title v permit renewal application carmeuse lime & stone ... · the coal handling operations at...
TRANSCRIPT
![Page 1: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/1.jpg)
February 26, 2019 Mr. Julian Breckenridge Minerals Section Supervisor Kentucky Division of Air Quality 300 Sower Boulevard, 2nd Floor Frankfort, Kentucky 40601 RE: Title V Permit Renewal Application Carmeuse Lime & Stone, Inc. – Black River Plant (AI – 3400) Dear Mr. Breckenridge: Carmeuse Lime & Stone (Carmeuse) owns and operates a limestone mine, limestone processing, and lime manufacturing plant in Pendleton County, Kentucky (Black River Plant). The plant is classified as a major source under the Title V operating permit program. The current Title V permit (V-14-002 R6) for the Black River Plant expires on August 26, 2019. Pursuant to Condition G.2.a of the permit, a renewal application must be submitted to the Kentucky Division for Air Quality (the Division) 6 months prior to permit expiration (February 26, 2019). Accordingly, Carmeuse is submitting the enclosed permit renewal application. If you have any questions or comments in regard to this submittal, please do not hesitate to call Mr. Paul Smith of Trinity Consultants at (859) 341-8100 or me at (859) 479-6715. Sincerely, Kris Milner, P.E. Environmental Area Manager Carmeuse Lime & Stone, Inc. [email protected] Enclosure cc: Mr. Michael R. Klenda, Carmeuse
Mr. Paul Smith, P.E., Trinity Consultants
![Page 2: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/2.jpg)
Environmental solutions delivered uncommonly well
TITLE V AIR PERMIT RENEWAL APPLICATION
Carmeuse Lime & Stone, Inc. 9043 Highway 154
Butler, Kentucky 41006
PreparedBy:
TRINITYCONSULTANTS1717DixieHighway,Suite900
Covington,Kentucky41011(859)341‐8100
www.trinityconsultants.com
Project191801.0026
February26,2019
![Page 3: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/3.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants i
TABLE OF CONTENTS
1. APPLICATION SUMMARY 1-1
1.1PurposeofApplication..........................................................................................................................................1‐1
1.2SummaryofApplicationContents.....................................................................................................................1‐1
2. FACILITY AND OPERATIONS DESCRIPTION 2-1
2.1FacilityLocation......................................................................................................................................................2‐1
2.2FacilityOperationsSummary..............................................................................................................................2‐1
2.3LimestoneHandling...............................................................................................................................................2‐1 2.3.1MinetoStockpileTransfer(LS01)................................................................................................................................2‐1 2.3.2LimestoneStockpiles(LS02)andLimestoneScreeningandCrushing(LS03).........................................2‐2 2.3.3KilnLimestoneFeedSystem(LS04)............................................................................................................................2‐2 2.3.4LimestoneLoadoutOperations(LS05)......................................................................................................................2‐2 2.3.5SinterProcess(LS06).........................................................................................................................................................2‐2
2.4CoalReceivingandStorage(CL01)....................................................................................................................2‐2
2.5RotaryKilns..............................................................................................................................................................2‐3
2.6LimeHandling..........................................................................................................................................................2‐3 2.6.1LimeDustCollectionSystems(PSD)(LM01)andLimeSystemBuildings(LM02).................................2‐3 2.6.2LimeStoragetoHydrate(LM03)..................................................................................................................................2‐4 2.6.3LimeDustCollectionSystems(Non‐PSD)(LM04).................................................................................................2‐4 2.6.4RejectLimeStockpiles(LM05),RejectLimeProcessing(LM06),andClinkerReclaim(LM07).......2‐4 2.6.5LimeLoadout(LM08)........................................................................................................................................................2‐5
2.7HydratePlant...........................................................................................................................................................2‐5 2.7.1HydrationPlant(HY01),HydrateBinstoLoadout(HY02),andPulverizationSystem(HY03)........2‐5
2.8SouthHyDratePlant(UnderConstruction)....................................................................................................2‐6 2.8.1LimeScreeningandTransfer..........................................................................................................................................2‐6 2.8.2LimeStorageandProcessing..........................................................................................................................................2‐6 2.8.3HydrationandDrying.........................................................................................................................................................2‐7 2.8.4HydrateStorageandLoadouttoTrucks....................................................................................................................2‐7
2.9FugitiveEmissionsFromRoads..........................................................................................................................2‐7
2.10StationaryEngines...............................................................................................................................................2‐7
3. BLACK RIVER PLANT EMISSION INVENTORY 3-1
3.1FrameworkforEmissionUnitInventory.........................................................................................................3‐1 3.1.1GroupingofEmissionUnits.............................................................................................................................................3‐1 3.1.2NomenclatureforIndividualEmissionUnits...........................................................................................................3‐1
3.2ChangestoRotaryKilnEmissionFactors........................................................................................................3‐3
4. APPLICABLE REQUIREMENTS SUMMARY 4-1
4.1SourceClassification..............................................................................................................................................4‐1 4.1.1PreventionofSignificantDeterioration.....................................................................................................................4‐1 4.1.2TitleVPermittingProgram..............................................................................................................................................4‐1
![Page 4: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/4.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants ii
4.1.3HazardousAirPollutants..................................................................................................................................................4‐2
4.2NewSourcePerformanceStandards................................................................................................................4‐2 4.2.1NSPSSubpartY–CoalPreparationandProcessingPlants...............................................................................4‐2 4.2.2NSPSSubpartHH–LimeManufacturingPlants.....................................................................................................4‐2 4.2.3NSPSSubpartOOO–NonmetallicMineralProcessingPlants..........................................................................4‐3 4.2.4NSPSSubpartUUU–CalcinersandDryers(NotApplicable)............................................................................4‐3 4.2.5NSPSSubpartIIII–StationaryCompressionIgnitionInternalCombustionEngines.............................4‐3 4.2.6NSPSSubpartJJJJ–StationarySparkIgnitionInternalCombustionEngines............................................4‐4
4.3NationalEmissionStandardsforHazardousAirPollutants.....................................................................4‐4 4.3.1NESHAPSubpartAAAAA–LimeManufacturingPlants......................................................................................4‐4 4.3.2NESHAPSubpartZZZZ–ReciprocatingInternalCombustionEngines........................................................4‐4 4.3.3NESHAPSubpartDDDDD–BoilersandProcessHeaters....................................................................................4‐5
4.4KentuckySIPRegulations.....................................................................................................................................4‐5 4.4.1401KAR51:017–PreventionofSignificantDeteriorationofAirQuality..................................................4‐5 4.4.2401KAR59:010–NewProcessOperations............................................................................................................4‐6 4.4.3401KAR59:015–NewIndirectHeatExchangers................................................................................................4‐6 4.4.4401KAR61:020–ExistingProcessOperations.....................................................................................................4‐6 4.4.5401KAR63:010–FugitiveEmissions........................................................................................................................4‐6 4.4.6401KAR63:020–PotentiallyHazardousMatterorToxicSubstances........................................................4‐7
4.5ComplianceAssuranceMonitoring...................................................................................................................4‐7 4.5.1CAMApplicabilityAnalysis..............................................................................................................................................4‐7 4.5.2CAMPlanSubmittalTimeframe.....................................................................................................................................4‐9
5. REQUESTED CHANGES TO TITLE V PERMIT 5-11
5.1VEMonitoringProvisionsforLimestoneandCoalHandlingOperations..........................................5‐11
5.2DifferentialPressureExcursionsforRotaryKilns#1to#5...................................................................5‐11
5.3DifferentialPressureExcursionsforLimeHandlingSystemBaghousesSubjecttoPSDLimits.5‐12
5.4StandardizeVisibleEmissionsFollow‐UpRequirements.......................................................................5‐13
5.5LimeHandlingSystemProcessRatesDuringTests..................................................................................5‐14
5.6CoalHeatingValueandSulfurContentLimitations..................................................................................5‐14
APPENDIX A: AREA MAP AND SITE PLAN A
APPENDIX B: EMISSION UNIT INVENTORY B
APPENDIX C: PROCESS FLOW DIAGRAMS C
APPENDIX D: DEP7007 APPLICATION FORMS D
APPENDIX E: SUGGESTED TITLE V PERMIT REVISIONS E
![Page 5: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/5.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 1-1
1. APPLICATION SUMMARY
1.1 PURPOSE OF APPLICATION
CarmeuseLime&Stone(Carmeuse)ownsandoperatesalimestonemine,limestoneprocessing,andlimemanufacturingplantinPendletonCounty,Kentucky(BlackRiverPlant).TheplantisclassifiedasamajorsourceundertheTitleVoperatingpermitprogram.ThecurrentTitleVpermit(V‐14‐002R6)wasissuedtotheplantonAugust26,2014andwasmostrecentlyrevisedonOctober28.2018.PursuanttoConditionG.2.aofthepermit,arenewalapplicationmustbesubmittedtotheKentuckyDivisionforAirQuality(Division)atleast6monthspriortopermitexpiration(i.e.,byFebruary26,2019).Accordingly,Carmeuseissubmittingthisrenewalapplication.
1.2 SUMMARY OF APPLICATION CONTENTS
ThisapplicationreportandassociatedappendicesconstitutethecompleteTitleVpermitapplicationfortheBlackRiverPlant.Pursuantto401KAR52:020,Section4(2)(c),applicationsforpermitrenewalsshallprovideonlytheinformationthatisnewordifferentfromthemostrecentsource‐widepermitapplicationandcertificationbyaresponsibleofficial.AsmostoftheinformationfromthelastTitleVrenewalapplicationcorrectlyreflectstheemissionunitsandapplicablerequirementsoftheplant,thecontentsofthisrenewalapplicationarelimited.Forreadabilityandcompleteness,adescriptionofthecoreprocessesispresentedinSection2alongwithsitemapsinAppendixA,anemissionunitindexinAppendixB,andprocessflowdiagramsinAppendixC.InSection3,abriefexplanationoftheorganizationandnomenclatureforemissionunitsisprovided.Section4providesareviewofapplicablerequirementsunderstateandfederalairregulatoryprogramsandfrompastpermitactions.InSection5,thechangestotheexistingpermitbeingsoughtthroughtherenewalactionarelistedalongwiththebackgroundandjustificationforeach.Forexample,Carmeuseisseekingsomechangestoexistingmonitoringandrecordkeepingrequirementsbasedonemissionsandmonitoringdatacollectedduringthecurrentpermitterm,withtheaimofimprovingthemethodsofcomplianceassuranceandminimizingunnecessaryadministrativeburdens.Supportingthediscussionofpermitconditionchanges,aredline/strike‐outversionofthecurrentTitleVpermitshowingpermitconditionchangesbeingsoughtthroughthisrenewalisprovidedinAppendixE.RequiredDEP7007seriesapplicationformsareprovidedinAppendixD.Withtheexceptionofsomeemissionfactorinformationfortherotarykilns,therearenoupdatesneededtotheapplicationformscurrentlyonfilewiththeDivisionfromthelastTitleVpermitrenewalapplicationandsubsequentrevisions.Thus,theonlyDEP7007formsprovidedforthisrenewalarethe7007AIandthe7007Nforthefiverotarykilns.Carmeuseisawarethat401KAR52:050wasrecentlypromulgatedthatincorporatesanewlyrevisedsetofDEP7007seriesforms.However,Section2of401KAR52:050allowsapplicantstocontinueusingpreviousversionsoftheformsuntilJuly1,2019.1Sincetheupdatedformswerenotavailableatthetimeofdraftingthisapplication,Carmeusehaselectedtousethecurrentlyapprovedversionsoftheformsuntilthenextpermitapplication.
1DivisionforAirQuality,ProposedRegulationChanges,401KAR52:050.Permitapplication,registrationapplication,andcomplianceforms,November,15,2018http://air.ky.gov/SiteCollectionDocuments/401%20KAR%2052.050%20AAC%20filed%2011‐15‐18.pdf
![Page 6: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/6.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-1
2. FACILITY AND OPERATIONS DESCRIPTION
2.1 FACILITY LOCATION
TheBlackRiverPlantislocatedapproximately26milessoutheastofCincinnatiinPendletonCounty,Kentucky,onastripoflandbetweentheOhioRiverandU.S.Highway8.Thepropertyencompassesanareaofapproximately1,200surfaceacres.FigureA‐1inAppendixAshowsthefacilitylocationandthesurroundingareaonatopographicalmap.TheUniversalTransverseMercator(UTM)coordinatesofthefacilityare(approximately)218.8kilometers(km)Eastand4,303.5kmNorth(Zone17,NAD83).FigureA‐2isanaerialimageofthefacility.Colored shading has been added to this image denoting the physical location of the major emission unit groupings. Figure A-3 provides a plan view of the facility showing the location of regulated point sources.
2.2 FACILITY OPERATIONS SUMMARY
HighcalciumlimeismanufacturedattheBlackRiverPlantthroughthecalcinationoflimestone,representedbythefollowingreaction:2 CaCO3+heat→CO2+CaO(highcalciumlime)Thecoreprocessoperationsare:(1)miningrawlimestone;(2)preparinglimestonebycrushingandsizing;(3)calcininglimestoneinkilns;and(4)transfer,storage,andloadoutoflimeandlimestone.Aportionofthelimeproducedisalsoconveyedtoahydrateplantatthesitetoproducehydratedlimeproducts.Adetaileddescriptionofthesecoreprocessoperationsaredescribedinthefollowingsections.TheorganizationandnomenclatureisconsistentwiththatrepresentedontheemissionunitindextableinAppendixB.Toaidinreviewingthedescriptions,thecorrespondingprocessflowdiagramsprovidedinAppendixCcanalsobereferenced.
2.3 LIMESTONE HANDLING
Thelimestonehandlingandprocessingareaissubdividedintosixfunctionalsubgroups:(1)minetostockpile;(2)stockpiles;(3)screeningandcrushingoperations;(4)kilnfeed;(5)loadout;and(6)sinteroperations.TheselimestoneprocessesarerepresentedonFigureC‐1inAppendixC.
2.3.1 Mine to Stockpile Transfer (LS01)
Limestoneissuppliedfromanundergroundminelocatedadjacenttoandundertheplant.Limestoneisminedbytheroomandpillarbenchingmethodusingdrillingandblasting.Limestoneiscrushedinaprimaryjawcrusherundergroundintheminebeforeitistransportedbyaseriesofbeltconveyorstoarun‐of‐minestockpileatthesurface.Thefugitiveemissionsfromtheconveyingandtransferoperationsarecontrolledbyavailablewatersprays(asneededtomaintainmoistmaterial)locatedatvariouspointsbetweenthemineportalexitandthestockpile.
2Limestonerockusedinlimeproductionistypicallyeitherpredominantlycalciumcarbonate,whichisthecaseforrockquarriedattheBlackRiverPlantor,itmaycontainahighmagnesiumcarbonateconcentration(termeddolomiticlimestone).
