this would include fixtures such as sockets, switches, sd

1
client project drawing scale original size passed checked drawn date status job no. drawing no. revision 1. Do not scale this drawing - if in doubt ask. 2. All sizes to be checked on site prior to construction. 3. This drawing is the copyright of the author. A1 s m i t h d e s i g n a s s o c i a t e s 01387 250579 www.smithdesign.co.uk 30 Castle Street, Dumfries DG1 1DU [email protected] Dumfries Leatherhead Glasgow New Luce Community Trust Kenmuir Arms Proposed Refurbishment Proposed Ground Floor Plan 1:50 JB - - 04.06.2020 WARRANT D2786 AL(0)025 A N o r t h Electrical All electrical work will be carried out by a competent electrical contractor. The installation, i.e.the design, construction, inspection and testing will be completed in strict accordance with BS7671:2008 (2015) incorporating any amendments (IEE Wiring Regulations, 17th Edition) and in compliance with other Building Regulations, in particular, will not compromise fire-stopping, structural integrity, sound insulation, thermal insulation and other related matters. The contractor will provide the relevant certification at the completion of this part of the work. Outlets and controls of electrical fixtures and systems should be positioned at least 350 mm from any internal corner, projecting wall or similar obstruction and, unless the need for a higher location can be demonstrated, not more than 1.2 m above floor level. This would include fixtures such as sockets, switches, fire alarm call points and timer controls or programmers. Within this height range: Light switches should be positioned at a height of between 900 mm and 1.1 m above floor level. Standard switched or unswitched socket outlets and outlets for other services such as telephone or television should be positioned at least 400 mm above floor level. Above an obstruction, such as a worktop, fixtures should be at least 150 mm above the projecting surface. Where socket outlets are concealed, such as to the rear of white goods in a kitchen, separate switching should be provided in an accessible position, to allow appliances to be isolated. LEGEND All layouts are suggestions only. Electrical layout, Emergency Lighting to BS 5266 Part 1 & Fire Alarm to BS 5839 Part 1 designed and installed by suitably qualified persons. Fire Exit Signage (New / Existing) External Emergency Lighting Radiator (R) TRV. Towel Rail (TR) TRV. Thermostat 24/7 LED recessed downlights fixed & adj' / Wall lights - White / Chrome E = Emergency light Small LED External lights controlled with dusk + timer Fans / Inlet & Outlets + Humidistat + Trickle Ventilation to 3.14.3 30l/s Hob Hood - SS All ducted to wall vent /roof slate vent outlet Ubbink UB11 + 3 Pole Isolator to regulations 3ph Mains & Fusebox - Existing & Relocated Light Switch - Wall mounted Light Switch - Pull Cord Razor Socket 115/230V (Bathroom) Socket for lights controlled by light switch Double Socket Low (400mm above floor) Some sockets to have inbuilt USB power outlets Double Socket High (Above Counter Top) SD - Ionisation / Multi & Manual Break Glass Opti SD - Optical HD - Heat Detectors CO - Carbon Monoxide CO2 - Carbon Dioxide (Air Quality Monitor) Fire Alarm Panel & Repeater Category L2 Alarm System to BS 5839 Part 1:2017 Category D Alarm System to BS 5839 Part 6:2019 to be designed & installed by competent person. All to 2.11 Mains & battery back up & Interlinked SD Opti SD HD CO CO2 SD Opti SD HD CO R 5 R T Fire Exit FAP E BG Rev A - BC Updates 31.07.2020 Concrete slab Oil Tank A I N S T R E E T R/W Wall Bar Store Kitchen Snug Hall WC F WC AWC M WC Cl. Flat Entrance WCs Bar / Restaurant Screen 1 Sliding double glazed panels Roof over hang Low & High Sections to Bar to 4.2.10 @ 750 & 1100mm Sitting Out Area Office Cellar Boilers Extension 38m2 Brick pillar R/W 10500 Brick wall removed. Ground levels adjusted and graded Block Paving Area c. 240m2 Brick wall removed. Ground levels adjusted and graded Brick wall & gate removed. New stone dyke infills gap. Ground levels adjusted and graded Garden Entrance Main Entrance Room 4 Utility WC En-suite Room 4 Entrance bollard bollard 4000 B gently graded path D01 2 x 475 D04 D05 D06 2 x 650mm D25 c.950mm GW01 GW02 GW03 GW04 GW10 GW15 GW11 GW12 GW13 GW14 new door & window Screen 2 17m2 55m2 Block Paving refuse bins e Bins to D&GC requirements 1.8m high hit and mis 1.8m high hit and miss vertical fence Car Parking 1 SVP Rodding Point AVV Rodding Point Rodding Point New bottom outlet IC New IC New IC New IC Under stair void inspection panel