third global project task force (gptf)...

107
Third Global Project Task Force (GPTF) Meeting Cape Town, South Africa 17-19 September 2012 Proceedings

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

Third Global Project Task Force (GPTF) Meeting

Cape Town, South Africa 17-19 September 2012

Proceedings

Page 2: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 2 -

List of Documents Agenda item 1 - Adoption of the agenda

GPTF/3/1 Secretariat Provisional and annotated agenda GPTF/3/1/1 Secretariat Detailed programme

GPTF/3/J/1 Secretariat Provisional list of participants GPTF/3/J/2 Secretariat Provisional list of documents

Agenda item 2 – GPTF terms of Reference and Rules of Procedure

GPTF/3/2 Secretariat GPTF Terms of Reference and Rules of Procedure

Agenda item 3 - Programme Coordination Unit (PCU) progress report

GPTF/3/3 Secretariat PCU progress report Agenda item 4 - Regional Coordinating Organization (RCO) Status Reports Agenda item 5 – Strategic Partners information papers on their involvement in

ballast water issues Agenda item 6 - Global Industry Alliance and IMO-EBRD Marine Biosafety Initiative

progress report

GPTF/3/6 Secretariat GIA and IMO-EBRD Marine Biosafety Initiative progress report

Agenda item 7 – Plan of Activities and Budget

GPTF/3/7 Secretariat Plan of Activities and budget

Agenda item 8 – Any Other business Background documents

GloBallast Project Document

Report of 1st GPTF (2008)

Report of 2nd GPTF (2010)

Final report of the Mid-Term Evaluation

Information note for participants

Page 3: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 3 -

Opening Address Delivered by John Paul Muindi, on behalf of Stefan Micallef, Director, MED, IMO

Ladies and Gentlemen,

Distinguished participants,

On behalf of Stefan Micallef, Director of the Marine Environment Division of the International

Maritime Organization, I am very pleased to welcome you to Cape Town on behalf of IMO for

this third GloBallast Partnerships Global Project Task Force Meeting.

It is great to note that this meeting is attended by most, if not all, GloBallast Lead Partnering

Countries and Regional Coordinating Organizations, as well as several of the Strategic

Partners: without you all, this Project will not be possible and IMO, as the executing agency

for the Project, would like to thank you again for your exceptional commitment and

dedication. GloBallast is an essential part of the IMO technical assistance activities and from

the very positive feedback that we get, both from delegations at the IMO Headquarters, and

through the IMO regional coordinators around the world, we realize how much this team of

Focal Points have contributed to the implementation of the Ballast Water Management

Convention, at all levels.

Together, you have created great momentum. In fact, looking at the global, regional and

national levels together, more than 150 specific activities have been implemented under the

Project over the past two years since the last Global Project Task Force Meeting, which is of

course astounding. And it seems as if this is not just a high and impressive number of

activities - we are actually starting to see the impacts of your efforts, through legal and policy

reforms in all of the GloBallast regions, as well as in other parts of the world.

As of today, 36 countries have ratified the Ballast Water Management Convention

representing 29.07% of the total world tonnage, but there are some remaining issues to

address before the Convention enters into force, such as the final details of the Port State

Control guidelines and the additional guidance on sampling. These issues are currently being

looked at by the relevant IMO bodies and we hope that they should be concluded in the near

future.

As you gather here in Cape Town this week to discuss the work plan for the coming years, it

is important to take a look at what we have learnt so far. Here, the Mid-Term Evaluation of

the Project, concluded by an independent consultant by the end of last year, plays an

important role. It is fair to say that you can be extremely proud of the results so far, but there

Page 4: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 4 -

is still a lot to do. However, if we keep working together, building on all the experiences

accumulated over the years, we should be able to meet the objectives that we have set for

ourselves when we agreed to work together to implement this Project. You can rest assure

that the continuation of the Project has the strongest support from IMO.

Finally, we would like to thank Mr Adnan Awad from the International Ocean Institute of

Southern Africa for hosting the meeting, as well as UNEP and Andy Hudson for the

continuous support and the long standing cooperation between our organizations.

Ladies and gentlemen, allow me to close these opening remarks by expressing our sincere

good wishes to all the participants in this Global Project Task Force Meeting. We at IMO

would like to thank you again for your outstanding and continued commitment to the Project

and for taking the lead globally in working with the implementation of the Ballast Water

Management Convention.

I know that many of you have come from very far away for this meeting. This shows exactly

the kind of spirit that has made GloBallast Partnerships a flagship Project and a pride for us

at IMO. We expect the GloBallast Partnerships to continue its championing efforts as the

Ballast Water Management Convention reaches its Entry into Force criteria and beyond.

We wish you all the best of luck for the meeting over the next three days.

Thank you very much.

Page 5: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 5 -

Group Photograph

From left to right: - 1st row: Ms. Aïcha Cherif (GBP PCU), Ms. Maja Markovčić-Kostelac (Croatia), Ms. Beverly Philip (Trinidad & Tobago), Eng. Kamal H. El-Kazzaz (Egypt). - 2nd row: Mr. Jack Barnett (Panama), Ing. Juan Sansegundo Deolivera (Venezuela), Capt. Luis Diaz Monclus (Venezuela), Mr. John Paul Muindi (IMO), Mr. Adaangiak Akanteyam (Ghana), Dr. Jacques Abe (IGCC/GCLME), Eng. Faisal Mohammed Maree (Yemen), Cdr Patrick McNeil (Bahamas), Mr. Brent Edward Williamson (Bahamas), Mr. Antoine Blonce (GBP PCU), Mr. Hector Huerta (CPPS). - 3rd row: Mr. Jonathan Pace (REMPEC), Mr. Murat Korcak (Turkey), Eng. Waleed Alsuheimat (Jordan), Dr. Mohammad Badran (PERSGA), Mr. Anthony Talouli (SPREP), Mr Andrew Hudson (UNDP). - 4th row: Capt. Raphael Baumler (WMU), Mr Fredrik Haag (GBP PCU), Mr. Bertrand Smith (Jamaica), Cdr. Felton L. Gilmore (RAC/REMPEITC-Caribe), Commodore Garnet Best (Trinidad & Tobago), Mr. Stanislav Suprunenko (EBRD).

Page 6: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 6 -

Meeting Agenda

Opening remarks (welcome messages) 1 Adoption of the Agenda 2 GPTF Terms of Reference and Rules of Procedure 3 Programme Coordination Unit (PCU) Progress Report 4 Regional Coordinating Organization (RCO) Status Reports on Regional and National

Progress 5 Strategic Partners information papers on their involvement in ballast water issues 6 Global Industry Alliance and IMO-EBRD Marine Biosafety initiative progress report 7 Plan of Activities and Budget 8 Any Other Business

Page 7: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 7 -

Minutes of the Second GloBallast Partnerships Global Project Task Force Meeting

The GloBallast Partnerships (GBP) Project Coordination Unit (PCU) organized the 3rd GEF-UNDP-IMO GloBallast Partnerships Global Project Task Force (GPTF) meeting, in Cape Town, South Africa, from 17 to 19 September 2012. The meeting was hosted by the International Ocean Institute Southern Africa (IOI-SA), and included an Open Seminar on Experiences and New Tools, which was organized on 19 September 2012 in order to present the latest tools under development by the Project and discuss this in the wider context of capacity building in the region. The open seminar was kindly hosted by the South African National Biodiversity Institute (SANBI). The meeting was attended by 30 participants in total (the list of participants is given in Annex 1) from almost all Lead Partnering Countries (LPCs), namely: Bahamas, Croatia, Argentina, Egypt, Ghana, Jamaica, Jordan, Nigeria, Panama, Turkey, Trinidad and Tobago, Venezuela and Yemen; all RCOs: CPPS, IGCC/GCLME-RCU, PERSGA, REMPEC, RAC/REMPEITC-Caribe and SPREP; as well as strategic partners such as the World Maritime University (WMU) and the European Bank for Reconstruction and Development (EBRD). Additional participants from South African stakeholders attended the open seminar on the third day, but are not captured in the Annex 1. The opening session was addressed by:

Mr. Andrew Hudson, Head, UNDP Water & Ocean Governance Programme and UNDP/GEF Principal Technical Advisor, International Waters,

Mr. John Paul Muindi, International Maritime Organisation (IMO) Regional Coordinator for East and Southern Africa (Anglophone), on behalf of Mr. Stefan Micallef, Director, Marine Environment Division, IMO,

Mr. Adnan Awad, Director, International Ocean Institute Southern Africa (IOI-SA).

Mr. Fredrik Haag, Chief Technical Adviser, GEF-UNDP-IMO GloBallast Partnerships As per the GPTF Rules and Procedures, the meeting was chaired by UNDP (Mr. Hudson). Agenda Item 1: Adoption of the Agenda The agenda (attached as Annex 2) was adopted without any amendments. The reversed order of agenda items, to accommodate for a better discussion, in particular on the progress report and work plan, was noted and approved. The detailed programme of the meeting can be found in Annex 3. Agenda Item 2: GPTF Terms of reference and Rules of Procedure The Chairman emphasised the importance of the GPTF as the highest advisory body of the project and invited the Secretariat to introduce document GPTF/3/2. The Terms of Reference and Rules of Procedures were adopted by 1st GPTF Meeting in 2008, and later amended by the 2nd GPTF Meeting in 2010. During a brief discussion, the GPTF noted several minor errors, mainly due to the change of timeline for the Project. The Terms of Reference and Rules of Procedures were adopted with these amendments, and the updated Terms of Reference are attached at Annex 4.

Page 8: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 8 -

Agenda Item 4: Regional Coordinating Organization (RCO) Status Reports on Regional and National Progress The review of the Project progress started with presentations from each of the RCOs, namely: CPPS, IGCC/GCLME-RCU, PERSGA, REMPEC, RAC/REMPEITC-Caribe and SPREP, who were invited to present a summary of progress on BWM at the national and regional levels for their respective regions, based on preliminary questionnaires that had been sent to the LPCs prior to the meeting and on a template sent to the RCOs, attached at Annex 6. South-East Pacific region - CPPS The Regional Technical Coordinator of the Permanent Commission of the South Pacific (CPPS), Mr. Hector Huerta, provided an overview of the RCO itself, the MoU between CPPS and IMO (October 2009, to facilitate the implementation of activities under the GloBallast Partnerships), the regional action plan and the Galapagos Commitment (2012) where the CPPS member states (Argentina, Chile, Colombia, Ecuador, Panama and Peru) expressed their willingness to collaborate with the IMO in order to address the invasive species issue. Mr. Huerta also summarized the work carried out in the region, especially the Regional Task Force Meetings (Chile 2008, Argentina 2009, Colombia 2010 and Chile 2012) and the capacity building activities. The status at the national level is summarized in Table 1 below:

Table 1: Progress at National Level – CPPS

West and Central Africa region - IGCC/GCLME-RCU Dr. Jacques Abe, Officer-In-Charge of the Interim Guinea Current Commission (IGCC) and the GCLME Project, presented an overview of the progress and challenges in the Guinea Current Large Marine Ecosystem (GCLME) region, which includes 16 countries of West and Central Africa (WACAF).

Page 9: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 9 -

Twelve out of sixteen countries responded to the LPC questionnaires (which was sent out to all countries in the region), giving Dr. Abe the opportunity to present a thorough analysis of the progress in the non-LPCs, as shown in Table 2 below:

Table 2: Progress at National Level – IGCC/GCLME One of the main points of interest underlined by IGCC/GCLME was the need to further develop the twinning with LPCs in order to disseminate the best practices and experiences in the region. Red Sea and Gulf of Aden region - PERSGA Dr. Mohammed Badran, Director for Projects’ Management, Scientific Research and Monitoring, of the Regional Organization for Conservation of the Environment of the Red Sea and Gulf of Aden (PERSGA), outlined the progress in the PERSGA region, and indicated that the Ballast water management Regional Strategy has been drafted and approved at the Technical Level. Several activities have been implemented in Egypt, Jordan and Yemen; and specific Project funds were allocated to twinning activities in Djibouti and Sudan. It was agreed that Dr. Badran will share their experiences from the twinning activities with the other regions as soon as possible, to assist the other regions in their preparations for similar activities. Mediterranean region - REMPEC Mr. Jonathan Pace, Senior Programme Officer, Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC), presented the progress in the Mediterranean region, following a brief introduction of the Centre and the region. A Regional Strategy and an Action Plan have been prepared and developed by a Regional Task Force over the period 2008-2011 and adopted by the 17th Ordinary Meeting of the Contracting Parties to the Barcelona Convention (Paris, France, February 2012). They set eight strategic priorities and actions concerning ballast water management in the region such as a Regional System for compliance, monitoring and enforcement. Harmonized voluntary temporary arrangements for ballast water exchange in the Mediterranean were also adopted and applied as from 1 January 2012.

Page 10: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 10 -

The delegate from Croatia, Ms. Maja Markovčić-Kostelac, stated that within the Commission from the Protection of the Adriatic Sea, the Adriatic Sea Ballast Water sub-commission has been established in order to enhance cooperation between the six states of the Adriatic Sea. Ms. Markovčić-Kostelac added that in 2013, a proposal will be submitted to IMO to designate the Adriatic Sea as a Particularly Sensitive Sea Area (PSSA) which, as the additional protective measures, will include measures related to ballast water management. Wider Caribbean region - RAC/REMPEITC-Caribe Cdr. Felton L. Gilmore, IMO consultant at the RAC/REMPEITC-Caribe and newly appointed GloBallast focal point, presented the Wider Caribbean region (WCAR) and the progress in the LPCs (Bahamas, Jamaica, Panama, Trinidad & Tobago, Venezuela). He explained that BWM is competing with other demands and needs in the region such as garbage or oil spill. However, Table 3 below detailed the good results achieved in the region: even if only Trinidad & Tobago has ratified the BWM 2004 Convention in the region, all the other countries have drafted proposals which are under various levels of scrutiny and review.

Table 3: Progress at National Level – WCAR

Cdr. Gilmore also noticed that the Regional Ballast Water Strategy and Action plan have been revised in April 2012. South Pacific region - SPREP Mr. Anthony Talouli, Marine Pollution Adviser at the Secretariat of the Pacific Regional Environment Programme (SPREP), presented the recent and forthcoming activities in the SPREP region, which hosts nearly 600 Marine Protected Areas (MPA) including the largest MPA in the world. A regional CME and legal training was organized in 2011, as well as several National activities on Economic Assessments, Status Assessments, Strategies and Legislation in Fiji, Samoa and Tonga.

Page 11: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 11 -

Agenda Item 3: Programme Coordination Unit (PCU) Progress Report The presentations by the RCOs were followed by a progress report (attached as Annex 5) by the PCU, covering the period from 1 October 2010 to 1 September 2012. The presentation included an introduction and background, which provided a context to the current status of activities and highlighted the objectives and expected outcomes for the Project. The progress with activities at all levels in relation to the expectations in relation to the Project Document was presented. In particular, the progress with national activities (see summary at the end of Annex 5) was highlighted stressing the need for those LPCs that have not yet requested the funds for national consultancies in support of the national strategy and legislation development, to do so as soon as possible. The presentation was followed by an in-depth discussion, highlighting a number of issues of relevance to the further implementation of the Project. Comments and results from the discussions during the meeting are presented under Agenda Item 7, Plan of Activities and Budget. Agenda Item 5: Strategic Partners information papers on their involvement in ballast water issues The Strategic Partners in the GloBallast Partnerships project were all invited to present their relevant progress and work plans. World Maritime University (WMU) Capt. Raphael Baumler, Assistant Professor at WMU briefly presented the Maritime Post-graduate University established by IMO in 1983, which offers several Master Degrees and PhDs. The WMU is a long-standing partner of the GBP Project and has co-developed with the PCU several training packages and guidelines, and is currently developing a Risk Assessment guidance document. WMU is also contracted regularly as consultants in national and regional training activities. International Ocean Institute Southern Africa (IOI-SA) Mr. Adnan Awad, Director of IOI-SA, introduced the International Ocean Institute in general and the IOI-SA based in Cape Town in particular, which is supervising and coordinating all the IOI centers based in Africa. The IOI-SA is also a frequent partner of the Project and has participated in the development of several training packages and guidelines. At present, Mr. Awad is leading the development of a new guidance document on Port Biological Baseline Surveys (PBBS). Mr. Awad is also a frequent lecturer and consultant on national and regional training activities. Agenda Item 6: GIA and IMO-EBRD Marine Biosafety initiative progress report Ms. Aicha Cherif from the GBP PCU presented the Global Industry Alliance (GIA) progress report. Table 4 below presents the status of implementation of the GIA activities:

Page 12: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 12 -

Table 4: Status of implementation of the GIA activities

Mr. Stanislav Suprunenko, Environmental Specialist at the European Bank for

Reconstruction and Development (EBRD), presented the IMO-EBRD Marine Biosafety

initiative progress report. Working with the IMO, the EBRD's Shareholder Special Fund has

so far made available €320,000 to fund training and awareness programs and to support the

development of the technical and infrastructural capacity required to cope with the

implementation of the BWM Convention.

It was noted that training programmes, including both introductory and advanced training

courses for mainly the private sector, were successfully conducted in Russia and Ukraine in

2011. The next phase will begin in October 2012 in Turkey and may later include other

countries.

Agenda Item 7: Plan of Activities and Budget

Mr. Antoine Blonce from the GBP PCU summarized the main conclusions of the Mid-Term

Evaluation (MTE) report, which is an integral and compulsory part of project management for

all GEF-funded projects, and thus an important part of the GBP project work plan. The MTE

was conducted by an independent consultant (Mr. Rick Boelens, Ireland) from May to

December 2011.

The main conclusions of the report are as follow:

.1 the Project has progressed very well towards achievement of its objectives;

.2 good synergies between the Project activities and the IMO ITCP activities;

.3 public-private partnerships may constitute a significant source of co-financing;

.4 significant benefits gained by facilitating and encouraging adaptive

management; and

.5 the report recommends the GloBallast Project as an example of best

practices.

However, the report also underlines that, even if the GBP Project in many respects can be

used as an example of best practice, there is still room for improvement, most notably on the

following points:

Page 13: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 13 -

.1 improving the annual reporting between LPCs, RCOs and the PCU;

.2 maintaining the continuity on the BWM experts in the governments; and

.3 increased attention on the GIA.

The PCU noted that it already addressed the GIA issue by allocating an assistant dedicated

to the public-private partnership aspect of the GBP Project.

Mr. Haag then detailed the technical and financial progress report of the Project including a

proposal for an extension of the Project until 2016, at no further increase to the total Project

funding from GEF. This extension will be possible due to the prudent financial management

throughout the Project, as well as the extensive co-financing from IMO and other, external,

sources. Based on this proposed extension, Mr. Haag then continued with a presentation of

a proposed draft work plan and budget for 2013-2016 (see Annex 7).

Group discussion

Following these detailed reports, the participants were invited to break into working groups

(per region) in order to share experiences, assess the remaining barriers, and discuss the

work plan of the GBP Project. The following questions served as a starting point for the

discussions:

General questions

To what extent the Project has been successful in helping your region/country in preparing for the entry into force of the BWM Convention; and

If the draft work plan (GTPF 3/7) is appropriate to ensure we achieve the objectives of the Project and thus prepare your region/country for the Convention.

Specific questions

Over all work-plan and meeting the Project Objectives

1. Does the draft Plan of activities prepared by the PCU (GPTF 3/7) meet the objectives for the Project? Does it address the points/concerns raised by the MTE? Please use the list of indicators from the Project Document in your discussions.

2. In what way, if any, can/should the work plan be modified to better assist countries in your region(s) to achieve the objectives of the Project and prepare for the Convention? Are there any specific barriers that need to be addressed that are not captured in the Project and the Draft plan of activities?

Regional strategy and diffusion of experiences

3. Are there any particular countries in your region that would benefit from

greater encouragement and/or assistance (i.e. ‘twinning’)? What kind of

assistance?

4. What would be the best ways to transfer the knowledge gained in the LPCs to

other countries in the region?

Page 14: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 14 -

5. What do you see as the main barriers when it comes to ensuring

implementation of the Regional Strategy and Action Plan?

Improving co-operation and efficiency

6. How do we improve the dialogue within and between the regions?

7. How do we improve the reporting from LPCs and RCOs to the PCU? Do we

need a more formal annual reporting format?

The session resulted in a very valuable list of priority actions, as identified by the regions and LPCs, highlighting the specific needs in terms of activities needed in order to fulfil the objectives of the Project, and most importantly for each LPC to be able to implement the BWM2004 Convention. The list of priority actions that resulted from the group discussions is attached in Annex 8. It was agreed that the list will serve as the main guidance for the PCU when organizing and prioritizing the intersessional activities, and that as many activities and recommendations as possible shall be incorporated into the work programme for the Project. Following the group discussions, the meeting endorsed the work plan for 2013-2016 and the PCU invited for further comments by correspondence. The meeting endorsed the PCU proposal to extend the Project by a further two years, and to request the Executive Committee to approve the extension formally at its earliest opportunity. It was noted that, following the formal approval of the budget extension by the ExCom later this year or early 2013, a revised budget for 2013-2016 would be prepared and submitted to UNDP for approval. This budget will be adjusted to reflect the extension of the timeline of the Project. Agenda Item 8: Any Other Business No other issues were raised. Closing remarks were given by UNDP (Mr. Hudson), IMO (Mr. Muindi) and the GloBallast PCU (Mr. Haag).