![Page 7: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/7.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-2
2.3.2 Limestone Stockpiles (LS02) and Limestone Screening and Crushing (LS03)
Twoundergroundbeltconveyorsreceivelimestoneviavibratingfeedersfromtherun‐of‐minestockpileandtransferitabovegroundtothescreeningbuilding.Insidethescreeningbuilding,twotripledecklimestonescreensseparatethestoneintolargekilnfeed(roughly2½"×1"),smallkilnfeed(roughly½"×1"),oversized,andundersizedstone.Thelargekilnfeedstonesaretransferredtoastockpileviatripperconveyors.Smallkilnfeedstonesaresenttoaseparatepileviatwobeltconveyors.Oversizedstonesarepassedthroughtwosecondaryconecrushers,whichbreakdownoversizedlimestoneintosmallerpieces.Thesecrushersoperateinaclosedcircuitwithscreenstorecyclethelimestonetokilnfeed.Undersizedstonefromthescreensistransferredtoadualscrewclassifier.Aradialstackerthentransfersstonetoastockpile(½×150Mesh)ortoasinterprocess(LS06).Thescreensinsidethescreeningbuildinghavetheabilitytobefloodedwithwatertoaidintheseparationofthebrokenlimestoneandminimizedustgeneration.Thesecondarycrushers,spiralclassifier,andconveyortransferpoints,whichalloperateinsidebuildingsandareenclosed,arenotadirectsourceofemissionstotheatmosphere.Fugitiveemissionsgeneratedinsidethebuildingsarecontrolledbyenclosureandarerepresentedintheemissioninventorybythescreening,crushing,andtransferhousebuildings.
2.3.3 Kiln Limestone Feed System (LS04)
Thekilnfeedlimestoneisrecoveredfromthestockpilesviaanundergroundbeltconveyor,whichisfedbymultiplevibratingfeederslocatedinareclaimtunnelunderthelimestonestockpiles.ThestoneisthentransferredbybeltconveyorstoeitherthestonebinsforKilns#1,#2,and#3ortothepreheatersforKilns#4and#5.ThreesetsofindoorandoutdoorbeltconveyorsfeedlimestonefromthestonebinstoKilns#1,#2,and#3.Fugitiveemissionsgeneratedfromlimestonefeedarecontrolledbymoistmaterialand/orenclosureinbuildings.
2.3.4 Limestone Loadout Operations (LS05)
Dependingonmarketdemand,limestonefromthestockpilescanbeloadedintotrucksusingfrontendloadersforoffsitedelivery.Alternately,limestonefromthestockpilescanbefedintostonedumphoppers,whichconveythestonetothelimestonebargeloadoutstation.Fugitiveemissionsfromthestonedumphoppersandtransferpointstothebargeloadoutstationarecontrolledbyenclosureandmoistmaterial.
2.3.5 Sinter Process (LS06)
Stonesfromthedualscrewclassifierinthescreeningbuildingaretransferredtoadoubledecklimestonescreeninthesinterprocessarea.Thescreenseparatesstoneinto8’sandsinter.Separatedstoneisthentransferredtorespectivestockpilesviatwofixedstackers.Thismaterialcanbefedintotrucksviafrontendloaders.Emissionsfromscreenandtransferpointsarecontrolledbyavailablewetsuppression(moistmaterial).
2.4 COAL RECEIVING AND STORAGE (CL01)
Coal,usedasthemainfuelintherotarykilns,isreceivedattheplantprimarilyviabarge,butitcanalsobereceivedviatruck.Coalreceivedviatrucksisfirstunloadedintotwodumphoppersandisthentransferredbybeltconveyorintothreeofthefourcoalsilos.Coalreceivedviabargeisunloadedintoacoalreceivinghopperlocatedonthebargeplatform.Coalisthentransferredtothefourcoalsilosviaaseriesofbeltconveyors.Vibratingfeederslocatedinsidethecoalsilosfeedcoaltoabeltconveyorthattransferscoalto5smallercoalsurgebinseachofwhichservesoneofthekilns.The5smallercoalbinsareusedtoholdtheshort‐termsupplyofcoalneededineachkiln.Allthecoalconveyorsareshroudedandfugitiveemissionsarecontrolledby
![Page 8: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/8.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-3
enclosureandmoistmaterial.ThecoalreceivingandstorageprocessesarerepresentedonFigureC‐2inAppendixC.
2.5 ROTARY KILNS
Therearefiverotarylimekilnscurrentlyinoperationattheplant.Inalimekiln,limestone(CaCO3)iscalcinedtoproducelime(CaO)andcarbondioxide(CO2).Calcinationisaccomplishedinthekilnbyexposingtheappropriatelysizedlimestonetohotexhaustgasesgeneratedfromtheburningoffuel.CoalistheprimaryfuelusedinKilns#1‐#4,althoughthefiringofcoalcanalsobesupplementedwithglycerinandnaturalgas.Naturalgasisalsousedasthestartupfuelforallofthekilns.CarmeusesubmittedaminorpermitrevisionapplicationinJanuary2017totheDivisioncoveringtheinstallationofnewmultichannelburnersinKilns#4and#5thatwillprovidetheabilitytoco‐firenaturalgaswithcoal.CarmeusehassincecompletedtheburnerchangeinKiln#5,allowingthekilntooperateinaco‐firingmode.Thus,theprimaryfuelforKiln#5isnowamixofnaturalgasandcoal,althoughtheKilnretainstheabilitytooperateon100%coal.AsdetailedinarequestforextensionofconstructionauthorityforKiln#4burnersubmittedtotheDivisioninNovember2018,theKiln#4burnerchangehasbeendelayedandisexpectedtooccursometimein2019.Thelimestoneisfedintothecolderendofthekilnandmovescountercurrenttothehotexhaustgasasthekilnrotatestowardsthehotendofthekilnswherethefuelburnerislocated.ThenewerKilns#4and#5areequippedwithpreheaters,whichutilizeexcessheatfromthekilntopre‐heatthelimestoneinpreheatingchamber.Thecalcinedlimeproductisdischargedfromthehotendofthekiln.Theexhaustgasesfromthekilnsareroutedthroughbaghousesbeforedischargingtotheatmosphere.TheexhaustgasesfromKilns#2,#4,and#5eachdischargethroughasinglestack.TheexhaustgasfromKiln#1issplitbetweentwostacks.TheexhaustgasfromKiln#3isdischargedtotheatmosphereoutofventsofthebaghouse.
2.6 LIME HANDLING
Thelimehandling,storage,andloadoutprocessesaresubdividedinto8groupsbasedonapplicableregulationsandfunctions,asdetailedineachofthefollowingsections.TheseprocessesarerepresentedonFiguresC‐1,C‐3,C‐4,andC‐5inAppendixC.
2.6.1 Lime Dust Collection Systems (PSD) (LM01) and Lime System Buildings (LM02)
Afterthelimeproductleavesthekilns,itpassesthroughcoolerssituatedinthetwokilndischargebuildingstoreduceitstemperature.Thelimeisthenconveyedfromthekilndischargebuildingstotheproducthandlingandstorageareabymeansofaseriesofconveyorsystems.AconveyorsystemtransferslimefromthedischargebuildingservingKilns#1,#2,and#3(33‐01)totheProductStorageBuilding(33‐05)viaTransferHouse1(33‐03).(RefertoFigureA‐2inAppendixAandFigureC‐3inAppendixC.)AseparateconveyorsystemtransferslimefromthedischargebuildingservingKilns#4and#5(33‐02)totheProductStorageBuildingviaTransferHouse2(33‐04).OnceintheProductStorageBuilding,thelimeisscreenedandsizedintosmall,medium,granular,andothergradesofproduct.Theproductisthenconveyedtoasetofstoragebinsorstoragesilos(33‐06).Therejectproductfromthekilnsystemisstoredinaseparatebinandissenttoadedicatedloadout.ThetransfersfromkilndischargetotheProductStorageBuilding,tostoragebins,andontotheloadoutstationsalloccurinsidethebuildingstructures.Alltransferpointsfromscrewconveyorstoscrewconveyors,screwconveyorstobucketelevators,andstoragebinstoscrewconveyorsinthelimehandlingareaarecompletelyenclosedwithnoemissionstotheinsidebuildingatmosphere.However,therearealsosomeopenbeltconveyor
![Page 9: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/9.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-4
toconveyortransfersthanmaybeasourceofindoordust.Multipledustcollectionsystemsprovidepickupductsattheseopenconveyortransferpointsandotherstrategicpointsinsidethebuilding.Theseairstreamsareductedanddirectedtofabricfilterswherethelimeisrecovered.Thedustcollectionsystemsthatwereinstalled,upgraded,ormodifiedin1995(orthataretiedtoconveyorsystemsthatwereinstalled,upgradedormodifiedin1995)areorganizedtogetherintoemissiongroupingLM01,sinceallthesesystemsarecoveredbyapplicablerequirementsfromthe1993PSDpermitaction.Becausethebuildingsenclosingtheseoperationsarealsosubjecttoopacityrestrictionsestablishedinthe1993PSDpermitaction,theyareorganizedtogetherintoemissiongroupingLM02.
2.6.2 Lime Storage to Hydrate (LM03)
SomeofthelimeproducedatthefacilitycanbetransferredfromtheProductStorageBuildingtotheHydratePlantviaaseriesofcoveredbeltconveyors.Smalldustcollectorsaresituatedatthetwoconveyortransferpointsbetweentheselocationstocaptureandminimizeemissions.PartofthebeltconveyorsystemusedtotransportlimetotheHydratePlantissharedforlimestonetransferfromthedumphopperstobargeloadout.Fugitiveemissionsfromthebeltconveyorareminimizedbyshroudingandenclosure.
2.6.3 Lime Dust Collection Systems (Non-PSD) (LM04)
PMinthekilnexhaustgasiscapturedbydedicatedbaghousesservingeachkiln.Thekilndustcapturedateachbaghouseiscollectedinthreedustbins.Aseriesofenclosedscrewconveyorstransportthekilndustfrombaghousestothesedustbins.Displacementairemissionstiedtoenclosedtransfersintothedustbinsarecontrolledbydedicatedbinventfiltersforeachdustbin.DustfromtheKiln#1and#2DustBinandfromtheKiln#3DustBinisloadedintotrucksattwotruckloadouts.Theemissionsfromthisloadingprocessarecapturedbydedicateddustcollectorsoneachloadoutspout.Inaddition,dustaccumulatedinallthekilndustbinscanbesenttoaslurrymixtank,whereitismixedwithwaterandsenttoundergroundinactiveareasofthemine.ThedustcollectionsystemsassociatedwiththedustbinsforKilns#1,#2,and#3werenotassociatedwiththe1993PSDpermitactionfortheplantexpansion.Therefore,becausetheyhaveamorelimitedsetofapplicablerequirements,theyareorganizedtogetherintoemissiongroupingLM04.ThedustcollectionsystemfortheKiln#4and#5dustbinwasapartoftheplantexpansionprojectcoveredbythe1993PSDpermit,andthusitisincludedinLM01.
2.6.4 Reject Lime Stockpiles (LM05), Reject Lime Processing (LM06), and Clinker Reclaim (LM07)
Duetovariousprocessinstabilitiesorothercauses,limethatisnotsuitabletouseasproductmaybegeneratedatboththehotandcoldendofeachkiln.Atthehotend,thisrejectlimeisseparatedwhentheproductlimeistransferredfromthecoolers.Alargechamberatthefeedend(coldend)ofeachkilnallowsforlargerdustparticlestodropoutbeforetheexhaustgasistreated.Rejectlime,dust,andyardmaterialgeneratedintheprocessiscollectedintooneoffourauthorizedlimecontainingmaterialstockpiles(LM05)whereitisstoredforfurtherdisposal.Aseparateemissionunitisdefinedforeachoftheserejectlimestockpiles,sincetheyhavethepotentialtobeasourceoffugitivedust.Therejectlimefromthesestockpilesisreclaimedusingfrontendloaders.Thelimeistransferredintoareceivinghopperthatislocatedwithinapartiallyenclosedshed.Thereceivinghopperfeedsawetscrewsystemthatisusedtoseparatefinesfromrejectlime.Dustgeneratedfromthetransferintothereceivinghopperisminimizedthroughuseofasmalldustcollectionsystem.Rejectlimeisthenhydraulicallytransferredtoaholdingtankandthen
![Page 10: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/10.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-5
undergroundfordisposal.SeparatedfinesmayalsobecollectedbyfrontendloadersandtransferredintoahighpHpondonsite,wheretheyaremixedwithwaterandsentundergroundfordisposal.ThisrejectlimeprocessingoperationisorganizedintoemissiongroupingLM06.Intheclinkerreclaimprocess(LM07),clinkerandlimematerialrecoveredatvariousstagesoftheprocessispickedupinfrontendloadersandistransferredtoareceivinghopper.Fromthishopper,thematerialistransferredtothelimeconveyersystemservingKilns#4and#5.Fromhere,itisconveyedtodownstreamlimescreening,crushing,andstoragesystemoperationsencompassedbyLM01andLM02.
2.6.5 Lime Loadout (LM08)
Differentgradesofproductstoredinsilosandproductbinsareshippedoffsiteforsalebymeansofrailcarloadout,truckloadout,andbargeloadoutoperations.Therejectsfromtheprocessarealsotransferredfromtherejectbintotrucksattherejecttruckloadoutstation.Fugitiveemissionsassociatedwitheachoftheseloadoutstationoperationsareminimizedthroughuseofdustcollectorsconfiguredtotheloadoutspouts.AllthelimeloadoutoperationsareorganizedintoemissiongroupLM08.
