MARK DATE DESCRIPTION
SHEET NUMBER:
AAAA
BBBB
CCCC
DDDD
AAAA
BBBB
CCCC
DDDD
1111 2222 3333 4444 5555
1111 2222 3333 4444 5555
OWNER
REVISION:
CS-1.0
COVER SHEET
612-1401
PENLAND BUILDINGMECHANICAL SYSTEMS
UPGRADES
LMA
SAP
PROJECT H29-9548
PENLAND BUILDINGMECHANICAL SYSTEMS UPGRADES
471 UNIVERSITY PKWY. AIKEN, SC 29801
JUNE 1, 2015
SCHEDULE OF DRAWINGSSHEET: TITLE:
CS-1.0 COVER SHEET
M-1.0 MECHANICAL SCHEDULESM-1.1 MECHANICAL ROOM DEMOLITION & NEW WORK PLANSM-1.2 MECHANICAL PENTHOUSE PLANSM-2.0 MECHANICAL DETAILS
E-1.0 ELECTRICAL PLAN
PROJECT LOCATION MAPNOT TO SCALE
USC AIKEN CAMPUS MAPNOT TO SCALE
LEGEND
= PROJECT LOCATION
PIPING.RVT
06/01/2015
Augusta, Georgia 30901550 11th Street
(706) [email protected]
PROJECT H29-9548
PENLAND BUILDING
MECHANICAL SYSTEM
UPGRADES
CHILLED WATER PUMP SCHEDULETAG MANUFACTURER MODEL SIZE TYPE SERVICE
FLOW(GPM)
HEAD(FT. W.G.)
EFFICIENCY(%)
IMPELLERDIA. (IN.)
VOLTS/ PH. BHP HP RPM
WEIGHT(LB.) OPTIONS:
PCP-1 BELL & GOSSETT E-1510 4BD BASE MOUNT END SUCTION PRIMARY CHILLED WATER 500 60 82.9 8 3/8 208/3 9.14 15 1,800 567 ①②③④⑤⑥⑦⑧
OPTIONS:① MECHANICAL SEAL.② SUCTION DIFFUSER EQUAL TO BELL & GOSSETT MODEL GF-3X (6" SYSTEM CONNECTION, 5" PUMP CONNECTION, 0.7 PSI DROP MAX).③ TRIPLE DUTY VALVE EQUAL TO BELL & GOSSETT MODEL 3DS-5B.④ AIR SEPARATOR EQUAL TO BELL & GOSSETT MODEL R-6F (6" CONNECTIONS, STRAINER, MODEL 107A AIR VENT, 700 GPM CAPACITY).⑤ EXPANSION TANK EQUAL TO BELL & GOSSETT MODEL B-200 (ASME, BLADDER, 53 GAL. TANK, 53 GAL. ACCEPTANCE, VERTICAL, 12 PSI CHARGE, 22 PSI RELIEF VALVE FOR 50 PSI SYSTEM PRESSURE).⑥ MOUNT ON EXISTING INERTIA BASE.⑦ VFD EQUAL TO DANFOSS VLT DRIVE.⑧ PROCURE THE SERVICES OF EMCOR SERVICES TO INTEGRATE PUMP VFD INTO THE EXISTING ANDOVER BUILDING MANAGEMENT SYSTEM.
