desali-

    nation facility and surfing pools part of the

    landscape. The pattern in the landscape follows the di-

    rectionality of the sites water systems. The horizontal

    lines represent the seawater on the site, and the verti-

    cal lines represent the direction the seawater takes as

    it goes through the desalination process to the public.

    The artificial water landscape has three types of line

    relationships to the site: convergent & divergent lines,

    vertical lines, and zigzag tangent lines. These lines,

    that reflect the urban and natural context of the site,

    provide a system of circulation. The main circulation

    paths for people and water use two actions from the

    water system: diverging and converging. Users coming

    from the city converge at the approach of the site.

    PROJECT 6

    PAGE 1 74

    COURSE Thesis Project

    PAGE 1 75

    TITLE The Swell: An artificial wave park with desalination facility

  • Then, the landscape makes these users diverge to the

    waterfront area for surfing, the park for wandering,

    the desalination area for education and work, and the

    waterfront for entertainment. For the water circula-

    tion, the surfing pools collect seawater from the canal

    at the pumping station. Then, the desalination facility

    converges the seawater, transforming it into fresh

    water and diverging to be used in the landscape and

    to supply the local communities.

    The Swell provides an artificial water landscape to

    connect the landscape park to the desalination

    facility and the surfing pools in the bay. It activates

    the heavy industrial land and returns it to public use,

    and creating a new waterfront area for the people of

    San Francisco. The Swell provides a geographic

    landscape, water supply, and sports activities for

    San Francisco.

    PROJECT 6

    PAGE 1 76

    COURSE Thesis Project

    PAGE 1 7 7

    TITLE The Swell: An artificial wave park with desalination facility

  • SURFING PARK PROGRAM STUDY

    PROJECT 6

    PAGE 1 78

    COURSE Thesis Project

    PAGE 1 79

    TITLE The Swell: An artificial wave park with desalination facility

  • PROJECT 6

    PAGE 1 80

    COURSE Thesis Project

    PAGE 1 8 1

    TITLE The Swell: An artificial wave park with desalination facility

  • CONCEPT WITH PROGRAM STUDY PROCESS

    PROJECT 6

    PAGE 1 8 2

    COURSE Thesis Project

    PAGE 1 8 3

    TITLE The Swell: An artificial wave park with desalination facility

  • PROJECT 6

    PAGE 1 8 4

    COURSE Thesis Project

    PAGE 1 8 5

    TITLE The Swell: An artificial wave park with desalination facility

  • PROJECT 6

    PAGE 1 8 6

    COURSE Thesis Project

    PAGE 1 8 7

    TITLE The Swell: An artificial wave park with desalination facility

  • CONCEPT WITH PROGRAM STUDY PROCESS

    From city to the waterfront

    DIVERGENT & CONVERGENT LINE

    ZIGZAG TANGENT LINE

    VERTICAL LINE

    Tangent line with existing

    building and context

    Direct to show the

    relationship between two

    existing building

    PROJECT 6

    PAGE 1 8 8

    COURSE Thesis Project

    PAGE 1 89

    TITLE The Swell: An artificial wave park with desalination facility

  • SPATIAL ANALYSIS

    PROJECT 6

    PAGE 1 90

    COURSE Thesis Project

    PAGE 1 9 1

    TITLE The Swell: An artificial wave park with desalination facility

  • 22ND ST

    WAVE #1

    10' H

    IGH RIP

    S

    WAVE #2

    10' H

    IGH RIP

    S

    WAVE #3

    7' HIG

    H RIPS

    WAVE #4

    7' HIG

    H RIPS

    WAVE #5

    5' HIG

    H RIPS

    WAVE #6

    5' HIG

    H RIPS

    WAVE

    #7 4

    ' HIGH

    RIPS

    WAVE

    #8 4

    ' HIGH

    RIPS

    WAVE

    #9 3

    ' HIGH

    RIPS

    WAVE

    #10

    3' HI

    GH RI

    PS

    MARSH SYSTEM CANAL

    TRAFFIC STOP

    BOAT LAUNCH

    MARSH SYSTEM

    WATE

    R CA

    NAL T

    O DE

    SALIN

    ATIO

    N

    23RD ST

    22ND ST

    HUMBOLDT ST

    ILLIN

    OIS

    ST

    24TH ST

    WAVE DE

    CAY ZO

    NE

    WAVE DE

    CAY ZO

    NE

    MARSH SYSTEM

    728'-2 5

    /8"

    248'-2"

    20'-0"

    217'-11

    "

