third national dialogue on urban nexus in thailand ......chiang mai municipality public works bureau...
TRANSCRIPT
Chiang Mai MunicipalityPublic Works BureauSanitary Engineering Division
Third National Dialogue on Urban Nexus in Thailand“strengthening Collaboration and Access to Financing to support Integrated
Resource Management in Thai Cities” Bangkok, Thailand, 3 May 2018
CHIANG MAI CURRENT SITUATION
Chaing Mai Municipality in collaboration with German International Cooperation(GIZ) under the project on Integrated Resource Management in Asian Cities : The Urban Nexus
Programs in the field of wastewater management and energy efficiency in the municipal area from 2013 - present
Project & Activities under the GIZ Nexus Program
1. Problem-solving of wastewater in the Mae Kha Canal2. Energy-efficient building design for elderly care center
3. Wastewater Collection System in old town and whole-sale fresh market4. Increasing Capacity of pump performance of fountain at city moat
1
2
3
4
Maekha Canel
Muang Mai Market
1. Problem-solving of wastewater in the Mae Kha Canal
Direct natural water into Mae Kha canal during dry season
2. Pumping from ping river
6,000 cm3 per day
1. Keaw pond
250,000 cm3 per day
2. Stop waste water entering the Mae Kha
Control wastewater from medium and big commercial building
ZONE 1 makha canelZONE 2 Chang klan areaZONE 3 Nimmanhemin areaZONE 4 Sirimanklajan areaZONE 5 Huaykeaw areaZONE 6 Suandok area
“ Stop wastewater “
Control wastewater from medium and large commercial building
Makha Canal illegal settlements
A
Makha canel illegal household
CLEAN UP WASTEWATER COLLECTION SYSTEM
Mae Kha channelOxygen content
• Change of waste water collection system from open channel to pipes
Mae Kha channelRecommendations Long Term
Walkway
Bicycle lane
Mae Kha
Walkway
Mae Kha
Bicycle lane
Foot path
Manhold along canal
Foot path
•Garbage removal in canal•Grease Trap•Aerated Lagoon
Treating Existing Wastewater in Mae Kha canal
Raising public awareness
Launching Campaign to raise public awareness on littering
“ NO Littering in Open Space ,Canals and Public area ”
1. Cut off wastewater line from Chang-pheuk Municipality to wastewater system in dry season
Plan Activities for 2018
Mae Kha Canal
St. Peter Hospital
Waste Water from Chang PheukMunicipality
Waste Water from Chiangmai Municipality
บอ่พกัท่อรวบรวมน ้ำเสีย
Existing Waste Water flow direction
Mae Kha Canal
Mae Kha Canal
บอ่พกัท่อรวบรวมน ้ำเสีย
Rong Ka Jae canal
Pumping Station 4
2. Collect waste water from Rong ka jae canal to wastewater system in dry season
Plan Activities for 2019
Mae Kha Canal
Pumping Station 5
Pumping Station 6
3. Expand Waste Water Collection Network
บอ่พกัท่อรวบรวมน ้ำเสีย
Future Plan
Thank you