this instruction will help you get the element … · 2015. 9. 15. · safc* esc 1 2 2 2ls 2ls dln2...
TRANSCRIPT
1. Review job prints.2. Connect grounding lug (NEC Article 250).3. Connect AC power, motor, and valves.
1. On the SCE-CPU and SCE-HVI boards unplug the five connectors pictured to
the left.2. Use MCE jumper assembly CPU-
CONSTR-JPR-HY to replace the three SCE-CPU and the top SCE-HVI con- nectors (wired as shown).3. Use MCE jumper assembly HVI- CONSTR-JPR-HY to replace the GOV/ SAFH/.. connector (wired SAFC to 2).
STEP 1: POWER CONNECTIONS.
STEP 2: CONSTRUCTION OPERATION ON MACHINE ROOM INSPECTION. STEP 3: CONSTRUCTION OPERATION ON CARTOP INSPECTION.
42-QR-1P26 B3© Motion Control Engineering. www.mceinc.com. 916 463 9200.
Low power or signal wires must always be in separate conduit from high power/current wires.
Ground
Three phase building supplySEE JOB PRINTS FOR MOTOR & VALVE CONNECTIONS
4. On the SCE-CPU board, INSP, CAR DOOR BYPASS, HOISTWAY DOOR BYPASS all UP. FLT BYPASS jumper in BYPASS position.
Run Enable
Run Up
Insp
NormRun Down
EMERGENCY STOP
SCE-CPU
SCE-HVI
* Remove jumper wire when connecting switch.
THIS INSTRUCTION WILL HELP YOU GET THE ELEMENT HYDRAULIC CONTROLLER RUNNING ON CONSTRUCTION OPERATION
SCE-UPD
SCE-UPD
TEMPORARY RUN BOX
CTENINCPICTUICTDINCT*
GOVSAFHSAFC*ESC
122
2LS2LS
DLN2DLN1GOS2GOS1
24HWY24FS
24CTP111
SCE-CPU
SCE-HVI
CPU-CONSTR HVI-CONSTRRGOK+24VL24V1FRAFRSFRSAFRSM
CTENINCPICTUICTDINCTINAATUATDABUABD
UTLUSL1USL2DTLDSL1DSL2UETSDETS
GOVSAFHSAFCESC2
If your job has optional features like emergency power or an oil pressure input, wire them or add jumpers before you run. See your job prints and/or the SYSTEM IO/Programmed Inputs menu to verify additional inputs.
From To+24V INCP INCT INA RGOK UTL USL1 USL2 DTL DSL1
From To 2 SAFC
5. Power up. Verify UTILS, Construct & Bypass Faults enabled. Verify Home screen indicates BP CONSTRUCTION.
REMOVE temporary jumpers before connecting actual equipment. Otherwise, circuit boards will be damaged (not covered by warranty). ALL jumpers must be removed before the car is released to passenger operation.
for Construction Operation