Page 15: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 15 -

Open Seminar on Experiences and New Tools Following the conclusion of the formal agenda, the meeting was opened up to external participants, as a Seminar on Experiences and New Tools. The seminar showcased the experiences from the region (southern Africa) since the Pilot Phase, as well as the latest developments in terms of the implementation of the Convention in South Africa. Furthermore, the latest GloBallast tools under development were presented (PBBS guidelines and risk assessment guidance). The seminar concluded with a discussion on training needs and possibilities. The full programme can be found in Annex 3. Field visit to Test Facility The GPTF also included a field visit to a test facility for ballast water treatment systems, located in the Port of Cape Town. The visit was hosted by Mr Bernard Jacobs, Chief Executive Officer of Resource Ballast Technologies (RBT), a ballast water treatment system developer based in Cape Town, and included a guided tour of the facility, including an introduction to the treatment system itself as well as the processes for testing the system to IMO standards. This visit was followed by a visit to Cape Point and the Cape of Good Hope.

Mr. Bernard Jacobs present the test facility and explains the treatment system testing process

Page 16: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 16 -

ANNEX 1 List of Participants

LEAD PARTNERING COUNTRIES (LPCS) BAHAMAS

1 Mr. Brent Edward Williamson

Response Coordinator Ministry of Transport and Aviation Port Department Prince George Wharf Port of Nassau Nassau, Bahamas Tel: +1 242 322 1596 / +1 242 322 8832 Email: [email protected]

2 Commander Patrick McNeil

Port Controller Ministry of Transport and Aviation Port Department Prince George Wharf Port of Nassau Nassau, Bahamas Tel: +1 242 328 7126 /+1 242 302 0200 Email: [email protected]

CROATIA 3 Ms. Maja Markovčić-Kostelac

Head, International and Legal Department Ministry of Maritime Affairs, Transport and Infrastructure Prisavlje 14 10000 Zagreb Croatia Tel: +385 1 616 9070 Email: [email protected]

EGYPT

4 Eng. Kamal H. El-Kazzaz

General Manager of Marine Environment Protection National Coordinator BWM Red Sea Egypt Red Sea Ports Authority Ministry of Transport P.O.Box 1 Porttawfiq Suez Egypt Tel: +20 62 3191123 Mobile: +20 122 1624 186 Email: [email protected]

Page 17: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 17 -

GHANA 5 Mr. Adaangiak Akanteyam

Dep. Director (Inspections and Survey) Ghana Maritime Authority Ministries Post Office, P.M.B. M34 Accra Ghana Tel: +233 302 684 382 / +233 244 957190 Email: [email protected] / [email protected]

JAMAICA 6 Mr. Bertrand Smith

Director-Legal Affairs Maritime Authority of Jamaica Office Centre Building 12 Ocean Boulevard Kingston Jamaica Tel: (876)967-1060-65/967-1067 Fax:(876)922-5765/922-5766 Email: [email protected]

JORDAN 7 Eng. Waleed Alsuheimat

Director, Maritime Safety Department Jordan Maritime Authority, Aralsheed Street, P.O Box 171 Aqaba – Jordan Tel: +962 3 2015858 Ext 104 E-mail: [email protected]

NIGERIA 8 Mrs. Ufuoma Martha Okorigba

Chief Marine Environment Management Officer Marine Environment Management Department Nigerian Maritime Administration and Safety Agency (NIMASA) No. 4 Burma Road Apapa Lagos Nigeria Tel: +234 803 307 1101 Email: [email protected]

9 Mr. Ahmad Abari Principal Marine Environment Management Officer Marine Environment Management Department Nigerian Maritime Administration and Safety Agency (NIMASA) No. 4 Burma Road Apapa, Lagos Nigeria Tel: +234 803 307 1101 Email: [email protected]

Page 18: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 18 -

PANAMA 10 Mr. Jack Barnett

Technical Officer Compliance and Enforcement Department Panama Maritime Authorithy Albrook, Pancanal Plaza, Edificio Pancanal Piso 3 Panama City, Panama Tel: +507 501 5030 / +507 501 5366 Email: [email protected]

TURKEY 11 Mr. Murat Korcak

Engineer Ministry of Transport, Maritime and Communication Başbakanlık Denizcilik Müsteşarlığı GMK Bulvari No: 128 Maltepe /Ankara Turkey Tel : +90 312 232 38 50/2174 Email: [email protected]

TRINIDAD AND TOBAGO

12 Ms. Beverly Philip

Director of Maritime Services Ministry of Transport of Trinidad and Tobago Level D, 23rd floor, Hyatt Compound Wrightson Road Port of Spain Trinidad and Tobago Tel: +1 868 473 8238 Email: [email protected] / [email protected]

13 Commodore Garnet Best (Ret’d)

Consultant LP#60 - Lot No. 3 Don Miguel Ext. El Socorro San Juan Trinidad and Tobago Tel: 1 868 683 4401 Email: [email protected]

VENEZUELA

14 Ing. Juan Sansegundo Deolivera

Gerente de Seguridad Integral del Instituto Nacional de los Espacios Acuáticos INEA Edificio INEA Las mercedesMunicipio Baruta Estado Miranda 1080 Venezuela Tel: +58 212 909 1552 Email: [email protected] /[email protected] [email protected]

Page 19: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 19 -

15 Cap. Luis Diaz Monclus

Consultor Marítimo Boyantes Las Mercedes – Caracas 1060 Venezuela Email: [email protected]

YEMEN

16 Eng. Faisal Mohammed Maree General Director of Maritime Safety and Pilotage Maritime Affairs Authority P.O. Box 1133 Aden Yemen Tel: +967 2 221 581/582/587 Email: [email protected] / [email protected]

***

REGIONAL COORDINATING ORGANIZATIONS (RCOs) CPPS 17 Mr. Héctor Huerta Rodríguez

Coordinador Técnico Regional Plan de Acción para la Protección del Medio Marino y Áreas Costeras del Pacífico Sudeste Av. Carlos J. Arosemena km 3 Ed. Classic 2do Piso Guayaquil Ecuador Tel. +593-4-2221200 Email: [email protected]

REMPEC 18 Mr. Jonathan Pace

Senior Programme Officer Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC) Maritime House Lascaris Wharf Valletta VLT 1921 Malta Tel: +356 21 337296/7/8 E-Mail: [email protected]

RAC/REMPEITC-Caribe 19 Cdr. Felton L. Gilmore

IMO Consultant RAC/REMPEITC-Caribe Aviation & Meteorology Building Seru Mahuma z/n

Page 20: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 20 -

Curacao Tel: +5999-868-4612 (General) Tel: +5999-839-3718 (Direct) Email: [email protected]

PERSGA 20 Dr. Mohammad Badran

Director, Projects' Management, Scientific Research and Monitoring Regional Organization for Conservation of the Environment of the Red Sea and Gulf of Aden “PERSGA” PO Box: 53662 Jeddah 21583 Saudi Arabia Tel: +9662 6573224 ext. 204 Email: [email protected]

IGCC/GCLME-RCU 21 Dr. Jacques Abe

Officer-In-Charge UNIDO/IGCC Project 5, Broz Tito Avenue P.O. Box: 324, Cantonments Accra Ghana Tel: +233 302 781 225 /243 630 649 Email: [email protected]

SPREP 22 Mr. Anthony Talouli

Marine Pollution Adviser Secretariat of the Pacific Regional Environment Programme (SPREP) PO Box 240 Apia Samoa Tel: +685 21929 ext243 Email: [email protected]

***

STRATEGIC PARTNERS/OBSERVERS IOI-SA

23 Mr. Adnan Awad

Director, International Ocean Institute - Southern Africa Department of Biodiversity and Conservation Biology University of the Western Cape P. Bag x17, Bellville 7535 Cape Town South Africa Tel. +27 (0)21 959 3088 Cell +27 (0)82 785 9678 Email: [email protected]

Page 21: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 21 -

WMU 24 Dr. Raphaël Baumler

Assistant Professor World Maritime University P.O. Box 500 - 210 24 Malmö Sweden Tel: +46 40 35 63 382 Email: [email protected]

EBRD 25 Mr. Stanislav Suprunenko

Environmental Specialist European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN United Kingdom Tel: +44 20 7338 7408 Mobile: +44 7584 686449 Email: [email protected]

UNDP 26 Mr. Andrew Hudson

Head, UNDP Water & Ocean Governance Programme & UNDP/GEF Principal Technical Advisor, International Waters FF-9100 1 United Nations Plaza New York, NY 10017 United States Tel: +1 212 906 6228 Email: [email protected]

IMO

27 Mr. John Paul Muindi IMO Regional Coordinator United Nations Complex Gigiri, Block M - Middle Level P.O. Box 30218 (00100) Nairobi, Kenya Tel: +254 20 7624377 (direct line) +254 20 7624378/4427 Fax: +254 20 7624485 Email: [email protected]

***

Page 22: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 22 -

SECRETARIAT/GLOBALLAST PCU 28 Mr. Fredrik Haag

Chief Technical Adviser GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR United Kingdom Tel : +44 207 463 4161 Mobile: +44 (0)79 17797 090 Email: [email protected]

29 Mr. Antoine Blonce Technical Adviser GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR United Kingdom Tel:+44 (0)20 7463 4127 Mobile: +44 (0)78 8157 6538 Email: [email protected]

30 Ms. Aïcha Cherif Project Management Assistant GloBallast Partnerships Marine Environment Division International Maritime Organization 4 Albert Embankment London SE1 7SR Tel: +44 207 463 4215 Email: [email protected]

___________

Page 23: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 23 -

ANNEX 2 Annotations to the

Provisional Agenda 1 Adoption of the Agenda

1.1 The meeting will be invited to adopt the agenda of its second session. 2 GPTF Terms of Reference and Rules of Procedure 2.1 The Programme Coordination Unit (PCU) will briefly introduce the GPTF Terms of Reference and Rules of Procedure, as adopted by the 1st GPTF meeting and revised by the 2nd GPTF meeting. 3 PCU Progress Report 3.1 A briefing paper on the progress in implementation of project activities will be submitted by the PCU. 3.2 The meeting will be invited to consider the report and to provide advice on this matter. It is expected that, after a general exchange of views, GPTF will endorse the report. 4 Regional Coordinating Organization (RCO) Status Reports on Regional and

National Progress 4.1 The representatives of the six RCOs will be invited to present the status of their initiatives with regard to the project’s implementation at regional level. The presentations will focus on the organizational aspects, communications with LPCs and PCs, regional mechanisms/forums, and current status of regional discussions on ballast water issues. The RCOs will also summarise the progress made in each of the 15 LPCs. 5 Strategic Partners information papers regarding involvement in the ballast

water issues. 5.1 The Strategic Partner Organizations will be expected to brief the meeting on their specific interest in ballast water issues and any relevant activities in the last two years. 6 Global Industry Alliance (GIA) and IMO-EBRD Marine Biosafety Initiative

progress report 6.1 The PCU will introduce a paper on the activities carried out under the framework of IMO- Global Industry Alliance. The paper will also summarise the progress made under the IMO-EBRD Marine Biosafety Initiative. 6.2 The meeting will be invited to consider the report and to provide advice on this matter. It is expected that, after a general exchange of views, the GPTF will endorse the GIA report. 7 Plan of Activities and Budgets

7.1 The PCU will present the status of Project expenditures as of 1 September 2012. The paper will also detail the co-financing achieved so far to support the objectives of the Project.

Page 24: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 24 -

7.2 The PCU will outline a revised plan of activities taking into account the progress achieved so far and propose an extension of the project timeline for a further two years. 8 Any other business

8.1 Participants will be invited to bring any other relevant issues to the attention of the GPTF.

___________

Page 25: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 25 -

ANNEX 3 Programme

Day 1 - Monday, 17 September 2012 (Winchester Mansions Hotel)

08:30 Registration 09:00 Opening remarks (welcome messages)

- UNDP-GEF - IMO-GloBallast PCU

09:15 Adoption of the Agenda

GPTF Terms of Reference GEF-UNDP briefing on the role of the GPTF

09:30 Summary of progress on BWM at the National and Regional level – Presented

by RCOs based on LPCs pre-GPTF questionnaires 10:30 Coffee break 11:00 Summary of progress on BWM at the National and Regional level – Presented

by RCOs based on LPCs pre-GPTF questionnaires (continued) 12.30 Lunch 14:00 Strategic Partners information papers on their involvement in ballast water

issues 14:15 Global Industry Alliance and IMO-EBRD Marine Biosafety initiative progress

report 14:30 Programme Coordination Unit (PCU) progress report (technical and financial) 15:30 Coffee break 16:00 Programme Coordination Unit (PCU) progress report (technical and financial)

continued 18:30 Ice-breaker function at the Winchester Mansions courtyard

Day 2 - Tuesday, 18 September 2012 (Winchester Mansions Hotel)

09:00 Round Tables: discussion of work plan 2012-2014 10:30 Coffee break 11:00 Summary discussion – Outcome of round Tables Field trip programme – timings approximate

Page 26: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 26 -

12:00 Departure by bus from hotel 12:30 Lunch at Panama Jacks Seafood Restaurant in Port of Cape Town 14:00 Test facility visit 15:00 Visit to Cape of Good Hope 19:00 Return to hotel and End of day 2 Day 3 - Wednesday 19 September 2012 (Kirstenbosch Botanical Gardens) 08:00 Departure by bus from hotel to Kirstenbosch Botanical Gardens (SA National

Biodiversity Institute (SANBI) Continuation of GPTF Agenda 08:45 GEF-UNDP-IMO GPTF Meeting wrap-up (revised work plans and budgets) 10:30 Coffee break Open Seminar on Experiences and New Tools 11:00 Welcome remarks, DDG of SANBI Introductory remarks, Chief Technical Adviser, GloBallast Partnerships

Project, IMO Introductory remarks, SA National Department of Transport 11:30 SAMSA maritime strategy and BW management – CEO SAMSA 11:45 South Africa - A GloBallast pilot country case study. How is the IMO BWM

Convention being implemented in South Africa (IOI-SA) 12:30 Lunch 14:00 Presentation of the new Guidelines for Port Biological Baseline Surveys and

experiences from within the region (IOI-SA) 14:30 Presentation of the new Guidelines on Ballast Water Risk Assessment (WMU) 15:00 Coffee break 15:30 National & Regional stakeholder meeting to develop a strategy for maritime

environment training & capacity building 17:00 Meeting closes 19:00 Department of Transport - Sponsored dinner function for all participants (Two

Oceans Aquarium)

***

Page 27: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 27 -

ANNEX 4 GPTF Terms of Reference &

Rules of Procedure

Terms of reference for the Global Project Task Force

(As revised by 3rd GPTF Meeting) Background

1 As this is a global project, it is necessary to have a global advisory and coordination mechanism to guide the PCU and participating countries in the implementation of programme activities, and to provide a forum for consultation and communication between the various international parties involved or with a vital interest in the programme. A Global Project Task Force (GPTF) has therefore been formed. The Terms of Reference for the GPTF are as follows: Role

2 The GPTF will be the highest advisory body of the programme. The GPTF will review the activities of the programme and will provide advice to the IMO and UNDP on the general directions to be followed. The GPTF will make its final recommendations to IMO and UNDP based on the principle of consensus. An organogram for the GloBallast Partnerships project explaining the functional relationships among the various stakeholders of the project is given in Annex 1. Membership

3 Initial GPTF membership will include a representative from each of the Lead Partnering Countries (LPC) and Regional Coordinating Organizations (RCO) as well as one each from GEF/UNDP, the private sector, other donor partners, the NGO community and the IMO. Two representatives from GloBallast Phase-1 Pilot Countries on a rotational basis will also be invited to GPTF meetings. Additional members can be added at the discretion of the IMO and UNDP on the advice of GPTF. The PCU Chief Technical Advisor (CTA) will act as Secretary to the GPTF. The GPTF will be chaired jointly by IMO and UNDP. A list of LPCs and RCOs is given below. Lead Partnering Countries (LPCs)

Argentina Bahamas Chile Colombia Croatia Egypt

Page 28: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 28 -

Ghana Jamaica Jordan Nigeria Panama Trinidad and Tobago Turkey Venezuela Yemen

Regional Coordinating Organizations (RCOs)

Permanent Commission for the South Pacific (CPPS) Guinea Current Large Marine Ecosystem (GCLME) Regional Organization for the Conservation of the Environment of the Red Sea & Gulf of Aden (PERSGA) Regional Marine Pollution Emergency Response Centre for the Mediterranean Sea (REMPEC) and Regional Activity Centre for Specially Protected Areas (RAC/SPA) Regional Activity Centre/Regional Marine Pollution Emergency, Information and Training Centre - Wider Caribbean (RAC/REMPEITC-Carib) South Pacific Regional Environment Programme (SPREP)

Tasks

The GPTF will advise and assist the IMO and UNDP on the following tasks:

- Provide overall strategic policy and management direction to the programme; - Assist in identifying and allocating programme support for activities consistent

with programme objectives; - Biennially review and assess the progress of the programme and its

components; - Biennially review and approve the work plan and comment on the budgets of

the programme and its activities, and provide strategic direction on the work plan;

- Provide guidance to the PCU in coordinating and managing the programme

and its activities; - Create mechanisms for interaction with the private sector (shipping, ports),

NGO and other stakeholders (e.g. public health); and

Page 29: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 29 -

- Seek additional funding to support the outputs and activities of the

programme.

Meetings 4 The GPTF will meet on a biennial basis. These three meetings will be built around the three key operational events:

- Inception meeting: agreeing on a detailed work plan and preparation of an inception report - Mid-term meeting: providing implementation status and an external mid-term evaluation

- Final meeting: discussing achievements, lessons learned and next steps / sustainability.

5 As much as possible, the GPTF meetings will be held back to back with the IMO MEPC meetings. During the project years 2009 and 2011, an Executive Committee, composed of UNDP/GEF, IMO and the PCU will convene to discuss project implementation, focusing on feedback from issues raised in the annual APR/PIR reports.

Page 30: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 30 -

GEF (Funding Agency)

IMO (Exe. Agency)

PCU (Proj. Coordination)

RTFRTF

NFPNFP

NPCNPC

ITFITF

GPTF (St. Committee)

RCO (Reg. coordination)RCO (Reg. coordination)

NTFNTF

NGO Group

Strategic

Partners ($)

GloBallast Partnership - Organogram

UNDP (Implem. Agency)

ANNEX 1: Project Organogram

Page 31: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Rules for Procedure for the Global Project Task Force

(Revised by the 3rd GPTF Meeting) Introduction

6 The purpose of these Rules of Procedure (ROP) is to provide a uniform basis for the Global Project Task Force (GPTF) of the GEF/UNDP/IMO Project-GloBallast Partnerships (the Project) and its subsidiary bodies, to conduct their work in an efficient and effective manner having regard to the available resources of the Project. 7 The ROP are applicable to the work of the GPTF and any subsidiary bodies that it may establish. The Chairmen of the GPTF and any subsidiary bodies should make all efforts to ensure strict compliance with the ROP. 8 The ROP and the appendices thereto was approved and adopted by the 1st Meeting of the GPTF and will be kept under review and updated as necessary by the GPTF in the light of experience gained in their application. Role of the GPTF

9 The role of the GPTF is to provide strategic advice and guidance on the activities of the Project and ensure the achievement of its development objectives, as outlined in the UNDP Project Document, in a co-ordinated, efficient and cost-effective manner, and to provide a forum for regular and on-going review and approval of the Project’s Implementation Plan. GPTF Tasks

10 The GPTF will advise and assist the IMO and UNDP on the following tasks:

- Provide overall strategic policy and management direction to the programme; - Assist in identifying and allocating programme support for activities consistent with

programme objectives; - Bi-annually review and assess the progress of the programme and its components; - Bi-annually review and approve the work plan and comment on the budgets of the

programme and its activities, and provide strategic direction on the work plan; - Provide guidance to the PCU in coordinating and managing the programme and its

activities; - Create mechanisms for interaction with the private sector (shipping, ports), NGO and

other stakeholders (e.g. public health); and - Seek additional funding to support the outputs and activities of the programme.

Membership 11 Membership of the GPTF is open to:

- the Global Environment Facility (GEF); - the United Nations Development Programme (UNDP); - the International Maritime Organization (IMO);

Page 32: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 32 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

- the National Focal Point (NFP) from each of the Lead Partnering Countries (LPC;) - the Project Focal Point (PFP) from each of the Regional Coordinating Organizations

(RCO); - one representative of each donor Financial Institution (FI); - one representative of Industry Task Force (ITF); - one representative from GloBallast Pilot Phase; - the following Observers:

- one representative each from International Chamber of Shipping (ICS) and

International Association of Independent Tanker Owners (INTERTANKO); - one representative from each of the environmental non-government

organizations - International Union for the Conservation of Nature (IUCN) and World Wide Fund for Nature (WWF);

- any other party approved by a meeting of the GPTF in accordance with these

ROP. Observer Members 12 The GPTF may grant Observer status to any organisation that is able to make a substantial contribution to the Programme, including but not restricted to the Observers listed under membership above. 13 Decisions by the GPTF to grant Observer status to any organisation shall be based on the following principles of purpose:

- for the purpose of enabling the GPTF to obtain information and/or expertise from an organisation with special knowledge, experience and/or interest in any particular subject relating to the Programme; and

- for the purpose of enabling an organisation which represents a large group who’s

activities have a direct bearing on the Programme, and vice-versa, to express their points of view to the GPTF.

14 Observer status may not be granted to an organisation unless it undertakes to support and promote the activities of the Programme. 15 The granting of Observer status shall confer the following privileges on an organization:

- the right to receive all documents relating to GPTF meetings; - the right to submit written statements on items of the agenda of GPTF meetings; and - the right to attend GPTF meetings and to make representations at such meetings, in

accordance with these ROP and the Chairman’s prerogative.

16 While, as a general rule the GPTF will make decisions based on the principle of consensus, including consensus of Observer members, in accordance with paragraphs 26 to 29, when voting is necessary Observer Members do not have voting rights.

