ArrowOnline.ca | Inspired by people. Driven by results. Suite 202, 13167 - 146 Street, Edmonton, AB T5L 4S8 T: 780.801.6100 F: 780.801.6199 DATE July 14, 2017 PROJECT# 7649-E 1 Electrical Addendum E2 PROJECT NAME Oasis Health Centre PRIME CONSULTANT Planworks Architecture Inc FROM Haitham Ahmed ([email protected]) THIS ADDENDUM IS BEING ISSUED TO PROVIDE FOR CERTAIN REVISIONS AND CLARIFICATIONS TO ANY AND ALL RELATED CONSTRUCTION DOCUMENTS, AND BECOMES PART OF SUCH DOCUMENTS. BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THEIR TENDER SUBMISSION. DRAWINGS 1 .1 Refer to E200 Main floor lighting & power .1 Re-label the LVRC in main electrical room to lighting control cabinet. Refer to drawing E500 for lighting control detail. .2 Provide 2 quad receptacles on dedicated circuits for security cabinet. Security by others. .3 Provide 15A, 120V hardwired connection for fire alarm monitoring. .4 Provide rough-in for security door contact for base building exterior doors. Refer to keynote #8 for detail. .5 Provide and install additional light fixture in elevator shaft. Connect to circuit within the shaft and control via same switch. 1 .2 Panel schedules updates .1 Provide and install 4X 15A-1P spare breakers in panel ‘6H’. .2 Provide and 8X 15A-1P breakers in panel ‘2H’ for the following: 4 spares; fire alarm monitoring; lighting control; 2X for security. END OF ELECTRICAL ADDENDUM E2 Distribution: COMPANY ATTENTION SENT VIA Planworks Architecture Inc Nancy Hansen [email protected]

Upload: hoangbao

Post on 18-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

ArrowOnline.ca | Inspired by people. Driven by results. Suite 202, 13167 - 146 Street, Edmonton, AB T5L 4S8 T: 780.801.6100 F: 780.801.6199

DATE July 14, 2017

PROJECT# 7649-E

1

Electrical Addendum E2 PROJECT

NAME Oasis Health Centre

PRIME

CONSULTANT Planworks Architecture Inc

FROM Haitham Ahmed ([email protected])

THIS ADDENDUM IS BEING ISSUED TO PROVIDE FOR CERTAIN REVISIONS AND CLARIFICATIONS TO ANY AND ALL RELATED CONSTRUCTION DOCUMENTS, AND BECOMES

PART OF SUCH DOCUMENTS. BIDDERS SHALL ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THEIR TENDER SUBMISSION.

DRAWINGS

1 .1 Refer to E200 Main floor lighting & power .1 Re-label the LVRC in main electrical room to lighting control cabinet. Refer to drawing E500 for lighting

control detail. .2 Provide 2 quad receptacles on dedicated circuits for security cabinet. Security by others. .3 Provide 15A, 120V hardwired connection for fire alarm monitoring. .4 Provide rough-in for security door contact for base building exterior doors. Refer to keynote #8 for

detail. .5 Provide and install additional light fixture in elevator shaft. Connect to circuit within the shaft and

control via same switch.

1 .2 Panel schedules updates .1 Provide and install 4X 15A-1P spare breakers in panel ‘6H’.

.2 Provide and 8X 15A-1P breakers in panel ‘2H’ for the following: 4 spares; fire alarm monitoring; lighting control; 2X for security.

END OF ELECTRICAL ADDENDUM E2

Distribution:

COMPANY ATTENTION SENT VIA

Planworks Architecture Inc Nancy Hansen [email protected]

REFER TO MAINFLOORMECHANICALAND ELECTRICALROOM DETAILON THISDRAWING

C

D

F

G

H

J

K

1 2 3 4 5 6 7 8 9 10 11

5 6

A

B

C

D

F

G

H

J

K

PROJECT MANAGER:

PROJECT#: 7649

KEYNOTES

MAIN FLOOR ELECTRICAL PLAN

MECH. AND ELEC. ROOM LAYOUT

LOBBY POWER AND FIRE ALARM PLAN

GENERAL NOTES