Introduction
Introducing TİTAŞ
Field of Operations
About Us
Ongoing Projects
Key Completed Road
Construction Projects
Road Construction
Photos
Key Completed Project
- Aliağa Natural Gas
Combined Cycle
Power Plant
Projects List
3 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50
Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Since its foundation in 1974, Titaş has completed many
road construction, infrastructural piping, petroleum piping,
drilling, blasting, dam and concrete structures, excavation
and hauling works and has undertaken all import and export
work of related materials and equipment to those projects.
For infrastructure work, Titaş has increased its annual
earthmoving capacity to more than 12 million cubic meters.
Many municipal domestic water distribution networks,
housing waste water networks, collectors, roads,
pavements, energy, communication, natural gas, complex
power plant infrastructure works, heating-cooling networks
for university campuses, industrial and public housing
complex projects have been completed before their
scheduled contract deadlines.
In a highly competitive environment, Titaş commits the
rationalization of its projects through strict standards by
achieving optimal cost efficiency.
Titaş believes that health, safety and environment (HSE) at
work have fundamental importance. It is Titaş’s policy to
take into account the requirements of all relevant HSE laws,
in all of its activities. Titaş provides all preventative
measures, such as HSE trainings, HSE forums with all of its
levels of personnel and precise instructions for health,
safety & environment in its projects. In recent projects, Titaş
has been working with world class oil and gas HSE
standards.
Additionally team spirit is a rational combination of the latest
engineering technology and experience is the key factor
that has made Titaş a preferred company in the fields of
infrastructure, earthwork and quarry works, drilling and
blasting works, complex infrastructural projects, oil and gas
industry.
4 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50
Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Includes;
Equipment Supply
Complex Infrastructure Works
Surface and Drainage Works
Piping Works (Concrete, HDPE, PVC,
Cast Iron, CLDI, Ductile Iron, GRP, PEHD)
Excavation, Backfilling and Compaction Works
Quarry Operations
Drilling and Blasting Works
Prefabricated elements for infrastructure works
5 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Vision & Values
TİTAŞ’s vision is to provide total solutions to our clients, whilst encouraging and harnessing the individual
potential of our employees, acting responsibly towards the enviroment and society. TİTAŞ’s vision and values
determine everything from employment to operation at home and abroad.
Excellence
While using the latest in engineering and management sciences always ensures the highest quality, TİTAŞ’s
standards are also based on internationally acknowledged procedures. TİTAŞ, as part of ENKA, is pertaining to
quality, which are also endorsed by ENKA’s standards, such as the British Standards Institution, include Quality
Management System ISO 9001:2008, Environmental Management System ISO 14001:2004 and Occupational
Health and Safety System OHSAS 18001:2007.
From engineering design through to commissioning, TİTAŞ interprets and complies with all quality management
requirements. Additionally, the continually revised work processes ensure that current best practices are
incorporated into the execution plan, the procedures, the specifications and the design guidelines of all work.
Innovation
Every engineering-related detail in completed and ongoing projects is constantly questioned and re-examined.
Also innovative engineering solutions are being continually researched and developed for better and more
efficient results.
Speed
Enhancing existing technologies in search of developing more and more rapid means of mobilization and project
completion methods is the desire of each and every project - execution group.
6 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Safety
"Zero Accident" policy is both a goal and achievement at TİTAŞ. Continuously implementing ENKA’s
comprehensive Health Safety and Environment (HSE) policy to protect all employees and associates working
at TİTAŞ offices, construction sites and related facilities. It is including protection from every kind of pollution,
hazard and accident that may result from its business.
Being a good member of the community
Acting as a contractor and/or subcontractor for construction and operation of industrial, commercial and
infrastructure facilities at home and abroad, TİTAŞ's mission requires that it must be involved in, and
continuously increase its contribution to the communities where it works. Management of social impact
includes the process of identifying, monitoring and managing the intended and unintended social
consequences of a project. Its aim is to bring about a more sustainable and fair environment.