WATER COOLED CHILLER SCHEDULE
TAG
MANUFACTURERNOMINALCAPACITY
(TONS)
EVAPORATOR CONDENSER PERFORMANCE AT AHRI CONDITIONS ELECTRICAL
WEIGHT(LB.) OPTIONS:
MAKE MODELDESIGNFLOW(GPM)
MINIMUMFLOW(GPM)
EWT(°F)
LWT(°F)
MAX PRES.DROP
(FT WG)NO. OFPASSES
DESIGNFLOW(GPM)
EWT(°F)
LWT(°F)
MAX PRES.DROP
(FT WG)NO. OFPASSES
INPUTPOWER AT
100%(Kw/TON)
SOUNDPRESSURE AT
100%(dB(A))
INPUTPOWER AT
50%(Kw/TON)
SOUNDPRESSURE AT
50%(dB(A))
REFRIGERANT VOLT/PH MCA MOCP
CH-1 CARRIER 23XRVA1A1NPHR251 200 480 125 54 44 19 2 615 95 85 17 2 0.627 87 0.302 77 R-134a 460 / 3 232 400 15,900 ①②③④⑤⑥⑦⑧⑨⑩⑪⑫
OPTIONS:① SINGLE POINT POWER CONNECTION.② POWER FACTOR CORRECTION TO MAINTAIN MINIMUM OF 0.95 UNIT POWER FACTOR INCLUDING COMPRESSORS AND FANS.③ VARIABLE SPEED DRIVE WITH CURRENT LIMITING CAPABILITY FOR EMERGENCY MODE OPERATION.④ UNIT SHALL BE ONE-PIECE.⑤ VARY UNIT CAPACITY FROM 100% TO 10% UTILIZING VARIABLE SPEED DRIVES AND COMPRESSORS. UNLOADING AND/OR HOT GAS BYPASS ARE NOT ACCEPTABLE.⑥ UNIT MOUNTED CIRCUIT BREAKER WITH LOCKABLE HANDLE.⑦ FIVE-YEAR TOTAL PARTS ONLY WARRANTY FOR COMPRESSOR.⑧ BACNET COMMUNICATION CARD.⑨ REFRIGERANT SERVICE ISOLATION VALVES.⑩ PROCURE THE SERVICES OF EMCOR SERVICES TO INTEGRATE CHILLER CONTROLS INTO THE EXISTING ANDOVER BUILDING MANAGEMENT SYSTEM.⑪ 150psig, HINGED, MARINE WATER BOXES ON EVAPORATOR AND CONDESER. COORDINATE OUTLET LOCATIONS WITH PIPING ARRANGEMENT.⑫ THE CHILLER FOOTPRINT SHALL NOT EXCEED THE EXISTING CONCRETE EQUIPMENT PAD DIMENSIONS OF 15'-0"x3'-10". EXISTING MECHANICAL ROOM CONDITIONS WILL NOT ALLOW FOR INCREASED PAD DIMENSIONS IN ANY DIRECTION.
WATER HEATER AND ACCESSORIESMARK MANUF. MODEL# CAPACITY
GAL. KW # STAGES /THERMOSTATS
THERMOSTATSTYLE
CW / HWTAP SIZE IN. ELECTRICAL OPTIONS TO BE PROVIDED:
EWH-1 RHEEM E85-54-GS 85 18 1 IMMERSION 1.5" 480/3/60FIELD MOUNTED AND INTERLOCKED SOLID STATE LOW WATER CUTOFFT&PRV VALVE FACTORY MOUNTEDWATTS EXPANSION TANK # DET-12 WITH SERVICE CHECK
06/01/2015
6" CHWS
6" CHWR
6" CHWR
6" CHWR
6" CHWS
6
1
1
2
3
4
5
6
M-2.0
7
M-2.0
8
M-2.0
5
M-2.0
CH-1PCP-1
6"ø CHWR
6"ø CHWS
6"ø CHWS
6"ø CHWR
6"ø CHWR
2
1
3
4
VFD
5
6
7
DEMOLITION KEY NOTES
1 REMOVE EXISTING FLOOR MOUNTED STORAGE TANK
AND CEILING HUNG EXPANSION TANK. EXISTING
MAKEUP WATER STATION AND CONCRETE EQUIPMENT
PAD TO REMAIN.
REMOVE EXISTING CONSTANT SPEED CHILLED WATER
PUMP. EXISTING INERTIA PAD TO REMAIN.
REMOVE EXISTING CHILLER. EXISTING CONCRETE
EQUIPMENT PAD TO REMAIN.
REMOVE EXISTING WELDED STEEL CONDENSER
WATER RETURN PIPING TO THE VERTICAL RISER
APPROXIMATELY 36” ABOVE FINISHED FLOOR.
REMOVE EXISTING WELDED STEEL CONDENSER
WATER SUPPLY PIPING TO THE EXISTING FLANGED
FLEXIBLE CONNECTOR. FLEXIBLE CONNECTOR TO
REMAIN.