Page 33: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 33 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

17 All Observer members shall keep the GPTF fully informed of those aspects of their own activities which are likely to be of interest and relevance to the Programme. 18 The GPTF shall review from time to time the list of Observer members and decide any necessary changes. Chairmanship & Secretariat 19 The GPTF will be chaired jointly by IMO and UNDP. 20 Any subsidiary groups which might be established shall elect from among their members a Chairman and Vice-Chairman. 21 The Chief Technical Adviser (CTA) of the Programme Coordination Unit (PCU) based at the International Maritime Organization (IMO) shall act as the Secretary of the GPTF and any subsidiary groups which may be established. He may delegate his functions to staff of the PCU and will be assisted in these functions by an IMO Officer back-stopping to the Programme. In carrying out these functions, he will have access to the resources and facilities of IMO. 22 It is the duty of the Secretariat to receive, process and circulate to Members all reports, resolutions, recommendations and other documents of the GPTF and its subsidiary bodies. Meetings

23 Throughout the project, the GPTF will meet on a biennial basis. These meetings are built around the 4 key operational events:

Inception meeting (2008): agreeing on a detailed work plan, budget and preparation of an inception report

Mid-term meeting (2010): providing implementation status and review of an external mid-term evaluation and the GloBallast Partnerships Project Implementation Plan for the period of 2010-2014

Interim meeting (2012): providing implementation status and review the GloBallast Partnerships Project Implementation Plan for the period of 2012-2014

Final meeting (2014): discussing achievements, lessons learned and next

steps/sustainability. 24 As much as possible, the GPTF meetings will be held back to back with the IMO MEPC meetings. During the project years 2009 & 2011 & 2013, an Executive Committee, composed of UNDP/GEF, IMO and the PCU will convene to discuss project implementation, focusing on feedback from issues raised in the annual APR/PIR reports. 25 The Secretariat, acting on the direction of the Chairman, shall notify Members at least two months in advance of the holding of a meeting. Agenda

26 The provisional, annotated agenda and supporting documents for each Meeting shall be prepared by the Secretary and shall normally be communicated to the Members 2 weeks before the opening of the meeting. 27 The first item on the provisional agenda for each meeting shall be the adoption of the agenda. 28 The provisional agenda for each meeting shall include:

Page 34: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 34 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

- any item proposed by a member; - any item proposed by the Secretariat; - all items the inclusion of which has been requested by the GPTF at a previous

meeting; and - any item of the agenda of a previous meeting, consideration of which has not been

completed, unless otherwise decided by the GPTF.

29 In circumstances of urgency the Secretary, with approval from the Chairman, may include any item suitable for the agenda which may arise between the dispatch of the provisional agenda and the opening of the meeting, in a supplementary provisional agenda which the GPTF shall examine together with the provisional agenda. Languages

30 The official language of the GPTF is English. Decision making and voting

31 In general, the GPTF will arrive at decisions by consensus of all Members, including Observers. 32 In exceptional situations where consensus may not be possible, the GPTF will arrive at decisions by voting, if required. The GPTF should normally vote by show of hands. Each Member organisation shall have one vote, except Observers, who shall not have the right of vote. Subsidiary bodies

33 The GPTF may establish and dis-establish such subsidiary bodies as and when it considers necessary. Such subsidiary bodies shall follow these ROP so far as they are applicable. 34 The subsidiary bodies should, as necessary, operate under the instructions of, and report to, the GPTF. Conduct of business

35 Seven Members shall constitute a quorum. 36 The Chairman shall declare the opening and closing of each meeting. He shall direct the discussion and ensure observance of these ROP, accord the right to speak, put questions to the vote and announce decisions resulting from the vote. Co-ordination and review of work plans

37 The GPTF should periodically examine the Project’s Implementation Plan, establish priorities, allocate work to subsidiary bodies and review the allocation of meeting dates to each body and their future work plans and provisional agendas, taking into account any recommendations made by meetings of the GPTF and subsidiary bodies. 38 The GPTF Chairman should, at the end of every 2 years, submit to the GPTF a joint plan covering the activities, priorities and meetings of the subsidiary bodies over the following 2 years. 39 The GPTF should:

Page 35: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 35 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

- decide on items to be included in the work plans of their subsidiary bodies with clear and detailed instructions for the work to be undertaken;

- establish priorities and target dates or the number of sessions needed for the

completion of the consideration of such items; and - assign work on such new items to appropriate subsidiary bodies.

40 The following should apply when the GPTF is invited to consider proposals for the inclusion of new items in its Work Plan:

- specific indication of the action required; - the need for the work proposed and its relation to the objectives of the Programme; - the scope and issues involved; - the costs to the Programme, the maritime industry, the legislative and administrative

burdens involved and benefits which would accrue therefrom; and - its degree of priority and a target completion date.

Preparation and introduction of documents and reports

41 For each meeting, the Secretariat shall prepare the following documents:

- the provisional, annotated agenda; - official invitations to all Members; and - the meeting report.

42 Documents should be prepared in single spacing and be as concise as possible so as to facilitate their timely processing. In order to enhance the clear understanding of documents, the following should be observed:

- all documents should include a brief summary prepared in accordance with the form given in appendix 1;

- substantive documents should conclude with a summary of the action the relevant

body is invited to take; - information documents should conclude with a summary of the information contained

therein.

43 All documents should be made available to GPTF Members by the Secretariat 4 weeks or more before a session and should be introduced in the plenary for the proper consideration of the matter concerned. 44 Reports of the GPTF and their subsidiary bodies should, in general, contain, under each section, only:

- a summary of key documents and listing of other documents submitted by GPTF Members and the Secretariat;

- a summary of views expressed, during consideration of an item, which may have

influenced the decision taken by the reporting body (thus not allowing the reports to

Page 36: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 36 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

turn into summary records, Statements by delegations should be included therein only at their express request during the session); and

- a record of the decisions taken.

45 Whenever possible, each subsidiary body should indicate in its report the progress made towards the target completion date set by the GPTF(s) for each major item. 46 Chairman of subsidiary bodies should not introduce their reports to the GPTF, as these should be taken as read. Observance of the Rules of Procedure

47 These ROP should be observed strictly. This will assist Members in preparing adequately for each meeting and enhance their participation in the debate and decision-making process during meetings. It will also avoid delegations experiencing difficulties when developing positions on subjects on the agenda of the GPTF or its subsidiary bodies. Members should ensure that their experts attending meetings of subsidiary bodies are adequately informed and instructed on any action necessary to give effect to decisions made by the GPTF.

Page 37: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 37 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

STANDARD FORMAT FOR DOCUMENTS

(APPENDIX 1) The text of all the documents should be preceded by a brief summary prepared in the form, and containing the information, as set out hereunder.

SUMMARY Executive summary: This description should be brief, outlining the proposed

objective and if this is a new proposal/activity then it should include information on whether a proposal will have any financial implications for the Project budget.

Action to be taken: A reference should be made to the paragraph of the

document, which states the action to be taken by the GPTF, subsidiary body, etc.

Related documents: Other Key documents should be listed to the extent

they are known to the originator of the document.

***

Page 38: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 38 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

ANNEX 5 Progress report

SUMMARY

Executive summary: This document provides an overview of the progress achieved in the implementation of the GloBallast Partnerships Project during the reporting period.

Action to be taken: Paragraph 10

Related documents: GPTF/3/7

1 This report covers the reporting period from 1 October 2010 to 1 September 2012. More than 150 specific activities (over 6 activities per month) to achieve the expected outcomes of the Project were undertaken at the global, regional and national levels, during the reporting period of 23 months. Most activities were undertaken with the backstopping and technical support of IMO’s Marine Environment Division and its Biosafety Section, and with significant co-financing support from Regional Coordinating Organizations (RCOs), Lead Partnering and Partnering Countries of the Project, the IMO-ITCP Programme, the Global Industry Alliance (GIA)and numerous strategic partners. 2 Looking at the Project work plan, last revised at the Global Project Task Force (GPTF) in 2010, approximately 70% progress against the current targets has been achieved at the Global and Regional level of the implementation of this project (as estimated by the PCU) as of 1 September 2012. All global and regional targets for the reporting period have been either met or exceeded. The legal, policy and institutional reform (LPIR) process at the national level, which, during the first few years of the Project, had been slower than anticipated, has now picked up momentum. The accelerated efforts at the national level are a direct result of the Project intervention at this level during 2010-2012. However, considerable efforts are still needed to overcome the political and capacity related constraints in some LPCs. Considering the relatively very short window of political opportunities in some countries to agree on policy and legislative reforms, the current extension of the project (until 2014) may prove to be insufficient, and the PCU is keeping a close eye on the developments at national level. Furthermore, as noted in the Mid-Term Evaluation completed in December 2011, the dissemination and sharing of experiences and capacity built within and between the regions will take longer than initially envisaged. Twinning activities can only be successfully implemented if at least one of the involved countries has reached a certain level of experience with respect to e.g the development of national assessments and strategies. Dialogue at the national and regional level, such as the regional strategy and action plans developed by the Regional Task Forces, are also essential elements. 3 Figure 1 below summarises the project objectives, expected outcomes, outputs and planned activities.

Page 39: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 39 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Figure 1: Summary of GloBallast Partnerships Objectives, Expected Outcomes and Activities

Modif.Risk

Assessm.

guidelines

Risk

Assessm.

training

Modif.Risk Assessm.

guidelines

Risk Assessm.

training

Develop

guidance

for

sediment

reception

facilities

Develop guidance for sediment reception

facilities

Page 40: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 40 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

4 Table 1 below summarises the progress achieved in terms of implementation of activities under the different outcomes of the Project, as per the Project Document and the latest Project Implementation Plan.

No Output and activity Description Completed Partially completed

(%)

To be Started

Comments

1.1 Project Management and coordination structures in place at global, regional and local level

1.1.1 Hire, equip and maintain project coordination unit staff and office at IMO HQ

1.1.2 Establish and support Global Project Task Force (GPTF)

1.1.3 Designate and coordinate with regional coordinating organizations

1.1.4 Establish and maintain regional task forces

1.1.5 Establish project coordination in each LPC, including identifying lead organization (LO), national focal point and national project coordinator

1.1.6 Establish and maintain National Task Forces

1.1.7 Represent and promote GloBallast Partnerships in international and regional conventions and forums

Continuous

2.1 Institutional capacities are enhanced through a comprehensive training program on Ballast water management

2.1.1 Update GloBallast Introductory Modular Course for Ballast Water Management

2.1.2 Hold training courses on BWM using updated Modular Training package (Introductory Training Package)

Additional 5 regional trainings

2.2 Risk-based, rapid status assessment reports are developed and used to guide country activities

2.2.1 Develop template and guidelines for rapid assessments Partnership with IOI

2.2.2 Develop rapid status assessments 90% 13/15 LPCs

2.3 Economic aspects of marine bio-invasions factored into national strategic planning

2.3.1 Develop guidance for economic assessments

Published with IUCN

2.3.2 Develop national economic impact and response cost assessments, taking into account the need for financial sustainability

75% 11/15 LPCs

2.3.3 Aggregate economic information

Page 41: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 41 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

2.4 National Ballast Water Management Strategy (NBWMS) developed and implemented

2.4.1 Develop guidelines for national BWMS development, including options for financial sustainability

2.4.2 Hold (a) regional harmonisation (including regional LPI assessment) and (b) Sustainability workshops

Continuous Same as RTF meetings.

2.4.3 Hold national stakeholder workshops Continuous Same as NTF

meetings

2.4.4 National Ballast Water management Strategy (BWMS) developed 90% 13/15 LPCs

2.5 National legal reforms instituted

2.5.1 Develop legal road map, model legislation and training manuals

2.5.2 Train LPC lawyers on developing legal frameworks for BWM

2.5.3 Develop national legislation 70% 10/15 LPCs

2.6 Specialist capacities improved for BWM

2.6.1 Develop model BWM (specialist) course

2.6.2 Capacitate Training Institutes for delivery of Introductory course and specialized courses

2.7 Compliance monitoring and enforcement indicators are developed and national systems enhanced, with an emphasis on risk-based priority setting, and the use of voluntary approaches

2.7.1 Develop and disseminate model CME framework, including indicators

2.7.2 Hold training workshops on CME

2.7.3 Countries implement modified CME systems

2.7.4 Conduct follow up reviews of modified CME systems and develop lessons learned study

3.1 Baseline information established on biodiversity and alien species presence in major ports

3.1.1 Update Port baseline survey protocols

3.1.2 Hold training workshops on port baseline survey design and implementation

3.1.3 Develop country, regional and global rosters of taxonomy experts Revised as Activity 3.4 (as per 2nd GPTF)

3.1.4 Train local taxonomists in generic tools and methodologies for marine invasive detection and analysis

3.1.5 LPCs carry out baseline surveys and develop national marine invasive reports

20% LPC funded

3.1.6 Compile country baseline data and input into GMEIS (see activity 3.2)

3.2 Global Marine Electronic Information System (GMEIS) for Ballast Water Management Established

Page 42: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 42 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

3.2.1 Identify GMEIS design/architecture options

Initial discussions started

3.2.2 Hold GMEIS expert workshop for design / architecture selection

3.2.3 Develop country profile database format and disseminate to participating countries

3.2.4 Provide training and technical assistance on knowledge management and database development for LPCs

3.2.5 Develop country profile databases

3.2.6 Develop and maintain GloBallast web portal Continuous

3.2.7 Launch and maintain national BWM websites 20% 2/15 LPCs

3.3 Stakeholder and public awareness of ballast water management and marine bio-invasion issues is raised and sustained

3.3.1 Stakeholder outreach to GB pilot regions, LMEs and Regional Seas Continuous

3.3.2 Publish and post semester newsletters

Continuous Replaced by website news, Twitter, Flikr, Youtube, etc

3.3.3 Develop, update and translate GloBallast brochures and publications Continuous

3.4 Development of a Risk Assessment

framework at the national level

3.4.1 Modification of the GloBallast Risk Assessment methodology to assist CME 50%, to be

finalized 2013

New activity as agreed by 2nd GPTF

3.4.2 Training on using GloBallast Risk assessment Tools New activity

as agreed by 2nd GPTF

4.1 Strategic partnership forged with shipping industry

4.1.1 Set up a Global Industry Task Force to meet annually and provide input to GloBallast Partnerships

4.1.2 Hold biannual industry dialogues between GIA Task Force and the GloBallast Steering Committee

Continuous

4.2 Globally agreed standards developed for ballast water technology test facilities

4.2.1 Develop framework for ballast water treatment equipment test facility standards and inter-calibration procedures

75%

Page 43: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 43 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

4.2.2 Hold experts workshop to propose test facility standards and procedures

3 meetings held, 4th workshop planned Nov. 12

4.2.3 Develop and disseminate standards and procedures manual for ballast water treatment equipment test facility standards

On-going

4.3 Solutions devised and best practices publicized on port-based reception facilities for ballast water tank sediments

4.3.1 Identify dry dock site and conduct feasibility study for pilot sediment facility

GPTF agreed to replace this with a guideline on best practices. To be initiated late 2012

4.3.2 Construct and manage pilot sediment facility

4.3.3 Assess pilot facility operation and disseminate lessons learned

4.4 State of the art in Ballast water treatment technology solutions identified and publicized

4.4.1 Establish Ballast Water Innovation Fund and support innovative projects

redesigned as GIA Fund

4.4.2 Hold biennial global R&D forums and biennial technology conferences

Continuous 4 held (2008, 2009, 2010, 2011)

5.1 Project monitoring, evaluation and reporting systems established and implemented

5.1.1 Conduct mid-term evaluation and initiate mid-course corrections MTE

completed Dec. 2011

5.1.2 Conduct terminal evaluation

5.1.3 Develop and submit APR/PIRs and other required GEF/UNDP project monitoring reports

Continuous

Page 44: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 44 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

5 A summary of key activities undertaken during the reporting period is given below: Global level

2nd ExCom extended the Project till December 2014.

2nd Global Project Task Force meeting in October 2010.

Publication of the guideline on Economic Assessment for Ballast Water Management jointly with the International Union for the Conservation of Nature (IUCN).

Translation of Monograph 18 “Guidelines for development of national ballast water management strategy” and GloBallast Monograph 19 “Economic Assessment for Ballast Water Management: A Guideline” in French with the support of Total Fondation.

Translation of Monograph 18 in Spanish with the support of Colombia and CPPS.

All three GBP Monographs have been translated in Russian and Arabic (draft).

Publication of a Joint GloBallast Monograph No. 20 and GESAMP Reports and Studies No. 83 on “Establishing Equivalency in the Performance Testing and Compliance Monitoring of Emerging Alternative Ballast Water Management Systems”.

Finalisation of an advanced training course on the operational aspects of BWM, funded by the GloBallast Partnerships Project, the Global Industry Alliance, and the IMO ITCP.

Coordination and facilitation of EBRD Phase 1 and phase 2 trainings on BWM in Russia and Ukraine, using GloBallast training packages.

Finalisation of a training package on CME issues in partnership with WMU and IUCN with support from the IMO ITCP, the Total Foundation and MPA Singapore, intended for Port and flag State Control officers. Translation of the training package in French, Spanish and Arabic.

2nd Global Test Facility Forum, Singapore and 3rd Global Test Facility Forum, Turkey.

1st IMO/GloBallast – IMarEST Shipbuilders’ Forum on BWM, Singapore and 2nd IMO/GloBallast – IMarEST Shipbuilders’ Forum on BWM, Turkey.

5th International Conference and Exhibition on BWM, Singapore.

4th R&D Conference on Ballast Water Management with focus on Compliance, Monitoring and Enforcement, Istanbul, Turkey.

Significant outreach activities undertaken in non-GBP regions, pilot countries and partner countries (Participation in the project Steering Committee meeting of the Agulhas Somali Current Large Marine Ecosystem Project, participation in the inception meeting of the ASEAN-India Cooperation project on the transfer of alien invasive organisms in South/ South-East Asia, Participation as Chair of the Joint MTEC-IMO-GloBallast Conference session & Panel discussion on Ballast Water Management and Marine Biosecurity during the International Maritime-Port Technology and development Conference MTEC 2011 in Singapore, Caspian consultancies, CaspEco steering committee). Several of these activities, that were co-financed by IMO and other partners, included regional capacity building programmes, regional strategy developments and national seminars and workshops.

Participation in international / regional forums (GEF-IWC6, RAC/REMPEITC-Caribe Steering Committee, etc.) as well as all relevant IMO Committee meetings (TCC, MEPC)

Development of Template and Guidelines for Port Biological Baseline Surveys in partnership with IOI-SA, NIO and IUCN initiated.

Development of a Risk Assessment guideline at the national and regional level in partnership with WMU initiated.

7th GloBallast Global Industry Alliance Task Force (GIA-TF). Meeting with new partners (Keppel) via teleconference.

Finalisation of the Mid-Term Evaluation of the GloBallast Project.

New CTA and TA appointed/recruited.

Development of online risk assessment tool with TUBITAK/Turkey initiated.

Page 45: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 45 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Regional level Approximately 20 activities were undertaken at the regional level during the reporting period. This is slightly less than during the previous reporting period, which is due to the fact that the focus during the period 2010-2012 has been national level progress, also coordinated by the RCOs. The key activities at regional level are summarised below:

Series of Regional Task Force meetings in all 5 regions (WACAF, South East Pacific + Argentina, Wider Caribbean, Mediterranean, Red Sea and Gulf of Aden) and strategies revised.

West African regional strategy was translated in French, Spanish and Portuguese.

Regional strategies developed in South Asia and Caspian regions.

Regional CME training courses in all five GBP regions.

Regional Legal training for Asia conducted in Singapore, and for the South Pacific conducted in Fiji.

A regional training course for Black and Caspian Sea littoral States on Port Biological Baselines Surveys was held in Georgia.

National level

Panama joined the Project as the 15th LPC and as the 5th in the Wider Caribbean region.

Several NTF meetings were held by all LPCs. NTFs were established and NTF meetings held is several PCs also.

A series of national seminars were held in non-LPC countries (Bangladesh, Benin, Cameroon, China, Indonesia, Kenya, Liberia, Peru, Senegal, Sri Lanka, Syria and Tanzania, Angola, Comoros, Fiji, Georgia, India, Madagascar, Mozambique, Thailand and Viet Nam). (Uruguay, Honduras, Syria, Montenegro, India, Sierra Leone and Tanzania).

Most of the Pilot Phase countries involved in the delivery of regional and global GBP activities, e.g. as consultants (South Africa, Brazil, Ukraine, India).

National consultancy projects to undertake BWM status assessments, economic assessment, legal review, and to develop a national BWM strategy completed in most LPCs. 2 countries (LPCs, PCs and Pilots) from the GBP regions ratified the IMO BWM Convention during the 2010-2012 period.

All LPCs are on track to adopt their national strategies during late 2012.

6 Annex 1 gives a detailed list of activities conducted during the reporting period, as per the logical framework (LogFrame) for the Project. The activities are shown against the expected outcomes and outputs set for the project.

7 As further detailed in document GPTF/3/8 (Plan of activities and budget) the adaptive and prudent financial management used in the Project, as well as the significant co-financing efforts by RCOs, LPCs, PCs, the IMO ITCP and strategic partners, has meant that while the actual expenditure per year has been significantly less than the initial, approved annual budget, all major targets for the reporting period have been met or exceeded. 8 These continued efforts have resulted in a contingency resource buffer within the Project budget. As indicated in previous reports, this has been done mainly in view of the anticipated barriers (mainly political and capacity related) for the legal, policy and institutional reforms that are still remaining at national level, as well as the slower than expected pace by which such reforms are taking place in some of the LPCs and PC countries. The saving made through co-financing in the initial years of the Project will therefore mitigate the financial risk, if any, during the remaining period of the Project.