Its people
TİTAŞ adopts, in all its offices and construction sites, the most recent labor policies and up-to-date working
conditions, enabling its employees to achieve the company's objectives in a comfortable, healthy and safe
environment. It is TİTAŞ's unwavering belief that its highly skilled staff and workforce is one of its most
significant competitive advantages. Also recognizing that training is an essential element in improving the
performance of individuals, which also translates into producing a successful project that both TİTAŞ together
with ENKA and its clients can be proud of.
7 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
25 projects in 13 countries
• Turkey • Russia • Kazakhstan
• Georgia • Kosovo • Croatia
• Albania • Iraq • Algeria
• Mali • Sierra Leone • Cameroon
• Ukranie
8 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50
Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Early Works and Facilities Construction for South
Caucasus Pipeline Expansion Project, Georgia
(Between 2014 – today)
SCPX Early Works & Facilities Construction – Bechtel
ENKA Joint Venture (BEJV)
The existing 690 km South Caucasus Pipeline is 42"
diameter and transports gas from the Sangachal
Terminal in Azerbaijan to markets in Georgia and
Turkey. It has a system design capacity of 7.4 bcma. As
a result of the extra gas arising horn the Shah Deniz 2
Project there is a requirement to increase the capacity of
the SCP system. This is called the South Caucasus
Pipeline Expansion (SCPX). SCPX will increase the
capacity of the existing system by approximately 16
bcma.
This expansion will be provided by a new 48" diameter
pipeline, which will run in parallel with the existing SCP
from KP 23 in Azerbaijan to the Georgian Border and a
further 63km into Georgia making a total length of 487
km.
In addition SCPX requires two new Compressor Stations
plus an expansion of an existing Pressure Reducing and
Metering Station, all situated in Georgia. The Early
Works that are associated to construction of these
Stations are the subject of this work, which will be
carried out by Titaş.
Key Project Features Realized by Titaş:
- 15 km asphalt road construction, Drilling and Blasting
works, Excavation and Filling Works, Drainage Works,
Gabion Walls, Gutter works, Quarry operations, Crusher
operations, Paving works
9 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Prishtine – Hani I Elezit (Route No:6) Motorway,
Kosovo (Between 2010-2013)
Bechtel ENKA General Partners (BEGP)
Motorway is beginning from Morine in the Albania border
then going through Prizren, Suhareke, Duhel, Malisheve,
Arlatte, Komorane, Sllatina and reaching Prishtina. It is
curving around Prishtina and ending in Besi small town on
the north of Prishtina.
Titaş helped BEGP to build 77 km of this route that total
length is 89 km. Motorway is 28 meters wide which has 2
circular strips of 3.75 meters with an emergency lane of
2.5 meters and the green belt in median width between 3-4
meters.
Project includes 22 bridges, 61 underpass/overpasses and
9 interchanges construction. Project team executed 20
million cubic meters excavation, 13 million cubic meters
embankment fill, 200,000 meters drainage pipe
installation, 265,000 cubic meters concrete and over 1
million tones asphalt works in 42 months. Motorway
opened to traffic as planned on November 2013.
Works, which has started in 2010, on the Morine-Merdare Motorway Project in Kosovo continued until 2013.
A total of 77-kilometer of the motorway was completed and opened for transportation on November 26, 2013.
Titaş, as an earthwork, drilling and blasting subcontractor feels proud of excavation-backfilling works with
approximately 7 million cubic meters earthmoving, construction of various size reinforced concrete vents and
culverts along a part of 20-kilometers of the opened 60-kilometer highway, was completed in 2012 by Titaş.
As of the end of 2013, Titaş had more than 200 employees and achieved ‘zero accident’.
Motorway is the biggest investment and infrastructure project ever done in Kosovo. The motorway project
Morine - Prizren - Prishtina, helps New Europeans that will be created by the new possibilities of free
movement, and integrates powerful country in the region of Kosovo. Moreover this motorway connected
Kosovo to Albania, Albania to Kosovo.