REMOVE EXISTING ELECTRIC WATER HEATER.
EXISTING BOOSTER PUMP AND CONCRETE EQUIPMENT
PAD TO REMAIN.
GENERAL DEMOLITION NOTE:
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
PROPERLY DISPOSE OF ALL ITEMS SCHEDULED FOR
DEMOLITION.
2
3
4
5
6
1 INSTALL NEW AIR-WATER SEPARATOR IN LOCATION
SHOWN. PROVIDE UNIT WITH OPTIONAL MOUNTING
BRACKETS. SUPPORT FROM STRUCTURE ABOVE
USING CONCRETE EXPANSION ANCHORS.
INSTALL NEW FLOOR MOUNTED EXPANSION TANK ON
EXISTING CONCRETE EQUIPMENT PAD. COORDINATE
LOCATION TO ALLOW SERVICE OF STRAINER ON
BOTTOM OF AIR-WATER SEPARATOR. PIPE
EXPANSION TANK PER DETAIL #2 ON DRAWING M-2.0.
INSTALL NEW VARIABLE SPEED PUMP ON EXISTING
INERTIA BASE. LOCATE AND MOUNT NEW VFD PER
ELECTRICAL DRAWINGS. INSTALL ALL ACCESSORIES
INDICATED ON SCHEDULE AND DETAIL #1 ON DRAWING
M-2.0.
INSTALL NEW VARIABLE SPEED CHILLER.
COORDINATE AND PROVIDE ALL MANUFACTURER'S
REQUIRED CLEARANCES FOR SERVICE.
INSTALL NEW CONDENSER WATER SUPPLY PIPING
FROM EXISTING FLEXIBLE CONNECTOR TO NEW
CONNECTION ON CHILLER. ROUTE CONDENSER WATER
RETURN PIPING OVERHEAD. COORDINATE WITH
CHILLER CLEARANCES AND EXISTING ELECTRICAL
CONDUITS.
INSTALL NEW ELECTRIC WATER HEATER. INSTALL
NEW ACCESSORIES AND RECONFIGURE PIPING AS
NECESSARY TO COMPLY WITH DETAIL #4 ON
DRAWING M-2.0.
INSTALL NEW CHILLED WATER SUPPLY AND RETURN
PIPING FROM EXISTING ISOLATION VALVES TO NEW
CHILLER AND PUMP CONNECTIONS. EXISTING PIPE
HANGERS MAY BE UTILIZED. INSULATE PER
SPECIFICATIONS.
2
3
4
NEW WORK KEY NOTES
5
6
7
PROJECT NO:
DRAWN BY:
CHK'D BY:
HVAC | Plumbing | Fire Protection550 11th Street
Augusta, GA 30901
[email protected](706) 774-1020
THIS DOCUMENT IS THE PROPERTY OF ING CONSULTING, INC. THE UNAUTHORIZEDREPRODUCTION, COPYING, OR OTHERWISE USE OF THIS DOCUMENT IS STRICTLY
PROHIBITED AND AN INFRINGEMENT THEREUPON MAY BE SUBJECT TO LEGAL ACTION.
COPYRIGHT © 2012 - ING CONSULTING, INC.
CONSULTANTS
CAD DWG FILE:
SHEET TITLE:
MARK DATE DESCRIPTION
SHEET NUMBER:
AAAA
BBBB
CCCC
DDDD
AAAA
BBBB
CCCC
DDDD
1111 2222 3333 4444 5555
1111 2222 3333 4444 5555
OWNER
REVISION:
M-1.1
MECHANICAL ROOMDEMOLITION AND NEW WORKPLANS
612-1401
PENLAND BUILDINGMECHANICAL SYSTEMS
UPGRADES
LMA
SAP
PROJECT H29-9548
NORTH
1/4" = 1'-0"M-1.11 DEMOLITION PIPING PLAN
NORTH
1/4" = 1'-0"M-1.12 NEW PIPING PLAN
PIPING.RVT
KEY PLAN
EWH1
06/01/2015
DN
(E)AHU-1
CV-2
C.H.W.S.