at low level in WC Vent Grills at high and low levels within WC Stair underside protected to 30minFR Deep seal easy clean Shower drain RWP Roddable gulley RWP Roddable gulley D10 60S FRVP 926mm D11 60S FRVP 926mm D16 826mm D17 926mm D18 826mm D19 826mm D21 800mm D22 926mm D23 VP 926mm D24 c.950mm D26 VP 926mm D27 VP 826mm D28 826mm D29 926mm D13 60S FRVP Screen 60FR 925mm D12 60S FRVP 826mm D15 60S FRVP 925mm D20 60S FR 826mm Channel drain Channel drain Screen 4 60FR + stained glass Screen 5 60FR + stained glass HD HD HD HD HD HD 1 Screen 6a (& 6b) 60FR AVV 1 New IC 1970 Large internal wall removed formation 1100 c.2000 c.4700 604 c.5100 c.1200 AVV SVP New IC c.4000 c.3500 1200 Non combustable Fire Stop DPC 60FR Rockwool Horizontal Fire Stop at GF Ceiling level all around building Non combustable Fire Stop DPC 60FR Rockwool Horizontal Fire Stop at GF Ceiling level all around building Non combustable Fire Stop DPC 60FR Rockwool Horizontal Fire Stop at GF Ceiling level all around building Non combustable Fire Stop DPC 60FR Rockwool Horizontal Fire Stop at GF Ceiling level all around building Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop Non combustable Fire Stops DPC 60FR Rockwool Vertical Fire Stops Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop SVP SVP pipework and boxing at high level 850 850 Fire Exit FAP Rub Off Mat Rub Off Mat Fire Exit Fire Exit Fire Exit Fire Exit Fire Exit Fire Exit Fire Exit Fire Exit Fire Exit Beer & Soft Drinks Python route & Duct 800 clear E PIR PIR PIR PIR PIR 5 5 5 5 E E E E E E PIR PIR E E E E E E 1400 shower tray former at FFL Whole floor gently graded towards shower tray & drain Low profile raised water bar at door Internal walls removed only after checking by engineer! Existing 3Ph Mains & Fusebox Relocated Cook Range Electric / Gas Prep' Servery Dishwash E E Proposed new position of 3Ph Mains, Meter & Fuse boxes New steel beams 1HRFR New steel beams 1HRFR PIR PIR HD TD WM DP TD DP WM Extract Vent Extract Vent Extract Vent Extract Vent Input Vent Ventilation Fans, (Option Heat Exchanger) & ducts at high level Extract Vent Extract Vent Extract Vent Roof AIR OUT Roof AIR IN High level boxing for rectangular vent' duct High level boxing for rectangular vent' duct PIR PIR PIR PIR Extract Fan Cowled Extract Fan Grill Aluminium Grill over Approximate new route SP Cable & Duct route to new switch & meter Approximate new route SP Cable & Duct route to new switch & meter Internal walls removed only after checking by engineer! R R R R R R R R R R R R R R R 5 SD SD SD SD SD BG SD SD SD SD HD HD HD SD R R TR R R R R R R R R R R R Windows blocked up AVV R 5 BG BG BG BG R SVP pipework and boxing at high level SVP New IC Services (small power etc) Layout by kitchen designer Gas related design by qualified gas engineer. If gas then gas interlock* with ventilation *or as required by gas regulations FAP (Repeater) SVP SVP pipework and boxing at high level Landline Telephone Point T New IC New drainage to existing Septic Tank & Outlet Existing LPG boiler(s) checked & replaced accordingly SD Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stop Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stops Non combustable Fire Stop DPC 60FR Rockwool Vertical Fire Stops Beam & block floor to stair enclosure CO CO 1525 1000 Multiple House Light Controls Multiple House Light Controls 250 250mm going 170mm rise 1000mm between handrails 250 All walls within Kitchen & Store have whiterock or equal wall cladding floor to ceiling. Stainless Steel sheet behind cooking area. Sinks Wash hand Sink Rodding Point D26a 926mm 850 Input Vent Sink E E E E E E E E E E Canopy over 60l/s 35 8 SD Stair Boxing above Multi fuel stove and hearth Multi fuel stove and hearth D01 left open during operational hours Fire Alarm linked to Hotel EVCS BS 5839: Part 9: 2011 EVCS Extract Fan Extract Fan Extract Fan AWC x 2 Alarm repeater AWC x 2 Alarm repeater AWC Alarm Indicator WC Alarm indicator Rub Off Mat Doc M Shower additional grab handles, floor drain & deep seal trap Emergency Pull Pull down seat all to 3.12.10 Fig 3.32 Reinorce walls with plywood and studs min 2300 min finished 2300 Roof AIR IN Extract Vent Extract Vent Roof AIR OUT Lintels 300mm above D22 door head to allow for ventilation ducts / grills 140mm 7N/mm2 blockwork 140mm 7N/mm2 blockwork 140mm 7N/mm2 blockwork 140mm 7N/mm2 blockwork 140mm 7N/mm2 blockwork 140mm 7N/mm2 blockwork c.200 c.200 c.200 Racking wall of 95 x 45 C16 @ 600mm c/c NOTE: Refer to Structural Engineers Information for Steel Beams & Columns, lintels and padstones etc

