Tier1 perspective on ISO 26262 – Confirmation Measures
![Page 2: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/2.jpg)
How do we know we’re doing enough to address safety?
Or..…
• How can we demonstrate we’ve done enough?
• A safety standard provides guidance as to what to do but not how to do it
• Whilst we aim to “confirm” we also wish to uncover any weaknesses ASAP prior to production.
• ISO 26262 provides “Confirmation Measures” to help address this
![Page 3: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/3.jpg)
ISO 26262 Recap
Risk
(ASIL)
Safety Measures
(ASIL)
Safety mechanisms
(technical)
Safety Activities
(process)
Random failures
Systematic failures
ASIL is the degree of unacceptable risk due to malfunctioning behaviour of an “Item”
The safety measure inherits the ASIL to indicate the “level” of risk reduction.
![Page 4: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/4.jpg)
OVERVIEW OF CONFIRMATION MEASURES
Assessment, Audit and Confirmation Reviews
![Page 5: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/5.jpg)
Confirmation Measures
Activities (requiring “Independence”) that are
dependent on the maximum ASIL of the safety goals.
•What: Process implementation
•When: process enactment, completed prior to safety assessment
Functional Safety Audit
•What: specific lSO 26262 isted work products
•When: after associated safety activity, all completed before safety assessment
Confirmation Reviews
•What: Safety Case - argument and evidence of safety of “Item”
•When: completed prior to release for production (single event or progressively)
Functional Safety
Assessment
![Page 6: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/6.jpg)
Confirmation Measures in relation to development
Functional Safety Assessment
Product Confidence
Analyses Verification Specification
/ Design / Architecture
Process Confidence
Functional Safety Audit
Confirmation Reviews
![Page 7: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/7.jpg)
CONFIRMATION REVIEWS Confirmation Reviews vs Verification Reviews
![Page 8: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/8.jpg)
The “review” in “Confirmation Review”:
• Review: Focus: work product
Objective: achievement of work product goal (wrt the purpose of the review)
• Verification: Focus : requirements (of the product).
Objective: complete and correct specification or implementation
• Verification Review: Focus : “project requirements, or technical requirements”
Objective: development activity fulfils requirements
• Confirmation Review: Focus: specific subset of ISO 26262 work products
Objective: “compliance” with the requirements of ISO 26262
Technical. But what are “project requirements”?
Everything and anything e.g. tech, process, competency etc.
Technical
Process (compliance). A “special” review, requirement for “Independence”
![Page 9: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/9.jpg)
Verification Review vs Confirmation Review
• Prior to ISO 26262, verification reviews typically covered process aspects.
• Verification Review
– Product focus
• Confirmation Review
– Process confidence
• Potentially some confusion or inefficiency??
![Page 10: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/10.jpg)
Can a Confirmation Review be a Verification Review? (or vice a versa)
Venn diagram
“Reviews”
“Verification Reviews” “Confirmation Reviews”
Other types of Review?? (but not Audit or
FSA)
Overlap or
not??
“Independence” of reviewer required
“Independence” not required
![Page 11: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/11.jpg)
Confirmation Reviews Proposals for ISO 26262 2nd Edition
• Scope of Confirmation Reviews to become assessment-like activity.
– Judgement of the contribution to achievement of safety
– Supporting the principle of phased, iterative assessments
![Page 12: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/12.jpg)
FUNCTIONAL SAFETY ASSESSMENT
![Page 13: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/13.jpg)
Can functional safety be achieved with a non-compliance?
• General consensus is that it may be so – depending on the non-compliance. – 100% compliance is questionable in any case
• Proposal for 2nd edition to make FSA objective based – Where each major clause has defined objective
– Audit and Confirmation reviews still important input
– Emphasis aimed at technical aspects
![Page 14: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/14.jpg)
Assessment Procedure and Competency
• Assessment requires a certain skill set and experience – From technical and procedural perspectives
• Technical: by an assessment “team” approach
• Procedural: via skill set akin to auditors, plus... – Guidance also available from UK’s ISA working group
• Independent Safety Assurance http://www.theiet.org/factfiles/isa/
– CASS • IEC 61508 - Conformity Assessment of Safety-related Systems
![Page 15: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/15.jpg)
Final Thoughts
• Efficient combination of verification and confirmation reviews
• Functional safety Assessment
– Competency of Assessment/Assessor
• Emphasise the technical to counter the tendency audit
• Maintaining independence of assessments in balance with required technical expertise
– The Safety Case – a “compilation of evidence” is not easy to assess without argument/claims
– Similarly with out process / audit confidence assessment may be impractical
• Confirmation Reviews
– A focus on aspects contributing to achievement of safety
• All three confirmation measures to be performed in a timely manner to uncover any issues ASAP
• Confirmation Measures are intended to provide redundant checks on development activities and not to devolve the team of responsibilities
![Page 16: Tier1 perspective on ISO 26262 Confirmation …...2016/06/03 · •What: specific lSO 26262 isted work products •When: after associated safety activity, all completed before safety](https://reader030.vdocument.in/reader030/viewer/2022041113/5f1d598a86e0633c083ff53b/html5/thumbnails/16.jpg)
Thanks for your time, any questions?
• ‘Insanity: doing the same thing over and over again and expecting different results.’ Albert Einstein
• ‘The prevention of hazards shall not be seen as following law, but merely as an act of human responsibility and economic reason.’ Werner von Siemens, 1880
• “ISO 26262 = engage brain and keep it engaged” Roger Rivett
• “It’s good that it’s better, but it would have been better if it was good” anon