Page 46: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 46 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

9 The total cash and in-kind co-financing so far to support the Project objectives is estimated to US$ 21,490,512, which includes both cash and in-kind co-financing support received from e.g. IMO, LPCs, PCs and Strategic Partners. The ratio of total co-financing as of 30 June 2012 to GEF actual expenditure for the reporting period is 7.66, well exceeding the expected co-financing ratio of 1:3, as per the GEF-UNDP ProDoc. Action Requested of the GPTF 10 The GPTF of the GEF-UNDP-IMO Partnership Project is requested to review the attached report on Project progress and make necessary revisions to ensure all activities are correctly reflected.

***

Page 47: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 47 -

ANNEX 1: GloBallast Partnerships Project- Status Report Project Title: Building Partnerships to Assist Developing Countries to reduce the Transfer of Harmful Aquatic Organisms in Ships’ Ballast Water (GloBallast Partnerships) Project Goal: To reduce the risks and impacts of ballast water mediated marine bio-invasions caused by international shipping. Objective: To assist vulnerable developing countries to implement sustainable, risk-based mechanisms for the management and control of ships’ ballast water and sediments in order to minimize the adverse impacts of aquatic invasive species transferred by ships. OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 1

Expected Outcomes

Outputs

Expected Activities

Indicator (as per Pro-Doc LogFrame)

OUTCOME 1: Learning, evaluation and adaptive management increased Project Management (Outcome 5 of the ProDoc)

Project Coordination Structure in place Monitoring and Evaluation Reports (QPR, APR)

Establish PCU 3 GPTF meetings Establish RCO 3 x 5 RTF meetings Formalize LA, NFP and NPC in LPCs Establish NTFs in LPCs GBP in international and regional forums

The project team at global, regional and local levels is effectively coordinating the project

Page 48: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 48 -

DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 1 (activities in shades show the progress since October 2010) No Activity Dates Outcome / Description Venue Funding (cash + in-

kind)

Project Coordination Unit

1 Recruitment of CTA October 2007 PCU established partly London, UK GloBallast Funds

2 Recruitment of Administrative Assistant April 2008 PCU strengthened London, UK GloBallast funds

3 Recruitment of TA October 2008 PCU established fully London, UK GloBallast Funds

4 Recruitment of Programme Management Asst.

September 2010 PCU changes London, UK GloBallast Funds

5 Appointment of new CTA January 2012 PCU changes London, UK GloBallast Funds

6 Recruitment of new TA June-July 2012 PCU changes London, UK GloBallast Funds

Global Task Force

1 First Global Project Task Force (GPTF) Meeting

March 2008 PIP approved and GPTF formalized

London, UK Cash- in-kind of 85K and time in-kind of 30K from LPCs) and some limited GloBallast funds

2 1st GBP Executive Committee Meeting February 2009 Progress Evaluated, strategy

refined London, UK UNDP In-kind – 5K

3 2nd

GBP Executive Committee Meeting January 2010 Progress Evaluated, strategy refined, project time-line extended

Malmo, Sweden

UNDP In-kind – 5K

4 Second Global Project Task Force (GPTF) Meeting

October 2010 Review of LPC/RCO progress 2008-2010 Review of expenditures 2008-2010 Endorsement of decision by ExCom to extend the project until December 2014 Approval of work plan/Budget 2010-2014

London, UK GloBallast funds 37K LPC cash and time in-kind 30K RCO cash and time in-kind 10K Strategic Partners cash and time in-kind 30K

5 3rd

ExCom Meeting November 2011 Progress Evaluated, strategy refined

London, UK GloBallast funds

6 3rd

GPTF Meeting September 2012 Cape Town, South Africa

GloBallast Funds 100K Strategic Partners cash and time in-kind LPCs cash and time in-kind RCOs cash and time in-

Page 49: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 49 -

kind

Regional Coordination Organizations

1 Regional Coordination Units Formalized in six Regions

October 2007 RCOs identified ( REMPEC, REMPEITC, CPPS PERSGA, GCLME/IGGC and SPREP) and coordinators nominated

GBP Regions In-kind from RCOs (72K)

2 MoU with CPPS finalized for implementation of GBP activities

October 2009 RCO arrangements for financial reporting formalized

London, UK Time-kind from CPPS and IMO (10K)

3 MoU with PERSGA amended to include implementation of GBP activities

June 2009 RCO arrangements for financial reporting formalized

London, UK Time-kind from PERSGA and IMO (10K)

Regional Task Forces

1 1st Mediterranean Regional Task Force

Meeting and seminar on Ballast Water Management

September 2008 Establishment of Regional Task Force and Development of Key elements of Regional Strategy

Dubrovnik, Croatia

MTF (REMPEC) Fund – 50K cash + GloBallast Fund (23K) + in-kind by countries (48K)

2 1st South East Pacific Regional Task

Force Meeting and Seminar for Ballast Water Management

September 2008 Establishment of Regional Task Force and Development of Key elements of Regional Strategy

Valparaiso, Chile

CPPS Fund (15K) GloBallast Fund (2K) + in-kind 12K

3 1st West and Central Africa (GCLME

Region) Task Force Meeting and seminar on Ballast Water Management

2006* Establishment of Regional Task Force and Development of Key elements of Regional Strategy

Ghana, Accra IMO ITCP (20K) + UNIDO (50K) + in-kind of 48K

4 2nd

(Interim) South East Pacific Regional Task Force Meeting and Seminar for Ballast Water Management

September 2009 Further elaboration of the regional strategy document and development of an action plan

Buenos Aires, Argentina

CPPS Fund (10K) IMO ITCP (20K) GloBallast Fund – (2K) LPC In-kind – (20K)

5 2nd

West and Central Africa (GCLME Region) Regional Task Force Meeting and seminar on Ballast Water Management

July 2009 Elaboration of the regional strategy based on the previous regional discussions and development of an action plan

Abidjan, Côte d’Ivoire

IMO ITCP Funds – 55K Country in-kind – 5K RCO In-kind – 10K

6 1st Red Sea and Gulf of Aden Regional

Task Force Meeting and seminar on Ballast Water Management

June 2009 Establishment of Regional Task Force and Development of Key elements of Regional Strategy

Aqaba, Jordan GloBallast Funds (20K) LPC in-kind – (20K) PERSGA In-kind – (10K)

7 1st Wider Caribbean Regional Task

Force Meeting and seminar on Ballast December 2009 Establishment of Regional Task

Force and Development of Key Panama City, Panama

IMO ITCP – (40K) UNEP- (15K)

Page 50: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 50 -

Water Management elements of Regional Strategy COCATRAM – 1.5K Panama In-kind – 30K REMPEITC In-kind – 20K

8 2nd

Mediterranean Regional Task Force Meeting and seminar on Ballast Water Management

May 2010 Further elaboration of the regional strategy document action plan. Draft final Strategy endorsed.

Istanbul, Turkey

IMO ITCP – 50K MTF (REMPEC) Fund – 25K cash + in-kind by countries (48K)

9 3rd

South East Pacific Regional Task Force Meeting and Seminar for Ballast Water Management

September 2010 Review of Regional Action Plan and progress

Bogota, Colombia

CPPS Fund – 20K LPC/PC in-kind – 20K

10 Participation of the WCAR RCO in the Regional Workshop for Senior Maritime Administrators in Trinidad and Tobago

February 2011 Awareness and facilitation of regional harmonization on Ballast Water Management

Port of Spain, Trinidad and Tobago

IMO ITCP – 1.6K

11 2nd

Red Sea and Gulf of Aden Regional Task Force Meeting and seminar on Ballast Water Management

June 2011 Review of progress achieved since 1

st RTF and agreement on draft

strategy for adoption and endorsement by the Contracting Parties to the Jeddah Convention.

Hurghada, Egypt

GloBallast Funds – 25K LPC in-kind – (5K) PERSGA In-kind – (20K)

12 3rd

GCLME Regional Task Force Meeting and seminar on Ballast Water Management

September 2011 Review of Regional Action Plan and progress + Translation of Regional Strategic Action Plan into French, Spanish and Portuguese

Lome, Togo Cost captured under outcome 2

13 2nd

Regional Task Force Meeting and seminar on Ballast Water Management

November 2011 Review of Regional Action Plan and progress

Kingston, Jamaica

Cost captured under outcome 2

14 South Asia Regional Ballast Water Management Strategy Development Meeting

May 2012 Mumbai, India IMO ITCP Funds – 40K

15 4th Regional Task Force Meeting on the

implementation of the Ballast Water Management Convention

July 2012 Review of Regional Action Plan and progress

Valparaiso, Chile

Cost captured under outcome 2

National LA, NFP, NPC

1 Identification of Lead Agency, National Focal Point and Project Coordinator in 13 LPCs

January – July 2008 September 2009 (Nigeria)

National level project implementation mechanism / institutional framework

LPCs LPC In-kind (156K)

2 Nigeria joined as LPC March 2010 Nigeria

3 Panama joined as LPC July 2011 Panama

National Task Force Meetings and Seminars

Page 51: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 51 -

1 Turkey-First National Seminar and Task Force Meeting on Ballast water Management

October 2007 draft NTF and National Roadmap Istanbul, Turkey

National Budget (20K cash) + in-kind 16K

2 Croatia-National Seminar and Task Force Meeting on Ballast water Management

May 2008 Formation of NTF and Development of National Roadmap

Zagreb, Croatia National Budget (20K cash)+ GloBallast Budget + in-kind 16K

3 Turkey-Second National Task Force Meeting on Ballast water Management

May 2008 Development of National Policies Ankara, Turkey National Budget (20K cash) + in-kind 16K

4 Colombia- 1

st National Seminar

on Ballast water Management

July 2008 Formation of NTF Bogotá, Colombia

UNEP Fund (4K) + National Budget (15K) + in-kind 16K

5 Colombia 2

nd

National Seminar on Ballast Water Management

October, 2008 Training using the introductory Ballast Water Management course from IMO-GloBallast

Cartagena, CO National Budget (20K) + in-kind 16K

6 Colombia- 2

nd National Task Force Meeting

October 2008 Development of National Roadmap and Action Plan for BWM

Cartagena, Colombia

National Budget (5K) + in-kind 5K

7 Colombia 3

rd National Ballast Water Management

Seminar

June, 2009 Capacity building and Awareness Raising In the Pacific coast

Palmira,CO National Budget (5K) + in-kind 5K

8 Colombia, 4

th National Ballast Water Management

Seminar

August 28, 2009 Confirmation of the technical adviser group of the NTF

Cartagena, CO National Budget (5K) + in-kind 5K

9 Colombia, 3

rd NTF meeting

November 4, 2009 Review of national level progress and action plans

Bogota, CO National Budget (5K) + in-kind 5K

10 Colombia, 4

th NTF meeting

July 27, 2010 Selection of consultants for National Ballast Water documents

Bogota, CO National Budget (5K) + in-kind 5K

11 Colombia, 5th NTF meeting September 10, 2010 Preparation of the Country report

for the II RTF (CPPS) meeting Bogota, CO National Budget (20K) +

in-kind 16K

12 Bahamas-National Seminar and task Force Meeting on Ballast water Management

September 2008 Awareness raising and Development of National Task Force

Nassau, Bahamas

UNEP Fund (4K) + National Budget (15K) + in-kind 16K

13 Trinidad and Tobago-National Seminar and task Force Meeting on Ballast water Management

September 2008 Formation of NTF and Development of National Roadmap

Port of Spain, Trinidad and Tobago

UNEP Fund (4K) + National Budget (15K) + in-kind 16K

14 Argentina-National Seminar and task Force Meeting on Ballast water Management

September 2008 Formation of NTF and Development of National Roadmap

Buenos Aires, Argentina

UNEP Fund (4K) + National Budget (15K) + in-kind 16K

Page 52: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 52 -

15 Venezuela – National Task Force Meeting

Formation of NTF and Development of National Roadmap

Caracas, Venezuela

National Budget (20K) + in-kind 16K

16 Jamaica – National Task Force Meeting February 2008 Formation of NTF and Development of National Roadmap

Kingston, Jamaica

National Budget (5K) + in-kind 16K

17 Chile – National Task Force Meeting October 2008 Formation of NTF and Development of National Roadmap

Valparaiso, Chile

National Budget (20K) + in-kind 16K

18 Egypt – 1st National Seminar and task

Force Meeting on Ballast water Management

June 2009 Formation of NTF and Development of National Roadmap

Suez, Egypt IMO ITCP – 3K LPC In-kind – 10K

19 Jordan – 1st National Seminar and task

Force Meeting on Ballast water Management

June 2009 Formation of NTF and Development of National Roadmap

Amman, Jordan IMO ITCP – 3K LPC In-kind – 10k

20 Yemen – 1st National Seminar and task

Force Meeting on Ballast water Management

July 2009 Formation of NTF and Development of National Roadmap

Sanaa, Yemen IMO ITCP – 3K LPC In-kind 10K

21 Ghana – 1st National Task Force

Meeting February 2009 Formation of NTF and

Development of National Roadmap

Accra, Ghana LPC In-kind – 10K

22 Panama – 1st National Seminar and

national Task force meeting February 2009 Start discussing the NTF formation

and Development of National Roadmap

Panama City, Panama

Country In-kind – 10K

23 Panama – 2nd

National Seminar and national Task force meeting

December 2009 Formation of NTF and Development of National Roadmap

Panama City, Panama

Country In-kind – 10K

24 Nigeria– 1st National Seminar and

National Task force meeting February 2010 Formation of NTF and

Development of National Roadmap

Lagos, Nigeria IMO ITCP – 8K LPC In-kind – 10K

25 Honduras - 1st National Seminar and

National Task force meeting May 2010 Formation of NTF and

Development of National Roadmap

Tegucigalpa, Honduras

IMO ITCP – 8K Country In-kind – 10K

26 Uruguay – 1st National Seminar and

National Task force meeting May 2010 Capacity building and Awareness

raising Monte video, Uruguay

IMO ITCP – 8K Country In-kind – 10K

27 Argentina – 2nd

National Seminar and National Task force meeting

May 2010 Review of national level progress and action plans

Buenos Aires, Argentina

IMO ITCP – 8K LPC In-kind – 10K

28 Ghana – 2nd

National Seminar and National Task force meeting

June 2010 Review of national level progress and action plans

Accra, Ghana GloBallast Funds – 2K LPC In-kind – 10K

Page 53: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 53 -

29 Tanzania – 1st National Seminar and

National Task force meeting September 2010 Capacity building and Awareness

raising Dar es Salaam, Tanzania

IMO ITCP – 2K Country In-kind – 10K

30 Sierra Leone – 1st National Seminar

and National Task force meeting February 2010 Capacity building and Awareness

raising Freetown, Sierra Leone

IMO ITCP – 8K Country In-kind – 10K

31 Yemen – 2nd

National Seminar and National Task force meeting

February 2010 Review of national level progress and action plans

Sanaa, Yemen IMO ITCP – 8K LPC In-kind – 10K

32 Jordan – 2nd

National Seminar and National Task force meeting

February 2010 Review of national level progress and action plans

Aqaba, Jordan IMO ITCP – 8K LPC In-kind – 10K

33 Syria – 1st National Seminar and

National Task force meeting February 2010 Capacity building and Awareness

raising Lattakia, Syria IMO ITCP – 8K

Country In-kind – 10K

34 Syria – 2nd

National Seminar on BWM July 2010 Capacity building and Awareness raising

Lattakia, Syria GloBallast Funds – 2K Country In-kind – 5K

35 Egypt – 2nd

National Seminar and National Task force meeting

February 2010 Review of national level progress and action plans

Suez, Egypt IMO ITCP – 8K LPC In-kind – 10K

36 Venezuela Regular bimonthly meetings

Review of national level progress and action plans

Venezuela LPC In-kind – 60K

37 Trinidad and Tobago 3 NTF Meetings Review of national level progress and action plans

Port of Spain, Trinidad and Tobago

LPC In-kind – 30K

38 China – National seminar and consultation meeting

October 2010 Review of national level progress and action plans

Qingdao, China IMO ITCP – 10K Host country In-kind – 5K

39 Benin – 1st National seminar November 2010 Capacity building and Awareness

raising Cotonou, Benin IMO ITCP – 4K

Host country In-kind – 2K

40 Cameroon – 1st National seminar November 2010 Capacity building and Awareness

raising Douala, Cameroon

IMO ITCP – 4K Host country In-kind – 2K

41 Liberia – 1st National seminar November 2010 Capacity building and Awareness

raising Monrovia, Liberia

IMO ITCP – 4K Host country In-kind – 2K

42 Senegal – 1st National seminar November 2010 Capacity building and Awareness

raising Dakar, Senegal IMO ITCP – 4K

Host country In-kind – 2K

43 Ethiopia – 1st National seminar November 2010 Capacity building and Awareness Adis Ababa, IMO ITCP – 4K

Page 54: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 54 -

raising Ethiopia Host country In-kind – 2K

44 Kenya – 1st National seminar November 2010 Capacity building and Awareness

raising Mombasa, Kenya

IMO ITCP – 4K Host country In-kind – 2K

45 Peru – 1st National seminar November 2010 Capacity building and Awareness

raising. Transfer of knowledge from Pilot country (Brazil)

Lima, Peru GloBallast funds 1.6K Host country In-kind – 2K

46 Panama – National consultation meeting with CPPS on the BWM Convention

December 2010 By regional coordinator to promote ratification and implementation of the BWM Convention

Panama City, Panama

GloBallast funds 1.6K CPPS 1K Host country In-kind – 2K

47 Bangladesh – 1st National seminar December 2010 Capacity building and Awareness

raising Dhaka, Bangladesh

IMO ITCP – 4.6K Host country In-kind – 5K

48 Sri Lanka – 1st National seminar December 2010 Capacity building and Awareness

raising Colombo, Sri Lanka

IMO ITCP – 4.8K Host country In-kind – 5K

49 Indonesia – 1st National seminar December 2010 Capacity building and Awareness

raising Jakarta, Indonesia

IMO ITCP – 5.2K Host country In-kind – 5K

50 Turkey – 2nd

National Task force meeting

February 2011 Increase awareness. Approval of national BWM strategy and action plan

Istanbul, Turkey

GloBallast funds – 1.2K LPC In-kind 5K

51 Viet Nam – 2nd

National seminar April 2011 Capacity building and Awareness raising

Hanoi, Viet Nam

IMO ITCP – 4.7K Host country In-kind – 2K

52 Angola – 1st National seminar including

twinning with Brazil May 2011 Capacity building and Awareness

raising Luanda, Angola IMO-UNIDO funds –

8.4K Host country In-kind – 15K

53 Thailand – 2nd

National seminar May 2011 Capacity building and Awareness raising

Bangkok, Thailand

IMO ITCP – 5K Host country In-kind –

Page 55: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 55 -

2K

54 Fiji – 1st National seminar May 2011 Capacity building and Awareness

raising Suva, Fiji IMO ITCP – 5K

Host country In-kind – 2K

Page 56: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 56 -

55 Mozambique – 1st National seminar July 2011 Capacity building and Awareness

raising Mozambique IMO ITCP – 4K

Host country In-kind – 2K

56 Madagascar – 1st National seminar July 2011 Capacity building and Awareness

raising Madagascar IMO ITCP – 4K

Host country In-kind – 2K

57 Comoros – 1st National seminar July 2011 Capacity building and Awareness

raising Comoros IMO ITCP – 4K

Host country In-kind – 2K

58 Georgia – 1st National seminar July 2011 Capacity building and Awareness

raising Batumi, Georgia

IMO ITCP – 4K Host country In-kind – 2K

59 India – National seminar and consultation meeting

September 2011 Review of national level progress and action plans

Mumbai, India IMO ITCP – 7K Host country In-kind – 5K

60 Tonga – 1st National seminar August 2011 Capacity building and Awareness

raising Tonga Host country In-kind –

2K

61 Ghana – 3rd

NTF September 2011 Review of national level progress and action plans

Accra, Ghana LPC in kind 5K

62 Marshall Islands – National seminar October 2011 Capacity building and Awareness raising

Marshall Islands

SPREP funds

63 Jordan – National Task Force Meeting March 2012 Capacity building and Awareness raising

Aqaba, Jordan GloBallast Funds 5K Host country in kind 10K

64 Trinidad and Tobago – National Task Force Meeting

April 2012 Review of national level progress and action plans

Port of Spain, Trinidad and Tobago

Host country in kind 2K

65 Malta – National seminar April 2012 Capacity building and Awareness raising

Valletta, Malta SafeMed II Funds

66 Tunisia – National Seminar June 2012 Capacity building and Awareness raising

Tunis, Tunisia IMO ITCP Funds 20K

67 Nigeria – National Task Force Meeting July 2012 Review of national level progress and action plans

Nigeria GloBallast funds 5K

68 South Africa – National progress seminar for GloBallast Phase 1 pilot country

September 2012 Cape Town, South Africa

Page 57: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 57 -

69 Morocco – National Seminar October 2012 Capacity building and Awareness raising

Morocco IMO ITCP Funds 20K

70 Israel – National seminar October 2012 Capacity building and Awareness raising

Israel SafeMed II Funds

71 Turkey – National Task Force meeting 2012

GBP in International and Regional Forums

1 GBP Participation in Black Sea Commission Meeting

October 2007 Development of GB Pilot phase follow-up Strategy

Istanbul, Turkey

GloBallast Budget

2 GloBallast Information Seminar – side event at the Conference of Parties of Barcelona Convention

January 2008 Seminar on Ballast Water Management convention and GloBallast Project

Almeria, Spain GloBallast Budget

3 Marine Biosecurity Lecture at Global Oceans Forum

April 2008 Lecture on Ballast Water Convention and Biosecurity

Hanoi, Vietnam BBC Project Fund (6K)