Upload: others

Post on 30-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: This would include fixtures such as sockets, switches, SD

client

project

drawing

scale

original size

passed

checked

drawn

date

status

job no. drawing no. revision

1. Do not scale this drawing - if in doubt ask.2. All sizes to be checked on site prior to construction.3. This drawing is the copyright of the author.

A1

s m i t h d e s i g n a s s o c i a t e s

01387 250579www.smithdesign.co.uk

30 Castle Street, Dumfries DG1 [email protected]

Dumfries Leatherhead Glasgow

New Luce Community Trust

Kenmuir ArmsProposed Refurbishment

ProposedGround Floor Plan

1:50 JB

-

-

04.06.2020

WARRANT

D2786 AL(0)025 A

N o r t h

Electrical

All electrical work will be carried out by a competent electrical contractor.

The installation, i.e.the design, construction, inspection and testing

will be completed in strict accordance with BS7671:2008 (2015)

incorporating any amendments (IEE Wiring Regulations, 17th Edition)

and in compliance with other Building Regulations, in particular,

will not compromise fire-stopping, structural integrity, sound insulation,

thermal insulation and other related matters.

The contractor will provide the relevant certification at the completion

of this part of the work.

Outlets and controls of electrical fixtures and systems

should be positioned at least 350 mm from any internal corner,

projecting wall or similar obstruction and,

unless the need for a higher location can be demonstrated, not more

than 1.2 m above floor level.

This would include fixtures such as sockets, switches,

fire alarm call points and timer controls or programmers.

Within this height range:

Light switches should be positioned at a height of between 900 mm

and 1.1 m above floor level.

Standard switched or unswitched socket outlets and outlets for

other services such as telephone or television should be positioned

at least 400 mm above floor level.

Above an obstruction, such as a worktop, fixtures should be at least

150 mm above the projecting surface.

Where socket outlets are concealed, such as to the rear of white goods

in a kitchen, separate switching should be provided in an accessible

position, to allow appliances to be isolated.

LEGEND

All layouts are suggestions only.

Electrical layout, Emergency Lighting to BS 5266 Part 1 &

Fire Alarm to BS 5839 Part 1

designed and installed by suitably qualified persons.

Fire Exit Signage (New / Existing)

External Emergency Lighting

Radiator (R) TRV.

Towel Rail (TR) TRV.

Thermostat 24/7

LED recessed downlights fixed & adj' /

Wall lights - White / Chrome

E = Emergency light Small LED

External lights controlled with dusk + timer

Fans / Inlet & Outlets + Humidistat + Trickle Ventilation to 3.14.3

30l/s Hob Hood - SS

All ducted to wall vent /roof slate vent outlet Ubbink UB11

+ 3 Pole Isolator to regulations

3ph Mains & Fusebox - Existing & Relocated

Light Switch - Wall mounted

Light Switch - Pull Cord

Razor Socket 115/230V (Bathroom)

Socket for lights controlled by light switch

Double Socket Low (400mm above floor)

Some sockets to have inbuilt USB power outlets

Double Socket High (Above Counter Top)

SD - Ionisation / Multi & Manual Break Glass

Opti SD - Optical

HD - Heat Detectors

CO - Carbon Monoxide

CO2 - Carbon Dioxide (Air Quality Monitor)

Fire Alarm Panel & Repeater

Category L2 Alarm System to BS 5839 Part 1:2017

Category D Alarm System to BS 5839 Part 6:2019

to be designed & installed by competent person.