Key Project Features Realized by Titaş:
Drilling and Blasting works, Excavation and Filling works, Drainage works
10 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Rreshen - Kalimash Motorway, Albania (Between 2007 – 2009)
Albania Motorway Project Rreshen to Reps & Quarry Operations - Bechtel ENKA Joint Venture (BEJV)
The Project was a key connection between Durnes Port, Albania's primary harbor on the Adriatic Sea and
Kosovo. In addition to the great amount of travel time saved, which will be 2 hours instead of 6 hours, this
new route served to stimulate the economy in Albania's northeastern region.
The first section of the 61 km long highway is the 18 km long stretch from Rreshen to Reps. The 27 km
Section 2 is from Reps to Thirra. 15 km long Section 3 is between Thirra and Kolshi where Mount Runes,
at an altitude of 1,858 m, will be crossed with a 5.5 km, double bore tunnel. All construction works
excluding one tube of the tunnel was completed in June 2009.
The Motorway was designed as dual carriageways of 2 X 3.75 m, supplemented with 2.0 m emergency
shoulder lanes. The major work items comprised 21 million cubic meters of excavation, 8.5 million cubic
meters of earth filling, 0.6 million cubic meters of concrete and shotcrete, 1.0 million tones of sub base
and cement treated base and 0.45 million tones of asphalt for the construction of the motorway of 61 km
long with all bridges, viaducts and two tubes each of 5.5 km in length, on the challenging topography of
the Albania mountains terrain at an altitude over 1,000 m.
Titaş undertook the Quarry Operations for material needs for the motorway project. As of the end of 2009,
Titaş had 118 employees and achieved ‘zero accident’ during the project.
Key Project Features Realized by Titaş:
- Drilling and Blasting works, Drainage works, Crusher operations, Quarry operations, Excavation and
Filling Works
11 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Bregana-Zagreb, Dubrovnik Motorway, Croatia (Between 2003 – 2004)
Drainage Works at Section B&C of the Bregana Zagreb Dubrovnik Motorway Project – Bechtel ENKA
Joint Venture (BEJV). Titaş, with ENKA and Bechtel (BEJV), undertook the turn-key construction of the
Croatian motorway in 2003.
The motorway project having a total length of 156 km, consisted of two independent sections. Section 1,
the 13 km Bregana-Jankomir motorway, the four-lane link from the capital city Zagreb to the border of
Croatia and Slovenia was opened to traffic in December 2000 and the other Section, the 143 km
Bosiljevo-Svetirok motorway from central Croatia towards the Dalmatian Coast was opened in July 2004.
The project was completed 14 months ahead of schedule with 4,000 workers employed at the peak of the
construction. The project has won the 2004 Croatian Contractor Safety Award as it was successfully
realized without any compromise in quality or safety.
The motorway was considered to be of vital importance as it provides the principal link between the
Zagreb region in central Croatia and the Dalmatian coast. With this motorway, Croatia’s Dalmatian coast
is integrated into the central and western European motorway network.
Throughout the construction, 21 million cubic meters of earth was excavated, 0.65 million cubic meters of
concrete was poured, 18 million cubic meters of fill material had been used, 5.1 million tones of sub-
base and cement treated base and 1.18 million tones of asphalt were laid down. The project also included
the construction of bridges and viaducts, having a total length of 7,500 m.
Key Project Features Realized by Titaş:
- Main Body Drainage and Surface Drainage Works, manholes, inlets, outlets, absorption wells
12 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Ankara - Gerede Highway, Turkey
ENKA and Bechtel began the design and construction of the motorway in 1987. The 120 km Gerede -
Ankara section is a 2x3 lane motorway, and the 110 km Ankara peripheral section is a 2x4 lane motorway.
There are six interchanges on the Gerede - Ankara section and 14 interchanges on the Ankara Ring road
section, as well as 22 viaducts, 3 bridges, 63 under and overpasses.
It is one of the most significant motorway projects in the world, involving 166 million cubic meters of
excavation, 22 million tones of paving and 1.5 million cubic meters of concrete. At the peak of construction,
a workforce of 6,300 was employed.
