This WeekProductivity Highlights
Week 26,27
15th July 2011
Monthly Throughput -July 2011 till date
39,026 TEUs
Total Number of Vessels 18
Max. Productivity
Achieved
29.5 mph on m.v Wan Hai
263 on 2nd July 2011
Max. Vessel moves in a
day
2650 moves on 6th July
20 11
Max. Gate moves in a day2860 moves on 9th July
2011
Maximum ICD moves in a
day
234 moves on 2nd July 2011
Highest parcel size3502 TEUs in m.v. Wan Hai
307 on 8th July 2011
Operation Highlights 1. Highest RTG moves -
1269 moves by M Santosh Kumar
(Emp_id: 1646)
2. Highest moves in an hour on
single lift QC:
37 moves by R.Venkatesan on 29th
June between 1700 & 1800 hrs
37 moves by K.Shanmugasundaram
on 5th July between 1200 & 1300 hrs
3. Highest moves in an hour on
twin lift QC :
58 moves by Syed Lufthullah on 2nd
July between 1100 & 1200 hrs
Operations Highlight:
Operations Team has achieved GCR of 25+ on 6 vessels in the first & second week of
July 2011. This was made possible because of the team’s commitment to deliver
superior service. Details are as under:
VIA Vessel Name Date Total Moves GCR CI
11261 Tiger Bridge 29/06/11 2128 25.04 2.04
11260 Sinar Brani 30/06/11 867 25.5 0.92
11266 Wan Hai 263 01/07/11 1213 29.47 2.33
11269 APL Pusan 02/07/11 1379 25.03 2.79
11270 Maersk Darlington 03/07/11 2132 25.03 3.31
11272 Maersk Delmont 04/07/11 1038 25.42 2.71
Page 2 This Week
TOWN HALL MEETING
The Town Hall on My World Employee Engagement Survey Results cascading was anchored by
Capt.Anil Singh, Our MD and Mrs.Monal,the Regional Head –HR in the presence of CEO on 6th July
2011.The Town Hall was conducted in three Spells wherein the points of Areas of Strengths of the
Subcontinent and vis-à-vis the Points for Improvements have been dealt with by Capt.Anil.Arasu,Our
CEO spelt out the Strengths of CCT viz 1.Customer Focus 2.Pride working in CCT 3.Awareness of DP
World 4.Teamwork 5.Socially/Environmentally Responsible and also the Improvisation Points of CCT
viz 1.Safety, Working Conditions & Work Load 2.Open and Transparent Communication 3.Rewards
and Recognition 4.Diverse and Equal Opportunity Employer, followed by Intelligent Questions from
the Participants answered in no Uncertain Terms by Anil, Arasu and Monal.
The Action Points were also noted for Execution. The Participation in the Town Hall was
Overwhelming.
Page 3 This Week
Safety & Environment Workshop on 6th July 2011
S&E Work Shop was organized by SCO region on 6th July 2011 at Chennai to draw a 100 days Action Plan for driving improvement in terms of more effective controls with regards People, Equipment and System.
Senior Management Team participated :
Mr. Andrew Adam, Senior Vice President (Operations)
Mr. Nabil Battal, Director, Global Safety & Environment.
Mr. Charles Haine, Global Environment Manager
Capt. Anil Singh, SVP & MD, SCO Region
Capt. Ankit Vaishnav , Régional Advisor –Safety & Environment
Mrs. Monal Srivastav, Regional HR
What is Safety Culture?
The safety culture of an organisation finds expression through the complex relationships between people, systems, knowledge and leadership. In essence, it is “how things work” and “what is impor-tant” that gives us “the way we do things around here”.
It is the safety culture of the organisation that influences the deployment and effectiveness of the safety management system, the work environment and underlying perceptions, attitudes and behav-ioural practices of employees at all levels.
Totally 44 members participated in the workshop from across the SCO region to enhance the safety & environment culture.
The welcome address was made by Mr.Ennarasu Karunesan, Director & CEO, DPW Chennai. He thanked Capt.Ankit for having initiated /mooted the novel idea of organizing this innovative workshop at Chennai and he also thanked Capt.Anil, Mr,Andrew, Mr.Nabil and Mr.Charles for having taken the effort of coming down for this workshop at a very short notice.
Opening address was made by Capt.Anil Singh wherein he welcomed Mr.Andrew and his team who despite a very short notice, spared their valuable time to come all the way to India to conduct this workshop. He mentioned that regrettably, 2011 has been a challenge for the Subcontinent in terms of performance in Safety and here he referred to the two fatalities in quick succession even before reaching the half way mark. Apart from these two fatalities, one of our colleagues Sunder Rajan was grievously hurt in which his right arm had to be amputated. We had other incidents where lashers were injured due to falling twist locks. Then, there was a recent accident at NSICT where an RMQC, one of our most important life lines for business sustained damage and had to be put out of action .