2.7 HYDRATE PLANT
2.7.1 Hydration Plant (HY01), Hydrate Bins to Loadout (HY02), and Pulverization System (HY03)
Aportionoftheproductstreamfromlimestoragemaybedirectedtothehydrateplantviaseriesofbeltconveyors(LM03).Thelimetobeprocessedinthehydrateplantisfirststoredintwohydratorfeedbins.Binventcollectorssittingonthetopofeachhydratorfeedbincontroltheemissionassociatedwiththetransferfromthebeltconveyorintothebin.Asetofcompletelyenclosedscrewconveyorsandabucketelevatorthentransferlimefromthefeedbinstothehydratorsysteminsidethehydrateplantbuilding.Emissionsfromtheenclosedhydratorsystem,whichincludesaclassifier,aseasoner,andamixer,arecontrolledbyadustcollector.Hydratedlimeisclassifiedintothepropersizerangeandisdirectedtohydrateproductbinsviascrewconveyorsystems.Thetransferpointsonthestoragebinsarecontrolledbyintegratedbinventfiltersystems.Thehydratedlimeproductcanbeshippedoffsiteviatrucksorrailcarsinbulkform.Alternately,theproductcanfirstbebaggedinabaggingoperation.Rejectsfromthehydrateplantarestoredinaseparaterejectbinandaretransferredbacktothelimestorageareaviatrucks.Emissionsfromloadoutoperationsatthehydrateplantareaarecontrolledbydustcollectorsontheloadingspouts.Therearenoemissionsassociatedwiththeconveyingandshipmentofbaggedproductsincethematerialisencasedinsealedbags.Thehydrateplantbuildingalsohousesapulverizersystemthatcanbeusedtogeneratedifferentsizegradesoflime.ThemainunitoperationsareaRaymondmillandwhizzer.Themillpulverizesthematerialand,aftersizing,theproductistransferredintoProductStorageBin#3andisshippedoffsiteviatruckinbulkform.TwodustcollectorscontrolemissionsfromtheRaymondmillandwhizzersinthepulverizationoperation.ThehydrateareaprocessesarerepresentedonFigureC‐6inAppendixC.
![Page 11: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/11.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-6
2.8 SOUTH HYDRATE PLANT (UNDER CONSTRUCTION)
CarmeusesubmittedasignificantpermitrevisionapplicationonMarch3,2016fortheconstructionofanewhydrateplant(termedtheSouthHydratePlant)onacurrentlyundevelopedsectionoftheexistingBlackRiverPlantproperty.ConstructionoftheSouthHydratePlantwasfirstauthorizedinV‐14‐002R3.TheprojectwasoriginallyintendedtobeginconstructioninMarch2018.However,asdetailedinarequestforextensionofconstructionauthoritysubmittedtotheDivisioninMarch2018,significantchangeshavetakenplaceinthelimeandhydratemarketsservedbytheBlackRiverPlantaftertheprojectwasoriginallyconceivedandplanned,andthesechangesnecessitatedthatCarmeusedelaythecommencementofconstructionfortheproject.3TherequestforextensionofconstructionauthoritywasapprovedbytheDivisioninMay2018,permittingtheconstructioncommencementauthoritytoextendtoSeptember30,2019.
2.8.1 Lime Screening and Transfer
AnexistingsmallbuildingattheBlackRiverPlantdesignatedasTransferHouse1enclosesthetransfersoflimefromconveyorsemanatingfromtheKilnDischargeBuildingtoconveyorsthattransportthelimetotheLimeProcessingandStorageBuildings.AspartoftheSouthHydratePlantproject,TransferHouse1willbeexpandedtocontainnewconveyingandscreeningequipmentassociatedwiththeSouthHydratePlant.Anewdivertergatewillbeinstalledtoprovidetheoptiontodivertlimefeedstockfromthecurrentlimetransferpointandredirectittothenewoperations.Thedivertedlimewillfirstbecarriedbyabucketelevatoruptoanewscreeningsystem,whichwillremovebothoversizedmaterialandfinesfromthelimefeedleavingamixof“pebblelime”.Thefinersizelimematerialwillbesentbacktotheexistinglimetransferpointusinganenclosedscrewconveyor.OversizedmaterialwillbecollectedinabunkerlocatedonthegroundleveloftheTransferHouse1,whereitcanbeperiodicallypickedupandremovedusingmobileequipment.Fromthescreen,thepebblelimewillbetransferredontoacoveredconveyorthatwillexitTransferHouse1.AllnewmaterialtransferandscreeningoperationswillbelocatedinsideTransferHouse1.Dustthatmaybegeneratedinsidethebuildingspaceattheequipmenttransferpointswillbepickedupinhoodswithadraftinducedfromanewdustcollector(DC‐06108)whichwilldischargethecleanedairstreamtotheatmosphere.
2.8.2 Lime Storage and Processing
Anewcoveredconveyorwilltransportthepebblelimeapproximately100feetfromTransferHouse1overtotheareaoftheplantwherethenewSouthHydratePlantwillbeconstructed.Theconveyorwilltransferthelimeintoanenclosedbucketelevator,whichwillraisethematerialupandintofullyenclosedchutesconnectedtotwostoragebins(QuickLimeBins#1and#2).Acartridgefiltersystem(DC‐06116)attheheadofthetransportconveyorwillbeusedtopulladraftonandcapturedustthatmaybegeneratedatthematerialtransferpoints.AirfromtheQuickLimeBinsdisplacedduringloadingofthebinswillexhaustthroughintegratedpassivebinventfiltersonthetopofthebins.FromtheQuickLimeBins,thepebblelimewillbetransferredonanenclosedconveyorrunningunderthebinsintotheSouthHydratePlantbuildingtoacrusherthatisusedtoachievethedesiredparticlesizedistributioninthelimestreamforthehydrationprocess.LimeexitingthecrusheristhentransferredtoaSurgeBinviaanenclosedbucketelevatorandscrewconveyor.PickuphoodsatthetransferpointontheconveyorundertheQuickLimeBins,atthetransferpointsinsidetheSouthHydrateBuilding,andfromtheSurgeBinwillcapturedustthatmaybegeneratedusingadraftinducedbyanewdustcollector(DC‐21105),whichwillexhausttoatmosphere.
3RefertoemailcommunicationfromMr.KrisMilner(Carmeuse)toMr.SeanAlteri(theDivision)onMarch21,2018containingtheConstructionAuthorizationExtensionRequestinPDFformat.
![Page 12: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/12.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-7
2.8.3 Hydration and Drying
FromtheSurgeBin,thelimewillbetransferredtothehydratorequipmentusingasetofenclosedscrewconveyors.IntheHydrator,thelimewillbemixedwithwatertoformhydrate.ThehydratorisequippedwithanintegratedprocessfilterthatcapturesandrecovershydratedustintherelativelysmallvolumeofexhaustgasgeneratedbytheHydratoritself.ThehydratewilldischargeintoascrewconveyorthatconveysittoaMillDryerthatwillbeusedtoremovefreemoisture.Hotairforthedryingprocesswillbesuppliedbyanewindirectnaturalgas‐firedheater.Combustiongasfromtheheaterwillexhaustoutadedicatedstacktotheatmosphere.ThedriedhydrateinthecarrierhotairstreamfromtheMillDryerwillbepneumaticallyconveyedtoalargeprocessfiltersystemtoseparatethedryingairfromthehydrateproduct.Theairstreamwillexhaustoutadedicatedstacktotheatmosphere.
2.8.4 Hydrate Storage and Loadout to Trucks
FromtheMillDryerProcessFilter,thehydratewillbetransferredbyscrewconveyorandbucketelevatortooneoftwostoragebins(HydrateBin#1and#2).Eachhydratebinwillbeequippedwithasmallblowertoinjectairintothebottomofthebintoenhancetheflowpropertiesofthehydrate.Anintegrateddustcollectoroneachhydratebinwillcaptureandrecoverentrainedhydrateandreturnittothebins.Thehydrateproductwillbeshippedoffsiteviatrucksinbulkform.Duetothephysicalspacingofthehydratebins,onlyonetruckwillbeabletobeloadedatanyonetime.Dustthatmaybegeneratedfromloadoutoperationswillbecontrolledbyringtypefabricfiltersystemsintegratedwiththeloadingspouts.TherewillbenoquantifiableincreaseintrucktrafficattheplantasaresultoftheSouthHydratePlantsincethetrucktrafficassociatedwiththenewhydrateplantwillbedisplacingexistingtrucktrafficassociatedwitheithertheexistinghydrateplantorlimearea.
2.9 FUGITIVE EMISSIONS FROM ROADS
ThemovementoftrucksandotherequipmentinandaroundthepropertyisasmallsourceoffugitivePMemissions.Aportionoftheroadsinthecentralpartofthefacilityarepaved.Rawmaterialdelivery,limestone,andlimeproducttrucksprimarilytravelinareasoftheplantthatarepaved.Limestonetruckmovementsalsotraverseareasofthepropertythatareunpaved.Fugitiveemissionsassociatedwithtruckmovementsonpavedandunpavedroadsegmentsareencompassedbyemissionunits23‐01and25‐01,respectively.Inadditiontotherawmaterial,limestone,andlimeproducttrucktrafficatthesite,trucksarealsooccasionallyusedtohaulmaterialstotheon‐sitelandfilllocatedwestofthecentralplantoperations.Mostoff‐specorunusablematerialsaccumulatedatthesitearedisposedtotheundergroundmineviatheRejectLimeProcessingoperation(LM06).However,sometypesofoversizematerialsuchaskilnbrickscannotbedisposedunderground.Previously,fugitiveemissionsassociatedwithhaultrucksandotherequipmenttiedtothelandfilloperationswerecoveredunderemissionunit24‐01.However,trucktraffictoandfromthelandfillisverysmallrelativetotrafficfromallothertypesofrawmaterialandproducttrucksattheproperty.Tosimplifyhowemissionsfromthesetypesofoperationsaretalliedandtrackedannuallyforfeepurposes,fugitivesassociatedwithlandfilltruckshavebeenincorporatedintoemissionunits23‐01and25‐01forpavedandunpavedroads.
2.10 STATIONARY ENGINES
TheBlackRiverplanthassix(6)stationarycompression‐ignitionenginesusingdieselfuel.Fiveoftheengines(includedinemissiongroupEN01)areusedtomaintaintherotationontherotarykilnsintheeventofpoweroutagesandonalimitedbasistoturnthekilnsduringplannedstartups,shutdowns,andmaintenanceevents.
![Page 13: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/13.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 2-8
Thesixthengine(initsownemissiongroupEN02)isusedformineshaftoperationsincaseofthepoweroutages.TheBlackRiverplantalsohasone(1)sparkignitionengineusingnaturalgas(includedinemissiongroupEN03),thatisintegraltoanemergencygeneratorinstalledin2017.Theemergencygeneratorhelpstoensurethesafeoperationofthekilnsbysupportingtheburnermanagementsystem(BMS)intheeventofapoweroutage.
![Page 14: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/14.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 3-1
3. BLACK RIVER PLANT EMISSION INVENTORY
AspresentedinSection2,theheartoftheoperationsattheBlackRiverPlantarethe5existingrotarykilns.Thekilns,whicharealsotheprimaryemissionunits,accountfornearlyallemissionsofregulatedpollutants,exceptforparticulatematter.Theothercorefunctionalareasoftheplantcanbelogicallysegregatedbetweenthosethatoccurupstreamofthekilns(limestoneprocessing)andthosethatoccurdownstreamofthekilns(limehandlingandhydrateplant).Alsosupportingthekilnsarethecoalreceivingandhandlingoperations.Thematerialhandling,storage,andloadoutoperationsassociatedwiththeprocessesupstreamanddownstreamofthekilnsareonlyasourceofparticulatematteremissions.ThesePMemissionscanbelargelyattributedtothereleaseoffugitivedustatconveyortoconveyortransferpointsandfromstoragepiles.Duetothephysicalcharacteristicsofthelimestonerockanditsmoisturecontent,thegenerationoffugitivedustfromlimestoneconveyingandstorageoperationsisrelativelylow.Similarly,thefugitivedustattributabletoconveyingandstorageofcoalisrelativelylow.Downstreamofthekilns,limeisconveyedtocrushingandscreeningprocessesandtostorage.Fromstorage,thelimeisdistributedtoloadoutsviabarge,railcarortruck.Withafewexceptions,allthelimeconveyingprocessesoccurindoors,eitherwithinbuildings,conveyortubes,orstoragesilos.Dustcollectionsystemscaptureandcollectemissionsgeneratedinsidethesestructuresattransferpointsandroutethemtofabricfiltersforcontrol.Thus,theprimaryemissionunitsinthelimehandlingpartoftheplantarethedustcollectionsystems.
3.1 FRAMEWORK FOR EMISSION UNIT INVENTORY
3.1.1 Grouping of Emission Units
TheBlackRiverPlantemissionunitinventoryisorganizedinto8categories,correspondingtothefunctionalprocessareasattheplant.Theemissionunitswithineachfunctionalareaarethenfurtherorganizedintologicalgroupingsbasedonthestageoftheprocesstheyencompassand/orcommonapplicablerequirements.Theemissiongroupingsgenerallyfollowtheflowofmaterialfromtheminethroughthelimestonescreeningandcrushingprocess,throughthekilns,andthenultimatelytoloadoutsviabarge,rail,ortruck.AlistingofthefunctionalareacategoriesandemissionunitgroupingsisprovidedinTable3‐1.EachSectionBoftheTitleVpermitcoverstheemissionunitsassociatedwitheachemissiongrouping.
3.1.2 Nomenclature for Individual Emission Units
3.1.2.1 Emission Unit ID Numbers
IndividualemissionunitsattheBlackRiverPlanthavealreadybeenassignedEquipmentIDs,SourceIDs,andProcessIDswithintheKentuckyEmissionInventorySystem(KyEIS).Bydesign,boththeEquipmentIDsandSourceIDsareuniqueforeachindividualemissionunit.TheSourceIDsdefinedintheKyEISsystemforemissionunitsattheBlackRiverPlantare4digitnumbers,withthefirsttwodigitslooselycorrespondingtoalegacybreakdownofthefunctionalareaoftheplantandthesecondtwodigitsbeingasequentialnumberinthatgrouping.WithregardtotheProcessIDnumberswithinKyEIS,theonlyemissionunitsattheBlackRiverPlantforwhichseparateProcessIDsaredefinedaretherotarykilns.ProcessID1foreachkilncoversemissionsfromtherotarykilnprocessthataretiedtolimeproduction,ProcessIDs2coversemissionsofcertainairtoxiccompoundsthataretiedtocoalcombustion,andProcessID3coverstheemissionsassociatedfiringofnaturalgasduringstartup.
![Page 15: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/15.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 3-2
3.1.2.2 Emission Unit Names and Descriptions
EachoftheemissionunitnamesareprefixedwiththeinternalequipmentidentificationnumberusedwithinCarmeuse’smasterequipmentinventorysystem.Forconveyortoconveyortransfers,thedescriptionindicatesthenameoftheconveyorcoveredandthenameoftheconveyorbeingtransferredto.Forexample,inemissiongroupingLS01–MinetoStockpileTransfers,thefirstemissionunitisaconveyortransferpointwithSourceID01‐01.Thisemissionunit,named“14‐101BeltConveyorTransferto14‐102BeltConveyor”encompassesfugitiveemissionsthatmayoccurfromthe14‐101BeltConveyoraswellasthosetiedtotheopentransfertothe14‐102BeltConveyor.Othertypesofequipment(e.g.,screens,storagebins,bucketelevators,dustcollectionsystems)aresimilarlynamedstartingwiththeequipmentnumberprefixandthenasuitablydetailedidentificationoftheequipment.EmissionunitsforactivitiesthatdonothaveanassignedequipmentnumberinCarmeuse’sinternalinventorysystem(e.g.,stockpiles,buildings)aresimplygivenasuitabledetailedtextdescription.