The Gerede - Ankara section of the project was opened to traffic on October 28, 1992. The Ankara Ring
road was completed on May 31, 1999.
13 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
DRILLING AND BLASTING WORKS
14 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
DRILLING AND BLASTING WORKS
15 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
EXCAVATION WORKS
16 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
EXCAVATION WORKS
17 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
EXCAVATION WORKS
18 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
FILLING WORKS
19 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
FILLING WORKS
20 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
GABION – STONE WALLS
21 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
GABION – STONE WALLS
22 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
GABION – STONE WALLS
23 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
GABION – STONE WALLS
24 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
INTRODUCTION
Following a build-own-operate (BOO) tender in 1997, the InterGen – ENKA partnership was awarded the
right to build, own and operate the Gebze Power Plant with a nominal capacity of 1,554 MW, the Adapazarı
Power Plant with a nominal capacity of 777 MW and the İzmir Power Plant with a nominal capacity of 1,523
MW, respectively. ENKA and Bechtel joint venture was the turnkey EPC contractor for all three plants.
Each power island in these natural gas-fired combined cycle power plants consisted of two combustion
turbines/generators, two-heat recovery steam generators and one steam turbine/generator. In the Gebze
and Adapazarı power plants, natural draft dry cooling towers serve each power island, whereas in the İzmir
plant, low-profile forced draft wet cooling towers were built, using seawater as a cooling medium.
The combustion turbine generators were supplied by General Electric (USA), the steam turbine generators
by Alstom Power (Germany), the closed cooling system by EGI (Hungary), the heat-recovery steam
generators by CMI (Belgium), the switchyards by Siemens (Turkey-Germany), the main and auxiliary
transformers by Alstom (Turkey), the water treatment plant by Aquatech – ENKA Teknik (USA-Turkey), the
gas RMS systems by ENKA Teknik (Turkey) and the DCS control systems by ABB-Bailey (USA).
At various times during construction, approximately 12,000 workers were employed at all three plants. The
Gebze and Adapazarı power plants were completed in 2002 and the İzmir plant in 2003.
ALIAGA IZMIR / TURKEY – NATURAL GAS CCPP
25 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
INTRODUCTION
During the commercial operations of plants, with their
annual generation capacity of 32 billion KWh, ENKA has
achieved high levels of availability and generated over
350 billion kWh from its three power plants, supplying
14% of Turkey’s electricity demand.
In that period, meticulous planning and close supervision
have enabled ENKA to successfully complete planned
maintenance in the shortest time yet achieved for GE
9FA +e machines.
Adapazarı plant achieved 99.8% availability, nearly 7
percentage points higher than the industry average, and
noted to be a global record in F-class gas turbine
technology. Considering that performance, Power
Magazine selected the Adapazarı plant as one of the
award-winning gas-fired top plants in 2011.
Key Project Features Realized by Titaş:
- Excavation, filling works, piping works, small
concrete structure works, road construction works
ALIAGA IZMIR / TURKEY – NATURAL GAS CCPP
26 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
EXCAVATION FILLING WORKS
Plant area general excavation 170.000 m3
Plant area general fill 360.000 m3
Foundation excavation 72.000 m3
Foundation backfill 82.000 m3
Sea water intake structure rock excavation 11.200 m3
27 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
PIPING WORKS
DN800-1000 HDPE pipe 7.450 m
Make-up, blowdown Sea water system
DN180 HDPE pipe 5.950 m
Make-up, blowdown Sea water system
DN300 - 800 Reinforced concrete pipe
980 m
Stormwater system
DN150 PVC pipe 1.350 m
Chemical waste water system
DN63-1000 HDPE pipe 7.470 m
Fire protection system
DN63-800 HDPE pipe 3.250 m
Raw water, domestic water, demin water
DN 150-350 CLDI pipe 170 m
HRSG foundation embedded piping
DN63-200 PVC pipe 1.800 m
Waste water
DN 100-150 Cast iron pipe 1.210 m
Potable water
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
28 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
DN-2200 PIPING WORKS
DN2200 Pre-stressing concrete pipe with steel sleeve 390 m Circulating sea water as cooling
water system
29 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
DUCT BANK WORKS
DN50-150 PVC Pipe 28.000 m Electrical & control system duct bank
DN 50-150 Galvanized Pipe 2.400 m Electrical & control system duct bank
30 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
CONCRETE WORKS
Sea water intake rock jetty construction 13.000 ton
Minor concrete structures 12.000 m3
31 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
ASPHALT WORKS
Facility roads asphalt 9.000 ton
Facility road subbase & base 19.000 ton
32 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
ALIAGA IZMIR / TURKEY - NATURAL GAS CCPP
PROJECT MAIN KEY QUANTITIES
OTHER WORKS Valve / air release / wash out 366 ea Misc.
