tisza river basin - addressing managment issues in a ......`tisza river length was reduced by...
TRANSCRIPT
![Page 1: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/1.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Tisza River Basin Tisza River Basin -- addressing addressing managmentmanagment issues in a complex issues in a complex
environmentenvironment
Dagmar Haase (UFZ)on behalf of the Hungarian and Ukrainian
Tisza Case Study Teamand the NeWater colleagues involved
![Page 2: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/2.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Outline
Major topics stressed in NeWaterSustainable Floodplain Management– CM– Game
Flood risk and vulnerability– CM & GMB– KnETs game
Training for trainers– Stakeholder Issues Analysis– Knowledge Elicitation Tools (KnETs)
Conclusions
![Page 3: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/3.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Major topics stressed
1. Sustainable management of the highly valuable Hungarian Tisza floodplains in order to secure both ecosystems and income.
2. Adapt better to flood risk due to climate change and to reduce vulnerability.
1. 1. HungaryHungary2. Ukraine2. Ukraine
![Page 4: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/4.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Sustainable floodplain managementTisza River length was reduced by >400 km by cutting meanders to straighten the river (transport).Floodplain area declined from 38,500 to 1,800 km2 (90%) by river embankment measures (dikes) to enlarge the agricultural area.What are options to modify or change the current regime from “protect from river” to “live with river”?Who are the actors?Where are niches for AM?
Sendzimir et al.
![Page 5: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/5.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Conceptual Modelling, CLD
Paradigm "Live in Harmony with the River"
Paradigm "Protect Landscape from the River"
Landscape Productivity
Agricultural Intensity
AgriculturalTechnology
Intensity
Crop Yield/haBig Farms
Profits/haBig Farms
IntensificationPressure
+
+
+
Dikes
+
+
Area forIntensive Use
+
WaterSufficiencyin Summer
Crop Damageby Flood
-
Floods Frequencyand Intensity
+
-
Pressure forFlood Protection
+
+
Landscape WaterStorage Capacity
+
River-LandscapeControlled Flow
+
AlternativeWater
Sources
Water Stored inLandscape
+
+
ClimateChange
+
HumanDevelopmentin Floodplain
-
Flood Damage toBuildings andInfrastructure
+
++
+
+
--
+
+
Soil Quality
Biodiversity
++
Profits/ha Small &Medium Farms +
CommunityWell-Being
+
WaterSteeringAbility
+
-
Pressurefor SFM
+
LobbyingCapacity of CA
Community actors (CA)attitude (active/passive)
+
+
++ Lobbyingcapacity of IAA
-
+
-
R1aR1b
+
R2
B1
B2
R3
B3a B3b
R4
R5
B4
LandscapeMosaic+
+
++ +
-
Magnuszewski, Sendzimir, 2008
Training Training forfor
trainerstrainers
![Page 6: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/6.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Floodplain Management Game: Modeling human-landscape interactions in river valleys
![Page 7: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/7.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Floodplain Management Game
…… moremore on on thisthis on on ThursdayThursday morningmorning!!
![Page 8: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/8.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Flood risk and vulnerabilityHazardous flood events regularly produce enormous damage in an area with very limited financial budgets. Local monitoring systems are based administratively on sectoral, technical and data collection related objectives. They ignore the complex situation of the “risk of being flooded” for local municipalities. Water management institutions and local municipalities do not address the complex flood context, as they are not clearly linked to local decision makers’ needs and perceptions of risk. Communities are extremely vulnerable since these needs are not being addressed. There is a need to implement a more participatory flood management analysis to identify ways to reduce flood risk by enhancing local capacity for coping with or adapting to the situation (e.g. using existing knowledge, social networks and resources).