    20'-0"

    222'-2"

    LENGTH

    OF WAV

    E #3

    LENGTH

    OF WAV

    E #2

    LENGTH

    OF WAV

    E #1

    WAVE M

    ACHINE

    PIER [ AL

    AMEDA W

    AVE CH

    ANNEL]

    0 100 150 FT

    381'-

    10 1/

    2"

    WAVE

    MAC

    HINE P

    IER [ O

    AKLA

    ND W

    AVE C

    HANN

    EL]

    163'-

    11 5/

    8"

    197'-

    10 7/

    8"

    WAVL

    ENGT

    H OF W

    AVE #

    10

    WAVL

    ENGT

    H OF W

    AVE #

    9

    218'-8"

    SKY BAR

    840'-

    6"

    WID

    TH

    OF

    SIT

    E

    200'-4"

    WATER TANK #1

    186'-3"

    WATER TANK #2

    195'-8 3/4"

    MARSH SYSTEM

    1062'-11 1/8"

    LENGTH OF SITE

    ELEVATION

    NOUTH

    ELEVATION

    EAST

    ELEVATION

    SOUTH

    S1

    S2

    S3

    S4

    UPS

    PIER

    OFFICES

    PIER

    OFFICES

    WAVE #1

    10' H

    IGH RIP

    S

    WAVE #2

    10' H

    IGH RIP

    S

    WAVE #3

    7' HIG

    H RIPS

    WAVE #4

    7' HIG

    H RIPS

    WAVE #5

    5' HIG

    H RIPS

    WAVE #6

    5' HIG

    H RIPS

    WAVE

    #7 4

    ' HIGH

    RIPS

    WAVE

    #8 4

    ' HIGH

    RIPS

    WAVE

    #9 3

    ' HIGH

    RIPS

    WAVE

    #10

    3' HI

    GH RI

    PS

    MARSH SYSTEM CANAL

    TRAFFIC STOP

    BOAT LAUNCH

    MARSH SYSTEM

    WATE

    R CA

    NAL T

    O DE

    SALIN

    ATIO

    N

    23RD ST

    22ND ST

    HUMBOLDT ST

    ILL

    INO

    IS S

    T

    24TH ST

    WAVE DE

    CAY ZO

    NE

    WAVE DE

    CAY ZO

    NE

    MARSH SYSTEM

    SEAWATER PUMP STATION

    SURFING SCHOOL

    SHOP & RENTAL

    PREPARATION BEACH

    WET ROOM

    WAVE PIER [ALAMEDA CHANNEL]

    WAVE PIER [OAKLAND CHANNEL]

    PREPARATION BEACH

    CLEAN ROOM

    218'-6"

    SKY BAR

    150'-8 1/8"

    SURFING SCHOOL

    ENTRANCE TO SKY BAR

    ENTRANCE TO SKY BAR

    ADMINISTRATION

    RESTROOM - FEMALE

    RESTROOM - MALE

    SHOWER &

    CHANGING ROOM

    SHOWER &

    CHANGING ROOM

    MEDICAL ROOM

    TICKET SELLS

    GENERAL OFFICE

    COACH OFFICE

    GYM

    SEAWATER PUMP STATION

    CUISINE PLAZA

    PIER BUILDING PLAZA

    PIER BUILDING PLAZA

    WATER TANK #1WATER TANK #2

    MEDIA AREA

    PRE-TREMENTREVERSE-OSMOSIS

    POST-CONDITIONING

    POST-CONDITIONING

    UPS

    PIER

    OFFICES

    PIER

    OFFICES

    0 100 150 FT

    Left_

    Site Plan

    Right_

    Ground

    Floor Plan

    SITE PLAN

    PROJECT 6

    PAGE 1 92

    COURSE Thesis Project

    PAGE 1 93

    TITLE The Swell: An artificial wave park with desalination facility

  • WAVE

    #8

    4' HIG

    H RIPS

    WAVE

    #10

    3' H

    IGH RI

    PS

    WATE

    R CA

    NAL T

    O DE

    SALIN

    ATIO

    N

    SEAWATER PUMP STATION

    SURFING SCHOOL

    SHOP & RENTAL

    PREPARATION BEACH

    WET ROOM

    WAVE PIER [ALAMEDA CHANNEL]

    WAVE PIER [OAKLAND CHANNEL]

    PREPARATION BEACH

    CLEAN ROOM

    218'-6"

    SKY BAR

    150'-8 1/8"