4 GloBallast PCU in INTERREG Ballast Water Opportunity Project Inception Meeting

24 March 2009 Lecture on BWM Issues, Convention, GIA and GBP

Hamburg, Germany

INTERREG – 3k

5 GloBallast PCU in Panama International Maritime Conference

February 2009 Lecture on BWM Issues, Convention, GIA and GBP

Panama City, Panama

GloBallast Funds – 10K

6 GloBallast facilitated a one day seminar on marine biosafety in the East Asian Seas Congress

November, 2009 Awareness raising on Ballast Water /biosecurity issues, invited speakers from the region and recommendations to Ministerial Forum

Manila, Philippines

IMO ITCP – 50K PEMSEA – 10K

7 GloBallast PCU and two RCO representatives participated in the GEF IW-5 Meeting

October 2009 Information sharing with other GEF programmes and key stakeholders, organized participant led workshop on BWM and participated in the Private sector partnership forums

Cairns, Australia

GloBallast Funds – 28K

8 GloBallast gave a keynote speech in the Total Foundation Biodiversity Seminar

October 2009 Lecture on BWM Issues, Convention, GIA and GBP

Les Porquerolles, France

TOTAL Foundation – 4K

9 GloBallast gave a invited talk in the ACI Ballast Water Conference

May 2009 Lecture on BWM Issues, Convention, GIA and GBP

Amsterdam, Netherlands

ACI – 3K

10 GloBallast gave a invited talk in the IMAREST Marine Environment Briefing

October 2009 Lecture on BWM Issues, Convention, GIA and GBP

London, UK

Page 58: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 58 -

11 GloBallast participated in the Global R&D Forum on emerging BWM systems

January 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

Malmo, Sweden

GloBallast Funds – 5K

12 GloBallast attended the GEF Assembly May 2010 GEF-IW workshop and lecture on BW issues and Project

Punta Del Este, Uruguay

IMO ITCP Funds – 5K GloBallast Funds – 2K

13 GloBallast participated in the ROPME BWM Steering Committee Meeting

April 2010 ROPME regional strategy and action plan for ballast water management

Through Video Conf

ROPME – 20K

14 Globallast participated in World Ocean Council – Sustainable Ocean Summit

June 2010 GloBallast Presentation on GEF Project, BWM Convention and GIA

Belfast, UK GloBallast Funds – 2K

15 GloBallast participated in ASCLME Regional Steering Committee meeting

September 2010 Awareness raising among ASCLME members

Dar-Es-Salaam, Tanzania

IMO ITCP funds – 5K

16 GloBallast attended the UN Inter-Agency Liaison Group Meeting

June 2010 Inter-agency cooperation on the issues strengthened and information exchange

Paris, France GloBallast Funds – 2K

17 GloBallast participated in the UN-EMG Issues Management Groups on Biodiversity

April 2010 Inter-agency cooperation on the issues strengthened and information exchange

Geneva, Switzerland

IMO ITCP Funds – 2K

18 GloBallast lectured at World Maritime University

2008, 2009, 2010, 2011 Awareness raising among WMU students who are mainly from maritime administrations of developing countries

Malmo, Sweden

WMU – 5K

19 GloBallast participated in the IMAREST – YMN event

June 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

London, UK

20 GloBallast participated in the IMAREST – Marine Environment Briefing

November 2009 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

London, UK

21 GloBallast participated in the IMAREST – Ballast Water Expert Group

May 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

London, UK

22 GloBallast participated in the Royal Institute of Naval Architects Event- Lecture

March 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

London, UK

Page 59: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 59 -

23 GloBallast participated in the Baltic Master II Regional Seminar on BWM

March 2010 Lecture on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

Gdynia, Poland EU Funds – 10K

24 IMO Marine Environmental protection Committee Meetings (MEPC) 58, 59, 60, 61 and 62 – PCU Information Papers and GloBallast / RCO/ LPC Presentations

2008, 2009, 2010, 2011 Updated the MEPC delegates on the progress of the Project, the status of Convention and GIA

London, UK

25 Participation in the 12th Global meeting

of the regional seas (IMO-UNEP forum) September 2010 Workshop on the strategic aspects

of regional and inter-regional cooperation on BWM

Bergen, Norway

IMO ITCP 2K UNEP 15K

26 IMO-UNEP Forum on regional cooperation in BWM

October 2010 Development of regional strategies for BWM

London, UK IMO ITCP 22K

27 Participation in 5th International

conference and exhibition on BWM November 2010 BWM implementation, challenges

and opportunities Singapore GloBallast funds 2K

28 Participation of the WCAR RCO [and RTF chair] in CABI regional meeting on Invasive Alien Species

March 2011 Increase awareness and facilitation of regional harmonization on Ballast Water Management

Bahamas ITCP

29 Chairing of the Joint MTEC-IMO-GloBallast workshop during the International Maritime-Port Technology and Development (MTEC) Conference 2011 in Singapore

April 2011 Update on BWM related developments

Singapore GloBallast funds

30 PCU presentation at the Joint Informal Meeting for IMarEST, the Nautical Institute London Branch, and the Honourable Company of Master Mariners, London

July 2011 Presentation on BWM Issues, Convention, GIA and GBP to key stakeholders dealing with BWM issues

London

31 GloBallast PCU and two RCO representatives participated in the GEF IW-6 Meeting

October 2011 Information sharing with other GEF programmes and key stakeholders, organized participant led workshop on BWM and participated in the Private sector partnership forums

Dubrovnik, Croatia

GloBallast Funds – 20K

32 IMO-GloBallast and the Republic of Turkey R&D Forum on BWM, Compliance, Monitoring and Enforcement, the next R&D challenge

October 2011 Scientific and technical information sharing

Istanbul, Turkey

GloBallast Funds 30K

Page 60: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 60 -

and opportunity

33 Shipbuilders’ forum on the BWM Convention

October 2011 Scientific and technical information sharing

Istanbul, Turkey

GloBallast Funds 5K

34 3rd

Test facility harmonisation meeting October 2011 Scientific and technical information sharing

Istanbul, Turkey

GloBallast Funds 6.7K

35 Participation of GloBallast PCU in the Rio+20 Conference

June 2012 Rio de Janeiro, Brazil

GloBallast Funds TBC

36 Participation of GloBallast PCU in the Yeosu Expo 2012

August 2012 Yeosu, Republic of Korea

GloBallast Funds TBC

AP/IP Reports

1 4 QPRs Submitted to UNDP April, July, Oct, December 2009

Progress feedback to UNDP London, UK

2 APR Submitted to UNDP October 2009 Progress feedback to UNDP London, UK

3 4 QPRs Submitted to UNDP April, July, Oct, December 2010

Progress feedback to UNDP London, UK

4 4 QPRs Submitted to UNDP April, July, October, December 2011

Progress feedback to UNDP London, UK

5 APR Submitted to UNDP October 2011 Progress feedback to UNDP London, UK

6 2 QPRs Submitted to UNDP April, July 2012 Progress feedback to UNDP London, UK

Page 61: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 61 -

OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 2 (activities in shades show the progress since 2010)

Expected Outcomes

Outputs

Activities (2008-2012)

Indicator (as per Pro-Doc LogFrame)

OUTCOME 2: BWM Strategies in place and legal, policy and institutional (LPI) reforms implemented and sustained at National level

Institutional Capacity Rapid Status Assessment BW Economic Assessment NBWMS National Legal Reforms Specialist Capacities CME Systems

Update GloBallast Modular Course Introductory Training on BWM in six Regions Develop guidelines for rapid assessment Develop guidance on economic assessment Develop templates for NBWMS Develop model legislations and legal training module Develop CME model and indicators Rapid assessments at National level Economic assessment at national level Aggregation of economic data Regional policy harmonization workshops in five regions Regional sustainability workshops in five regions National level stakeholder workshops

Each LPC is implementing an effective program of ballast water management in line with the IMO Convention and any Regional Strategies.

Page 62: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 62 -

Develop NBWMS Legal Training in five regions Development of National Legislations in LPCs Capacitating Training Institutes in LPCs CME training in five regions CME implementation in LPCs Review of CME system in LPCs

Page 63: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 63 -

DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 2 (activities in shades show the progress since 2010)

No Activity Dates Outcome / Description Venue Funding (cash + in-kind)

Update GloBallast Modular Course

1 Updating of Introductory Training Package on Ballast Water Management

January 2008 Major revision to the GloBallast package in line with the new IMO BWM Convention

Global/IMO IMO ITCP (25K cash)

2 Translation of GloBallast Introductory Training Package into Spanish

October 2008 GloBallast Training Package in Spanish

In-kind contribution by Argentina, Chile and Colombia (36K)+ ITCP funds for vetting the translation (11K)

3 Minor revision of Introductory Training Package on Ballast Water Management

February 2009 Updating of the Training Package by PCU with the latest feedback from previous deliveries

Global/IMO

4 Translation of GloBallast Introductory Training Package into Russian

April 2009

GloBallast Training Package in Russian

Global/IMO,

IMO ITCP– 11K

5 Translation of five modules of GloBallast Introductory Training Package into French

July 2009 GloBallast Training Package in French

Global/IMO and Accra, GCLME

IMO ITCP – 11K GCLME in-kind 5k

6 Translation of GloBallast Introductory Training Package into Arabic

December 2009 GloBallast Training Package in Arabic

Bahrain ROPME-MEMAC In-kind – 10K

Page 64: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 64 -

Introductory Training on BWM in GBP Regions

1 Wider Caribbean Regional Training Course on Ballast water Management

February 2008 Regional Train-The-Trainer Course

Kingston, Jamaica

IMO – ITCP Fund (50K) + LPC in-kind cash (10K) + In-kind time (48K)

2 Mediterranean Regional Training Course on Ballast Water Management

April 2008 Regional Train-the-Trainer Course

Alexandria, Egypt IMO – ITCP Fund (89K) + LPC in-kind cash (10K) + in-kind time (48K)

3 Red Sea and Gulf of Aden Regional Training Course on Ballast Water Management

November 2008 Regional Train-the-Trainer Course

Aden, Yemen IMO – ITCP Fund (65K) + LPC in-kind cash (10K) + In-kind time (48K)

4 South East Pacific Regional Training Course on Ballast Water Management as part of the ROCRAM regional Training

March 2009 Regional Train-the-Trainer Course (including other ROCRAM countries)

Viña del Mar, Chile

IMO ITCP Fund – 80k LPC In-kind – 20K ROCRAM In-kind – 10K CPPS In-kind – 10K

5 West and Central Africa (GCLME) Regional Training Course on Ballast Water Management

March, 2009 Regional Train-the-Trainer Course

Accra, Ghana IMO ITCP Funds – 20k UNIDO – 30k LPC In-kind – 10K IMO-In-kind – 10K

6 South Pacific Regional Training Course on Ballast Water Management

June 2009 Regional Train-the-Trainer Course

Suva, Fiji IMO ITCP Funds – 45K Country In-kind – 5K SPREP In-kind – 5K

7 Caspian Regional Training Course on Ballast Water Management

April 2009 Regional Train the –Trainer training on BWM

Baku, Azerbaijan IMO ITCP Funds – 42K Country in-kind – 20K

8 Baltic Regional Training Course on Ballast Water Management

June 2009 Regional Train the –Trainer training on BWM

Klaipeda, Lithuania

IMO ITCP Funds – 40K Country in-kind – 20K

9 Central American Region Regional Training Course on Ballast Water Management

October 2009 Regional Train the –Trainer training on BWM

San Jose, Costa Rica

IMO ITCP Funds – 50K Country in-kind – 20K

10 Western Indian Ocean Regional Training and seminar on Ballast Water Management

April 2010 Training on BWM issues to ASCLME Project stakeholders

Port-Louis, Mauritius

ASCLME – 20K

Page 65: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 65 -

Develop Guidelines for Rapid Assessment

1 LoA with IOI Finalized to jointly develop the National BW Assessment guidelines

October 2009 Formalized IOI Partnership as a Strategic Partner

Global/IMO GloBallast Funds – 2.5K IOI Funds – 2.5K

2 National BW Assessment guidelines published as a monograph and reprinted

December 2009 April 2011

Tools for LPCs to undertake national assessments

Global/IMO GloBallast Funds – 5K GloBallast funds 3K

Rapid assessments at National level

1 Turkey – National Ballast Water Study (national project)

2007-2008 National assessment, risk assessment, GIS system development and collection of ballast water data

Turkey Turkey (cash -500K)

2 Croatia– National Ballast Water study (national project)

Based on 2004-2005 study

Implementing a national assessment and studies

Croatia N/A

3 Turkey – GloBallast Consultancy Task on National BWM Status Assessment

September 2010 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K

4 Argentina – GloBallast Consultancy Task on National BWM Status Assessment

July 2011 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K

5 Chile – GloBallast Consultancy Task on National BWM Status Assessment

July 2011 Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K

6 Colombia – GloBallast Consultancy Task on national BWM Status Assessment

July 2011

Final report submitted Colombia National budget – 20K GloBallast Funds – 5K

7 Jamaica – GloBallast Consultancy Task on National BWM Status Assessment

May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K

8 Ghana – GloBallast Consultancy Task on National BWM Status Assessment

September 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K

9 Nigeria – GloBallast Consultancy Task on National BWM Status Assessment

May 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K

10 Jordan – GloBallast Consultancy Task on National BWM Status Assessment

February 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K

11 Jordan in-depth overview and additional assessment in Arabic

June 2012 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 10K PERSGA 10K

11 Yemen – GloBallast Consultancy Task on National BWM Status Assessment

September 2010 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K

12 Egypt – GloBallast Consultancy Task on National BWM Status Assessment

March 2012 Draft report submitted Egypt GloBallast Funds – 5K LPC in-kind 5K

13 Trinidad and Tobago – GloBallast Consultancy April 2012 In progress Trinidad and GloBallast Funds – 5K

Page 66: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 66 -

Task on National BWM Status Assessment Tobago LPC in-kind – 5K

14 Panama –National Ballast Water study April 2012 In progress Panama LPC in-kind – 5K

15 Tonga-Fiji-Samoa January-March 2012

Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K Host country in-kind 5K

Guidance on Economic Assessment

1 LoA Finalized with IUCN on development of the Economic Assessment Guidelines and the first draft of the Guidelines completed.

July 2009 Formalized IUCN as a Strategic Partner

Global/IMO IUCN in-kind – 10K GloBallast Funds– 10K

2 National Economic Assessment Guidelines published as a monograph and reprinted

January 2011 April 2011

Tools for LPCs to undertake economic assessment

Global/IMO GloBallast funds 6K GloBallast funds 2.6K

Economic assessments at National level

1 Turkey – GloBallast Consultancy Task on National Economic Assessment

September 2011 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K

2 Nigeria – GloBallast Consultancy Task on National Economic Assessment

May 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K

3 Jordan – GloBallast Consultancy Task on National Economic Assessment

February 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K

4 Yemen – GloBallast Consultancy Task on National Economic Assessment

September 2010 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K

5 Colombia – GloBallast Consultancy Task on National Economic Assessment

July 2011

Final report submitted Colombia National budget – 20K GloBallast Funds – 5K

6 Ghana – GloBallast Consultancy Task on National Economic Assessment

January 2012 Final report submitted Ghana GloBallast Funds 5K LPC in-kind – 5K

7 Chile – GloBallast Consultancy Task on National Economic Assessment

March 2012

Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K

8 Jamaica – GloBallast Consultancy Task on National Economic Assessment

March 2012 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K

9 Trinidad and Tobago – GloBallast Consultancy Task on National Economic Assessment

April 2012 In progress Trinidad and Tobago

GloBallast Funds – 5K LPC in-kind – 5K

10 Egypt – GloBallast Consultancy Task on National BWM Status Assessment

March 2012 In progress Egypt GloBallast Funds – 5K LPC in-kind 5K

Guidelines/templates for National BWM Strategy (NBWMS)

1 MoU Finalized with IUCN on development of the NBWMS Guidelines

July 2009 Formalized IUCN as a Strategic Partner

Global/IMO GloBallast Funds – 10K IUCN funds – 10k

Page 67: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 67 -

2 NBWMS guidelines published as a monograph and reprinted

December 2009 April 2011

NBWMS Tools for LPCs Global/IMO GloBallast funds 2.8K

Develop NBWMS

1 Turkey – Developed a draft National Ballast Water Management Strategy

2008 Development of a Draft Strategy and National Policy based on the initial assessments

Turkey National Budget (cash – 200K

2 Turkey – GloBallast Consultancy Task on National BWM Strategy Development (summary of earlier study and translation)

May 2010 Final report submitted Turkey GloBallast Funds – 5K LPC in-kind – 5K

3 Argentina – GloBallast Consultancy Task on National BWM Strategy Development

July 2011 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K

4 Colombia – GloBallast Consultancy Task on National BWM Strategy development

July 2011 Final report submitted – Waiting for NTF approval

Colombia GloBallast Funds – 5K LPC in-kind – 5K

5 Chile – GloBallast Consultancy Task on National BWM Strategy development

July 2011 Final report submitted Chile GloBallast Funds – 5K LPC in-kind – 5K

6 Jamaica – GloBallast Consultancy Task on National BWM Strategy Development

May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K

7 Ghana – GloBallast Consultancy Task on National BWM Strategy Development

September 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K

8 Nigeria – GloBallast Consultancy Task on National BWM Strategy Development

August 2011 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K

9 Jordan – GloBallast Consultancy Task on National BWM Strategy Development

March 2011 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 5K

10 Yemen – GloBallast Consultancy Task on National BWM Strategy Development

March 2011 Final report submitted Yemen GloBallast Funds – 5K LPC in-kind – 5K

11 Tonga-Fiji-Samoa January-March 2012

Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K

12 Panama –National Ballast Water Management Strategy

April 2012 In progress Panama LPC in-kind – 5K

13 Trinidad and Tobago – GloBallast Consultancy Task on National BWM Strategy Development

April 2012 In progress Trinidad and Tobago

GloBallast Funds – 5K LPC in-kind – 5K

Develop Model legislation and Training Module

1 Developed Model BWM legislation for English Speaking Caribbean Countries

November 2008 Model BWM legislation for WCAR region

Global/IMO IMO – ITCP Fund (20K)

2 Developed a Global Model Legislation for BWM

September 2009 A Global framework / model for BWM legislation at

Global/IMO GloBallast Funds – 5k

Page 68: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 68 -

national level

3 Developed a set of tools including a legal roadmap, and legislative review

September 2009 set of tools including a legal roadmap, and legislative review

Global/IMO ITCP Fund – 10K

4 Established a GloBallast Global Legal Task Force

June 2009 Development of a roster of legal experts

Global/IMO LPC In-kind – 10K RCO In-kind – 10K

5 Held a Global legal expert workshop to develop a legal training package and finalized the training package

September 2009 Legal Training package to assist capacity building

Global/IMO GloBallast Funds – 13k

6 Translation of GloBallast Legal Training Package into Arabic

December 2009 GloBallast Training Package in Arabic

Global/PERSGA GloBallast Funds – 5K

7 Revision of Legal training package based on feed backs from first three deliveries

January 2010 Legal Training package to assist capacity building

Global/IMO GloBallast Funds – 4K

Regional Legal Training

1 Mediterranean Regional Training Course on Legal aspects of Ballast Water Management

December 2009 Regional Train-the trainer course in legal training

Istanbul, Turkey IMO ITCP Funds – 50K MED Trust Fund – 50K LPC In-kind – 20K RCO In-kind – 10K

2 Wider Caribbean Regional Training Course on Legal aspects of Ballast Water Management

December 2009 Regional Train-the trainer course in legal training

Panama City, Panama

IMO ITCP Funds – 40K LPC In-kind – 10K RCO In-kind – 5K

3 Red Sea and Gulf of Aden Regional Training Course on Legal aspects of Ballast Water Management

December 2009 Regional Train-the trainer course in legal training

Hurghada, Egypt IMO ITCP Funds – 30K LPC In-kind – 20K RCO In-kind – 10K

4 West and Central Africa Regional Training Course on Legal aspects of Ballast Water Management

June, 2010 Regional Train-the trainer course in legal training

Lagos, Nigeria IMO ITCP Fund – 80K IGGC Funds -LPC in-kind – 20K

5 South East Pacific + Argentina Regional Training Course on Legal aspects of Ballast Water Management

May 2010 Regional Train-the trainer course in legal training

Buenos Aires, Argentina

IMO ITCP Fund – 20K CPPS Funds – 5K -LPC in-kind – 20K

6 Central America Regional Training Course on Legal aspects of Ballast Water Management

May 2010 Regional Train-the trainer course in legal training

Tegucigalpa, Honduras

IMO ITCP Fund – 50K Country in kind 5K

7 Black Sea Regional Training Course on Legal aspects of Ballast Water Management

July 2010 Regional Train-the trainer course in legal training

Odessa, Ukraine IMO ITCP Fund – 58K RCO – 10K

8 South East Asia regional legal training on ballast water management for the South East Asia region under the IMO-Singapore third Party Programme

October 2010 Regional Train-the trainer course in legal training

Singapore IMO ITCP Funds – 15K Singapore In-kind 11K

Page 69: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 69 -

9 South Pacific Regional Training on the Legal Implementation of the BWM Convention with particular emphasis on Compliance Monitoring and Enforcement

May 2011 Regional Train-the trainer course in legal training

Suva, Fiji IMO ITCP Fund 75K

Development of National Legislations

1 Turkey – Draft National Legislation 2008 Draft legislation in discussion

Turkey National Budget (cash – 100K)

2 Croatia – National Legislation Completed on 1 September 2007

National legislation in place Croatia National Budget (cash – 100K)