Fire hydrant 42 ea Fire protection system
Fiber optic cable installation 19.250 m
Medium voltage cable installation 27.000 m
33 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
No Project Title Detailed Project Description Scope of Work
Detailed
Project Category Country Location Client Start Date Finish Date Main Key Quantities
25 Early Works and Facilities
Construction for South Caucasus
Pipeline Expansion Project,
Georgia
Equipment supply and construction of 15km 6mt. width asphalt
road and Compressor Station in CSG2 area substructure,
Temporary Facilities substructure, Camp Areas substructure.
Quarry Operations for material needs for the motorway together
with Bilgin İnş. as subcontractor. Scope of Work includes
Blasting, Gabion Walls and Drainage Works. Unit price contract,
supply for machinery and equipment, complete asphalt road
construction, excavation and compaction of Temporary
Facilities, Camp Areas, Compressor Station substructures, and
Quarry Operations.
Engineering +
Procurement +
Construction + Quarry
Operations
Compressor Station
substructure,
complete 15km.
Asphalt Road
Georgia Tsalka ENKA-Bechtel JV 13.05.2014 31.12.2016 1.063.804 m3 Excavation,
655.760 m3 Compaction Fill,
314.344 m3 Topsoil Removal
24 Morine to Pristina North Junction,
Section 1 Prishtine – Hani I Elezit
(Route No:6) Motorway
Equipment supply and construction of 77km of total 89km
motorway, which is beginning from Morine in the Albania border
then going through Prizren, Suhareke, Duhel, Malisheve, Arlatte,
Komorane, Sllatina and reaching Prishtina. It is curving around
Prishtina and ending in Besi small town on the north of
Prishtina.Motorway is 28 meters wide which has 2 circular strips
of 3.75 meters with an emergency lane of 2.5 meters and the
green belt in median width between 3-4 meters. Unit price
contract, supply for machinery and equipment, construction,
excavation, and compaction of 77km road substructure, up to
asphalt level.
Excavation +
Compaction +
Engineering +
Procurement +
Construction
77km of Motorway
substructure
Kosovo Prizren-Prishtine ENKA-Bechtel JV 28.05.2010 01.12.2013 6.000.000 m3 Excavation-
Backfilling
23 Albania Motorway Project Rreshen
to Kalimash & Quarry Operations
Rreshen
Equipment supply and construction of 61km long highway, which
is the 18 km long stretch from Rreshen to Reps ,the 27 km
Section 2 is from Reps to Thirra , 15 km long Section 3 is
between Thirra and Kolshi with a 5.5 km, double bore tunnel.
Quarry Operations for material needs for the motorway together
with Pimtek A.Ş. as partners. Unit price contract, supply for
machinery and equipment, construction, excavation, and
compaction of 61km road substructure, up to asphalt level and
Quarry Operations.