Table3‐1.FunctionalAreaCategoriesandEmissionGroupingsforEmissionUnitsattheBlackRiverPlant
FunctionalAreaEmissionGroupID
EmissionGroupName
1. LimestoneProcessing LS01 MinetoStockpileTransfers LS02 LimestoneStockpiles LS03 LimestoneScreening&Crushing LS04 KilnLimestoneFeedSystem LS05 LimestoneLoadoutOperations2. CoalReceiving&Storage CL01 CoalReceiving,StorageandConveying3. RotaryKilns KL01 RotaryKiln#1 KL02 RotaryKiln#2 KL03 RotaryKiln#3 KL04 RotaryKiln#4 KL05 RotaryKiln#54. LimeHandling&Storage LM01 LimeDustCollectionSystems(PSD) LM02 LimeSystemBuildings LM03 LimeStoragetoHydratePlant LM04 LimeDustCollectionSystems(Non‐PSD) LM05 RejectLimeStockpiles LM06 RejectLimeProcessing LM07 LimeClinkerReclaim LM08 LimeLoadout5. HydrationPlant HY01 HydratePlant HY02 HydrateBinstoLoadout HY03 LimePulverizerSystem6. Roads RD01 HaulRoads7. Engines EN01 StationaryEngines EN02 StationaryEmergency‐UseCIEngines EN03 StationaryEmergency‐UseSIEngines8.SouthHydratePlant SH01 SouthHydratePlant SH02 HotAirHeater
![Page 16: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/16.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Renewal Application Trinity Consultants 3-3
3.2 CHANGES TO ROTARY KILN EMISSION FACTORS
CarmeuseisseekingtoupdatetheemissionfactorsrepresentedintheKyEISforeachoftherotarykilnstoreflectrecentperformancetestscompletedinthepermitterm.Accordingly,updatedfactorsandcalculatedemissionsareprovidedonanupdatedsetof7007NapplicationformsforthekilnsinAppendixD.Foreachofthekilns,emissionsareestimatedusinganemissionfactorappliedtoadesignprocessrateorfuelfiringrate.Theemissionfactorsutilizedarederivedfromsite‐specifictestdataorareobtainedfrompublishedemissionfactorsforsimilarprocesses.Todefinetheemissionrateslistedonthe7007Napplicationform,theserepresentativeactualemissionfactorsareappliedtoprocessratesandfueluseratesthatcorrespondtothemaximumkilncapacities.Thesetalliedemissionsthusrepresentamaximumemissionratethatwouldoccurifakilnoperatedcontinuouslyatitsdesignrate.Thetalliedemissionsshouldnotbeconstruedaseitherthepotentialemissionratesorexpectedactualannualemissionrates.Thisisbecausethepotentialemissionratewouldbebasedonemissionlimitsallowedunderregulationratherthanrepresentativeemissionfactorsshownontheapplicationforms.Forannualemissioninventoriescompletedforfeepurposes,actualemissionswouldbelessthantalliedontheformssincetherepresentativeemissionfactorswouldbeappliedtoactualannualprocessratesandfuelfiringrates,ratherthandesignrates.
![Page 17: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/17.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-1
4. APPLICABLE REQUIREMENTS SUMMARY
ThissectionofthepermitapplicationsummarizestheairqualityregulationsthatapplytooperationsattheBlackRiverPlant.Specifically,applicablerequirementsunderNewSourcePerformanceStandards(NSPS),NationalEmissionStandardsofHazardousPollutants(NESHAP),andKentuckyStateImplementationPlan(SIP)regulationsarecovered.AcopyoftheexistingTitleVpermitshowingmarkupsforchangesbeingsoughtthroughthisrenewalalsodelineatesallapplicablerequirementsfromtheseregulations.
4.1 SOURCE CLASSIFICATION
4.1.1 Prevention of Significant Deterioration
TheBlackRiverPlantislocatedinPendletonCounty,Kentucky,whichhasbeendesignatedbyU.S.EPAasunclassified/attainmentforallcriteriapollutants.4Therefore,withrespecttothefederalNewSourceReviewpermittingprogram,onlythePreventionofSignificantDeterioration(PSD)programrequirementsarerelevanttothefacility.KentuckyhasincorporatedtherequirementsofthePSDpermittingprogramintoitsStateImplementationPlan(SIP)at401KAR51:017.5ThesePSDregulationsspecificallydefine28industrialsourcecategoriesforwhichthemajorsourcethresholdis100tpyofanyregulatedpollutant.6Themajorsourcethresholdforfacilitiesnotonthis“Listof28”is250tpy.AspresentedinSection2.2,theprimaryfunctionofBlackRiverPlantistoproducelimefromlimestone.Assuch,theBlackRiverPlantisclassifiedunderSIC3274(Lime).Thisfacilityclassificationisincludedonthe“Listof28”sourcecategories.Thus,themajorsourcethresholdunderthePSDprogramforthefacilityis100tpyofaregulatedNSRpollutant.SincethepotentialemissionsofatleastoneregulatedNSRpollutant(e.g.,SO2)currentlyexceeds100tpy,theBlackRiverPlantisclassifiedasanexistingmajorsourceunderthePSDprogram.
4.1.2 Title V Permitting Program
40CFRPart70containstheregulationsimplementingtheTitleVoperatingpermitprogrammandatedbytheCleanAirAct.KentuckyhasincorporatedtheprovisionsofthisfederaloperatingpermitprograminitsSIPregulationsat401KAR52:020.Asspecifiedin401KAR52:001,Section1(46),amajorsourcewithrespecttotheTitleVregulationsencompassesfacilitieswithpotentialemissionsof100tpyofanyregulatedpollutant,10tpyofanysingleHAPand/or25tpyofanycombinationofHAPs.TheBlackRiverPlantisanexistingmajorsourceandiscurrentlyoperatingundertheTitleVoperatingpermitV‐14‐002R6,issuedAugust26,2014,andmostrecentlyrevisedonOctober28,2018.
4401KAR51:010.
540CFR52.931.
6401KAR51:001,Section1(118)(a)(2)(a)
![Page 18: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/18.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-2
4.1.3 Hazardous Air Pollutants
AmajorsourceofHAPisonewithpotentialemissionsinexcessof25tpyfortotalcombinedHAPsand/orpotentialemissionsinexcessof10tpyforanyindividualHAP.AsexistingpotentialemissionsofcombinedHAPsexceed25tpy,theBlackRiverPlantisclassifiedasanexistingmajorsourceofHAPs.
4.2 NEW SOURCE PERFORMANCE STANDARDS
NSPSrequirenew,modified,orreconstructedsourcesinapplicablesourcecategoriestocontrolemissionstothelevelsachievablebythebestdemonstratedtechnologyasspecifiedintheapplicableprovisions.AnysourcesubjecttoanNSPSisalsosubjecttothegeneralprovisionsofNSPSsubpartA,exceptasnoted.ThefollowingNSPSsubpartsarepotentiallyapplicabletotheemissionunitsattheBlackRiverPlant:> SubpartY–CoalPreparationandProcessingPlants> SubpartHH–LimeManufacturingPlants> SubpartOOO–NonmetallicMineralProcessingPlants> SubpartUUU–CalcinersandDryersinMineralIndustries> SubpartIIII–StationaryCompressionIgnitionInternalCombustionEngines> SubpartJJJJ–StationarySparkIgnitionInternalCombustionEnginesAnanalysisofapplicabilityforeachoftheserulesisprovidedinthefollowingsubsections.TherearenootherNSPSregulationsthatareapplicableorpotentiallyapplicabletoemissionunitsattheplant.TheemissionunitssubjecttoeachregulationandtheapplicablerequirementstiedtoeachareaddressedintheSuggestedPermitinAppendixE.
4.2.1 NSPS Subpart Y – Coal Preparation and Processing Plants
NSPSSubpartYappliestoaffectedfacilitiesincoalpreparationandprocessingplantsconstructedormodifiedafterOctober27,1974,thatprocessmorethan200tonsofcoalperday.A“coalpreparationandprocessingplant”isdefinedundertheruleasanyfacility(excludingundergroundminingoperations)whichpreparescoalbyoneormoreofthefollowingprocesses:breaking,crushing,screening,wetordrycleaning,andthermaldrying.ThecoalhandlingoperationsattheBlackRiverfacilityhavethecapacitytoprocessmorethan200tonsperdayofcoalandthecoalispulverizedpriortobeingdeliveredtothekilns.ThroughtheinitialTitleVpermitaction,theDivisionpreviouslydeterminedthatNSPSSubpartYappliestothecoalhandlingoperations.NSPSSubpartYlimitstheopacityfromcoalprocessingandconveyingequipmentto20%.Sincenoneoftheexistingcoalhandlingequipmentatthefacilityhasbeenconstructed,reconstructed,ormodifiedafterApril28,2008,newerprovisionsinSubpartYpromulgatedonOctober8,2009donotapply.
4.2.2 NSPS Subpart HH – Lime Manufacturing Plants
NSPSSubpartHHappliestorotarylimekilnsconstructedormodifiedafterMay3,1977.Kiln#1,Kiln#2,andKiln#3attheBlackRiverfacilitywereconstructedin1970,1970and1974,respectively,andhavenotsincebeenmodified(asdefinedin40CFR60SubpartA).7Therefore,thesekilnsarenotcurrentlysubjecttothe
7CapitalimprovementsweremadetoKiln#2followinganunplannedshutdownin1998duetoequipmentfailure.Theseimprovements,intheinterimperioduntilthekilnrestartedin2005,includedreplacementofthestoneandcoalbinsservingKiln#2,anupgradeofthebaghousesystem,andotherminorstructuralandequipmentchanges.However,noneof
![Page 19: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/19.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-3
requirementsofthisSubpart.Kiln#4andKiln#5,whichwereconstructedin1995,aresubjecttotherequirementsofthissubpart.
4.2.3 NSPS Subpart OOO – Nonmetallic Mineral Processing Plants
NSPSSubpartOOOregulatesPMemissionsfromeachcrusher,grindingmill,screeningoperation,bucketelevator,beltconveyor,baggingoperation,storagebin,andenclosedtruckorrailcarloadingoperationatanonmetallicmineralprocessingplantconstructed,reconstructed,ormodifiedafterAugust31,1983.Pursuantto40CFR§60.671,anonmetallicmineralprocessingplantmeansanycombinationofequipmentthatisusedtocrushorgrindanynonmetallicmineralwhereverlocatedexceptasprovidedin40CFR§60.670(b)and(c).Limestoneisincludedinthelistofnonmetallicmineralscoveredbytherule.Therefore,limestonehandlingequipmentattheBlackRiverPlantconstructedormodifiedafterAugust31,1983,issubjecttotherequirementsofSubpartOOO.Theboundaryofthenonmetallicmineralprocessingplantbeginsattheconveyorfromtherun‐of‐minestonestockpile(01‐03)andcoverslimestoneprocessingoperationsuptothepointthatprocessedstoneistransferredtothetwokilnfeedstockpiles.AttheBlackRiverplant,thematerialhandlingoperationswithinthenonmetallicmineralprocessingplantincludecrushers,screeningoperations,andbeltconveyors,whicharegroupedtogetherunderemissiongroupLS03–LimestoneScreeningandCrushing.TheseemissionunitsaresubjecttotherequirementsofSubpartOOOastheunderlyingequipmentwasconstructedormodifiedin1995.Thescreeningoperationsinthesinterprocessarea(LS06)arealsosubjecttoSubpartOOO.Thelimestoneconveyingoperationsbetweenthekilnfeedpilesandthekilns(LS04)arenotsubjecttoSubpartOOOsincetheyarenotpartofthenonmetallicmineralprocessingplantasdefinedundertherule.Theyare,however,regulatedunderNESHAPSubpartAAAAAasaprocessedstonehandlingsystem,asdetailedfurtherbelow.
4.2.4 NSPS Subpart UUU – Calciners and Dryers (Not Applicable)
NSPSSubpartUUUappliestocalcinersanddryersatmineralprocessingplants.Theexistingrotarykilnsmeetthedefinitionofcalcinerin§60.731.However,limestoneisnotoneofthenamedmineralsinthedefinitionofmineralprocessingplant.Therefore,therotarykilnsattheBlackRiverPlantarenotsubjecttotherequirementsofthissubpart.
4.2.5 NSPS Subpart IIII – Stationary Compression Ignition Internal Combustion Engines
NSPSSubpartIIII,whichwasoriginallypromulgatedonJuly11,2006,establishedstandardsforownersandoperatorsofstationarycompressionignition(CI)internalcombustionengines(ICE)constructed,reconstructed,ormodifiedafterJuly11,2005andmanufacturedafterApril1,2006.8AsnotedinSection2.9andshownintheemissionunitinventorytableprovidedinAppendixB,therearesevenstationaryenginescurrentlyattheBlackRiverplant,sixofwhicharecompression‐ignitionenginesusingdieselfuel.Fiveoftheengines,whichareusedtoturnthekilnsintheeventofapoweroutage(34‐01,34‐02,34‐03,34‐04,and34‐05),wereallconstructedbetween2015and2018andaretherebysubjecttoSubpartIIII.Additionally,the166hpMineEscapeShaftEmergencyGenerator(34‐06)wasinstalledin2006.Thisengine,whichwasorderedafterJuly11,2005,wasmanufacturedbyJohnDeereonMay2,2006,justaftertheApril1,
thesechangesresultedinanincreaseinshort‐termpotentialemissions(lb/hr)ofanypollutantregulatedunderSubpartHH(i.e.,PM)andthusKiln#2remainsgrandfatheredwithrespecttothisregulation.
8Per40CFR60.4200(a),forthepurposesofNSPSSubpartIIII,thedatethatconstructioncommencesisthedatetheenginewasorderedbytheowneroroperator.
![Page 20: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/20.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-4
2006applicabilitydate.Therefore,thisengineisalsosubjecttoSubpartIIII.Thecurrentpermit(V‐14‐002R6)adequatelycapturesalloftheapplicablerequirementsforthecompressionignitionenginesunderSubpartIIII.
4.2.6 NSPS Subpart JJJJ – Stationary Spark Ignition Internal Combustion Engines
NSPSJJJJisapplicabletoownersandoperatorsofstationarysparkignition(SI)internalcombustionengines(ICE)thatcommencedconstructionafterJune12,2006andweremanufacturedafterJanuary1,2009foremergencyengineswithamaximumenginepowergreaterthan25hp.Becausethenaturalgas‐firedemergencygeneratorengine(34‐07)wasorderedafterJune12,2006andmanufacturedafterJanuary1,2009,pursuantto40CFR60.4230(a)(4)(iv),theSIICEissubjecttorequirementsinSubpartJJJJ.Astheenginemeetstherequirementsof40CFR60.4243(d),theengineisalsoclassifiedasanemergencystationaryICE.Becausethegeneratorenginehasamaximumenginepowerbetween25bhpand100bhp,pursuantto40CFR60.4233(d),theenginemustmeettheemissionrequirementslistedinTable1of40CFR60,SubpartJJJJ.TheKohlerengineiscertifiedtomeettheseemissionstandardsandcomplieswithallapplicablerequirementsinSubpartJJJJ.
