Temporary Steam Plant Guidelines
Presented by Jack Muscia
Rental Business Development Manager Indeck Power Equipment Company
![Page 2: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/2.jpg)
Are You Prepared for Possible Steam Interruptions?
• Management expects 24/7 operations.
• Do you have contingency plans in place?
• Do you have temporary tie-ins installed?
• Is the equipment provider located in Illinois?
![Page 3: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/3.jpg)
Hospitals Require the Services with no Interruption…
• Sterilization • Humidification • Heating • Hot Water
![Page 4: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/4.jpg)
Some of the Reasons for a Temporary Steam Plant are
Unplanned Outages
Planned Outages
Winter Loads
Delays Bringing
New Plant On-line
![Page 5: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/5.jpg)
A Typical Unplanned Outage
• Reason: Emergency Boiler Rental • Capacity: (4) 70,000 PPH • Type: Trailer-Mounted Boilers • Design Pressure: 350 psi • Burner: Low NOx
![Page 6: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/6.jpg)
A Planned Outage Example
• Reason: Continuous Operations • Capacity: (4) 75,000 PPH • Type: Trailer-Mounted Boilers • Design Pressure:750psi/750F
![Page 7: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/7.jpg)
Temporary Steam Plant Planning Stages
• Capacity • Operating pressure • Steam temp
(saturated or superheat)
• Fuel type
• 1 month • 3 month • 6 month • 12 month plus
• Weekday vs. weekend
• Winter vs. summer months
• Holiday vs. non-holiday
![Page 8: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/8.jpg)
Delivery Timing - Winter Shipment
(1) 60,000 PPH trailer-mounted watertube boiler being shipped for temporary process steam.
![Page 9: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/9.jpg)
Next Steps in the Planning Stages
• Boiler Placement • treated feedwater • Boiler chemicals • Electrical & Fuel • Steam • Blow downs • Instrument air
• Varies with AQMD • Permit to construct • Permit to operate
• Permit details: - timing - cost - source test - variances
![Page 10: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/10.jpg)
Final Planning Stages
• Review and implement a HAZOP procedure
• Request descriptions and drawings from equipment supplier
• Ideal to Implement a Master Agreement Program between Lessor & Lessee
![Page 11: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/11.jpg)
![Page 12: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/12.jpg)
• Deaerators • Feedwater Pumps • Demineralizers, Water
Softeners, Chemical FS
• Blowdown Tanks • Diesel Generators • Valves • Controls
Planning Stages - Equipment Offerings
![Page 13: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/13.jpg)
Auxiliary Equipment
Water Softeners
Deaerators Economizers
![Page 14: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/14.jpg)
Planning Stages – Boiler Types
![Page 15: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/15.jpg)
Complete Mobile Steam Plants
• System Components: firetube boiler, feed system, water softener, and blowdown separator
• Steam Flows: 8,625 PPH to 10,500 PPH (250/300 BHP)
• Pressure: 15 psig to 250 psig
![Page 16: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/16.jpg)
Mobile Boiler: Drawing
![Page 17: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/17.jpg)
Saturated Watertube Trailers
• Steam Flows: 24,000 PPH to 80,000 PPH
• Pressure: 125 psig to 750 psig
![Page 18: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/18.jpg)
20-40-60-75,000 PPH Watertube Boilers
![Page 19: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/19.jpg)
40,000 PPH Rental Boiler: Drawing
![Page 20: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/20.jpg)
Qualifying a Rental Boiler Company
How long have they been in business?
Types of boilers offered?
Where is service support out of?
Availability and when can they deliver?
Rental term / duration (price points)?
![Page 21: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/21.jpg)
Qualifying a Rental Boiler Company
Ask for references?
What is condition of the rental boiler?
Do they offer ancillary equipment?
What’s required from Lessee to obtain a boiler rental?
![Page 22: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/22.jpg)
What’s Required to Rent ?
Purchase Order
Signed Contract
& Insurance Certificate
Rental Monies
& Security Deposit
Boiler Rental
![Page 23: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/23.jpg)
Lessee/Lessor Scope
Purchase Order: Lessee
Signed Lease Rental Agreement: Lessee / Lessor
Certificate of Insurance: Lessee
Tax exemption or resale certificates: Lessee
Freight arrangements / O & M manual: Lessor
Coordinate start-up service: Lessee / Lessor
Other installation and operating requirements: Lessee
Future: Implement a Master Rental Agreement between Lessee / Lessor
![Page 24: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/24.jpg)
Common Questions
How long since the boiler was last inspected and tested?
When do rental charges begin and end?
What equipment and supplies are included in rental charges?
Do start up charges apply?
Certificates of Insurance?
![Page 25: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/25.jpg)
Common Questions (continued)
Who provides the oil pump / tanks?
Who supplies the gas regulator?
Who provides the smokestacks / EPA ports?
Who pays the freight?
Who makes freight arrangements?
![Page 26: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/26.jpg)
Common Questions (continued)
Who provides the hookup?
Who supplies the utilities?
What about feedwater treatment?
How should boilers be operated?
How about disconnecting?
How is boiler to be prepared for shipment?
Loading / unloading preparations?
![Page 27: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/27.jpg)
Final Common Questions (continued)
Heat tracing and insulation?
What is shipped loose for field-installation?
![Page 28: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/28.jpg)
Heat Tracing and Insulation
• Drum heads – insulated
• Feedwater piping – heat traced and insulated
• Heat trace and insulation for economizer piping by Lessee
75,000 PPH Trailer-Mounted Watertube
![Page 29: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/29.jpg)
Back Front Valves
What is on a Trailer-Mounted Boiler?
![Page 30: Third Quarter Meeting Presentation Temporary Steam Plant](https://reader035.vdocument.in/reader035/viewer/2022070605/586a27be1a28ab7f7d8bdb89/html5/thumbnails/30.jpg)
Top 4 Reasons for a Master Agreement Program
Minimize Down Time
Insurance Requirement
Timely Rental Process/Response
Successful Implementation & Execution