Engineering +
Procurement +
Construction + Quarry
Operations
61km of Motorway
substructure, 5.5km
of Tunnel excavation
Albania Rreshen -
Kalimash
ENKA-Bechtel JV 05.04.2007 30.06.2009 21.000.000 m3 Excavation,
8.500.000 m3 Earth Filling
22 Drainage Works at Section B&C of
the Bregana Zagreb Dubrovnik
Motorway Project
Equipment supply and construction of the drainage works and
substructure works at Section B&C of the Bregana Zagreb
Dubrovnik Motorway Project. Unit price contract, supply for
machinery and equipment, construction, excavation, and
compaction of Drainage Works
Engineering +
Procurement +
Construction
Motorway Drainage
Works, Substructure
Works
Croatia Bregana-Zagreb-
Dubrovnik
ENKA-Bechtel JV 23.12.2003 30.09.2004 269.985 m3 Excavation,
120.677 m3 Compaction Fill
21 Sabancı University Infrastructure
Works
Earthmoving, Grading and Structural Backfill works of Sabancı
University Infrastructure Works/ Istanbul. Scope of work includes
all pipe laying, construction of a mini tunnel, construction of a
man-made pond, campus roads and asphalt works, construction
of some concrete buildings. Unit price contract, Earthwork,
Grading and Structural Backfill. Also, works include all pipe
laying, construction of a mini tunnel, construction of a man-made
pond, campus roads and asphalt works, construction of some
concrete buildings.
Excavation +
Compaction +
Engineering +
Procurement +
Construction
N/A Turkey İstanbul Koray Yapı
Endüstrisi ve Ticaret
A.S.
01.05.1998 31.08.2001
20 ENKA Country (ENÇA)
Infrastructure Works
Earthmoving, Grading and Structural Backfill works of ENKA
Country (ENÇA) Infrastructure Works Hereke / Izmit. Unit price
contract, Earthwork, Grading and Structural Backfill
Excavation +
Compaction +
Engineering +
Procurement +
Construction
N/A Turkey İzmit ENCA Konut Yapı
Kooperatifi
01.10.1999 30.09.2000
19 USA Istanbul Embassy
Infrastructure Works
Equipment supply and infrastructure works of USA Istanbul
Embassy. Equipment rental, supply for machinery and
equipment, construction, excavation, and compaction of USA
Istanbul Embassy infrastructure
Engineering +
Procurement +
Construction
N/A Turkey İstanbul Caddell Construction
Co.Inc.
01.01.2001 31.12.2001
18 Aliağa Natural Gas Combined
Cycle Power Plant
Earthmoving, Grading and Structural Backfill works of Aliağa
Natural Gas Combined Cycle Power Plant / Izmir. Scope of work
includes all substructure pipe laying, drainage system
earthworks, construction of cooling water system from sea level,
all asphalt roads within the site, building duct banks for electrical
power system. Unit price contract, Earthwork, Grading and
Structural Backfill Also, including all substructure pipe laying,
drainage system earthworks, construction of cooling water
system from sea level, all asphalt roads within the site, building
duct banks for electrical power system
Excavation +
Compaction +
Engineering +
Procurement +
Construction
N/A Turkey İzmir ENKA-Bechtel JV 01.01.2001 31.08.2002
17 Younde Embassy Infrastructure
Works
Equipment supply and infrastructure works of USA Cameroon /
Younde Embassy. Equipment rental, supply for machinery and
equipment, construction, excavation, and compaction of USA
Cameroon / Younde Embassy infrastructure
Engineering +
Procurement +
Construction
N/A Cameroon Younde Caddell Construction
Co.Inc.
01.01.2004 31.01.2006
16 Bamako Embassy Infrastructure
Works
Equipment supply and infrastructure works of USA Mali /
Bamako Embassy. Equipment rental, supply for machinery and
equipment, construction, excavation, and compaction of USA
Mali / Bamako Embassy infrastructure
Engineering +
Procurement +
Construction
N/A Mali Bamako Caddell Construction
Co.Inc.
01.07.2004 30.09.2006
15 Freetown Embassy Infrastructure
Works
Equipment supply and infrastructure works of USA Sierra Leone
/ Freetown Embassy. Equipment rental, supply for machinery and
equipment, construction, excavation, and compaction of USA
Sierra Leone / Freetown Embassy infrastructure
Engineering +
Procurement +
Construction
N/A Sierra Leone Freetown Caddell Construction
Co.Inc.