C.H.W.R.
3" Ø
3" Ø
5" Ø
5" Ø
4" Ø
4" Ø
CV-1BV-1
3
(E)AHU-2
5 4 1 (E)AHU-3
(E)AHU-4
C.H.W.S.
4" Ø
C.H.W.R.
4" Ø
3" Ø
3" Ø
4" Ø
4" Ø
3" Ø
3" Ø
CV-3 BV-3
CV-4
BV-4
1
2 4
4
1 REMOVE AND REPLACE EXISTING FLANGED 3”
THREE-WAY CONTROL VALVE AND ACTUATOR
WITH A NEW TWO-WAY CONTROL VALVE. NEW
VALVE SHALL BE EQUAL IN SIZE, Cv VALUE AND
ACTUATOR ELECTRICAL REQUIREMENTS.
CONTRACTOR TO CONFIRM EXISTING VALVE AND
ACTUATOR REQUIREMENTS PRIOR TO PURCHASE.
PROVIDE AND INSTALL NEW CALIBRATED
BALANCING VALVE. IN RETURN PIPING AND
ADJACENT TO NEW CONTROL VALVE. TYPICAL 2
PLACES.
REMOVE AND REPLACE EXISTING NPT 2” THREE-
WAY CONTROL VALVE AND ACTUATOR WITH A
NEW TWO-WAY CONTROL VALVE. NEW VALVE
SHALL BE EQUAL IN SIZE, Cv VALUE AND
ACTUATOR ELECTRICAL REQUIREMENTS.
CONTRACTOR TO CONFIRM EXISTING VALVE AND
ACTUATOR REQUIREMENTS PRIOR TO PURCHASE.
PROVIDE AND INSTALL NEW CALIBRATED
BALANCING VALVE. IN RETURN PIPING AND
ADJACENT TO NEW CONTROL VALVE. TYPICAL 2
PLACES.
REMOVE AND REPLACE EXISTING NPT 2” THREE-
WAY CONTROL VALVE AND ACTUATOR WITH A
NEW THREE-WAY CONTROL VALVE. NEW VALVE
SHALL BE EQUAL IN SIZE, Cv VALUE AND
ACTUATOR ELECTRICAL REQUIREMENTS.
CONTRACTOR TO CONFIRM EXISTING VALVE AND
ACTUATOR REQUIREMENTS PRIOR TO PURCHASE.
PROVIDE AND INSTALL NEW CALIBRATED
BALANCING VALVE. IN RETURN PIPING AND
ADJACENT TO NEW CONTROL VALVE. TYPICAL 2
PLACES.
REMOVE BYPASS BRANCH TO EXISTING
BALANCING VALVE. CAP AND INSULATE.
INSTALL NEW DIFFERENTIAL PRESSURE SENSOR
IN THIS LOCATION. TIE IN NEW D-P SENSOR TO
CONTROL SYSTEM TO CONTROL NEW VARIABLE
SPEED PRIMARY PUMP.
2
NEW WORK KEY NOTES
3
4
5
1. REPAIR ALL EXISTING DAMAGED
FIBERGLASS PIPING INSULATION LOCATED
WITHIN THE MECHANICAL ROOM. MATCH
EXISTING THICKNESS AND ASJ JACKET.
2. REPLACE EXISTING PIPING AND FITTINGS AS
NECESSARY FOR INSTALLATION FOR NEW
CONTROL VALVES AND CALIBRATED
BALANCING VALVES.
GENERAL NOTES
TAG
AHU-1
AHU-2
AHU-3
AHU-4
EXISTING AIR HANDLER
CHILLED WATER FLOW DATA
GPM
230
95
165
95
PROJECT NO:
DRAWN BY:
CHK'D BY:
HVAC | Plumbing | Fire Protection550 11th Street
Augusta, GA 30901
[email protected](706) 774-1020
THIS DOCUMENT IS THE PROPERTY OF ING CONSULTING, INC. THE UNAUTHORIZEDREPRODUCTION, COPYING, OR OTHERWISE USE OF THIS DOCUMENT IS STRICTLY
PROHIBITED AND AN INFRINGEMENT THEREUPON MAY BE SUBJECT TO LEGAL ACTION.