![Page 9: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/9.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Conceptual Modelling and GMB
Community Welfare
Adaptive Capacity
Coping Ability
Flood Exposure
Flood Damages
risk awareness (expecteddamage & loss of
income)
insurancesystem
householdbudget
socialnetworks
education onfloods
citizens' responsecapacity
inundationdepth
household damages &losses of income
state funds
+
floodfrequency
sense of personalresponsibility
flood early warningsystem
+
communitydamages
funds for floodmitigation
+
+
+technical flood
prevention+
-
-
+
+
institutional responsecapacity
floodmanagement
plans
+
+
monitoring
+
+
+ -
+
+
infrastructure
-
compensation bystate
+
spatial pattern of floodplainbuildings, infrastructure and
land use
-
flood relevantlegislation, spatialplanning and itsimplementation
+
-
+
+
+
++
![Page 10: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/10.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Conceptual Modelling and GMB
Community Welfare
Adaptive Capacity
Coping Ability
Flood Exposure
Flood Damages
risk awareness (expecteddamage & loss of
income)
insurancesystem
householdbudget
socialnetworks
education onfloods
citizens' responsecapacity
inundationdepth
household damages &losses of income
state funds
+
floodfrequency
sense of personalresponsibility
flood early warningsystem
+
communitydamages
funds for floodmitigation
+
+
+technical flood
prevention+
-
-
+
+
institutional responsecapacity
floodmanagement
plans
+
+
monitoring
+
+
+ -
+
+
infrastructure
-
compensation bystate
+
spatial pattern of floodplainbuildings, infrastructure and
land use
-
flood relevantlegislation, spatialplanning and itsimplementation
+
-
+
+
+
++
risk awareness(expected damage& loss of income)
private insurancesystem
socialnetworks
education on softflood measures
sense of personalresponsibility
funds for floodmitigation
+
+
+
compensationby state
spatial pattern of floodplainbuildings, infrastructure and
land use
flood relevantlegislation
-
+
+
+
++
+
+
++
experiments withalternative measures
conventional, big-scale,expensive technical measures
for flood prevention
+
small-scale, decentralized,flexible technical measures
for flood prevention++
+ +
flood zonesinformation and
maps
+
++
enforcement ofspatial planning
+
flood relevantspatial planning
+
+
enforcement of floodrelated legislation
+
number of peoplediscussing soft
measures
flood actionplans
+
+number of
peopleinsured
+
+
+
![Page 11: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/11.jpg)
New Approaches to Adaptive Water Management under Uncertainty
KnETs game
![Page 12: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/12.jpg)
New Approaches to Adaptive Water Management under Uncertainty
KnETs game
![Page 13: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/13.jpg)
New Approaches to Adaptive Water Management under Uncertainty
KnETs game
![Page 14: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/14.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Training for trainersConceptual modelling and management gameStakeholder issues anaylsis; Knowledge elicitation tools (KnETs)
![Page 15: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/15.jpg)
New Approaches to Adaptive Water Management under Uncertainty
Conclusions: Newater in the Tisza River Basin …… added new knowledge about water management to existing one and uncovered some of the underlying and shadow processes and structures,… elicitated knowledge in flood risk decision-making,… identified niches for AM to modify / change prevailing WMR “protect from river” to “life with river”… created new networks of communication.
Climate Change adaptation is still a challenge.Climate Change adaptation is still a challenge.Data availability (e.g. crossData availability (e.g. cross--section data, water quality data) section data, water quality data) has to be further improved.has to be further improved.Newater activities did not cover major river basin impacts by Newater activities did not cover major river basin impacts by the energy sector and navigation … BUT developed a range of the energy sector and navigation … BUT developed a range of tools which are very suitable to tackle them. tools which are very suitable to tackle them.
![Page 16: Tisza River Basin - addressing managment issues in a ......`Tisza River length was reduced by >400 km by cutting meanders to straighten the river (transport). `Floodplain area declined](https://reader033.vdocument.in/reader033/viewer/2022052102/603bfbe63f14133e45231895/html5/thumbnails/16.jpg)
New Approaches to Adaptive Water Management under Uncertainty
ProductsPapers
– Haase, D., Bohn, C., 2007. Flood vulnerability and preparedness: model approach to mitigate the risk for local communities. In: Schumann, A., Pahlow, M., Bogardi, J.J., van der Zaag, P. (eds) Reducing the Vulnerability of Societies Against Water Related Risks at the Basin Scale. IAHS Red Book Series 317, 1-7.
– Krysanova, V., H. Buiteveld, D. Haase, F. F. Hattermann, K. Van Niekerk, K. Roest, P. Martínez-Santos and M. Schlüter 2008. Practices and Lessons Learned in Coping with Climatic Hazards at the River-Basin Scale: Floods and Droughts. Ecology and Society 13 (2): 32.
– Sendzimir, J. et al., 2008. Assessing the Resilience of a River Management Regime: Informal Learning in a Shadow Network in the Tisza River Basin. Ecology and Society 13 (1): 11.
– Various papers and conference contributions by Flachner, Z., 2007, 2008– 2 papers (Haase, D., Huntjens, P., Schlüter, M., Hirsch, D., Kranz, N. on Group Model Building and Kuptsova,
S., Haase, D., Bharwani, S., Fischer, M.D., Downing, T.E. on KnETs) submitted and under revision. Ecology and Society.
ReportsTools
– KnETs game– Floodplain Management Game– Series of CM for the Hungarian and Ukrainian part of the basin