Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers, these two systems were retrofitted into existing tanks. •Carlin Construction was the general contractor on the job. •The Grit System is located in the headworks just after the mechanical screens. •The Septage Receiving System is in an underground tank adjacent to the headworks of the plant.

Upload: others

Post on 23-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson MATideflex

Course Bubble Aeration- Grit and Septage -

•Designed by Wright – Pierce Engineers, these

two systems were retrofitted into existing tanks.

•Carlin Construction was the general contractor on the job.

•The Grit System is located in the headworks just after the mechanical screens.

•The Septage Receiving System is in an underground tank adjacent to the headworks of the plant.

Page 2: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Grit

The TFA’s are

located right above

the grit screw.

There are 10

TFA1.50 diffusers.

The diffusers create

a rolling action in

the tank to wash

the organics from

the grit particles;

the diffusers are

mounted ~3’ above

the collection zone

allowing the grit to

settle out.

Page 3: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Grit

The piping material

for this application

is Schedule 10

316L stainless

steel. This is the

isolation valve

located at the top of

the drop pipe.

Page 4: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Grit

This type of

system is a

removable

manifold

configuration

constructed

entirely of

schedule 10

SS. The

Contractor is in

the process of

adjusting the

diffusers to

their correct

alignment.

Page 5: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Grit

Page 6: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Septage

This is a “fixed

mounted” type

configuration.

Total 12 diffusers.

(6) TFA1.50 on each

side.

All angled uniformly

so the air is evenly

distributed.

Orifice plugs are

also used to evenly

distribute the air to

all valves.

Page 7: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Septage

Page 8: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Septage

Tideflex uses all

Victaulic Brand

couplings (304SS &

316SS) for the

connections within

the stainless steel

systems.

Page 9: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Hudson Septage

Page 10: Tideflex Course Bubble - Hudson MA · Hudson MA Tideflex Course Bubble Aeration - Grit and Septage - •Designed by Wright – Pierce Engineers , these two systems were retrofitted

Design assistance

• Just fill out an Application Data Sheet and

Tideflex Engineers will size up a system

for you. They will supply detail CAD

drawings and sample specifications.

• A complete evaluation will be included.

• Please contact Bob Mack at NE3 for

assistance 781-275-1001 or

[email protected].