COPYRIGHT © 2012 - ING CONSULTING, INC.
CONSULTANTS
CAD DWG FILE:
SHEET TITLE:
MARK DATE DESCRIPTION
SHEET NUMBER:
AAAA
BBBB
CCCC
DDDD
AAAA
BBBB
CCCC
DDDD
1111 2222 3333 4444 5555
1111 2222 3333 4444 5555
OWNER
REVISION:
M-1.2
MECHANICAL PENTHOUSEPLANS
612-1401
PENLAND BUILDINGMECHANICAL SYSTEMS
UPGRADES
LMA
SAP
PROJECT H29-9548
NORTH
1/4" = 1'-0"M-1.21 MECHANICAL SOUTH PENTHOUSE PIPING PLAN
NORTH
1/4" = 1'-0"M-1.22 MECHANICAL NORTH PENTHOUSE PIPING PLAN
PIPING.RVT
KEY PLANKEY PLAN
06/01/2015
NOTES:
1. PIPE WATER COILS TO PROMOTE AIR REMOVAL FROM COIL
(WATER ENTERS AT BOTTOM), UNLESS NOTED OTHERWISE
IN MANUFACTURER'S INSTRUCTIONS.
2. UNION LOCATIONS SHALL PERMIT REMOVAL OF EQUIPMENT
WITH NO PIPING REMOVAL BEYOND UNION.
3. ALL PIPING AND EQUIPMENT, EXCEPT EXPANSION TANK,
INSULATED AND JACKETED PER SPECIFICATIONS.
INTERNAL STRAINER
INSTALL UNIT LEAVING ADEQUATE DISTANCE TO
MOVEMENT OF STANDING PERSONNEL BENEATH UNIT
BLOW-DOWN AND DRAIN VALVE
WITH HOSE CONNECTION
CENTRIFUGAL AIR SEPARATOR EQUAL
TO BELL & GOSSETT ROLAIRTROL
AIR CHARGING VALVE
(PRE-CHARGE TANK TO 12 PSI.)
LOW CAPACITY AIR VENT
SYSTEM CONNECTION - (CONNECT TO
SIDE OR BOTTOM OF MAIN HEADER)
DRAIN VALVE W/HOSE CONNECTION
12" MINIMUM UNDER-SLUNG CONNECTION
TO PROVIDE THERMAL TRAP
(CHILLED WATER SYSTEM ONLY)
HIGH CAPACITY AIR VENT
UNION
BALL OR BUTTERFLY VALVES
PRESSURE GAUGE
W/ NEEDLE VALVE
BLADDER EXPANSION TANK
WITH FULL ACCEPTANCE
TO PUMP SUCTION
TO ADJACENT MAKE-UP
WATER STATION
1"
1"
SIZE PER DRAWINGS
1" FULL PORT BALL VALVE
SIZE PER DRAWINGS
EXISTING
HOT RETURN PIPING
EXISTING
CIRCULATION PUMP
COMMERCIAL
ELECTRIC WATER
HEATER
PRE-CHARGED EXPANSION
TANK W/SERVICE CHECK
SUPPORT FROM FLOOR
T&P DISCHARGE OUTLET ROUTE
COPPER TYPE "M" R/V DRAIN
LINE TO FLOOR DRAIN
Trerice
9" INDUSTRIAL THERMOMETER
W/ 3/4" NPT COPPER WELL (TYP)
DRAIN VALVE
W/ HOSE CONNECTION
HOSE END DRAIN
VALVE
SHUTOFF VALVE (FULL
PORT BALL VALVE TYP.)
0-100PSI PRESS. GAUGEMIN. 3" DIAL
Trerice
WATER HAMMER ARRESTER Trerice
4" CONCRETE HOUSE KEEPING
PAD W/ 1" CHAMFER EDGE
HOT WATER TO BLDG.
B&G CB-3/4LF
CIRCUIT SETTER VALVE
HEAT TRAP
COLD WATER INLET
1 1/2"
1 1/2" 1 1/2"
1 1/2"
UNION (TYP.)