Time has come when we need to do a comprehensive health check-up of our region with regard to safety. As a start point, we decided on S&E Workshop and that is how we are all gathered here today. As participants, we purposely chose to have a team of key people from QHSE, Operations and Engi-neering because Safety is teamwork and you all have to drive this together.
The first session was addressed by Mr.Andrew Adam wherein he stressed on 4 topics—
Performance: What we know, Perception: What we believe, Root Causes: What the problem(s) are
& Action Plan: How we can improve. He mentioned that safety management ultimately aims to
prevent harm to people. Lag indicators are direct measures of this harm, while lead indicators measure things that are in some ways precursors to harm.
Page 4 This Week
Safety & Environment Workshop on 6th July 2011
Analysis of the 8 fatalities in the SCO region were described and mentioned as under:
• All fatality activities had a risk assessment completed,
• 7 of the fatality activities had a procedure in existence,
• 6 of the fatalities were caused by “struck by vehicle” and remaining 2 caused by “struck by
container”
• 6 of the fatalities occurred during night shift,
• Of the 6 fatalities struck by vehicle 4 were contractor related and 2 employee related and
• All 4 contractor fatalities occurred on night shift.
The second session was addressed by Mr.Nabil, the core issue he focused was on “Perception - what
we believe” and on patterns of improving safety. He underlined the following and explained on:
Clarity: Clear strategic direction, principles and expectations.
Commitment: The strategy and expectations are measured and continuously monitored by
the leadership team with an emphasis on sustainability.
Capability: The competency required to achieve sustained performance is engaged.
Consequence: Responsibility and accountability levels are consistently administered.
Care: Increased understanding and trust ingrains safety into how we do business.
He also addressed on the topic - “Root causes— what the problems are”, The main identified root
causes are Incident Reporting,, Quantity of reporting, Quality of reporting, Contractor management,
Direct contractors, External truck drivers, Vessel conformance, Identifying appropriate corrective ac-
tion(s), Traffic management, Systems & Risk management system.
He concluded with stating a ANZ quote : The first step to sustainably improving our
safety performance is not a question of more resources, new tools or different jargon; it is a simple
question of appropriately targeting what we want to focus on and learn from.
The final session was addressed by Mr.Charles, who lucidly explained on the various factors impacting
our environment and what measures we need to undertake to reduce our carbon foot print.
Welcome Address by Mr. Ennarasu
Karunesan, CEO & Director
Page 5 This Week
Lighting of Kuthuvizhakku (Lamp)
Opening address by Capt.Anil Singh, Sr.VP & M.D, DP World ISC Region
Page 6 This Week
Safety & Environment Workshop on 6th July 2011
Address by Mr. Andrew Adam
Address by Navil Battal
Environment Session by Charles Haine
Page 7 This Week
Memento presentation by Mr.Arasu
Page 8 This Week
Safety Intervention by GSE & CCT Management Team on 07.07.2011:
The visiting GSE team, Capt.Ankit, Mr.Ennarasu and members of CCT management
team did a safety intervention of all the terminal areas including In gate, Out gate, yard,
wharf, reefer area, survey area, contractors rest area and Gate 1. The members were
split into groups of 3 members each and were asked to intervene and report the
positives and negatives of each work area. The team also took stock of the situation at
Gate 1.
Following the intervention, a de-briefing session was held at the training hall wherein
each member spoke out on the findings. Mr.Arasu assured to Mr.Ankit and the GSE
team that Team CCT will initiate necessary steps to overcome the present safety related
issues and make CCT a safe and healthy work place.
Page 9 This Week
Safety & Environment Signage fixed at prominent locations in terminal:
Safety & Environment Signage boards have been placed at prominent locations areas within the ter-
minal to create awareness to employee, contractor & truck drivers. Boards are prepared in vernacu-
lar & English so that it could be read and understood by all terminal visitors.
Enhanced Terminal Traffic Management plan has also been placed at wanted locations for easy un-
derstanding and access by the private truck drivers.
Page 10 This Week
Safety & Environment Signage fixed at prominent locations in terminal:
Newly elected CCT employees union:
The newly elected office bearers of the CCT employees union met and felicitated
Capt.Anil Singh, Sr.V.P & M.D, DP World ISC Region during his visit to CCT on
6.07.2011.
Page 11 This Week
Customer Visits:
APL India linx - 25.06.2011
HOCHTIEF (India)
Pvt.Ltd., -
01.07.2011
KMTC & Seahorse -
07.07.2011
Page 12 This Week
Thought for the Week:
Love in all of its forms - kindness, gentleness, respect for others,
consideration, and much more - is the hall mark of greatness.
Maersk Line - 07.07.2011
Customer Visits:
Maersk Line & Nissan Motors -
16.06.2011
NYK Line & Toyota - 06.07.2011