    SURFING SCHOOL

    ENTRANCE TO SKY BAR

    ENTRANCE TO SKY BAR

    ADMINISTRATION

    RESTROOM - FEMALE

    RESTROOM - MALE

    SHOWER &

    CHANGING ROOM

    SHOWER &

    CHANGING ROOM

    COACH OFFICE

    GYM

    SEAWATER PUMP STATION

    MEDIA AREA

    PRE-TREMENT

    0 30 50 FT

    WAVE

    #8

    4' HIG

    H RIPS

    WAVE

    #10

    3' H

    IGH RI

    PS

    WATE

    R CA

    NAL T

    O DE

    SALIN

    ATIO

    N

    0 30 50 FT

    WAVE

    #8

    4' HIG

    H RIPS

    WAVE

    #10

    3' H

    IGH RI

    PS

    WATE

    R CA

    NAL T

    O DE

    SALIN

    ATIO

    N

    0 30 50 FT

    Left_

    Sky Bar1st Floor Plan

    Right_

    Sky Bar2nd Floor Plan / 3rd Floor Plan

    PROJECT 6

    PAGE 1 94

    COURSE Thesis Project

    PAGE 1 95

    TITLE The Swell: An artificial wave park with desalination facility

  • 0 50 100 FT

    0 50 100 FT

    ELEVATIONS

    PROJECT 6

    PAGE 1 96

    COURSE Thesis Project

    PAGE 1 97

    TITLE The Swell: An artificial wave park with desalination facility

  • SECTIONS 0 50 100 FT

    MEDICAL ROOM

    0 50 100 FT

    0 50 100 FT

    0 50 100 FT

    PROJECT 6

    PAGE 1 98

    COURSE Thesis Project

    PAGE 1 99

    TITLE The Swell: An artificial wave park with desalination facility

  • ETAIL 1

    ETAIL 2

    ETAIL 3

    ETAIL 4

    Wall SectionSection

    PROJECT 6

    PAGE 200

    COURSE Thesis Project

    PAGE 201

    TITLE The Swell: An artificial wave park with desalination facility

  • 1 STEEL A LE

    ETAL STU ITH ON ETE

    LOO

    1 HS STEEL

    OU LE LASS LA IN

    ATE OO E ANE

    1 4 I E E ENT ANEL

    1 2 I E E ENT ANEL

    1 2 I E E ENT ANEL

    2 12 HS STEEL

    ETAL STU ITH ON ETE

    LOO

    OU LE LASS LA IN

    2 12 HS STEEL

    1 HS STEEL

    3 INSULATION

    2 ON ETE ANEL

    ATE OO E ANE

    1 4 I E E ENT ANEL

    STEEL AVE ENE ATO

    STEEL ONNE T I LAN E ITH

    1 OLTS

    STEEL OLU N

    STEEL EA ITH LAN E

    U E AIL SU O TS

    LO E AIL SU O TS

    EIN O E ON ETE O

    DETAILS

    WATERPROOF MEMBRANE REINFORCE

    CONCRETE DOCK

    UPPER RAIL &

    SUPPORTS

    LOWER RAIL &

    SUPPORTS

    STEEL BEAM

    WITH FLANGE

    STEEL COLUMN

    STEEL CONNECT

    RIM FLANGE

    WITH 10 BOLTS

    STEEL WAVE

    GENERATOR

    3 INSULATION

    2 CONCRETE PANEL

    20 X 12 RHS STEEL

    16 X 8 RHS STEEL

    1/4 FIBER CEMENT PANEL

    DOUBLE GLASS GLAZING

    5 METAL STUD WITH

    CONCRETE FLOOR

    20 X 12 RHS STEEL

    1/2 FIBER CEMENT PANEL

    1 STEEL CABLE

    WATERPROOF MEMBRANE

    1/4 FIBER CEMENT PANEL

    DOUBLE GLASS GLAZING

    16 X 8 RHS STEEL

    1/2 FIBER CEMENT PANEL

    5 METAL STUD WITH

    CONCRETE FLOOR

    PROJECT 6

    PAGE 202

    COURSE Thesis Project

    PAGE 203

    TITLE The Swell: An artificial wave park with desalination facility

  • EXTERIOR RENDERINGS

    PROJECT 6

    PAGE 204

    COURSE Thesis Project

    PAGE 205

    TITLE The Swell: An artificial wave park with desalination facility

  • PROJECT 6

    PAGE 206

    COURSE Thesis Project

    PAGE 207

    TITLE The Swell: An artificial wave park with desalination facility