01.07.2004 01.09.2005
14 Oued Athmania Dam Project Equipment rental, supply for machinery and equipment for Oued
Athmania Dam Project
Engineering +
Procurement +
N/A Algeria Oued Athmania ENKA İnşaat ve
San.A.Ş.
01.02.2005 01.12.2006
34 of 35 Balmumcu Mah., Zincirlikuyu Yolu No: 3 Enka Dış İşleri Binası 3.Kat 34349, Beşiktaş, İstanbul, Turkey Phone : +90 - (212) 376 11 70 Fax : +90 - (212) 275 40 50 Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
No Project Title Detailed Project Description Scope of Work
Detailed
Project Category Country Location Client Start Date Finish Date Main Key Quantities
13 SED New USA Embassy
Compound
Equipment rental, supply for machinery and equipment for SED
New USA Embassy Compound Project
Engineering +
Procurement +
N/A Algeria Alger ENKA İnşaat ve
San.A.Ş.
01.03.2005 01.01.2006
12 AGIP KCO North Caspian Sea
Exploration Project Quarry
Operations Construction of
Cuttings Pits Works
AGIP KCO North Caspian Sea Exploration Project Quarry
Operations Construction of Cuttings Pits Works / Kazakhstan –
Caspian Sea. Unit price contract, supply for machinery and
equipment, excavation, and Quarry Operations.
Engineering +
Procurement + Quarry
Operations
Quarry Operations Kazakhstan Caspian Sea ENKA İnşaat ve
San.A.Ş.
01.03.2005 01.01.2007
11 Uzel Tractor Factory Infrastructure
Works
Infrastructural Works; Drainage and Piping Works Engineering +
Procurement +
Infrastructure Turkey İstanbul ENKA İnşaat ve
San.A.Ş.
01.01.1999 01.01.2000
10 Bursa 1400 MW Natural Gas
CCPP
Scope of Works includes Topsoil Removal and Depositing,
Excavation, Backfilling, Culvert and Ditch Construction
Engineering +
Procurement +
CCPP Turkey Bursa / Orhaneli ENKA-Bechtel JV 01.01.1997 01.10.1997
9 Gerede-Ankara and Ankara Ring
Road under E+B Contract,
Substructure and Drainage Works
Equipment supply and construction of the drainage works and
substructure works at Gerede-Ankara and Ankara Peripheral
Motorway Project. Unit price contract, supply for machinery and
equipment, construction, excavation, and compaction of Gerede-
Ankara and Ankara Peripheral Motorway
Engineering +
Procurement +
Construction
Motorway Drainage
Works, Substructure
Works
Turkey Ankara ENKA-Bechtel JV 25.10.1991 31.12.1997 34.000 m3 Excavation, 22.500
m3 Compaction Fill, 26.833 m
Pipe Laying, 30.000 m3
Excavation, 20.000 m3
Compaction Fill, 15.950 m
Pipe Laying, 121.216 m3
Excavation, 22.216 m3
Compaction Fill, 118.843 m
Pipe Laying
8 Krasnodar Military Housing Project Infrastructural Works; Drainage and Piping Works Engineering +
Procurement +
Infrastructure Russia Krasnodar ENKA İnşaat ve
San.A.Ş.