A.S.M.E. APPROVED
TEMPERATURE AND
PRESSURE RELIEF VALVE
1 1/2"
TO SYSTEM
STAINLESS STEEL
BRAIDED CONNECTOR
(INCREASER WHERE REQ'D.)
MULTIPORT PRESSURE
INDICATOR (4-PORT)
OSHA/ANSI COUPLER GUARD
BASE MOUNTED
END SUCTION PUMP
(LONG COUPLED)
GROUTABLE FABRICATED
STEEL BASE PLATE
1/4" O.D. COPPER TUBING
W/ COMP. FITTINGS
SPRING ISOLATED
INERTIA MOUNTING BASE
SUCTION DIFFUSER
WITH STRAINER
FIELD FABRICATED SUPPORT LEG
DRAIN: TERMINATE NEAR F.D.
PENTHOUSE FLOOR
ISOLATION VALVE
STAINLESS STEEL
BRAIDED CONNECTOR
9" INDUSTRIAL THERMOMETER
W/ 3/4" NPT COPPER WELL
TRIPLE DUTY VALVE
PIPE HANGERS (SPRING
& NEOPRENE TYPE)
FROM SYSTEM
HOA
VFD
MOUNT & COORDINATE VFD
LOCATION ON WALL WITH PUMPS
(SECONDARY PUMPS ONLY)
6"ø CHWR
6"ø CHWR
6"ø CHWR
6"ø CHWS
6"ø CHWR
6"ø CHWS
6"ø CHWR
6"ø CHWR
6" STAINLESS
STEEL BRAIDED
FLEXIBLE
CONNECTOR.
6" WAFER
BUTTERFLY
VALVE.
4" TRIPLE
DUTY VALVE
6" WAFER
BUTTERFLY
VALVE.
6"ø CHWR 6"ø CHWR
4" TRIPLE DUTY VALVE
6" STAINLESS STEEL
BRAIDED FLEXIBLE
CONNECTOR.
6" WAFER
BUTTERFLY
VALVE
6"ø CHWR
6"ø CHWS
6"ø CHWR
6"ø CHWS
N/E
UNDERSLAB PIPING TO
COOLING TOWER
PROJECT NO:
DRAWN BY:
CHK'D BY:
HVAC | Plumbing | Fire Protection550 11th Street
Augusta, GA 30901
[email protected](706) 774-1020
THIS DOCUMENT IS THE PROPERTY OF ING CONSULTING, INC. THE UNAUTHORIZEDREPRODUCTION, COPYING, OR OTHERWISE USE OF THIS DOCUMENT IS STRICTLY
PROHIBITED AND AN INFRINGEMENT THEREUPON MAY BE SUBJECT TO LEGAL ACTION.
COPYRIGHT © 2012 - ING CONSULTING, INC.
CONSULTANTS
CAD DWG FILE:
SHEET TITLE:
MARK DATE DESCRIPTION
SHEET NUMBER:
AAAA
BBBB
CCCC
DDDD
AAAA
BBBB
CCCC
DDDD
1111 2222 3333 4444 5555
1111 2222 3333 4444 5555
OWNER
REVISION:
M-2.0
MECHANICAL DETAILS
612-1401
PENLAND BUILDINGMECHANICAL SYSTEMS
UPGRADES
LMA
SAP
PROJECT H29-9548
PIPING.RVT
3/8" = 1'-0"M-2.06 AIR-WATER SEPARATOR ELEVATION
3/8" = 1'-0"M-2.07 CHILLER FRONT ELEVATION
3/8" = 1'-0"M-2.08 PUMP SIDE ELEVATION
3/8" = 1'-0"M-2.05 CHILLER SIDE ELEVATION
M-2.03 MECHANICAL ISOMETRIC PIPING DETAIL
N/E
NOT TO SCALEM-1.0
1NOT TO SCALE
BASE MOUNTED PUMP DETAILM-1.0
2NOT TO SCALE
AIR SEPARATOR AND EXPANSION TANK DETAIL
M-1.0
4NOT TO SCALE
COMMERCIAL ELECTRIC WATER HEATER DETAIL
EWH1
06/01/2015