All to 2.11 Mains & battery back up & Interlinked

SD

Opti SD

HD

CO

CO2

SD

Opti SD

HD

CO

R

5

R

T

Fire

E

xit

FAP

E

BG

Rev A - BC Updates 31.07.2020

Concrete slab

Oil Tank

M

A

I N

S

T

R

E

E

T

R

/

W

W

a

ll

Bar

Store

Kitchen

Snug

Hall

WC

F WC

AWC M WC

Cl.

Flat

Entrance

WCs

Bar / Restaurant

S

c

r

e

e

n

1

S

l

i

d

i

n

g

d

o

u

b

l

e

g

l

a

z

e

d

p

a

n

e

l

s

R

o

o

f

o

v

e

r

h

a

n

g

Low & High Sections to Bar

to 4.2.10 @ 750 & 1100mm

Sitting Out Area

Office

Cellar

Boilers

Extension 38m2

Brick pillar

R

/

W

1

0

5

0

0

Brick wall removed.

Ground levels adjusted and

graded

Block Paving Area

c. 240m2

Brick wall removed.

Ground levels adjusted and

graded

Brick wall & gate removed.

New stone dyke infills gap.

Ground levels adjusted and

graded

Garden

Entrance

Main

Entrance

Room 4

Utility

WC

En-suite

Room 4

Entrance

bollard

bollard

4

0

0

0

B

gently graded path

D01

2 x 475

D04

D05

D06

2 x 650mm

D25

c.950mm

GW01

GW02

GW03

GW04

GW10

GW15

GW11

GW12

GW13

GW14

new door & window

S

c

r

e

e

n

2

17m2

55m2

Block Paving Area for

refuse bins etc

Bins to D&GC latest

requirements

1.8m

hig

h hit and m

iss vertic

al fence

1

.8

m

h

ig

h

h

it a

n

d

m

iss ve

rtica

l fe

n

ce

Car Parking 1

SVP

Rodding Point

AVV

Rodding Point

Rodding Point

New bottom outlet IC

New IC

New IC

New IC

Under stair void inspection panel at low level in WC

Vent Grills at high and low levels within WC

Stair underside protected to 30minFR

Deep seal easy clean

Shower drain

RWP

Roddable gulley

RWP

Roddable gulley

D10 60S FRVP

926mm

D11 60S FRVP

926mm

D16

826mm

D17

926mm

D18

826mm

D19

826mm

D21

800mm

D22

926mm

D23 VP

926mm

D24

c.950mm

D26 VP

926mm

D27 VP

826mm

D28

826mm

D29

926mm

D13 60S FRVP

Screen 60FR

925mm

D12 60S FRVP

826mm

D15 60S FRVP

925mm

D20 60S FR

826mm

C

h

a

n

n

e

l

d

r

a

i

n

C

h

a

n

n

e

l

d

r

a

i

n

S

c

r

e

e

n

4

6

0

F

R

+

s

t

a

i

n

e

d

g

l

a

s

s

S

c

r

e

e

n

5

6

0

F

R

+

s

t

a

i

n

e

d

g

l

a

s

s

H

D

H

D

H

D

H

D

H

D

H

D

1

S

c

r

e

e

n

6

a

(

&

6

b

)

6

0

F

R

AVV

1

New IC

1

9

7

0

Large internal wall removed

f

o

r

m

a

t

i

o

n

1

1

0

0

c

.

2

0

0

0

c

.

4

7

0

0

6

0

4

c

.

5

1

0

0

c

.