4.3 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
NationalEmissionStandardsforHazardousAirPollutants(NESHAP)areemissionstandardsformajorandareasourcesofHAP.Part63NESHAPallowableemissionstandardsand/orworkpracticeformajorHAPsourcesindesignatedsourcecategoriesareestablishedonthebasisofaMaximumAchievableControlTechnology(MACT)determination.TheBlackRiverPlantisclassifiedasamajorsourceofHAPssincecombinedHAPemissionsexceed25tpy.InreviewingthesourcecategoriesforwhichNESHAPareestablishedformajorHAPsources,thereareonlytwothatarepotentiallyapplicabletotheemissionunitsattheBlackRiverPlant.Thesearediscussedinthefollowingsections.TheemissionunitssubjecttoeachregulationandtheapplicablerequirementstiedtoeachareaddressedintheSuggestedPermitinAppendixE.
4.3.1 NESHAP Subpart AAAAA – Lime Manufacturing Plants
NESHAPSubpartAAAAAappliestoeachlimekiln,theirassociatedcoolers,andprocessedstonehandlingoperationslocatedatlimemanufacturingplantslocatedatamajorsourceofHAP.AlloftheexistingrotarykilnsattheBlackRiverfacilityaresubjecttotherequirementsofthissubpart.Allfivekilnseachmeetthedefinitionofanexistinglimekilnin§63.7082(e)sincetheywereallconstructedpriortoDecember20,2002,thedatetheregulationwasinitiallyproposed..Processedstonehandlingisdefinedin§63.7143asequipmentortransferpointsbetweenequipmentusedtotransportprocessedstone(limestoneprocessedtoasizesuitableforfeedingtoalimekiln),andincludes:storagebins,conveyingsystemtransferpoints,bulkloadingorunloadingsystems,screeningoperations,bucketelevators,andbeltconveyors,endingwheretheprocessedmaterialisfedtothekiln.AttheBlackRiverPlant,thelimestonehandlingequipmentusedtotransferprocessedlimestonefromthekilnfeedstockpiletostonebins,andfromstonebinstothekilnsaregroupedunderLS04–KilnLimestoneFeedSystem.EmissionunitsinthisgroupingaresubjecttotherequirementsSubpartAAAAA.Inaddition,becausetheKiln1,2&3DischargeBuilding(33‐01)enclosessomeofthebeltconveyorsmovinglimestonebetweenthe#1,#2,and#3StoneBinsandKiln#1,#2,and#3,thisbuildingisalsosubjecttotheopacitystandardsofSubpartAAAAA.
4.3.2 NESHAP Subpart ZZZZ – Reciprocating Internal Combustion Engines
SubpartZZZZregulatesHAPsemittedfromstationaryreciprocatinginternalcombustionengines(RICE)locatedatmajorandareasourcesofHAPemissions.WhenSubpartZZZZwasoriginallypromulgated(June15,2004),theaffectedsourcewaslimitedonlytostationaryRICElocatedatmajorsourcesofHAPsthathadacapacity
![Page 21: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/21.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-5
greaterthan500hp.However,EPApromulgatedrevisionstoSubpartZZZZonJanuary18,2008,that,amongotherchanges,broadenedtheapplicabilityoftheruletocovernewstationaryRICEwithcapacitieslessthanorequalto500hpatamajororareasourceofHAPswithfewexceptions.Then,onMarch3,2012,therulewasagainrevisedtopullinexistingstationaryRICEofanysizeatbothmajorandareaHAPsources.9AffectedsourcesunderSubpartZZZZareclassifiedaseitherexistingstationaryRICEornewstationaryRICE.ForRICEwitharatinglessthanorequalto500hp(whichisallenginesattheBlackRiverPlant),existingRICEarethosethatwereconstructedorreconstructedbeforeJune12,2006.10SincealltheenginesatthefacilitywereconstructedafterJune12,2006,theyareallnewstationaryRICEunderSubpartZZZZ.Pursuantto§63.6590(c),alltheenginesattheBlackRiverPlantmeettherequirementsofSubpartZZZZbymeetingtherequirementsofSubpartIIIIorSubpartJJJJasapplicable.
4.3.3 NESHAP Subpart DDDDD –Boilers and Process Heaters
40CFR63SubpartDDDDDappliestoownersandoperatorsofindustrial,commercial,orinstitutionalboilersorprocessheatersasdefinedin40CFR63.7575thatarelocatedat,orarepartof,amajorsourceofHAP.Thenewgas‐firedairheater(EU35‐21)servingtheMillDryer(EU35‐20)thatwillbeinstalledaspartoftheSouthHydratePlantprojectwillbeconsideredaprocessheaterasdefinedin40CFR63.7575.Asspecifiedin40CFR63.7490(b),theheaterwillbeclassifiedasanewaffectedfacilitysinceitwillcommenceconstructionafterJune4,2010.Astheheaterwillbedesignedtoonlyburnnaturalgas,theheaterwillbeinthe“unitsdesignedtoburngas1fuels”subcategoryasspecifiedin40CFR63.7499.Assuch,thenewheaterwillnotbesubjecttoanyemissionlimitsinTables1and2or11through13ofSubpartDDDDD,ortheoperatinglimitsinTable4ofSubpartDDDDD.Instead,thenewheaterwillonlybesubjecttotheworkpracticestandardsasdetailedinTable3ofSubpartDDDDDandassociatedrequirements.
4.4 KENTUCKY SIP REGULATIONS
4.4.1 401 KAR 51:017 – Prevention of Significant Deterioration of Air Quality
AsindicatedintheSection4.1,theBlackRiverPlantisclassifiedasanexistingmajorsourceunderthePSDprogram.KentuckyhasincorporatedtherequirementsofthePSDpermittingprogramintoitsStateImplementationPlan(SIP)at401KAR51:017.RotaryKiln#4,Kiln#5,downstreamlimeconveyingequipment(groupedunderLM01)andtheirassociatedbuildings(groupedunderLM02)wereallpartofaproject(authorizedbyPermitC‐93‐032onAugust12,1993)thattriggeredPSDpermittingrequirements.Fromthatproject,eachoftheseemissionunits/groupshaveBestAvailableControlTechnology(BACT)emissionlimitsinthecurrentTitleVpermitalongwithassociatedoperatinglimitsandworkpracticestandards.CarmeusehasalsotakenoperatingandemissionlimitationsoncertainemissionunitsassociatedwiththeSouthHydratePlantproject(authorizedbyV‐14‐002R3)toprecludetriggeringPSDpermittingrequirements.Eachoftheselimitationsarerepresentedinthecurrentpermit(V‐14‐002R6).
969Fed.Reg.33474,June15,2004;73Fed.Reg.3568,January18,2008;75Fed.Reg.9648,March3,2010.
1040CFR63.6590(a)(1)(ii).
![Page 22: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/22.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-6
4.4.2 401 KAR 59:010 – New Process Operations
Particulateemissionsfromnewprocessoperations(commencedonorafterJuly2,1975)notsubjecttoothernewsourcestandardsareregulatedby401KAR59:010.Theaffectedfacilitiesregulatedbythisstandardincludeany“method,form,action,operation,ortreatmentofmanufacturingorprocessing,andshallincludeanystorageorhandlingofmaterialsorproducts,before,during,oraftermanufacturingorprocessing.”Dustcollectionsystemsandotherpointsourcesinthelimehandlingarea,hydrateplant,andsouthhydrateplantthatwereconstructedafterJuly2,1975,aresubjecttothisregulation.ThesearenotedontheemissionunitindextableprovidedinAppendixB.Section3oftheruleestablishesopacityandPMmassemissionsstandards.Opacityofcontinuousemissions(visibleemissionsofparticulatematterpersistingformorethanthreeminutes)shallnotequalorexceed20percentfromacontroldeviceorstackassociatedwithanaffectedfacility.Themassemissionstandardforparticulateemissionsintotheopenairfromacontroldeviceorstackislimitedbasedontheprocessweightrate.Adifferentprocessweightbasedallowableemissionratealgorithmappliesdependingoniftheprocessweightfortheoperationisaboveorbelow60,000lb/hr.
4.4.3 401 KAR 59:015 – New Indirect Heat Exchangers
Theprovisionsof401KAR59:015applytoeachindirectheatexchangerhavinganinputcapacitygreaterthanone(1)millionBTUperhour(MMBtu/hr)andcommencedonorafterApril9,1972.401KAR59:015containsstandardsforPMandsulfurdioxide(SO2).Forsourceswithatotalheatinputcapacitytotalingten(10)MMBtu/hrorlessforallaffectedfacilitiesatthesource,emissionsofPMshallnotbeinexcessof0.56lb/MMBtuandemissionsofSO2shallnotbeinexcessof3.0lb/MMBtuforcombustionofgaseousfuels.Inaddition,affectedfacilitiesshallnotcauseemissionsofPMinexcessoftwenty(20)percentopacity.Thenewnaturalgas‐firedairheatertobeinstalledaspartattheSouthHydratePlantwillhaveaninputcapacitygreaterthanoneMMBtu/hrandwillcommenceafterApril9,1972.Therefore,theprovisionsof401KAR59:015willapplytothenewheater.Asthenewheaterwillbenaturalgas‐firedonly,itwillbeincompliancewithallprovisionsof401KAR59:015bydesign.
4.4.4 401 KAR 61:020 – Existing Process Operations
Particulateemissionsfromexistingprocessoperations(commencedpriortoJuly2,1975)areregulatedby401KAR61:020.Asin401KAR59:010,Section3oftheruleestablishesopacityandPMmassemissionsstandardsbasedontheprocessweightrate.Kiln#1,Kiln#2,andKiln#3aretheonlyprocessoperationsattheBlackRiverfacilitythatarecoveredunderthisrulesincetheywereconstructedpriortoJuly2,1975.ThepotentialPMemissionratefromeachofthesekilnsisbelowtheallowableemissionlimitunder401KAR61:020.
4.4.5 401 KAR 63:010 – Fugitive Emissions
FugitiveemissionsgeneratedfromvariousactivitiesattheBlackRiverfacilityareregulatedby401KAR63:010.401KAR63:010isagenerallyapplicablestandardthatrequiresreasonableprecautionstopreventairbornePMemissions.Operationsthatareregulatedunder401KAR63:010arenotedontheemissionunittableinAppendixB.Inaccordancewith401KAR63:010,Carmeusetakesreasonableprecautionsasdescribedintheregulationtopreventfugitiveemissionsandtoensurenovisiblefugitivedustemissionsaredischargedbeyondthepropertyline.
![Page 23: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/23.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-7
4.4.6 401 KAR 63:020 – Potentially Hazardous Matter or Toxic Substances
Kentuckyregulatestheemissionsoftoxicairpollutantemissionsthrough401KAR63:020.TheDivisioncanrequirethatdispersionmodelingorotheranalysesbecompletedbyfacilitiesatpermitrenewalorwhenconstructingormodifyingequipmentwhenthereisanincreaseinairtoxicpollutantemissions,asdefinedin401KAR63:020Section2(2),deemedtobesignificant.Thisisdonesothatthereisadocumentedbasisforaffirmingthatafacilitydoesnotcauseanadverseimpact.However,pursuantto401KAR63:020,Section1,therequirementsofthisruleareapplicableonlytotheextentthatsuchemissionsarenotelsewheresubjecttotheprovisionsoftheKentuckyAdministrativeRegulations.BecausethetoxicairpollutantemissionsfromemissionunitsatBlackRiverfacilityarealreadyregulatedunderNESHAP,whichareincorporatedbyreferenceintheKAR,noadditionalrequirementsunder401KAR63:020applytothisfacility.
4.5 COMPLIANCE ASSURANCE MONITORING
4.5.1 CAM Applicability Analysis
Under40CFRPart64,theComplianceAssuranceMonitoring(CAM)regulations,facilitiesarerequiredtoprepareandsubmitmonitoringplansforcertainemissionunitswithaTitleVapplication.TheCAMplansareintendedtodocumentmethodsthatwillprovideon‐goingandreasonableassuranceofcompliancewithemissionlimits.Pursuantto§64.2(a),theCAMregulationsapplytoapollutant‐specificemissionsunit(PSEU),asdefinedin§64.1,atamajorTitleVsourceifthefollowingcriteriaaremet:
1. thePSEUissubjecttoanemissionlimitationorstandardfortheregulatedpollutant,otherthananemissionlimitationorstandardthatisexemptunder§64.2(b),
2. thePSEUusesacontroldeviceasdefinedin§64.1toachievecompliancewiththeemissionlimitation,and
3. thePSEUhaspotentialpre‐controlledemissionsoftheapplicableregulatedairpollutantthatareequaltoorgreaterthanTitleVmajorsourcethresholds.
AnanalysisofapplicabilitytoCAMforeachunitthatissubjecttoanemissionlimitationorstandardattheBlackRiverPlantisprovidedinthissection.Emissionunitsnotsubjecttoanyemissionstandards,whicharethereforenotaddressedherein,includethefugitiveemissionsourcesinthelimestoneprocessingarea,whichareonlysubjectto401KAR63:010.Thisregulationdoesnotprescribeanyunit‐specificemissionstandards,onlygeneralworkpractices.
4.5.1.1 Rotary Kilns
AllfiverotarykilnsattheBlackRiverplantaresubjecttoPMemissionstandards.EachkilnisequippedwithadedicatedbaghousewhichisusedtoachievecompliancewiththesePMemissionlimitsandpre‐controlledemissionsexceed100tpy.However,CAMrequirementsdonotapplytoemissionlimitsproposedbyEPAafterNovember15,1990,pursuanttoSection111or112oftheCleanAirAct.11ThelowestapplicablePMemissionlimitapplicabletothekilnsisfrom40CFR63SubpartAAAAA,theNESHAPforLimePlants,whichwasproposedonDecember20,2002.Accordingly,therotarykilnsarenotsubjecttoCAMrequirementsforPM.12
1140CFR64.2(b)(1)(i).
12AlthoughKilns#1,#2,and#3arealsosubjecttoPMemissionstandardsunder401KAR61:020,theNESHAPSubpartAAAAAPMlimitismorestringentandsubsumestheseSIP‐basedPMstandards.