3 Croatia – Seminar on Ballast Water Convention, Regional Cooperation and National legislation

May 2008 National introductory seminar

Zagreb, Croatia National budget

4 Jamaica – held a national legislative workshop to start the process of drafting national legislation

December 2009 Capacity building among lawyers drafting national legislation prior to ratification of Convention

Kingston, Jamaica

GloBallast Funds – 2K LPC In-kind – 10K

5 Turkey – GloBallast Consultancy Task on National Legislation Development

May 2010 In progress Turkey GloBallast Funds – 5K LPC in-kind – 5K

6 Argentina – GloBallast Consultancy Task on National Legislation Development

January 2012 Final report submitted Argentina GloBallast Funds – 5K LPC in-kind – 5K

7 Jamaica – GloBallast Consultancy Task on National Legislation Development

May 2010 In progress Jamaica GloBallast Funds – 5K LPC in-kind – 5K

8 Ghana – GloBallast Consultancy Task on National Legislation Development

May 2010 Final report submitted Ghana GloBallast Funds – 5K LPC in-kind – 5K

9 Nigeria – GloBallast Consultancy Task on National Legislation Development

May 2010 Final report submitted Nigeria GloBallast Funds – 5K LPC in-kind – 5K

10 Jordan – GloBallast Consultancy Task on National Legislation Development

February 2012 Final report submitted Jordan GloBallast Funds – 5K LPC in-kind – 10K

11 Yemen – GloBallast Consultancy Task on National Legislation Development

May 2010 In progress Yemen GloBallast Funds – 5K LPC in-kind – 5K

12 Colombia – Draft National Legislation 2008 September 2010 Draft legislation in discussion by the NTF

Colombia National budget – 15K GloBallast Funds – 5K

12 Panama – Draft National Legislation December 2011 Capacity building among lawyers drafting national legislation prior to ratification of Convention

Panama GloBallast funds 15K

13 Tonga-Fiji-Samoa January-March 2012

Final report submitted Tonga-Fiji-Samoa IMO ITCP Funds 6K

Page 70: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 70 -

Ratification of BWM Convention by GB Pilots, LPCs and PCs

1 Nigeria (LPC) 2005 BWM Convention Ratified Nigeria Country In-kind (50K)

2 Egypt (LPC) 2007 BWM Convention Ratified Egypt Country In-kind (50K)

3 Barbados (PC) 2007 BWM Convention Ratified Barbados Country In-kind (50K)

4 Sierra Leone (PC) 2007 BWM Convention Ratified Sierra Leone Country In-kind (50K)

5 Albania (PC) 2009 BWM Convention Ratified Albania Country In-kind (50K)

6 Antigua & Barbuda (PC) 2008 BWM Convention Ratified Antigua & Barbuda

Country In-kind (50K)

7 Liberia (PC) 2008 BWM Convention Ratified Liberia Country In-kind (50K)

8 South Africa (Pilot) 2008 BWM Convention Ratified South Africa Country In-kind (50K)

9 Mexico (PC) 2008 BWM Convention Ratified Mexico Country In-kind (50K)

5 Albania (PC) 2009 BWM Convention Ratified Albania Country In-kind (50K)

10 Brazil (Pilot) 2010 BWM Convention Ratified Brazil Country In-kind (50K)

11 Croatia (LPC) 2010 BWM Convention Ratified Croatia Country In-kind (50K)

12 Iran (Islamic Republic of) (Pilot country) 2011 BWM Convention Ratified Iran Country In-kind (50K)

13 Trinidad and Tobago 2012 BWM Convention Ratified Trinidad and Tobago

Country In-kind (50K)

Develop Specialist Courses

1 Held a Training package development expert workshop to identify the industry training needs and to outline the training package

June 2010 Identified industry training needs

Mumbai, India IMO ITCP Funds – 28K

2 Development of an advanced industry Training Package developed using a team of three international experts Resources mobilized from IMO ITCP and GIA

June 2011

Global/IMO Funds captured under outcome 4

3 Developed a Specialized training package for Port Biological Baseline Survey in partnership with NIWA, New Zealand

2008-2009 Specialized training course NIWA Funds – 20K

4 CME training package development workshop June 2011 Training course for Flag and Port State Control Officers

Malmo, Sweden Costs captured above

5 Development of CME training package with support from WMU, IUCN, and MPA Singapore

October-December 2011

Training course for Flag and Port State Control Officers

Global/IMO IMO ITCP 6K GloBallast Funds – 7K WMU – in-kind 5K IUCN-Total 20K cash – IUCN in-kind 5K MPA Singapore – In-

Page 71: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 71 -

kind 15K

6 Translation of CME training course in Spanish March 2012 CPPS/Chile IMO ITCP Funds 5K

7 Translation of CME training course in French March 2012 Ghana IMO ITCP Funds 5K

8 Translation of CME training course in Arabic March 2012 PERSGA IMO ITCP Funds 5K

9 Consolidation and implementation training course on the ballast water management Convention

May 2012 Malta SafeMed II Funds

Regional training courses on CME

1 Mediterranean and CIS pilot training workshop March 2011 Training on CME Split, Croatia IMO ITCP 42K REMPEC/MTF 10K Industry in-kind 5K

2 South Pacific Regional Training on the Legal Implementation of the BWM Convention with particular emphasis on Compliance Monitoring and Enforcement

May 2011 Regional Train-the trainer course in legal training

Suva, Fiji Cost captured under outcome 2

3 West and Central Africa (GCLME) training workshop

September 2011 Training on CME Lome, Togo IMO ITCP 92K UNIDO-GCLME funds 36K

4 Wider Caribbean training workshop November 2011 Training on CME Kingston, Jamaica

GloBallast funds 37K UNEP 10K IMO ITCP – 49K

5 PERSGA training workshop May 2012 Training on CME Aqaba, Jordan IMO ITCP – 28.5K GloBallast Funds -6K LPC in kind 5K PERSGA 10K

6 CPPS training workshop July 2012 Training on CME Valparaiso, Chile GloBallast Funds -50K LPC In kind – 5K

Capacitating Training Institutes in LPCs

1 Colombia- National Training on Ballast Water Management using GloBallast Training package in Spanish

October 2008 Training on Ballast water Management

Cartagena, Colombia

DIMAR (Colombia) cash 50K + GBP Budget support for one legal expert

Page 72: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 72 -

OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 3 (activities in shades show the progress since 2010)

Expected Outcomes

Outputs

Activities (2008-2012)

Indicator (as per Pro-Doc LogFrame)

OUTCOME 3: Knowledge management and electronic communications systems developed and utilized

Enhanced baseline information GloBallast Marine Electronic Information System Enhanced stakeholder participation

Update PB survey protocols PB survey training in six regions Develop taxonomy expert roster in six regions Taxonomy training for LPC experts PB Survey and Reports PBS information into GMEIS Select design Options for GMEIS GMEIS Expert Workshop Country Profile Database Format development GloBallast + GMEIS Webportal LPC Training on Country Profile Database LPC develop Country Profile Database National BWM websites Partnership with Pilot Regions, Pilot Countries and

Sufficient information is available to implement risk-based ballast water management systems and raised global awareness on ballast water management

Page 73: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 73 -

LME regions Newsletters and e-forums Local brochures and publications at LPC level

DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 3 (activities in shades show the progress since October 2010)

No Activity Dates Outcome / Description Venue Funding (cash + in-kind)

PBS Protocol Update

1 Updating of PBS Protocol in partnership with NIWA (draft)

October 2008

A draft updated PBBS protocol

New Zealand In-kind contribution by NIWA captured above.

2 Development of a Guideline Document on Port Biological Baseline Surveys in partnership with IUCN-NIO and IOI-SA

January-September 2012

Guideline document/GloBallast Monograph

Global GloBallast funds 4.5K NIO in kind 5K IOI-SA in kind 5K IUCN in kind 5K

3 NIO/GloBallast/IOI-SA/IUCN Workshop for the finalisation of the Port Biological Baseline Study Guidelines

March 2012 Draft updated Guideline Goa, India GloBallast Funds 6K NIO time in-kind IOI-SA time in-kind IUCN in-kind 5K

PB survey training

1 Mediterranean Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management

October 2008

Regional Train-the-Trainer Course including hands on training

Istanbul, Turkey

SAFEMED Budget (85K) + MTF (20K) + NIWA in-kind (20K) + GloBallast Fund

2 Red Sea and Gulf of Aden Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management

2006* Regional Train-the-Trainer Course including hands on training

Hurghada, Egypt

PERSGA budget cash 50K + GloBallast + NIWA In-kind contribution

3 Wider Caribbean Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management (jointly with CPPS)

August 2009

Regional Train-the-Trainer Course including hands on training

Cartagena, Colombia

GloBallast Funds – 32K LPC In-kind – 10K RCO Inkind – 5K

4 South East Pacific Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management (jointly with WCAR)

August 2009

Regional Train-the-Trainer Course including hands on training

Cartagena, Colombia

IMO ITCP Funds – 20K LPC in-kind – 10K RCO Inkind – 5K

Page 74: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 74 -

5 South Pacific Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management

June 2009 Regional Train-the-Trainer Course including hands on training

Suva, Fiji IMO ITCP Funds – 45K LPC in-kind – 5K RCO In-kind – 10K

6 West and Central Africa (GCLME) Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management

July 2009 Regional Train-the-Trainer Course including hands on training

Abidjan, Cote d’Ivoire

IMO ITCP Funds – 65k LPC in-kind – 5K RCO In-kind – 10K

7 CPPS Regional workshop on harmonization of BW sampling and monitoring methodologies

February 2010

Regionally harmonized sampling methodologies

Chile CPPS Funds – 20K LPC inkind – 10K

8 Black sea and Caspian sea Regional Training Course on Port Biological Baseline Surveys for Ballast Water Management

July 2011 Regional Train-the-Trainer Course including hands on training

Batumi, Georgia

IMO ITCP Funds – 50K Host country in-kind 10K

9 CPPS Regional workshop on sampling techniques for ballast water

July 2011 Regionally harmonized sampling methodologies

Buenos Aires, Argentina

CPPS Funds – 17K LPC inkind – 10K

10 National Training Course on Port Biological Baseline Surveys for Ballast Water Management

August 2011

National Train-the-Trainer Course including hands on training

Lagos, Nigeria IMO ITCP funds 16K LPC in kind 5K

PBBS Surveys

1 Ghana PBBS of Tema Port September 2011

Baseline information and inventory of marine species

Ghana Country 25K in cash Country 10K in kind

Country Profile Database Format development

1 Develop Country Profile Database Format 2008 Draft Country Profile Database Format

Global/IMO GloBallast Fund – 2K

2 Pilot tested the Country profile database and database made operational through GloBallast website

November 2009

Country Profile Database format and database finalized

Global/IMO GloBallast Fund – 2K

3 Chile, Turkey, Croatia and Colombia completed the CPD

2009-2010

GloBallast + GMEIS Webportal

1 GloBallast Website Portal Update 2008 GloBallast Portal IMO, London GloBallast Fund – 2K

2 Ongoing website management and content generation including news flashes and electronic documents

2009 GloBallast Portal IMO, London GloBallast Fund – 1K

3 Strategic linkage established with MERC Global portal

2009 Link to wider global information sharing system on marine

IMO, London MERC Fund – 20K

Page 75: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 75 -

pollution

4 Workshop on development of Geographic Information Systems, TUBITAK

February 2011

Discussion on available Turkish decision support systems and possible link to future GloBallast GMEIS

Istanbul, Turkey

GloBallast – 2K Host country in-kind 5K

5 Meeting with TUBITAK on web-based risk assessment tool

February 2012

Agreement on a roadmap towards a global version of Turkey online risk assessment tool

Istanbul, Turkey

GloBallast – 2K

Letter of Agreement with TUBITAK for the Development of a Global Web-based Risk Assessment Tool

September-December 2012

Online Ballast Water Reporting Form and database; Port Risk Assessment tool, building on the GloBallast Port Risk Assessment methodology; global database of Invasive Alien Species

IMO/Turkey GloBallast Funds - TUBITAK

LoA with WMU on RA?

Development of a Risk Assessment Framework at the national level

1 Letter of Agreement with WMU for the development of a guideline document for risk assessments at the national and regional level, in the context of the BWM Convention

March-December 2012

Guidelines, tools, and training for risk assessments at the national and regional level

IMO/WMU GloBallast Funds 25K WMU time in-kind

Partnership with Pilot Regions, Pilot Countries and LME regions

1 National Seminar on Ballast Water Management – Mauritius (Indian Ocean – Pilot Region)

January 2008

Development of National Roadmap

Port Louise, Mauritius

IMO-ITCP Fund (40K) + Country cash (20K) + country time in-kind – 48K

2 Contemporary Oceans Policy and Management Issues Seminar: World Maritime University Lecture (Global)

May 2008 Lecture on BWM convention and technologies

Malmo, Sweden

WMU Fund (cash 2K)

3 Ballast Water Management Workshop during OSCE International Expert Conference in the Black Sea Basin” (Black Sea – Pilot Region)

June 2008 IMO chaired and facilitated the workshop on Ballast water

Odessa, Ukraine

OSCE Fund (cash 3K) + time in-kind (10K)

Page 76: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 76 -

management

4 Central America Regional Workshop on “Identify and address trade-related aquatic invasive species”

July 2008 GloBallast lecture on ballast water issues and management options

San Salvador, El Salvador

NOAA Fund (cash 5K)

5 Facilitated 1st ROPME/MEMAC Regional Steering

Committee Meetings for Ballast Water Management (ROPME Sea Region – Pilot Region)

November 2008

Development of Key elements of Regional Strategy and Action Plan

Manama, Bahrain

ROPME (cash 50 K) + in-kind 48K

6 National Ballast Water Training and Seminar – Montenegro

November 2009

Awareness raising and national roadmap development

Montenegro IMO ITCP Fund – 8K PC In-kind – 10K RCO In-kind – 5K

7 National Seminar on Ballast Water Management – India

November 2009

Awareness raising among the Port Sector

Goa, India GloBallast Funds – 2K Pilot Country In-kind – 10K

8 Participation of Pilot Country (South Africa, Brazil, Ukraine and India) experts in GloBallast Partnership Activities

2008-2010 Use of GloBallast pilot country expertise to expand the expertise pool

Global/IMO

9 Strategic partnership established with ASCLME region and LME Project

2009 Global/IMO

10 Supported second ROPME/MEMAC Regional Steering Committee Meetings for Ballast Water Management (ROPME Sea Region – Pilot Region)

April 2010 ROPME Sea Region BWM Circular and Regional Strategy

Global/IMO MEMAC Funds –

11 Strategic partnership established with ASEAN-India Programme on Ballast water and bio fouling

2009 In progress ASEAN Fund – 0.5K

12 ROCRAM Regional BWM Strategy RTF Meeting November 2009

Regional discussion of a draft Regional strategy for ROCRAM region and key elements to be included in Strategy

Buenos Aires, Argentina

IMO ITCP Funds – 80K LPC in-kind – 20K IMO In-kind – 5K

13 Mobilized ITCP resources for national BWM seminars in Indonesia, Sri Lanka, Bangladesh and China

2010 Preparation in progress for activity to be conducted in November/December 2010

Indonesia, Sri Lanka, Bangladesh and China

IMO ITCP Funds – 32K

14 Mobilized resources for regional legal training on ballast water management for the South East Asia region

2010 Preparation in progress for activity to be conducted in November 2010

Singapore IMO ITCP Funds – 50K

15 Mobilized resources for regional port biological baseline surveys for Black Sea (pilot region) and Caspian Regions

2010 Preparation in progress for activity to be conducted in March 2011

Georgia IMO ITCP Funds – 54K

Page 77: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 77 -

16 Supported India’s efforts in mobilizing resources for Port Biological Baseline Surveys in all major Indian ports and also for Test facility developments

2010 India allocated USD15 million dollars in the 11

th

5-year plan

Mumbai, India India Cash Funds – USD15 million

17 Participation in Inception meeting for the ASEAN-India project on the Extent of transfer of alien invasive organisms in South/Southeast Asia region by shipping

December 2010

Transfer of experiences in relation to BWM. Close partnership

Munnar, India GloBallast funds 2K

18 GloBallast-CaspEco training in Caspian region National Focal Points on GloBallast tools for development of national BWM strategy

February 2012

Transfer of experiences in relation to BWM. Close partnership

Baku, Azerbaijan

GloBallast Funds 6K

19 Development of BWM national status assessment, economic assessment and national strategy in Caspian region

December 2011-June 2012

Transfer of experiences in relation to BWM. Close partnership

Azerbaijan, Kazakhstan, Russian Federation and Turkmenistan

IMO ITCP Funds 20K

20 Participation of GloBallast in CaspEco final Steering Committee

March 2012 Transfer of experiences in relation to BWM. Close partnership

Moscow, Russian Federation

GloBallast Funds 2K

21 Letter of Agreement with IOI-SA for the Development of a Guideline Document on Port Biological Baseline Surveys

January-September 2012

Guideline document/GloBallast Monograph

IMO/IOI-SA Costs captured above

22 South Asia Regional Ballast Water Management Strategy Development Meeting

May 2012 Mumbai, India IMO ITCP Funds – 40K

23 Regional Workshop to Develop a Regional Strategy and Action Plan to Implement the BWM Convention

July 2012 Baku, Azerbaijan

IMO ITCP Funds – 60K

22 3rd

GPTF Meeting in South Africa September 2012

Cape Town, South Africa

Costs captured above, under Outcome 1

23 National progress seminar for GloBallast Phase 1 pilot country

September 2012

Cape Town, South Africa

Costs captured above, under Outcome 2

Page 78: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 78 -

Brochures and Publications and other awareness generation tools

1 GloBallast Brochures Published and distributed (2000 copies)

2009-2010 Awareness raising material

Global/IMO GloBallast Funds – 2k

2 GIA brochures published and distributed (2000 copies)

2009-2010 Awareness raising material

Global/IMO GIA Funds -2k

3 GloBallast Pull-up Poster 2009 Awareness raising material

Global/IMO GloBallast Funds - 1k

4 GIA Pull-up Poster 2009 Awareness raising material

Global/IMO GIA Funds - 1k

5 “Invaders from the Sea” – subtitled in Spanish 2009 Awareness raising material

REMPEITC RCO In-kind – 2K

6 “Invaders from the Sea” – script translated into French

2009 Awareness raising material

Global/IMO IMO ITCP Funds – 3k

7 “Invaders from the Sea” – script translated into Russian

2009 Awareness raising material

Global/IMO IMO ITCP Funds -

8 “Invaders from the Sea” – dubbed into Arabic 2009 Awareness raising material

Global/IMO ROPME/MEMAC Funds – 20K

9 Resources mobilized through GIA for a revision of Invaders from the Sea

2009 Awareness raising material

Global/IMO GIA Fund – captured elsewhere

10 Invaders from the Sea – screened in several international, regional and national forums

2008-2010 Awareness raising material

Global/IMO

11 Three Globallast monographs Published (rapid assessment guidelines, national BWM strategy guidelines and proceedings of the R&D symposium)

2009-2010 Awareness raising material

Global/IMO GloBallast Funds – captured elsewhere

12 Established Strategic Partnership with IUCN, World Maritime University (WMU) and Total Foundation on awareness raising and capacity building

2009 Awareness raising Global / IMO Total Foundation Fund – 90K

13 GloBallast Brochures reprinted 2011 Awareness raising material

Global/IMO GloBallast Funds – 1.1k

14 GIA brochures reprinted 2011 Awareness raising material

Global/IMO GIA Funds -1.5k

15 Globallast monographs 17, 18 and 19 published 2009-2010-2011

Awareness raising material

Global/IMO Cost captured under outcome 2

16 GloBallast Monograph 17 translated into Spanish 2010 Awareness raising material

Global/IMO Panama in-kind 5K

17 GloBallast Monograph 18 translated into Spanish 2011 Awareness raising Global / IMO Colombia and CPPS in-

Page 79: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 79 -

material kind 5K

18 GloBallast Monographs 18 and 19 translated into French

2011 Awareness raising material

Global / IMO Total foundation captured above

19 GloBallast-GESAMP Monograph 20 2011 Awareness raising material

Global / IMO GIA funds captured under outcome 4

20 Monograph 17-19 translated into Arabic 2011 Awareness raising material

Global / IMO Total Foundation captured above

21 Monograph 17-19 translated into Russian 2012 Awareness raising material

Global / IMO GloBallast funds 6K

22 New GloBallast leaflet and updated website 2012 Awareness raising material

Global / IMO GloBallast funds 1K

23 New GloBallast leaflet for Rio+20 and Yeosu Expo 2012 Awareness raising material

Global / IMO GloBallast funds 1K

24 New GloBallast posters 2012 Awareness raising material

Global / IMO GloBallast funds 1K

25 “Invaders from the Sea” – dubbed into Korean 2012 Awareness raising material

Global/IMO Republic of Korea in kind

OVERVIEW OF PROGRESS ACHIEVED TOWARDS OUTCOME 4 (activities in shades show the progress since 2010)

Expected Outcomes

Outputs

Activities (2008-2012)

Indicator (as per Pro-Doc LogFrame)

OUTCOME 4: Public-private partnerships developed for accelerating technology solutions

Global Industry Alliance (GIA) Test Facility Standards Sediment Management Solutions BW R&D – Forums and State of the Art

Establishment of GIA General framework for Test facility harmonization and Global expert workshop on test Facilities Test Facility Manual GIA Fund R & D Forums

Cost effective technology solutions and testing standards are developed, tested and promoted through a successful partner-ship with industry

Page 80: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 80 -

DETAILED LIST OF ACTIVITIES UNDERTAKEN TO SUPPORT OUTCOME 4 (activities in shades show the progress since October 2010) No Activity Dates Outcome / Description Venue Funding (cash + in-

kind)

Establishment of Global Industry Alliance (GIA)