1

2

0

0

AVV

SVP

New IC

c.4

0

0

0

c.3500

1

2

0

0

N

o

n

co

m

b

u

sta

b

le

F

ire

S

to

p

D

P

C

6

0

F

R

R

o

ckw

o

o

l H

o

rizo

n

ta

l F

ire

S

to

p

a

t

G

F

C

e

ilin

g

le

ve

l a

ll a

ro

u

n

d

b

u

ild

in

g

N

o

n

co

m

b

u

sta

b

le

F

ire

S

to

p

D

P

C

6

0

F

R

R

o

ckw

o

o

l H

o

rizo

n

ta

l F

ire

S

to

p

a

t

G

F

C

e

ilin

g

le

ve

l a

ll a

ro

u

n

d

b

u

ild

in

g

N

o

n

co

m

b

u

sta

b

le

F

ire

S

to

p

D

P

C

6

0

F

R

R

o

ckw

o

o

l H

o

rizo

n

ta

l F

ire

S

to

p

a

t

G

F

C

e

ilin

g

le

ve

l a

ll a

ro

u

n

d

b

u

ild

in

g

N

o

n

c

o

m

b

u

s

t

a

b

l

e

F

i

r

e

S

t

o

p

D

P

C

6

0

F

R

R

o

c

k

w

o

o

l

H

o

r

i

z

o

n

t

a

l

F

i

r

e

S

t

o

p

a

t

G

F

C

e

i

l

i

n

g

l

e

v

e

l

a

l

l

a

r

o

u

n

d

b

u

i

l

d

i

n

g

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

Non combustable Fire Stops DPC 60FR

Rockwool Vertical Fire Stops

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

SVP

SVP pipework and

boxing at high level

8

5

0

8

5

0

F

i

r

e

E

x

i

t

FAP

Rub Off Mat

Rub Off Mat

F

i

r

e

E

x

i

t

F

i

r

e

E

x

i

t

F

i

r

e

E

x

i

t

F

i

r

e

E

x

i

t

F

i

r

e

E

x

i

t

F

ire

E

xit

F

ire

E

xit

F

ire

E

xit

F

ire

E

xit

Beer & Soft Drinks

Python route & Duct

8

0

0

c

l

e

a

r

E

PIR

PIR

PIR

PIR

PIR

5

5

5

5

E

E

E

E

E

E

PIR

PIR

E

E

E

E

E

E

1

4

0

0

shower tray

former at FFL

Whole floor gently

graded towards

shower tray & drain

Low profile raised

water bar at door

Internal walls removed only

after checking by engineer!

Existing 3Ph Mains & Fusebox

Relocated

Cook Range

Electric / Gas

Prep'

Servery

Dishwash

E

E

Proposed new position of 3Ph

Mains, Meter & Fuse boxes

N

e

w

s

t

e

e

l

b

e

a

m

s

1

H

R

F

R

N

e

w

s

t

e

e

l

b

e

a

m

s

1

H

R

F

R

PIR

PIR

H

D

TD

WM

D

P

T

D

D

P

W

M

Extract Vent

Extract Vent

Extract Vent

Extract Vent

Input Vent

Ventilation Fans,

(Option Heat Exchanger)

& ducts at high level

Extract Vent

Extract Vent

Extract Vent Roof AIR OUT

Roof AIR IN

H

ig

h

le

ve

l b

o

xin

g

fo

r

re

cta

n

g

u

la

r ve

n

t' d

u

ct

H

ig

h

le

ve

l b

o

xin

g

fo

r

re

cta

n

g

u

la

r ve

n

t' d

u

ct

PIR

PIR

PIR

PIR

Extract Fan

Cowled

Extract Fan Grill

Aluminium Grill over

A

p

p

r

o

x

i

m

a

t

e

n

e

w

r

o

u

t

e

S

P

C

a

b

l

e

&

D

u

c

t

r

o

u

t

e

t

o

n

e

w

s

w

i

t

c

h

&

m

e

t

e

r

A

p

p

ro

xim

a

te

n

e

w

ro

u

te

S

P

C

a

b

le

&

D

u

ct ro

u

te

to

n

e

w

sw

itch

&

m

e

te

r

Internal walls removed only

after checking by engineer!

R

R

R

R

R

R

R

R

R

R

R

R

R

R

R

5

SD

SD

SD

SD

SD

BG

SD

SD

SD

SD

HD

HD

HD

SD

R

R

TR

R

R

R

R

R

R

R

R

R

R

R

Windows blocked up

AVVR

5

BG

BG

BG

BG

R

SVP pipework and

boxing at high level

SVP

New IC

Services (small power etc) Layout by kitchen designer

Gas related design by qualified gas engineer.