01.02.1993 31.08.1994
7 Kahramanmaraş City, Construction
of Sewage System, Citywater
System, Road Construction
Kahramanmaraş City, Construction of Sewage System,
Citywater System, Road Construction. Unit price contract, supply
for machinery and equipment, construction, excavation,
compaction and drainage works of Kahramanmaraş City
Sewage and City Water Systems
Engineering +
Procurement +
Construction
N/A Turkey Kahramanmaraş Bank of Provinces
General Directorate /
Ankara
25.01.1984 16.01.1991 464.720 m Pipe Laying,
215.000 m Pipe Laying,
370.000 m Pipe Laying
6 Sakarya District, Sapanca
Municipality Sewage System
Construction and Urban Utility
Connections
Sakarya District, Sapanca Municipality Sewage System
Construction and Urban Utility Connections. Unit price contract,
supply for machinery and equipment, construction, excavation,
compaction and drainage works of Sakarya District / Sapanca
Municipality Sewage System
Engineering +
Procurement +
Construction
N/A Turkey Sakarya Bank of Provinces
General Directorate /
Ankara
03.11.1985 09.02.1989 37.000 m Pipe Laying
5 Ankara Municipality City Water
System Construction and Urban
Utility Connections
Ankara III.Step Dikmen Group / IV.Step Yenimahalle Group /
VI.Step Güzelyaka-Kaletepe Group / VI.Step Gaziosmanpaşa-
Kavaklıdere Group City Water System Construction and Urban
Utiliy Connections, C2 Main Water Line Construction, E3-2
1.Step Main Water Line Construction, Altındağ-Feridun Çelik
District Sewage System, Keçiören Municipality Yakacık District
Sewage System, 3.Step Darıdere Pump Station City Water
Urban Utility Connections. Unit price contract, supply for
machinery and equipment, construction, excavation, compaction
and drainage works of Ankara Municipality City Water System
Engineering +
Procurement +
Construction
N/A Turkey Ankara Ankara Municipality
ASKI General
Directorate
30.05.1988 25.12.1992 165.889,30 m Pipe Laying,
195.000,00 m Pipe Laying,
37.000,00 m Pipe Laying,
138.000,00 m Pipe Laying
4 Diyarbakır City, Construction of
Sewage System (including Urban
Utility Connections) and Discharge
Collector, Construction of City
Water System
Diyarbakır City, Construction of Sewage System (including
Urban Utility Connections) and Discharge Collector, Construction
of City Water System. Unit price contract, supply for machinery
and equipment, construction, excavation, compaction and
drainage works of Diyarbakır City Sewage and City Water
Systems
Engineering +
Procurement +
Construction
N/A Turkey Diyarbakır Bank of Provinces
General Directorate /
Ankara
02.02.1982 03.08.1992 65.000 m Pipe Laying, 17.000
m Pipe Laying, 91.000 m Pipe
Laying
3 Bursa Water and Sanitation
Project Water Supply and Sewage
Construction
Unit price contract, supply for machinery and equipment,
construction, excavation, compaction and drainage works of
Bursa Metropolitan Municipality City Sewage and City Water
Systems
Engineering +
Procurement +
Construction
N/A Turkey Bursa / Orhaneli Bursa Metropolitan
Municipality
06.02.1995 24.07.1997
2 Ankara Hippodrome Construction
of 4 Blocks of 24 Boxes Staples
Ankara Hippodrome Construction of 4 Blocks of 24 Boxes
Staples. Lump sum, supply for machinery and equipment,
construction, excavation, and compaction of 4 Blocks of 24
Boxes Staples at Ankara Hippodrome
Engineering +
Procurement +
Construction
N/A Turkey Ankara Turkey Jockey Club 03.06.1999 24.08.1999
1 Russian Natural Gas Pipeline,
BOTAŞ Ankara River Pass
Russian Natural Gas Pipeline,BOTAŞ Ankara River Pass. Unit
price contract, supply for machinery and equipment, construction,
excavation, and compaction of Natural Gas Pipeline.
Engineering +
Procurement +
Construction
Gas Pipeline Turkey Ankara ENKA-Spie-Capag
(France) Consortium
01.09.1986 31.08.1988
TİTAŞ Toprak İnşaat ve
Taahhüt A.Ş.
Balmumcu Mah. Zincirlikuyu Yolu
No: 3 Enka Dış İşleri Binası 3.Kat
34349 Beşiktaş – İstanbul
Web: http://www.titastoprak.com.tr/ E-mail: [email protected]
Tel: +90 (212) 376 11 70 Fax: +90 (212) 275 40 50