1 Develop MoU with Industry Partners to form GIA October 2008 Conclusion of MoU with four partners (Vela, BP, APL and Daewoo)

IMO, London In-kind by all partners (100K)

2 Establish GIA Task Force and conduct first TF meetings

December 2008 GIA Task Force and meeting IMO, London Cash In-kind by all partners (20K)

3 Establish GIA Fund December 2008 GIA Fund Industry Cash (200K)

4 GIA Officially launched at IMO February 2009 GIA established IMO, London GIA In-kind – 10K GIA Fund – 3K

5 2nd

GIA task Force Meeting to select five GIA projects

February 2009 GIA projects approved and budget allocated

IMO, London GIA – In-kind – 5K

6 GIA – Activity 1: Global Forum on Test Facilities for BWM treatment systems

January 2010 Initial discussion on harmonization of testing protocols and development of an action plan

Malmo, Sweden

GIA Fund – 15K Test Facilities – 100K WMU – 2K

7 GIA – Activity 2: Global R&D Forum and Workshop on Alternative Systems for Ballast Water

January 2010 Information exchange among 150 participants on alternative BWM options and discussions on proving equivalency. Publication of proceedings

Malmo, Sweden

GIA Fund – 20K WMU – 20K Country / private sector delegates – 450K

8 GIA – Activity 3: Expert study on comparison of Alternative Management systems and establishment of a scientific basis for equivalency

Sep - December 2009

A scientific basis for comparing and approving alternative management options

IMO, London GIA Fund: 20K GESAMP time in-kind: 5K

9 GIA – Activity 4:GIA – CARES (Communication and Awareness Raising for Environmental Sustainability)

2008-2010 Development of a number of awareness raising tools (in progress)

IMO, London GIA Fund: 60K

Page 81: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 81 -

10 GIA – Activity 5: Development of a Specialized BWM Training Package for Shipping and Port Industry

2009-2010 2012

Training package developed to meet special needs of the industry to implement the Convention

IMO, London GIA Fund: 44K Great Eastern Maritime Training Institute, India – 5K Private sector – time in-kind: 10K

11 Advanced specialised training package for Shipping and port industry translated into Russian

2011 Training package translated into Russian

EBRD EBRD Funds

12 3rd

GIA task Force Meeting to review progress September 2009 Review of GIA progress IMO, London GIA In-kind – 1K

13 4th GIA task Force Meeting to review progress January 2010 Review of GIA progress Malmo,

Sweden GIA Task Force –time in-kind : 5K

14 5th GIA task Force Meeting to review progress June 2010 Review of GIA progress IMO, London

(Video Conf) GIA Task Force –time in-kind : 2 K

15 Established partnership with EBRD to launch IMO-EBRD Biosafety Initiative

December 2009 Resources Mobilized IMO. London EBRD Cash Commitment – 300K

16 Held Joint EBRD-IMO-Training Partner Meeting May 2010 Training Strategy Developed EBRD, London

17 6th GIA task force meeting November 2010 Review of GIA progress Singapore GloBallast funds 5K

GIA partners in-kind 2K

18 EBRD Phase 1 training on BWM, using GloBallast training package

February 2011 Coordination and facilitation of training

Odessa, Ukraine

EBRD funds captured above

19 EBRD Phase 1 training on BWM, using GloBallast training package

April 2011 Coordination and facilitation of training

Gelendzhik, Russia

EBRD funds captured above

20 EBRD Phase 2 training on BWM, using GloBallast training package

December 2011 Coordination and facilitation of training

Odessa, Ukraine and Gelendzhik, Russia

EBRD funds captured above

21 7th GIA task force meeting via teleconference to

meet new partner Keppel January 2012 Review of GIA progress and

draft agreement on new activities

London, UK GIA Task Force –time in-kind : 2 K

22 EBRD trainings in Mediterranean region using GloBallast training package

2012 Coordination and facilitation of training

Turkey EBRD funds

R&D Forums

1 Joint GloBallast-NIO International Biofouling and Ballast Water Conference

February 2008 Scientific and technical information sharing

India India (cash 50K) + GloBallast Budget

2 Joint GloBallast-IESE International Conference on Ballast Water Management

October 2008 Scientific and technical information sharing

Singapore Singapore (cash 100K) + GloBallast Budget

3 IMO-WMU Global R&D Forum on Emerging January 2010 Scientific and technical Malmo, GIA Funds: captured

Page 82: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 82 -

Alternative BWM systems information sharing Sweden elsewhere

4 IMO-GloBallast Turkey Global R&D Forum on CME

October 2011 Scientific and technical information sharing

Istanbul, Turkey

GloBallast budget Turkey (cash 5K)

Abbreviations: GBP: GloBallast Partnerships Project; BWM: Ballast Water Management; GPTF: Global Project Task Force; RTF: Regional Task Force; NTF: National Task Force; LA: Lead Agency; NFP: National Focal Point; NPC: National Project Coordinator; LPC: Lead Partnering Country.

________________

Page 83: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 83 -

Page 84: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

ANNEX 6 Template for Presentations by Regional

Coordinating Organizations

Each organization will be given approximately 15 minutes to present the information during the meeting. The following template has been developed to assist you in providing the information that may be of use for the meeting. You may wish to prepare a power-point presentation to inform the meeting. If you wish to circulate a summary of the report to other participants, please do send it to us at least one week prior to the meeting. It is expected that the information provided by the regional organization will include the following: Brief introduction to the region

Brief description of the region’s marine environment and resources and the importance of ballast water / marine invasive species issues to the region

Basic Information about the regional organization

Focal point for BWM

Brief description of the organization and its main roles / mandates related to marine environment protection in the region

List of member countries

Decision making mechanism at regional level Relevant regional agreements and conventions

Any existing regional conventions/protocols governing marine biosafety/biosecurity/ballast water issues.

Major challenges in terms implementation of a harmonized BWM regime in the region (e.g. regional cooperation, political support, institutional arrangements, technical capacity).

Existing inter-regional cooperation on marine biosafety/biosecurity/ballast water issues Status of BWM related activities

Progress at the regional level with o Development of a Regional Strategy o Training and capacity building o Other issues

Progress at the national level

Cooperation with other regions

Future challenges and needs Other Useful Information Please attach any other information that might be useful to the meeting. Longer documents, such as e.g. a Regional Strategy, can also be circulated to the participants but will not be distributed in hard copy at the meeting.

***

Page 85: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 85 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

ANNEX 7 Work Plan and

Budget for 2013-2016

SUMMARY

Executive summary: This document provides a budget overview and proposes an extension of

the Project by another two years, at no increase in the total Project budget.

The document also provides a draft revised GloBallast Partnerships

Project Implementation Plan for the period of 2013-2016.

Action to be taken: Paragraph 17

Related documents: GPTF/3/3

Introduction and background

1 In accordance with the GEF-UNDP Project Document (ProDoc), the 1st Global Project Task Force

Meeting held in March 2008 developed and endorsed a Project Implementation Plan (PIP) to guide the

execution of the GloBallast Partnerships Project (GBP). The PIP (document GPTF/1/3) outlined a detailed

work plan and budget to achieve the main goal of the GBP which is to assist vulnerable developing countries

to implement sustainable, risk-based mechanisms for the management and control of ships’ ballast water and

sediments in order to minimize the adverse impacts of aquatic invasive species transferred by ships.

2 The 2nd

Global Project Task Force meeting in October 2010 revised the Project work plan for the

remainder of the Project, (GPTF/2/8), taking into account an extension of the Project timeline by a further two

years, until 2014. The work plan was later updated by the PCU and approved by the Executive Committee

meeting held in November 2011.

3 The GloBallast Partnerships Project is currently at mid-point of its implementation. Since the second

GPTF in October 2010, the main focus of activities has been on the national level, giving priority to the

establishment of a national information base and basic structures in the Lead Partnering Countries (LPCs),

such as National Task Forces and most importantly the development of national BWM strategies and

legislation. Other major project activities were the outreach to partner countries (PCs) and the development of

two advanced training packages. Furthermore, the Mid-Term Evaluation was completed in December 2011,

and its findings will serve as a guide for the continuous improvement of the implementation of the Project.

Page 86: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 86 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

4 In line with the Logical Framework (LogFrame) for the Project (approved by GEF) and as per the

indicators of success identified for the Project, it is expected that, by the end of the project, all LPCs can

demonstrate significant improvement in legal, policy and institutional structures, with corresponding reduced

risk of ballast water borne marine bio-invasions. The LogFrame also identified the way of measuring this

over-arching indicator as follows:

All lead partnering countries (LPCs) have assigned a Lead Agency, formed a National Task

Force and developed National Ballast Water Management Strategy (NBWMS).

Each LPC has revised its legal instruments, instituted a risk-based compliance monitoring

and enforcement (CME) system, and established a sustainable financing structure for their

national ballast water management program.

All lead participating countries are proceeding towards ratification of the IMO ballast water

management Convention, with at least 10 LPCs having ratified and implementing the

Convention.

At least 3 neighbouring partnering countries have developed draft NBWMS.

The Regional Seas and LME conventions in each partner region include approved provisions

supporting improved BWM, the BWM convention and BWM regional strategies.

5 Since the achievement of the overall goal of the Project will be supported by four main outcomes, the

LogFrame had also included the indicators for each of the specific outcomes as well as their sources of

verification. A more detailed account of the outcome-based indicators and sources of verification, as per the

LogFrame is given below:

No Outcome: Indicators Sources of Verification

1 Learning, evaluation and

adaptive management

increased (Process

Outcome)

The project team at global,

regional and local levels is

effectively coordinating the

project, with objectives met,

and outputs completed in

time and within budget

Satisfactory / Highly

satisfactory ratings on key

activities and outcomes

during terminal evaluation

2 BWM Strategies in place,

with legal, policy and

institutional reforms

developed, implemented

and sustained at national

level (Process Outcome)

At project conclusion, each

LPC is implementing an

effective program of ballast

water management in line

with the IMO Convention

and any Regional

Strategies. During the

project, each LPC is sharing

the lessons learned with

other countries in the region

By the end of the project,

each LPC will have a

National Task Force and

approved National Ballast

Water Management

Strategy (NBWMS) in

place

All LPCs will have

revised legal structures,

improved Compliance

Monitoring and

Enforcement (CME)

systems and a cadre of

trained experts

Regional Task Forces and

Regional Action Plans in

place in each cooperating

region by the end of the

Project.

Regional Coordinating

Organizations are

Page 87: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 87 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

facilitating the participation

of other partnering

countries in capacity

building activities hosted by

LPCs

3 Knowledge management

tools and marine monitoring

systems are effectively

utilized to expand global

public awareness and

stakeholder support,

improve understanding of

ballast water impacts on

marine ecology, and

enhance maritime sector

communications. (Process

Outcome)

Sufficient information is

available by the end of the

project for LPCs to

implement risk-based

ballast water management

systems. All LMEs and

regional Seas programs

globally have raised ballast

water management as an

important coastal zone

concern, with their

members taking steps to

address the issue.

Momentum on BWM is

sustained in the GB pilot

regions.

Global Marine Electronic

Information System

(GMEIS) is operational,

web sites are in place in

each of the 15 LPCs.

Newsletters are

published. The GMEIS

web portal includes

information showing

ballast water protocols

and strategies in each

LME and Regional Seas.

4 Public-private partnerships

developed to spur the

development of cost-

effective ballast water

technology solutions (P and

Stress Reduction Outcome)

Cost effective technology

solutions and testing

standards are developed,

tested and promoted

through a successful

partnership with industry

A GloBallast Industry

Alliance (GIA) is launched,

testing facility standards

are developed, sediment

facility options have been

piloted, at least 2 R&D

symposiums held, and the

BWM Innovation Fund

gets launched.

Note: text in bold shows the indicators that are yet to be fully demonstrated.

6 With the above objectives and outcomes in mind, the strategy adopted for execution of the Project is

based on a three-tiered approach:

A global component, managed through a Programme Coordination Unit (PCU) at IMO in

London, providing international coordination and information dissemination, including

the development of toolkits and guidelines, and establishing a strong cooperation with

industry and NGOs.

A regional component, providing regional coordination and harmonization, information

sharing, training, and capacity building in the application of ballast water management

tools and guidelines.

A significant country component, that establishes a fast track (LPC) and partner track

(PC) process for GEF-eligible countries in the priority regions. LPCs were selected based

on their commitment to develop and implement a National Ballast Water Management

Strategy (NBWMS), and to adopt legal, policy and institutional Reforms (LPIR).

Page 88: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 88 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Budget and Project timeline

7 The Project is aimed at assisting partnering countries by providing a “roadmap” on how to achieve

legal, policy and institutional reforms, and then by assisting partnering countries to steer the course. At the

centre of the project management approach is a significant country engagement, where ownership of the issue

and significant co-financing is expected from the beneficiary LPCs. Hence, the Project budget does not have

pre-determined budget allocations at the national level. Instead, a highly adaptive project management

approach is employed, where budget allocations are made as progress is demonstrated and specific, current

needs are identified. In addition, since ownership by countries and other stakeholders is crucial for the success

for the Project, it relies heavily on partnerships and co-financing. Therefore, the Project budget is revised by

the PCU and approved by UNDP every year.

8 The latest revision of the Project budget was approved by UNDP in May 2012, through Budget

Revision D (attached to this document as Annex 1). The next Budget Revision will be submitted in 2013,

which will take into account any savings through co-financing since Budget Revision D.

9 It should be noted that the total project budget remains the same as the original GEF approved budget,

despite the two year project extension and the additional number of activities carried out in the last two years.

This was possible mainly due to the significant savings made during the first half of the project through

prudent resource management by all Project partners and extensive cash co-financing mobilized by the PCU

and RCOs. Currently, the ratio for co-financing is 1:8 (GEF funds to cash and in-kind co-finance), which is a

very high figure, and a clear indication of the tremendous ownership of the Project and the issue by all

involved partners.

10 As can be noted from Budget Revision D (see Annex 1), the total Project fund expenditure from 2008

to 2011 is US$2,638,352 (US$2,591,871 + prior year reconciliation US$46,481). As of 1 January 2012, the

remaining Project funds were US$3,049,648. From Annex 1 it can also be deduced that based on the average

yearly expenditure during the first four years, and given that many of the Outcome 2 and Outcome 3 activities

have been completed or are well under way, an average annual expenditure for the years ahead would

realistically be 550k to 650k. During 2012, expenditure is expected to be considerably less than the previous

annual averages, since the Technical Adviser position vas vacant from January to July (seven months).

Similarly, expenditure during the last year of the Project is also expected to be less than other years, since the

Project is expected to end in September, and there will be very few national and regional level activities.

11 Consequently, the PCU concludes that there is sufficient financial room to extend the project by

another two years (until September 2016) without any increase in the overall project budget. The GPTF is

therefore invited to endorse the extension of the work plan by a further two years, subject to the formal

approval by the Executive Committee during 2013, followed by the formalisation of the new Project timeline

in Budget Revision E (to be completed March-April 2013). The extension of the Project would allow a

reasonable timeframe to achieve the national level goals of the project and ensure that the experiences from

the LPCs are shared with the neighbouring countries. It would also be strategic given that the Convention has

not yet entered into force but may be expected to do so in the next 1.5-3 years’ time. During this time and the

years immediately following entry into force, the GloBallast Partnerships Project and partners (RCOs, LPCs

and strategic partners) will have a crucial role to play.

12 The proposal by the PCU to extend the project also takes into consideration the fact that significant

further co-financing can be mobilized during the extended period of the Project, especially considering the co-

financing track record in the first four years.

Page 89: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 89 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Revised work plan 2013-2016

13 As demonstrated in the Progress Report (document GPTF/3/3), and as confirmed by the Mid-Term

Evaluation report, significant progress has been achieved in the first four years of the Project. Most of the

targets set for the 2008-2011 period have been met or exceeded, but some key targets remain to be met, not

least under Outcome 2 and Outcome 3. Several tools have been developed to assist with the national level

LPIR process, significant capacity building activities have been implemented at regional level and regional

frameworks and strategies for cooperation and collaboration are being built. However, some hurdles still

remain at the national level when it comes to development of a national BWM strategy, national legislation

and institutional framework to implement the BWM Convention. As noted during the GPTF in 2010 and the

ExCom meeting in 2011, while several LPCs have come a long way in their national level processes, the

indications are that for some countries this process will take considerably more time than was originally

envisaged. One reason is the continued delays at the international level in finalizing the BWM Port State

Control procedures, uncertainties related to the ballast water sampling and monitoring methods, a yet to be

fully matured ballast water treatment technology market and most importantly the global economic crisis that

significantly shifted priorities when it comes to implementation of marine environmental protection regulatory

regimes, not to mention the pressure from regulated industry community on flag states to buy in more

preparatory time for implementation of the Convention.

14 The attached draft work plan, developed by the PCU, takes into consideration the remaining priorities

of the project and the proposal above for an extended timeline. The remaining priorities of the project are

listed below in Annex 1 and are also graphically presented in Figure 1. It is also suggested that some of the

activities originally captured in the ProDoc may need to be revisited and revised, considering the latest

developments in the field. The GPTF meeting will also be invited to discuss if there are other barriers, not

captured in the initial Project Document, that need additional attention to ensure the success of the Project.

15 In summary, in order to sustain the momentum at national level and to continue building the technical

and institutional capacity, the project will focus on the following areas in the years to come:

Global level

Finalisation and distribution of guidelines for Port Biological Baseline Surveys

Development of guidelines for risk assessment

Development of a manual/guideline for sediment reception facilities

Development of a Global Marine Electronic Information System, including an on-line version of the

GloBallast Risk Assessment tool (with TUBITAK, Turkey)

Updating of the Compliance Monitoring and Enforcement training package to include issues of

sampling as per guidance being developed at IMO

Continued partnership with the industry through the GIA

Regional level

Implementation of Regional Strategies, and incorporation into regional seas convention frameworks

Regional training on risk assessment in all regions

National level

Finalisation of national assessments, strategy developments and legislation drafting in remaining

LPCs

Outreach to pilot countries (“twinning”) and transfer of experiences from LPCs to PCs

National training on Compliance Monitoring and Enforcement (including sampling)

16 Annex 2 below provides a more detailed outline of the priority activities during 2013-2016, and the

full draft work plan can be found in Annex 3. For Annex 3 it should be noted that a number of activities would

Page 90: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 90 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

need to be continued throughout the duration of the Project, whereas some activities have been fully

implemented in the past.

Action Requested of the GPTF

17 The GPTF is requested to review the document and endorse the revised timeline and work plan for

2013-2016, subject to the formal approval by the ExCom and the subsequent Budget Revision E (expected

early 2013).