![Page 24: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/24.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-8
RotaryKilns#4and#5arealsosubjecttoBACTemissionlimitsforSO2,NOX,andCOestablishedaspartofthe1993PSDpermitaction.However,thereisnocontroldeviceusedtoachievecompliancewiththeseemissionstandards.Therefore,CAMdoesnotapplytoKiln#4and#5forSO2,NOX,orCO.
4.5.1.2 Dust Collection Systems in Lime Handling Area
MultipledustcollectionsystemsareusedtocapturePMemissionsgeneratedinthematerialhandlingandtransferoperationsinthelimeareaoftheplant.MostofthedustcollectionsystemsconsistofductingtopickuphoodsthatroutecapturedPMemissionstoafiltersystemforcontrolofPMpriortodischargetotheatmosphere.Thevariousbarge,railcar,andtruckloadoutstationsalsousefiltersystemsontheloadingchutestocontrolPMemissions.ThesedustcollectionsystemsarewithinemissiongroupingsLM01–LimeDustCollectionSystems(PSD),LM03–LimeStoragetoHydrate,LM04–LimeDustCollectionSystem(non‐PSD),andLM06–RejectLimeProcessing.DustcollectionsystemsunderLM01aresubjecttoPMemissionstandardsestablishedaspartofthe1993PSDpermitaction,aswellas401KAR59:010.DustcollectionsystemsunderLM03,LM04,andLM06aresubjecttoprocessweightbasedPMstandardsunder401KAR59:010only.Whilethepost‐controlledPMemissionratesforallthelimehandlingdustcollectionsystemsarelessthan100tpy,basedonthemassemissionratesattheexitofthedustcollectionsystemsandthenominalcontrolefficienciesthebaghouseswouldbeexpectedtoachieve,itisreasonabletoassumethatpotentialpre‐controlledemissionsexceed100tpy.13Therefore,pursuantto40CFR64.2(a),becausethefabricfiltersareusedtoachievecompliancewithPMemissionlimits,CAMappliestotheseemissionunitsforPM.ACAMplanforPMthatcanbeappliedforallthedustcollectionsystemswaspreparedandsubmittedwiththelastTitleVpermitrenewalapplicationin2012andtherehavebeennochangessincethatwarrantarevision.
4.5.1.3 Bin Vent Filters and Dust Collection Systems in Hydrate Area
Thehydratorfeedbinsandhydrateproductstoragebins,whicharesubjecttoprocessweightbasedPMemissionstandardsunder401KAR59:010,areequippedwithbinventfiltersystemstominimizetheamountofPMreleasedwithdisplacementair.ThesebinventfiltersystemsmayormaynotbeclassifiedasairpollutioncontrolequipmentunderCAMsincetheyareintegratedcomponentsofthestoragebins.Regardless,thepost‐controlledemissionsfromeachofthebinventfiltersystemarelowanditisreasonabletopresumebasedonfeasibleoperatingtimesandnominalcontrolefficienciesprovidedbythefiltersystemsthatpre‐controlledemissionsarelessthan100tpy.Thus,CAMdoesnotapplytothebinventfiltersystemsinthehydratearea.Similartothelimehandlingarea,thetruckandrailcarloadoutstationsforthehydrateplantemployfabricfiltertocontrolPMemissions.Theestimatedpre‐controlledemissionsfromeachoftheseoperationshoweverarelessthan100tpy.Thepre‐controlledemissionsfromtheotherpointsourcesinthehydrateareaequippedwithdustcollectorsarealsolessthan100tpy.Thus,CAMdoesnotapplytothedustcollectionsystemsinthehydratearea.
4.5.1.4 Hydrator/Scrubber System in Hydrate Area
Thehydrator/scrubbersystem(21‐12inemissiongroupHY01)isasmallsourceofPMemissionsthatisentrainedinthesteamplumereleasedfromthehydrator.Thesteamisproducedfromheatgeneratedintheexothermicreactioncausedbythemixingoflimeandwaterinthehydratorunit.Awaterscrubberinherenttothehydratorunitisusedtointroducewatertotheprocessandcoolthesteam.Indirectly,thehydratorscrubberprovidesincidentalcontrolofPMentrainedinthesteam.However,becausethehydratorscrubberisaninherent
13Basedonthelowexhaustflowandintermittentoperationofcertaindustcollectionsystems(e.g.,atthebarge,rail,andtruckloadoutstations),theirpre‐controlledemissionsmaybelessthan100tpyofPM,inwhichcaseCAMwouldnotbeapplicable.However,intheabsenceofspecificdataavailabletoaccuratelydefinetheinletloadingconcentrationstothebaghouses,aconservativepresumptionhasbeenmadethattheyareallsubjecttoCAM.
![Page 25: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/25.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-9
partofthehydrationprocess,itwouldnotbeclassifiedasanairpollutioncontroldeviceunderCAM.Therefore,CAMdoesnotapplytothisemissionunit.
4.5.1.5 Stationary Internal Combustion Engines
Noneofthestationaryenginesatthefacilityuseacontroldevicetoachievecompliancewithanapplicablestandard.Inaddition,theemissionstandardsapplicableunderNSPSSubpartIIIIandNSPSSubpartJJJJareexemptfromCAMpursuantto40CFR64.2(b)(1)(i)and,sincethisregulationwaspromulgatedafterNovember15,1990.Therefore,CAMdoesnotapplytothestationaryengines.
4.5.1.6 South Hydrate Plant
1. MaterialHandlingandTruckLoadoutDustCollectionSystems
TherearethreedustcollectionsystemstobeinstalledattheSouthHydratePlantthatwillbeusedtominimizedustemissionsfrommaterialhandlingandtransferoperations.TheseareDC‐06108(EU35‐01to35‐04),DC‐06116(EU35‐05to35‐07)andDC‐21105(EU35‐10to35‐18).Inaddition,thetruckloadoutstationsforthehydrateplantemployfabricfiltersintegratedwiththeloadingspouttocontrolPMemissions(EU35‐24and35‐25).Eachofthesesystemsandtheunderlyingoperationsbeingcontrolled,aresubjecttoprocessweightbasedPMemissionstandardsunder401KAR59:010.However,theestimatedpre‐controlledemissionsfromeachoftheseoperationsarewellbelow100tpy.Thus,CAMdoesnotapplytothedustcollectionsystemsinthehydratearea.
2. BinVentFiltersThenewSouthHydratePlantQuickLimeBins(EU35‐08and35‐09)feedbinsandHydrateBins(EU35‐22and35‐23),whicharesubjecttoprocessweightbasedPMemissionstandardsunder401KAR59:010,willbeequippedwithbinventfiltersystemsordustcollectionsystemstominimizetheamountofPMreleasedwithdisplacementair.ThesebinventfiltersystemsarenotconsideredtobeairpollutioncontrolequipmentunderCAMsincetheyareintegratedcomponentsofthestoragebins.Regardless,thepost‐controlledemissionsfromeachofthebinventfiltersystemarelowanditisreasonabletopresumebasedonfeasibleoperatingtimesandnominalcontrolefficienciesprovidedbythefiltersystemsthatpre‐controlledemissionsarelessthan100tpy.Thus,CAMwillnotapplytothebinventfiltersystems.
3. HydratorDustCollectorSystemandProcessFilterSystem
TheHydratorSystem(EU35‐19)isasmallsourceofPMemissions.Adustcollectorinherenttotheoperationofthehydratorunitisusedtocapturehydratematerialfromtheexhaustofthehydratorandreturnthematerialbackintothehydrator.Becausethehydratordustcollectorisaninherentpartofthehydrationprocess,itisnotclassifiedasanairpollutioncontroldeviceunderCAM.Therefore,CAMdoesnotapplytothisemissionunit.TheprocessfiltersystemassociatedwiththeMillDryer(EU35‐20)isdesignedtoseparatethedriedhydratefromthehotaircarrierstreamthatispneumaticallyconveyedfromtheMillDryer,andtotransferittotwohydrateproductbins.Thisprocessfilterisanecessarypieceofequipmentandthemanufacturingprocesscouldnotfunctionproperlywithoutit.Assuch,itisnotclassifiedasanairpollutioncontroldeviceunderCAM.Therefore,CAMdoesnotapplytothisemissionunit.
4.5.2 CAM Plan Submittal Timeframe
AllthedustcollectionsystemsinthelimehandlingareaforwhichCAMrequirementsapply(forPM)aresmallpollutant‐specificemissionunitssincepost‐controlledPMemissionsforeachfiltersystemarelessthan100tpy.
![Page 26: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/26.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 4-10
Pursuantto§64.5(b),theinitialproposedCAMplansareduetobesubmittedaspartoftheapplicationforrenewalofaTitleVpermit.However,therequiredCAMPlanwasdevelopedandsubmittedwiththepriorTitleVrenewalapplicationandtherehavebeennochangessincethatwarrantanupdateorrevision.TheCAMPlanrequirementsforthelimehandlingoperationsarealreadyincorporatedintothecurrentTitleVpermit.
![Page 27: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/27.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 5-11
5. REQUESTED CHANGES TO TITLE V PERMIT
Carmeuseisseekingtohavecertainexistingpermitconditionsreplacedorrewordedaspartofthispermitaction.Insomecases,experiencesinthecurrentpermittermhaverevealedchangesthatcouldmakethecurrentcompliancemethodsmoreeffectiveorthatcouldreducedatacollectionandmanagementchallengeswithoutaffectingthecomplianceassuranceprovided.Inothercases,changesareneededsimplytoaddmoreclarityandconsistencytopermitconditions.Afewerrorsandtyposhavealsobeennoted.AllthechangesbeingproposedareintendedtoimprovetheeffectivenessofthemonitoringmethodsandbetterallowCarmeusetodemonstratecompliancewiththeapplicableoperatingandemissionstandardsofthepermit.ThefollowingsectionsdiscussthechangesbeingsoughtbyCarmeusetotheexistingpermitprovisionsalongwiththerationaleforthechanges.SpecificwordingchangestoexistingconditionsofthepermitarenotedintheSuggestedPermitRevisionsprovidedinAppendixE.
5.1 VE MONITORING PROVISIONS FOR LIMESTONE AND COAL HANDLING OPERATIONS
Condition4inSectionB,EmissionGroupLS03–LimestoneScreeningandCrushing,(Page7of125)EmissionGroupCL01–CoalReceivingandStorage,(Page17of125)Thecurrentpermit(V‐14‐002R6)includesarequirementforCarmeusetoconductweeklyvisibleemissions(VE)monitoringforthelimestoneandcoalmaterialhandlingoperationslistedabove.However,duetothepropertiesofthelimestoneandcoalmaterialhandled,theseoperationsareveryunlikelytobeasourceofvisiblefugitivedustandamonthlyrecordthatthereisnoobservedvisibleemissionsshouldbesufficientfordemonstratingcompliancewith401KAR63:010.Therefore,CarmeuseisrequestingthattherequiredVEmonitoringfrequencybechangedtomonthly.TheDivisionhasalreadyestablishedthatamonthlyVEmonitoringrequirementisappropriateforessentiallyidenticallimestoneandcoalhandlingoperationsatthesisterCarmeuseplantinMaysville,Kentucky.14TheDivisionhasalsoestablishedthatmonthlyVEmonitoringissufficientfortheprocessedstonehandlingsystemsattheBlackRiverPlant(EmissionGroupLS04),whicharesubjecttomorestringentemissionstandardsundertheLimeMACT(40CFR63,SubpartAAAAA)thantheotherlimestonehandlingoperations.Forthesereasons,andsothereisconsistencybetweenallthelimestonehandlingoperationswithintheBlackRiverPlant,andconsistencybetweentheBlackRiverPlantandMaysvillePlantTitleVpermitsforsimilaremissionunits,CarmeuserequeststhattheVEmonitoringfrequencyforthelistedsystemsberevisedtomonthly.
5.2 DIFFERENTIAL PRESSURE EXCURSIONS FOR ROTARY KILNS #1 TO #5
SectionB,RotaryKiln#1,Condition4.b(Page20of125)RotaryKiln#3,Condition4.b(Page32of125)
14Forexample,inPermitV‐16‐014R1fortheMaysvillePlant(AI3003),refertoCondition4forEmissionGroup1:LS01–MinetoStockpileTransfers;Condition4.aand4.bforEmissionGroup3:LS03–LimestoneScreeningandCrushing;andCondition4forEmissionGroup7:CL01–CoalReceiving&Storage.
![Page 28: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/28.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 5-12
Forthebaghousecontrolsystemsoneachofthefiverotarykilns,uponobservingadifferentialpressurereadingoutsidethenormaloperatingrangedocumentedintheOM&MPlan,thecurrentpermitrequiresthatCarmeuseconductanimmediateMethod9opacityreadingfollowingthecompletionofthecorrectiveactionforanyreadingoutsideofthepressuredroprange,or,forthekilnsequippedwithContinuousOpacityMonitors(COMS)toverifycompliancewiththeopacitylimitviatheCOMSreading.CarmeusehaspreviouslyanalyzedoverlappingcontinuousdifferentialpressureandopacitymonitoringdataforRotaryKilns#2,#4,and#5andconfirmedthatthereisnocorrelationbetweenopacityatakilnbaghousestackandchangesinbaghousedifferentialpressure,evenchangeswherethepressureextendsoutsidethenormalrange.Therefore,thesignificantadministrativecostandeffortofconductingMethod9opacityreadingsinresponsetoeachandeverydifferentialpressureexcursionyieldsnoadditionalcomplianceassurancebenefits.AlthoughCarmeuserecognizesthattheremustbesomeadditionalcomplianceassurancemeasuretakeninresponsetobaghousedifferentialpressureexcursions,theDivisionhasalreadyestablishedwhatitconsiderstobeappropriatemonitoringandcorrectiveactionprovisionsforequivalentlimekilnssubjecttothesameLimeMACTemissionlimitsinthepermitfortheCarmeuseMaysvillePlant(V‐16‐014R1).15 ForRotaryKilns#1and#3,whicharenotequippedwithCOMS,Carmeuseisproposingthatimmediateanddocumentedcorrectiveactionandaverificationthatthedifferentialpressurehasreturnedtonormalrangeissufficienttoensurethebaghousesareoperatingasdesigned.ThisapproachavoidstheunnecessarycompletionofaMethod9procedureinsituationswhentherearenovisibleemissionsandnoimpactonopacityduetothedifferentialpressureexcursions.ThesuggestedstrikeoutofCondition4.bisprovidedbelow.b. FollowingareadingoutsideofthepressuredroprangespecifiedintheOM&M:
1) Maintenancepersonnelshallinspectthemonitoringsystem,baghouse,andoperationsimmediately;andtakecorrectionactionassoonaspracticable.