If gas then gas interlock* with ventilation

*or as required by gas regulations

FAP (Repeater)

SVP

SVP pipework and

boxing at high level

Landline

Telephone Point

T

New IC

New drainage to existing

Septic Tank & Outlet

Existing LPG boiler(s)

checked & replaced

accordingly

SD

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stop

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stops

Non combustable Fire Stop DPC 60FR

Rockwool Vertical Fire Stops

B

e

a

m

&

b

l

o

c

k

f

l

o

o

r

t

o

s

t

a

i

r

e

n

c

l

o

s

u

r

e

CO

CO

1

5

2

5

1000

M

u

l

t

i

p

l

e

H

o

u

s

e

L

i

g

h

t

C

o

n

t

r

o

l

s

M

u

l

t

i

p

l

e

H

o

u

s

e

L

i

g

h

t

C

o

n

t

r

o

l

s

250

250mm going

170mm rise

1000mm between handrails

2

5

0

All walls within Kitchen & Store

have whiterock or equal wall cladding floor to ceiling.

Stainless Steel sheet behind cooking area.

Sinks

Wash hand

Sink

Rodding Point

D26a

926mm

8

5

0

Input Vent

Sink

E

E

E

E

E

E

E

E

E

E

Canopy over 60l/s

3

5

8

SD

S

t

a

i

r

B

o

x

i

n

g

a

b

o

v

e

Multi fuel stove

and hearth

Multi fuel stove

and hearth

D01 left open during

operational hours

Fire Alarm

linked to Hotel

EVCS BS 5839: Part 9: 2011

EVCS

Extract Fan

Extract Fan

Extract Fan

A

W

C

x

2

A

l

a

r

m

r

e

p

e

a

t

e

r

A

W

C

x

2

A

l

a

r

m

r

e

p

e

a

t

e

r

AWC Alarm Indicator

WC Alarm indicator

Rub Off Mat

Doc M Shower additional grab

handles, floor drain & deep seal trap

Emergency Pull

Pull down seat all to 3.12.10 Fig 3.32

Reinorce walls with plywood and studs

m

in

2

3

0

0

m

i

n

f

i

n

i

s

h

e

d

2

3

0

0

Roof AIR IN

Extract Vent

Extract Vent

Roof AIR OUT

L

i

n

t

e

l

s

3

0

0

m

m

a

b

o

v

e

D

2

2

d

o

o

r

h

e

a

d

t

o

a

l

l

o

w

f

o

r

v

e

n

t

i

l

a

t

i

o

n

d

u

c

t

s

/

g

r

i

l

l

s

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

1

4

0

m

m

7

N

/

m

m

2

b

l

o

c

k

w

o

r

k

c

.

2

0

0

c

.

2

0

0

c

.

2

0

0

R

a

ckin

g

w

a

ll o

f 9

5

x 4

5

C

1

6

@

6

0

0

m

m

c/c

NOTE: Refer to Structural Engineers

Information for Steel Beams & Columns,

lintels and padstones etc

AutoCAD SHX Text
50.59
AutoCAD SHX Text
50.50
AutoCAD SHX Text
50.93
AutoCAD SHX Text
50.71
AutoCAD SHX Text
50.71
AutoCAD SHX Text
50.46
AutoCAD SHX Text
50.31
AutoCAD SHX Text
50.47
AutoCAD SHX Text
50.52
AutoCAD SHX Text
50.36
AutoCAD SHX Text
50.39
AutoCAD SHX Text
50.27
AutoCAD SHX Text
50.55
AutoCAD SHX Text
47.81
AutoCAD SHX Text
48.64
AutoCAD SHX Text
48.15
AutoCAD SHX Text
47.93
AutoCAD SHX Text
48.39
AutoCAD SHX Text
50.77
AutoCAD SHX Text
50.75
AutoCAD SHX Text
50.68
AutoCAD SHX Text
50.53
AutoCAD SHX Text
50.14
AutoCAD SHX Text
50.06
AutoCAD SHX Text
47.85
AutoCAD SHX Text
48.23
AutoCAD SHX Text
48.98
AutoCAD SHX Text
48.63
AutoCAD SHX Text
48.37
AutoCAD SHX Text
48.48
AutoCAD SHX Text
48.09
AutoCAD SHX Text
50.06
AutoCAD SHX Text
50.48
AutoCAD SHX Text
SVs
AutoCAD SHX Text
EP
AutoCAD SHX Text
IC
AutoCAD SHX Text
R/W
AutoCAD SHX Text
IC?
AutoCAD SHX Text
Wall
AutoCAD SHX Text
SV
AutoCAD SHX Text
49
AutoCAD SHX Text
48