***

Page 91: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 91 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Figure 1: Remaining GBP Priority Activities during 2013-2016 (shaded in red/yellow)

Modif.Risk

Assessm.

guidelines

Risk

Assessm.

training

Develop

guidance

for

sediment

reception

facilities

Page 92: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 92 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Annex 1: Budget Revision D (approved 2012)

Award

ID: 00048032

Award

Title: PIMS No 3050 IW FSP: GloBallast Partnerships

Business

Unit: UNDP1

Project

Title:

PIMS No. 3050 IW FSP: Building Partnerships to Assist Developing Countries to reduce the

Transfer of Harmful Aquatic Organisms in Ships’ Ballast Water (GloBallast Partnerships)

Implemen

ting

Partner

International Maritime Organization (IMO)

GEF Outcome /

ATLAS Activity

Responsible

Party

Fund

ID Donor

Name

Atlas Budgetary

Account

Code

ATLAS

Budget Description

Amount

2008

(USD)

Amount

2009

(USD)

Amount

2010

(USD)

Amount

2011

(USD)

Amount

2012

(USD)

Amount

2013

(USD)

Amount

2014

(USD)

Total from

GEF

(USD)

See

Budget

Note:

OUTCOME 1:

LEARNING,

EVALUATION

AND ADAPTIVE

MANAGEMENT

INCREASED

IMO

62000

GEF

71200

International

Consultants / experts

149,859

(149,859)

86,138

(86,138)

60,487

(71,250)

66,888.44

(137,000)

150,000

(120,000)

137,700

(115,000)

152,686

(152,686)

839,997

(650,997)

1, 4

71300 Local Consultants /

experts

34,898

(34,898)

18,468

(18,468)

30,000

(37,500)

70,000

(100,000)

100,000

(32,000)

50,000

(10,000)

70,000

(70,000)

290,388

(304,149)

71600 Travel 9,661

(9,661) 9,810

(9,810) 6,227

(7,784) 14,550.61 (18,000)

100,000 (18,000)

10,000 (10,000)

10,000 (10,000)

81,698 (69,471)

Sub-Total GEF

194,418

(194,418)

114,416

(114,416)

96,714

(116,534)

151,439.05

(255,000)

350,000

(170,000)

197,700

(135,000)

232,686

(232,686)

1,212,083

(1,024,617)

Page 93: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 93 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

GEF Outcome /

ATLAS Activity

Responsible

Party

Fund ID

Donor

Name

Atlas

Budgetary

Account Code

ATLAS Budget

Description

Amount

2008

(USD)

Amount

2009

(USD)

Amount

2010

(USD)

Amount

2011

(USD)

Amount

2012

(USD)

Amount

2013

(USD)

Amount

2014

(USD)

Total from

GEF

(USD)

See

Budget

Note:

Total Outcome 1 194,418

(194,418)

114,416

(114,416)

96,714

(116,534)

151,439.05

(255,000)

170,000

(403,783)

135,000

(0)

232,686

(0)

1,212,083

(1,024,617)

OUTCOME 2:

BWM

STRATEGIES IN

PLACE, WITH

LEGAL, POLICY

AND

INSTITUTIONAL

REFORMS

DEVELOPED,

IMPLEMENTED

AND SUSTAINED

AT NATIONAL

LEVEL

IMO

62000

GEF

71200

International

Consultants / experts

140,343

(140,343)

78,416

(78,416)

118,488

(143,750)

64,121

(105,000)

150,000

(150,000)

180,000

(180,000)

130,000

(110,000)

878,759

(633,759)

71300 Local Consultants /

experts

-

(-)

47,881

(47,881)

140,821

(176,026)

130,000

(305,000)

77,280.90

(20,000)

90,000

(81,400)

5,000

(5,000)

599,471

(1,098,881)

Sub-Total GEF

140,343

(140,343 )

126,297

(126,297)

259,309

(319,776)

194,121

(410,000)

227,280.90

(170,000)

270,000

(261,400)

135,000

(115,000)

1,478,230

(1,732,640)

Total Outcome 2 140,343

(140,343 )

126,297

(126,297)

259,309

(319,776)

410,000

(410,000)

170,000

(380,000)

261,400

(0)

115,000

(0)

1,478,230

(1,732,640)

OUTCOME 3:

KNOWLEDGE

MANAGEMENT

TOOLS AND

MARINE

MONITORING

SYSTEMS ARE

EFFECTIVELY

UTILISED TO

EXPAND

GLOBAL PUBLIC

AWARENESS

AND

STAKEHOLDER

SUPPORT,

IMPROVE

UNDERSTANDIN

G OF BALLAST

WATER

IMPACTS ON

MARINE

ECOLOGY, AND

IMO

62000

GEF

71200

International

Consultants /

experts

107,825 (107,825)

96,875 (96,875)

118,489 (143,750)

64,121 (127,000)

189,000 (189,000)

150,000 (110,000)

130,000 (110,000)

855,700 (804,700)

71300 Local Consultants /

experts

-

(-)

43,947.17

(43,947.17)

17,683

(22,104)

46,118

(51,000)

70,000

(50,000)

60,000

(35,000)

3,752

(3,752)

190,991

(468,232)

74100 Professional

Services

-

(-)

-

(-)

0

(0)

10,000

(10,000)

35,000

(5,000)

5,000

(5,000)

5,000

(5,000)

25,000

(55,000)

72300 Materials

and Goods

-

(-)

4,348

(4,348)

0

(0)

9,849

(20,000)

15,000

(15,000)

15,000

(15,000)

15,000

(15,000)

68,084

(99,348)

71600 Travel 2,290

(2,290)

4,000

(4,000)

0

(0)

4,000

(4,000)

28,000

(8,000)

8,000

(8,000)

8,000

(8,000)

34,290

(30,290)

Sub-Total GEF 110,115

(110,115)

149,170.17

(149,170.17)

136,172

(165,854)

134,088

(212,000)

337,000

(267,000)

238,000

(173,000)

161,752

(141,752)

1,174,065

(1,457,570)

Page 94: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 94 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

GEF Outcome /

ATLAS Activity

Responsible

Party

Fund ID

Donor

Name

Atlas

Budgetary

Account Code

ATLAS Budget

Description

Amount

2008

(USD)

Amount

2009

(USD)

Amount

2010

(USD)

Amount

2011

(USD)

Amount

2012

(USD)

Amount

2013

(USD)

Amount

2014

(USD)

Total from

GEF

(USD)

See

Budget

Note:

ENHANCE

MARITIME

SECTOR

COMMUNICATI

ONS.

Total Outcome 3 110,115

(110,115)

149,170.17

(149,170.17)

136,172

(165,854)

212,000

(212,000)

267,000

(413,285)

173,000

(0)

141,752

(0)

1,174,065

(1,457,570)

OUTCOME 4:

PUBLIC-

PRIVATE

PARTNERSHIPS

DEVELOPED TO

SPUR THE

DEVELOPMENT

OF COST-

EFFECTIVE

BALLAST

WATER

TECHNOLOGY

SOLUTIONS

IMO

62000

GEF

71200

International

Consultants / experts

53,189

(53,189)

113,237.36

(113,237.36)

118,488

(143,750)

64,121

(125,000)

140,000

(142,500)

150,000

(130,500)

113,000

(113,000)

790,640

(634,024)

71600 Travel 10,434

(10,434)

580

(580)

24,295

(30,369)

10,000

(20,895)

20,000

(20,500)

20,500

(20,500)

7,210

(5,000)

102,205

(113,514)

Sub-Total GEF 63,623

(63,623)

113,817.36

(113,817.36)

142,783

(174,119)

74,121

(145,895)

163,000

(163,000)

170,500

(151,000)

120,210

(118,000)

892,845

(747,538)

Total Outcome 4 63,623

(63,623)

113,817.36

(113,817.36)

142,783

(174,119)

145,895

(145,895)

163,000

(330,098)

151,000

(0)

118,000

(0)

892,845

(747,538)

OUTCOME 5:

MONOTORING.

LEARNING,

DAPATIVE

FEEDBACK &

EVALUATION

IMO

62000

GEF

71200 International

Consultants

-

(-)

-

(-)

-

(0)

24,528

(40,000)

-

(-)

-

(-)

50,000

(50,000)

90,000

(100,000)

Sub-Total GEF -

(-)

-

(-)

-

(0)

24,528

(40,000)

-

(-)

-

(-)

50,000

(50,000)

90,000

(100,000)

Total Outcome 5 -

(-)

-

(-)

-

(0)

24,528

(40,000)

-

(-)

-

(-)

50,000

(-)

90,000

(100,000)

PROJECT

MANAGEMENT

UNIT

71400

Chief

Technical Advisor -

Level p5

27,000 (27,000)

9,898 (9,898)

27,000 (33,750)

27,000 (27,000)

27,000 (27,000)

27,000 (27,000)

27,000 (27,000)

171,898 (115,474)

2

71400 Technical Advisor -

Level p3

-

(-)

-

(-)

15,000

(18,750)

15,000

(15,000)

15,000

(15,000)

15,000

(15,000)

15,000

(15,000)

75,000

(45,000)

2

71400 Administrative Assistant

(G6)

39,675

(39,675)

56,731

(56,731)

11,211

(14,014)

65,000

(65,000)

75,000

(75,000)

75,000

(75,000)

75,000

(75,000)

403,980

(291,731)

2

72500 Office Supplies

13,571 (13,571)

8,225 (8,225)

13,287 (16,609)

17,306.76 (20,000)

20,000 (20,000)

20,000 (20,000)

20,000 (0)

116,686 (103,222)

71600 Travel 2,948

(2,948)

6,541.68

(6,541.68)

1,002

(1,252)

10,000

(15,000)

15,000

(15,000)

15,000

(15,000)

20,000

(0)

73,213

(70,207)

3

Page 95: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 95 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

GEF Outcome /

ATLAS Activity

Responsible

Party

Fund ID

Donor

Name

Atlas

Budgetary

Account Code

ATLAS Budget

Description

Amount

2008

(USD)

Amount

2009

(USD)

Amount

2010

(USD)

Amount

2011

(USD)

Amount

2012

(USD)

Amount

2013

(USD)

Amount

2014

(USD)

Total from

GEF

(USD)

See

Budget

Note:

Sub-Total 83,194

(83,194)

81,395.68

(81,395.68)

67,500

(84,375)

92,306.76

(142,000)

152,000

(152,000)

152,000

(152,000)

152,000

(0)

840,777

(625,635)

Total Management 83,194

(83,194)

81,395.68

(81,395.68)

67,500

(84,375)

92,306.76

(142,000)

152,000

(152,045)

152,000

(0)

152,000

(0)

840,777

(625,635)

PROJECT TOTAL

591,693

(591,693)

585,096.21

(585,096.21)

702,478

(860,658)

712,603.80

(1,204,895)

1,226,280.90

(922,000)

1,023,200

(872,400)

846647.84

(809,438)

5,688,000

(5,688,000)

5

1 The Project Management Activities and Monitoring and Evaluation activities are combined with OUTCOME 1 in the log-framework. Costs associated with these items are now separately shown in this

table under Project Management and Outcome 5, respectively. 2 The personnel cost under Project Management Unit component represents only the costs associated with the project administration activities by the Project Coordination Unit. Costs associated with the

technical experts (CTA and TA), who will deliver most of the technical outcomes, are incorporated within the International Consultants components. 3 The travel costs are primarily for PCU staff for the purpose of project management, administration and for outreach activities. Travel costs for technical workshops, training events and travel costs for

international Consultants are incorporated within the local and international consultant components, unless specified otherwise. 4 The PCU time is captured as costs distributed between all Project Outcomes. 5 The cash co-financing that has already been mobilized amounts to USD6,679,000 (as of 30 June 2011, see Mid Term Evaluation)

Page 96: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 96 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Page 97: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 97 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Annex 2: List of GBP priority activities during 2013-2016

The following table provides a summary of the priority activities for the period 2013-2016.

Tier Remaining Priority Actions

to be started

Remaining Priority

Actions to be sustained

Comments

Activities to be Implemented

Global Terminal Evaluation

Aggregate Economic Impact

Data at Global Level

To result in an updated

publication of GloBallast

Economic Impact

Assessment Study

Update CME Model and

Training Package

Training Package developed

Global Marine Electronic

Information System – Design

Some components already

underway, the main

structure/architecture to be

developed in 2013/14 Global Marine Electronic

Information System – Expert

Workshop

Development of guidelines for

sediment management

To be initiated late

2012/early 2013

To develop a new Risk

assessment activity to

undertake national level risk

assessment – using GloBallast

package, to support CME.

PCU to update the risk

assessment methodology and

pass it on to LPCs

In cooperation with other

efforts such as EU risk

assessment initiative, other

LPCs Risk Assessment

initiatives (e.g. Turkey)

Test Facility

Standardization Manual

Based on inputs from GIA

funded test facility forum

discussions

3rd

GPTF In 2012

4th GPTF In 2014

5th GPTF In 2016

QPR/APRs Continuous

Global Industry

Alliance Activities

Expansion of GIA and

additional activities with

GIA Fund + EBRD

Partnerships

Global R&D Forums

6th IBWMC in November

2012

5th IMO-R&D Forum in

2013

Regional CME Training Regional level training

completed, national trainings

to follow once sampling

procedures are included.

Remaining Regional

Task Force Meetings

Depending on the Progress

achieved in developing the

Strategy

Regional Strategy to be

adopted by Regional

Conventions

CPPS – already adopted by

Lima Convention

Process initiated in

Mediterranean, Wider

Caribbean, GCLME region

Page 98: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 98 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

and Red Sea & Gulf of

Aden.

LME/RS /Pilot Country

Cooperation / Outreach

More regional/national level

interventions as possible

National Rapid Assessments and

Reports

Submitted by most LPCs

Economic Impact

Assessments and

Reports

Submitted by most LPCs

National BWM

Strategies

Submitted by most LPCs

Develop National

Legislation

Drafts submitted by most

LPCs

Implement CME Based on training at

regional/national level

Review of CME

implementation success

Corrective actions if needed.

Develop National BWM

Websites

PCU to develop a model

and to be distributed to

LPCs (if needed)

Complete Country Profile

Database

Support / Action from LPCs

urgently needed.

National Task Force

Meetings

NTF is expected to be

eventually replaced with a

formal institutional

mechanism to implement the

Convention

Page 99: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 99 -

- 99 -

Annex 3: Project Implementation and Work Plan for 2013-2016

No Output and activity Description 2013 2014 2015 2016 Responsibility

1.1 Project Management and

coordination structures in place at

global, regional and local level

1.1.1 Hire, equip and maintain project

coordination unit staff and office

at IMO HQ

IMO-PCU

1.1.2 Establish and support Global

Project Task Force (GPTF)

IMO-PCU

1.1.3 Designate and coordinate with

regional coordinating

organizations

IMO-PCU

1.1.4 Establish and maintain regional

task forces

RCOs

1.1.5 Establish project coordination in

each LPC, including identifying

lead organization (LO), national

focal point and national project

coordinator

Completed

1.1.6 Establish and maintain National

Task Forces

LPCs

1.1.7 Represent and promote GloBallast

Partnerships in international and

regional conventions and forums

IMO-PCU/

RCOs/LPCs

2.1 Institutional capacities are

enhanced through a

comprehensive training program

on Ballast water management

2.1.1 Update GloBallast Introductory

Modular Course for Ballast Water

Management

IMO-PCU

2.1.2 Hold regional training courses on

BWM using updated Modular

Training package

Completed

2.2 Risk-based, rapid status

assessment reports are developed

and used to guide country

activities

Page 100: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 100 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

2.2.1 Develop template and guidelines

for rapid assessments

Completed

2.2.2 Develop rapid status assessments

LPCs

2.3 Economic aspects of marine bio-

invasions factored into national

strategic planning

2.3.1 Develop guidance for economic

assessments

Completed

2.3.2 Develop national economic impact

and response cost assessments,

taking into account the need for

financial sustainability

LPCs

2.3.3 Aggregate economic information

IMO-PCU

2.4

National Ballast Water

Management Strategy (NBWMS)

developed and implemented

2.4.1

Develop guidelines for national

BWMS development, including

options for financial sustainability

Completed

2.4.2

Hold (a) regional harmonisation

(including regional LPI

assessment) and (b) Sustainability

workshops

RCOs

2.4.3 Hold national stakeholder

workshops

LPCs

2.4.4

National Ballast Water

management Strategy (BWMS)

developed

LPCs

2.5 National legal reforms instituted

Page 101: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 101 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

2.5.1 Develop legal road map, model

legislation and training manuals

Completed

2.5.2

Train regional LPC lawyers on

developing legal frameworks for

BWM

Completed

2.5.3 Develop national legislation

LPCs

2.6 Specialist capacities improved for

BWM

2.6.1 Develop model BWM (specialist)

course

Completed

2.6.2

Capacitate Training Institutes for

delivery of Introductory course

and specialized courses

LPCs

2.7

Compliance monitoring and

enforcement indicators are

developed and national systems

enhanced, with an emphasis on

risk-based priority setting, and the

use of voluntary approaches

2.7.1

Develop and disseminate model

CME framework, including

indicators

Completed

2.7.2 Hold regional training workshops

on CME

Completed

2.7.3 Countries implement modified

CME systems

LPCs

2.7.4

Conduct follow up reviews of

modified CME systems and

develop lessons learned study

LPCs

Page 102: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 102 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

3.1

Baseline information established

on biodiversity and alien species

presence in major ports

3.1.1 Update Port baseline survey

protocols

Completed

3.1.2

Hold regional training workshops

on port baseline survey design and

implementation

Completed

3.1.3 Develop country, regional and

global rosters of taxonomy experts Replaced by Activity 3.4

3.1.4

Train local taxonomists in generic

tools and methodologies for

marine invasive detection and

analysis

Replaced by Activity 3.4

3.1.5

LPCs carry out baseline surveys

and develop national marine

invasive reports

Replaced by Activity 3.4

3.1.6

Compile country baseline data

and input into GMEIS (see

activity 3.2)

See activity 3.2

3.2

Global Marine Electronic

Information System (GMEIS) for

Ballast Water Management

Established

3.2.1

Identify GMEIS

Design/architecture Options

IMO-PCU

3.2.2 Hold GMEIS expert workshop for

design / architecture selection

IMO-PCU

3.2.3

Develop country profile database

format and disseminate to

participating countries

Completed

3.2.4

Provide training and technical

assistance on knowledge

management and database

development for LPCs

IMO-PCU

Page 103: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 103 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

3.2.5 Populate the country profile

database

LPCs

3.2.6 Develop and maintain GloBallast

GMEIS web portal

IMO-PCU

3.2.7 Launch and maintain national

BWM websites

LPCs

3.3

Stakeholder and public awareness

of ballast water management and

marine bio-invasion issues is

raised and sustained

3.3.1 Stakeholder outreach to GB pilot

regions, LMEs and Regional Seas

IMO-PCU/RCOs

3.3.2 Publish and post semester

newsletters

IMO-PCU

3.3.3

Develop, update and translate

GloBallast brochures and

publications

IMO-PCU

3.4

Development of a Risk

Assessment framework at the

national level

3.4.1

Modification of the GloBallast

Risk Assessment methodology to

assist CME

IMO-PCU

3.4.2 Training using GloBallast Risk

assessment Tools

IMO-PCU

4.1 Strategic partnership forged with

shipping industry

4.1.1

Set up a Global Industry Task

Force to meet annually and

provide input to GloBallast

Partnerships

Completed

4.1.2

Hold biannual industry dialogues

between GITF and the GloBallast

Steering Committee

IMO-PCU

4.2

Globally agreed standards

developed for ballast water

technology test facilities

4.2.1

Develop framework for ballast

water treatment equipment test

facility standards and inter-

IMO-PCU

Page 104: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 104 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

calibration procedures

4.2.2

Hold / facilitate experts workshop

to propose test facility standards

and procedures

IMO-PCU

4.2.3

Develop and disseminate

standards and procedures manual

for ballast water treatment

equipment test facility standards

IMO-PCU

4.3

Solutions devised and best

practices publicized on port-based

reception facilities for ballast

water tank sediments

4.3.1

Develop best practices manual for

sediment management (redesigned

activity after GPTF 2)

IMO-PCU

4.4

State of the art in Ballast water

treatment technology solutions

identified and publicized

4.4.1

Establish Ballast Water Innovation

Fund and support innovative

projects

IMO-PCU

4.4.2

Hold biennial global R&D forums

and biennial technology

conferences

IMO-PCU

5.1

Project monitoring, evaluation and

reporting systems established and

implemented

5.1.1 Conduct mid-term evaluation and

initiate mid-course corrections

Completed

5.1.2 Conduct terminal evaluation

IMO-PCU

5.1.3

Develop and submit APR/PIRs

and other required GEF/UNDP

project monitoring reports

IMO-PCU

6.1 Project Management Unit

coordinates the various activities

6.1.1 Project Manager (CTA)

IMO-PCU

Page 105: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

- 105 -

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

No Output and activity Description 2013 2014 2015 2016 Responsibility

6.1.2 Assistant Project Manager (TA)

IMO-PCU

6.1.3 Administrative Assistant (AA)

IMO-PCU

6.1.4 Office supplies

IMO-PCU

6.1.5 Travel related to Project

Management

IMO-PCU

____________

Page 106: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

106

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

ANNEX 8 List of Priority Activities

2013-2016

During group discussions at the 3rd GPTF the following activities were identified by the LPCs and RCOs as priority actions needed to meet the objectives of the Project, and the implementation of the Convention at regional and national level. Global level

update the introductory training course (activity 2.1.1), in particular to make it more country- and region-specific;

update CME training package, in particular to include a module on sampling;

support to RCOs, PCs and LPCs for biennium R&D Forum (activity 5.1.1);

more emphasis on awareness and outreach and lack of logistics at national level (activity 5.1.2);

harmonization of best practices between regions (e.g. PERSGA twinning); and

new website with better access to global, regional and national level data.

Regional level

Regional strategy plan;

more focus on assisting the implementation of the regional strategy and global information system (activity 1.1.4);

twinning on inter-regional basis, not only regional basis;

regional risk assessments, e.g. an allocation for each RCO to carry out risk assessment in their region. Further support (e.g. from UNEP?) could be mobilized;

stakeholders workshop: support needed for LPCs (activity 2.4.3);

improving the link between regional activities and the national level; and

enforcement of the trans-boundary agreements.

National level

training of PSCOs. Here, twinning between LPCs or LPC to PC on the PSC issue was suggested, even including secondment of PSCOs;

training for sampling (see global level, updating CME package);

support of NTFs;

twinning between the RCOs will be beneficial;

financial resources ;

provide report format and timetable for national reporting;

more focus on PCs in the future years = twinning and national capacity building activities;

replicate on national scale the GIA concept, i.e. national GIA with shipping industry and ship owners, need for more awareness;

engage the ROs : type approval process - flag state implementation;

work with marine environment protection agencies; and

rapid assessment: PCs need additional support (activity 2.2.2).

Page 107: Third Global Project Task Force (GPTF) Meetingcpps.dyndns.info/cpps-docs-web/planaccion/docs2013/mar/xix_ag/0… · Final report of the Mid-Term Evaluation Information note for participants

107

C:\Users\bworku\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\A9KQJODC\3rd_GPTF_Report_version_final.docx

Reporting The meeting identified that there is a need to improve the reporting both within regions and between the PCU and the RCOs/LPCs. Several suggestions were identified:

more regular meetings between RCOs: Skype, videoconference or MEPC meeting, OPRC-HNS TG;

PCU providing a summary of activities on an annual basis; and

RCOs to request status reports form the LPCs on the implementation of the ratification;

quite possibly a quarterly reporting could be achieved, if a web-based system is implemented. Such a reporting system should be clearly linked to the regional strategies; and

Venezuela offered to take the lead on the development of a web-based form for reporting.

Region-specific comments GCLME:

4 countries were identified as possibly in need of the most assistance: Guinea Bissau, Sao Tome, Equatorial Guinea and Angola. Here, increased efforts on twinning would be useful.

REMPEC:

One issue would be how to engage EU – Med Sea Member States in the implementation of the regional strategy (funds through the UNEP/MAP MTF budget were previously provided for the RTF meetings and capacity building activities). However, GEF funds cannot cover EU countries and a solution for funding may need to be looked into.

SPREP:

The issue of PBBS training at national level would be of interest for the countries in the SPREP region.

REMPEITC:

LPCs are progressing well, moving towards ratification. However, further support to other countries of the region in order to encourage flag states with large tonnage to ratify should be a priority;

There is also a need to harmonize between the 5 LPCs, with mutual support and twinning;

In addition the region has many other stakeholders (non GEF countries) making regional harmonization difficult in the WCAR;

The issue of sediment reception facilities was also raised; and

The dialogue in the region between the ministers of transport.