2) Uponcompletedcorrectiveaction,thepermitteeshallimmediatelyconductanEPAReferenceMethod9opacityreadingonthedustcollectionsystemservicedensurepressuredrophasreturnedtonormalrange.[401KAR52:020,Section10]
5.3 DIFFERENTIAL PRESSURE EXCURSIONS FOR LIME HANDLING SYSTEM BAGHOUSES SUBJECT TO PSD LIMITS
EmissionGroupLM01encompassesallthelimehandlingsystembaghousesattheBlackRiverPlantthataresubjecttoPMemissionandopacitylimitsestablishedinapriorPSDpermitaction.Asisthecasefortherotarykilnbaghouses,uponobservingadifferentialpressurereadingoutsidetheexcursionrangespecified,thecurrentpermitrequiresthatCarmeuseconductanimmediateMethod9opacityreadingfollowingthecompletionofcorrectiveaction.Aswiththerotarykilns,CarmeusemaintainsthatconductingaMethod9opacityreadingisnotanappropriateorusefulcomplianceassurancemeasureinresponsetoabaghousedifferentialpressurereading.FortheCarmeuseMaysvillePlanttheDivisionhasestablishedwhatitconsiderstobeappropriatemonitoringandcorrectiveactionprovisionsforequivalentlimehandlingbaghouses,someofwhicharealsosubjecttothesamePSDemissionlimitsasthoseattheBlackRiverPlant.16Carmeusemaintainsthatdocumentedcorrectiveactionbymaintenancepersonnelandaverificationthatthepressurehadreturnedtothenormalrangeshould
15Forexample,refertoCondition4.binSectionBforRotaryKilns#1‐#3ofPermitV‐16‐014R1(page25of74)fortheMaysvillePlant.
16Forexample,refertoCondition4.cinSectionBforEmissionGroup10:LM01–LimeDustCollectionSystems,ofPermitV‐16‐014R1(page41of74)fortheMaysvillePlant.
![Page 29: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/29.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 5-13
besufficientandappropriate,aswiththekilns,sincetheDivisionhaspreviouslydeterminedthatadditionalfollow‐upmeasuresintheformofaMethod9readingarenecessary.CarmeuserequeststhattheconditionberewordedtoremovetheMethod9readingrequirement. b. FollowingareadingoutsideofthepressuredroprangespecifiedintheOM&M:
1) Maintenancepersonnelshallinspectthemonitoringsystem,baghouse,andoperationsimmediately;andtakecorrectionactionassoonaspracticable.
2) Uponcompletedcorrectiveaction,thepermitteeshallimmediatelyconductanEPAReferenceMethod9opacityreadingonthedustcollectionsystemservicedensurepressuredrophasreturnedtonormalrange.[401KAR52:020,Section10]
5.4 STANDARDIZE VISIBLE EMISSIONS FOLLOW-UP REQUIREMENTS
SectionB,EmissionGroupLS03–LimestoneScreeningandCrushing,(Page7of125)EmissionGroupCL01–CoalReceivingandStorage,(Page17of125)EmissionGroupLM01–LimeDustCollectionSystems(PSD),(Page58of125)EmissionGroupLM02–LimeSystemBuildings,(Page60of125)EmissionGroupHY01–HydrationPlant(Page83of125)EmissionGroupHY02–HydrateBinstoLoadout(Page87of125)EmissionGroupHY03–LimePulverizerSystem(Page89of125)EmissionGroupSH01–SouthHydratePlant(Page95of125)Thecurrentpermit(V‐14‐002R6)includesrequirementsforCarmeusetoconductVEmonitoringforthelimestone,lime,andcoalmaterialhandlingoperationslistedabove.However,thecurrentVEmonitoringrequirementsforeachemissiongroupcontaininconsistentphrasingandverboseorduplicativelanguage.Therefore,CarmeuseisrequestingthattheVEmonitoringrequirementlanguagebemadeconsistentthroughouttheTitleVpermit.Additionally,eachoftheVEmonitoringrequirementsfortheemissiongroupsindicatedaboverequirethatMethod9testingbeconductedimmediatelyifanyvisibleemissionsareobservedduringavisualobservation.CarmeuseconsidersthisrequirementoverlyburdensomeandunnecessaryfortheBlackRiverPlant.WhenvisibleemissionsareobservedfromanemissionunitattheBlackRiverPlant,itcanmostoftenbequicklyresolvedthroughcorrectiveaction.ByrequiringimmediateMethod9readingsthecorrectiveactionisdelayedandinduecourseresultsinhigherparticulateemissions.CarmeuseisrequestingthattheDivisionremovetherequirementforimmediateMethod9readingswhenvisibleemissionsaredetectedduringaVEreadingandinsteadprovideopportunityforimmediatecorrectiveaction.Theproposedlanguagetoallowforimmediatecorrectiveactionisprovidedbelow.Importantly,CarmeuseisrequestingthatthissamelanguagebeusedforallcoveredemissionunitsotheVErequirementsareconsistentthroughoutthepermit.
Conductvisualobservations(daily,weekly,ormonthly)duringdaylighthours.Ifvisibleemissionsareobserved,takecorrectiveactionandconductafollow‐upvisualobservation.Ifvisibleemissionsareobservedafterthecorrectiveaction,conductanEPAReferenceMethod9reading.
![Page 30: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/30.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 5-14
5.5 LIME HANDLING SYSTEM PROCESS RATES DURING TESTS
SectionB,EmissionGroupLM01–LimeDustCollectionSystems(PSD),(Page56of125)PursuanttoConditionG.5.b,anyrequiredperformancetestshallbeconductedundernormalconditionsthatarerepresentativeofthesource’soperationsandcreatethehighestrateofemissions.Ifthemaximumproductionraterepresentsasource’shighestemissionsrateandaperformancetestisconductedatlessthanthemaximumproductionrate,asourceshallbelimitedtoaproductionrateofnogreaterthan110percentoftheaverageproductionrateduringtheperformancetests.ThisgeneralrequirementisreasonableformostemissionunitsregulatedbytheDivision,howeverthebaghousescontrollinglimehandlingemissionsareanexception.AfterlimeleavestheKilns,itistransferredtoaseriesofindoorconveyanceequipment.Manyofthetheseconveyorshandlethelimeproducedfrommultiplekilnsconcurrently(refertoAppendixC,FigureC‐3).TofullysatisfytherequirementsinConditionG.5.b,duringperformancetesting,CarmeusewouldneedtooperatealloftheKilnsthatcouldpotentiallyuseeachconveyancesystemduringtheperformancetesting.Duetomarketvolatility,certainkilnsmaybeidledforperiodsoftimeandschedulingperformancetestingaroundlimeproductionoperationsisimpractical.ItisnotpracticallyoreconomicallyfeasibleforCarmeusetostartupanykilnsnotalreadyinoperationsolelytoconductaperformancetest.Inaddition,theamountoflimedustgeneratedattheinteriortransferpointsthatarecontrolledbythebaghousesisrelativelyconsistentregardlessofhowmanykilnsareinoperation.401KAR50:045,Section5,allowstheDivisiontowaivethe110percentproductionrateperformancetestingrequirementonacase‐by‐casebasisifthesourcedemonstratestotheDivision'ssatisfactionthatthesourceisincompliancewithallapplicablerequirements.ThelastsetofperformancetestingofthelimehandlingbaghouseswasconductedonFebruary24‐26,2015.Thistestingdemonstratedthattheopacityfromeachoftherepresentativedustcollectorswaszeropercentandthemeasuredparticulatematteremissionswerewellbeloweachoftheirrespectiveemissionlimitations.Carmeusebelievesthatthetestingconductedinthecurrentpermitterm,coupledwithon‐goingcontroldevicemonitoring,providessufficientassuranceofcompliancemovingforwardforthelimehandlingbaghouses.However,shouldtheDivisionincludeanynewtestingrequirementsforthelimehandlingsystemsfortheupcomingpermitterm,CarmeuseisrequestingthataprovisionbeaddedtotheStatementofBasisclarifyingthatthegenerallyapplicableprocessraterequirementsforperformancetestsonthelimehandlingsystemsareconsideredmetsolongasallcurrentkilnsinoperationareoperatingwithin90%oftheirstatedcapacity.
5.6 COAL HEATING VALUE AND SULFUR CONTENT LIMITATIONS
SectionB,EmissionRotaryKiln#4,Condition1.b(Page36of125)RotaryKiln#5,Condition1.b(Page45of125)Aspartofthe1995PSDpermitaction,operatinglimitsonthesulfurcontentandheatingvalueofthecoalburnedasfuelinRotaryKilns#4and#5wereestablished.Thecurrentoperatinglimitationrequiresthattheminimumaverageheatingvalueofthecoalbe12,900Btu/lbandthattheaveragesulfurcontentofthefuelbenomorethan0.9%unlesstheNOX,CO,PM,andSO2emissionlimitsarenotexceeded.Theaverageisfurtherdefinedastheaverageofshipmentsreceivedineachmonth.CarmeusebelievestheintentoftheexistingoperatinglimitscanberetainedwhileprovidingmoreclaritybyslightlyrewordingtheselimitsasshownbelowandinthesuggestedpermitprovidedinAppendixE.
![Page 31: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/31.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants 5-15
b. Theonlysolidfuelpermissibleinthekilniscoal.[401KAR51:017,C‐93‐032]
1) Coalwithlessthananaverageheatingvalueofeither12,900Btu/lbortheaverageforthecoalburnedduring a prior passing compliance demonstration for nitrogen oxide (NOx), carbonmonoxide (CO),particulate(PM),andsulfurdioxide(SO2),whicheverislower,shallnotbeburned.Forthepurposesofthiscondition,averageheatingvalueisdefinedastheweightedaverageheatingvalueinthecoalfromallshipmentsreceived ineachmonthonadryweightbasis.Coalwith less thanaminimumaverageheatingvalueof12,900Btu/lbforeachshipmentshallnotbeburnedasfuelunlessthenitrogenoxide(NOx), carbon monoxide (CO), particulate (PM), and sulfur dioxide (SO2) emission limits are notexceeded.Averageisdefinedastheaverageheatingvalueofshipmentsreceivedineachmonth.
2) Coalwithmorethananaveragesulfurcontentofeither0.9%ortheaverageforthecoalburnedduringapriorpassingcompliancedemonstrationforNOx,CO,PM,andSO2,whicheverishigher,shallnotbeburned.Forthepurposesofthiscondition,averagesulfurcontent isdefinedastheweightedaveragesulfurcontent inthecoalfromallshipmentsreceived ineachmonthonadryweightbasis.Coalwithmorethananaveragesulfurcontentof0.9%foreachshipmentshallnotbeburnedasfuelunlesstheNOx,CO,PM,andSO2emissionlimitsarenotexceeded.Averageisdefinedastheaveragesulfurcontentofshipmentsreceivedineachmonth.
![Page 32: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/32.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants
APPENDIX A: AREA MAP AND SITE PLAN
FigureA‐1:AreaMap
FigureA‐2:AerialImageSitePlan
FigureA‐3:EmissionPointLocation
![Page 33: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/33.jpg)
_̂
190,000 200,000 210,000 220,000 230,000 240,000 250,000
4,275
,000
4,285
,000
4,295
,000
4,305
,000
4,315
,000
4,325
,000
4,335
,000
4,345
,000
Appendix A-1. Area Map
UTM Easting (m)
UTM
North
ing (m
)
All Coordinates shown in UTM Coordinates,Zone 17, NAD 83 Datum
Area Map Extent
Carmeuse Lime & StoneBlack River Plant
Black River Plant
![Page 34: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/34.jpg)
LM-03
LS - 01LS-02 LS-03
LS-05
LS-06CL-01
KL 01 - KL 03
KL04 - KL 05LM-02
LM-02LM-02
LM-02
LM-02
LM-02LM-02
LM-06
LM-06
LM-08
LM-08
HY01 - HY 03
218,6
0021
8,700
218,8
0021
8,900
219,0
0021
9,100
4,303,300 4,303,400 4,303,500 4,303,600 4,303,700 4,303,800 4,303,900 4,304,000 4,304,100 4,304,200
±
LegendColored shaded denotes locationof major emission groupings and their ID
Appendix A-2. Site PlanBlack River Plant
UTM
North
ing (m
)
UTM Easting (m)All Coordinates shown in UTM Coordinates,
Zone 17, NAD 83 Datum
![Page 35: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/35.jpg)
21 0821 05
21 35
22 0921 31
21 23
27 02
21 1820 2120 20
32 0632 1032 14
32 13
32 15
32 08
21 01
29 0429 03
18 3018 27
18 2418 22
18 16
18 09
18 0618 01
17 4117 3217 27
17 17 17 13 17 10
17 05
16 11
11 0110 01
09 01 08 0107 01
218,6
0021
8,700
218,8
0021
8,900
219,0
00
4,303,300 4,303,400 4,303,500 4,303,600 4,303,700 4,303,800 4,303,900 4,304,000 4,304,100 4,304,200
±
UTM Easting (m)
UTM
North
ing (m
)
All Coordinates shown in UTM Coordinates,Zone 17, NAD 83 Datum
Appendix A-3. Emission Point LocationBlack River Plant
![Page 36: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/36.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants
APPENDIX B: EMISSION UNIT INVENTORY
EmissionUnitIndexTable
![Page 37: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/37.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 1 of 7Printed: 2/22/2019
1. Emission Unit IndexEmis
GroupID
Title V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
LS01 Mine to Stockpile Transfers 001 EQPT00030 01 01 1 14-101 Belt Conveyor Transfer to 14-102 Belt Conveyor 1969 63:010 Moist Material Fugitive
LS01 Mine to Stockpile Transfers 001 EQPT00031 01 02 1 14-102 Belt Conveyor Transfer to 14-200 Reversing Belt Conveyor
1969 63:010 Moist Material Fugitive
LS01 Mine to Stockpile Transfers 001 EQPT00032 01 04 1 14-200 Reversing Belt Conveyor Transfer to Stockpiles 1995 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00001 01 03 1 Limestone Stockpile (42,000 tons) (8x0 ROM) 1995 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00003 01 08 1 Small Kiln Feed Stockpile (1/2 x 1) 1995 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00005 01 12 1 Large Kiln Feed Stockpile (2 1/2 x 1) 1995 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00008 01 16 1 1/2 x 150 Mesh Stockpiles 1995 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00017 31 01 1 Riverside Stone Stockpile #1 2001 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00018 31 04 1 Riverside Stone Stockpile #2 2001 63:010 Moist Material Fugitive
LS02 Limestone Stockpiles 001 AREA00019 31 07 1 Riverside Stone Stockpile #3 2001 63:010 Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00033 01 06 1 51-100 Belt Conveyor Transfer to 51-201 Belt Conveyor 1969 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00035 01 09 1 51-206 Belt Conveyor Transfer to Small Kiln Feed Stockpile 1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00036 01 11 1 51-208 Tripper Conveyor Transfer to Large Kiln Feed Stockpile
1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00037 01 15 1 51-204 Radial Stacker Transfer to 1/2x150 Mesh Stockpile or 51-221 Limestone Screen
1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00079 02 01 1 51-200 Belt Conveyor Transfer to 51-201 Belt Conveyor 1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00084 02 07 1 51-304 Secondary Cone Crusher Transfer to 51-201 Belt Conveyor
1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00085 02 08 1 51-305 Secondary Cone Crusher Transfer to 51-201 Belt Conveyor
1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Conveyor Transfers
001 EQPT00089 02 12 1 51-203 Belt Conveyor Transfer to 51-204 Radial Stacker 1995 NSPS OOO Moist Material Fugitive
LS03 Limestone Screening & Crushing
Limestone Processing Buildings
001 EQPT00080 02 02 1 Screening Building Operations 1995 NSPS OOO Moist Material Inside Building
Fugitive
LS03 Limestone Screening & Crushing
Limestone Processing Buildings
001 EQPT00083 02 05 1 Crusher Building Operations 1995 NSPS OOO Moist Material Inside Building
Fugitive
LS03 Limestone Screening & Crushing
Limestone Processing Buildings
001 EQPT00087 02 10 1 Transfer House from Screening Building to Stockpiles 1995 NSPS OOO Moist Material Inside Building
Fugitive
LS04 Kiln Limestone Feed System Feed Piles to Stone Bins
001 EQPT00049 01 32 1 52-215 Belt Conveyor Transfer to #3 Stone Bin 1976 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Feed Piles to Stone Bins
001 EQPT00092 02 15 1 52-301 Belt Conveyor Transfer to 52-302 Belt Conveyor 1995 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Feed Piles to Stone Bins
001 EQPT00093 02 16 1 52-302 Belt Conveyor Transfer to 52-303 Belt Conveyor or 52-215 Belt Conveyor or #1 Stone Bin or #2 Stone Bin
1995 NESHAP 5A Moist Material Fugitive
![Page 38: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/38.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 2 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
LS04 Kiln Limestone Feed System Feed Piles to Stone Bins
001 EQPT00095 02 18 1 52-303 Belt Conveyor Transfer to 52-304 Belt Conveyor or #4 Preheater
1995 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Feed Piles to Stone Bins
001 EQPT00234 02 20 1 52-304 Belt Conveyor Transfer to #5 Preheater 1995 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Stone Bins to Kilns 001 EQPT00044 01 26 1 81-121 Belt Conveyor Transfer to 81-131 Belt Conveyor 1970 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Stone Bins to Kilns 001 EQPT00045 01 27 1 81-131 Belt Conveyor Transfer to Kiln # 1 1970 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Stone Bins to Kilns 001 EQPT00047 01 30 1 82-122 Belt Conveyor Transfer to 82-132 Belt Conveyor 1970 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Stone Bins to Kilns 001 EQPT00048 01 31 1 82-132 Belt Conveyor Transfer to Kiln # 2 1970 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Stone Bins to Kilns 001 EQPT00051 01 35 1 83-228 Belt Conveyor Transfer to Kiln # 3 1976 NESHAP 5A Moist Material Fugitive
LS04 Kiln Limestone Feed System Lime Storage Building 003 33 01 1 Kilns 1, 2, & 3 Discharge Building - Burner Building 1 1970 63:010, 51:017; NESHAP 5A
DC + Enclosure Fugitive
LS05 Limestone Loadout Operations 001 EQPT00098 03 01 1 93-102 Belt Conveyor and Barge Loadout 2007 63:010 Moist Material Fugitive
LS05 Limestone Loadout Operations 001 EQPT00264 04 01 1 93-110 Stone Dump Hoppers Transfer to 93-100 Belt Conveyor
2007 63:010 Moist Material Fugitive
LS05 Limestone Loadout Operations 001 EQPT00096 05 02 1 93-100 Belt Conveyor Transfer to 93-101 Belt Conveyor (When in Limestone Service)
1995 63:010 Moist Material Fugitive
LS05 Limestone Loadout Operations 001 EQPT00259 31 02 1 Limestone Transfers via Front End Loader to 93-110 Stone Dump Hoppers
2007 63:010 Moist Material Fugitive
LS05 Limestone Loadout Operations 001 EQPT00260 31 03 1 Limestone Transfers via Front End Loader to Trucks 2007 63:010 Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Truck Receiving 002 EQPT00137 06 01 1 Coal Receiving Hoppers at Truck Dump 1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Truck Receiving 002 EQPT00281 06 03 1 54-801 Belt Conveyor Transfer to 54-802 Reversing Belt Conveyor or #2 Silo
1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Truck Receiving 002 EQPT00149 06 05 1 54-802 Reversing Belt Conveyor Transfer to #1 Silo, #2 Silo, or #3 Silo
1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Barge Receiving 002 EQPT00254 28 01 1 Barge Receiving Hopper 2006 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Barge Receiving 002 EQPT00255 28 02 1 54-101 Belt Conveyor Transfer to 54-102 Belt Conveyor 2006 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Barge Receiving 002 EQPT00256 28 03 1 54-102 Belt Conveyor Transfer to 54-103 Belt Conveyor 2006 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Barge Receiving 002 EQPT00257 28 05 1 54-103 Belt Conveyor Transfer to 54-802 Reversing Belt Conveyor or #4 Silo
2006 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00282 06 07 1 54-803 Belt Conveyor Transfer to 54-804 Belt Conveyor 1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00283 06 09 1 54-804 Belt Conveyor Transfer to 54-805 or 54-806 Belt Conveyors or #2 Coal Bin
1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00284 06 11 1 54-806 Belt Conveyor Transfer to 54-807 Belt Conveyor or #3 Coal Bin
1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00285 06 12 1 54-807 Belt Conveyor Transfer to 54-808 Belt Conveyor or #4 Coal Bin
1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00286 06 16 1 54-808 Belt Conveyor Transfer to #5 Coal Bin 1995 NSPS Y Moist Material Fugitive
![Page 39: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/39.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 3 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00287 06 18 1 54-805 Belt Conveyor Transfer to #1 Coal Bin 1995 NSPS Y Moist Material Fugitive
CL01 Coal Receiving & Storage Coal Silos to Bins 002 EQPT00288 28 07 1 54-821 Belt Conveyor Transfer to 54-803 Belt Conveyor 1995 NSPS Y Moist Material Fugitive
KL01 Rotary Kiln #1 003 COMB00001 07 01 1 Rotary Kiln #1 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL01 Rotary Kiln #1 003 COMB00001 07 01 2 Pulverized Coal Burner 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL01 Rotary Kiln #1 003 COMB00001 07 01 3 Natural Gas - Startup 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL02 Rotary Kiln #2 003 COMB00007 08 01 1 Rotary Kiln #2 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL02 Rotary Kiln #2 003 COMB00007 08 01 2 Pulverized Coal Burner 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL02 Rotary Kiln #2 003 COMB00007 08 01 3 Natural Gas - Startup 1970 61:020, NESHAP 5A, CAM
Baghouse Point
KL03 Rotary Kiln #3 003 COMB00008 09 01 1 Rotary Kiln #3 1974 61:020, NESHAP 5A, CAM
Baghouse Point
KL03 Rotary Kiln #3 003 COMB00008 09 01 2 Pulverized Coal Burner 1974 61:020, NESHAP 5A, CAM
Baghouse Point
KL03 Rotary Kiln #3 003 COMB00008 09 01 3 Natural Gas - Startup 1974 61:020, NESHAP 5A, CAM
Baghouse Point
KL04 Rotary Kiln #4 003 COMB00009 10 01 1 Rotary Kiln #4 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
KL04 Rotary Kiln #4 003 COMB00009 10 01 2 Pulverized Coal Burner 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
KL04 Rotary Kiln #4 003 COMB00009 10 01 3 Natural Gas - Startup 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
KL05 Rotary Kiln #5 003 COMB00010 11 01 1 Rotary Kiln #5 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
KL05 Rotary Kiln #5 003 COMB00010 11 01 2 Pulverized Coal Burner 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
KL05 Rotary Kiln #5 003 COMB00010 11 01 3 Natural Gas - Startup 1995 51:017, NSPS HH, NESHAP 5A
Baghouse Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00289 16 11 1 84-018 Dust Collection System for Kiln 4 & 5 Discharge Conveyors
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00175 17 05 1 89-858 Dust Collection System for Lime Bins and Truck Loadout
1998 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00177 17 10 1 89-855 Dust Collection System for Silo #11 Feed Conveyors 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00180 17 13 1 89-856 Dust Collection System for Silo #12 Feed Conveyors 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00183 17 17 1 89-857 Dust Collection System for Silo #13 Feed Conveyors 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00188 17 27 1 89-850 Dust Collection System for Lime Screening Area 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00193 17 32 1 89-861 Dust Collection System for Lime Bins and Screens 1998 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln Discharge to Lime Storage
003 EQPT00199 17 41 1 89-851 Dust Collection System for Lime Screening and Bucket Elevator
1995 59:010, 51:017, CAM
na Point
![Page 40: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/40.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 4 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00202 18 01 1 94-835 Dust Collection System for #13 & #14 Kiln Run Silo Transfer to 94-801
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00207 18 06 1 94-834 Dust Collection System for #11 & # 12 Kiln Run Silo Transfer to 94-803
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00210 18 09 1 94-836 Dust Collection System for Kiln Silo Discharge Conveyors
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00217 18 16 1 94-832 Dust Collection System for Product Bin Discharge Conveyors and Screens
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
003 EQPT00224 18 22 1 94-831 Dust Collection System for Product Bin Discharge Conveyors
1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00225 18 24 1 94-829 Dust Collection System for Lime Railcar Loadout 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00226 18 27 1 94-837 Dust Collection System for Lime Barge Loadout 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Lime Storage to Loadout
004 EQPT00232 18 30 1 94-833 Dust Collection System for Lime Truck Loadout 1995 59:010, 51:017, CAM
na Point
LM01 Lime Dust Collection Systems (PSD)
Kiln 4 & 5 Dust Bin 005 EQPT00290 32 08 1 63-270 Bin Vent Collector System for Kiln 4 & 5 1995 59:010, 51:017, CAM
na Point
LM02 Lime System Buildings 003 EQPT00292 33 02 1 Kilns 4 & 5 Discharge Building - Burner Building 2 1995 63:010; 51:017 DC + Enclosure Fugitive
LM02 Lime System Buildings 003 EQPT00293 33 03 1 Transfer Tower 1 from Kiln to Storage and/or to South Hydrate Plant
1970 63:010; 51:017 DC + Enclosure Fugitive
LM02 Lime System Buildings 003 EQPT00294 33 04 1 Transfer Tower 2 from Kiln to Storage 1970 63:010; 51:017 DC + Enclosure Fugitive
LM02 Lime System Buildings 004 EQPT00295 33 05 1 Product Storage Building 1995 63:010; 51:017 DC + Enclosure Fugitive
LM02 Lime System Buildings 004 EQPT00296 33 06 1 Product Storage Silos 1995 63:010; 51:017 DC + Enclosure Fugitive
LM02 Lime System Buildings 001 EQPT00297 33 07 1 Transfer House 3 Deg Tower 1980 63:010; 51:017 DC + Enclosure Fugitive
LM03 Lime Storage to Hydrate Conveyor Transfers 001 EQPT00058 20 01 1 94-550 Belt Conveyor Transfer to 93-100 Belt Conveyor 1980 63:010 93-111 (DC) Fugitive
LM03 Lime Storage to Hydrate Conveyor Transfers 001 EQPT00101 29 01 1 93-100 Belt Conveyor (In Lime Service) Transfer to 93-101 Belt Conveyor
1980 63:010 93-112 (DC) Fugitive
LM03 Lime Storage to Hydrate Dust Collection Systems
001 EQPT00102 21 01 1 90-014 Dust Collection System for DEG Tower Conveyors 1980 59:010; CAM na Point
LM03 Lime Storage to Hydrate Dust Collection Systems
004 EQPT00298 29 03 1 93-111 Dust Collection System for 94-550 Belt Conveyor Transfer
2009 59:010; CAM na Point
LM03 Lime Storage to Hydrate Dust Collection Systems
004 EQPT00299 29 04 1 93-112 Dust Collection System for 93-100 Belt Conveyor Transfer (When in Lime Service)
2009 59:010; CAM na Point
LM04 Lime Dust Collection Systems (Non PSD)
Loading Spouts 005 EQPT00302 32 11 1 63-261LS Kiln 1 & 2 Dust Bin Loading Spout 1970 63:010 63-271 (DC) Fugitive
LM04 Lime Dust Collection Systems (Non PSD)
Loading Spouts 005 EQPT00303 32 12 1 63-353LS Kiln 3 Dust Bin Loading Spout 1974 63:010 63-272 (DC) Fugitive
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 EQPT00300 32 09 1 63-400 Dust Collection System for Kiln 1 & 2 Dust Bin and Transfers
2011 59:010; CAM na Point
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 EQPT00301 32 10 1 63-264 Dust Collection System for Kiln 1 & 2 Dust Bin and Transfers
1970 59:010; CAM na Point
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 EQPT00304 32 13 1 63-271 Dust Collection System for Kiln 1 & 2 Dust Bin Loading Spout
2004 59:010; CAM na Point
![Page 41: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/41.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 5 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 EQPT00305 32 14 1 63-272 Dust Collection System for Kiln 3 Dust Bin Loading Spouts
2004 59:010; CAM na Point
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 32 15 1 63-354 Dust Collection System for Kiln 3 Dust Bin and Transfers
2004 59:010; CAM na Point
LM04 Lime Dust Collection Systems (Non PSD)
Dust Collection Systems
005 EQPT00326 32 16 1 89-848 Dust Collection System for Lime Transfers 2014 59:010; CAM na Point
LM05 Reject Lime Stockpiles 005 AREA00020 32 01 1 Reject Lime Stockpile 2007 63:010 Wet Suppression Point
LM05 Reject Lime Stockpiles 005 AREA00021 32 02 1 Reject Lime Stockpile (Reject Bunker) 2007 63:010 Wet Suppression Point
LM05 Reject Lime Stockpiles 005 AREA00022 32 03 1 Reject Lime Stockpile (South of Hydrate Plant) 2007 63:010 Wet Suppression Point
LM05 Reject Lime Stockpiles 005 AREA00023 32 04 1 Reject Lime Stockpile (South of Kiln #5) 2007 63:010 Wet Suppression Point
LM06 Reject Lime Processing 005 EQPT00307 32 05 1 89-005 CM Screw Receiving Hopper 2007 63:010 89-004 (DC) Fugitive
LM06 Reject Lime Processing 005 EQPT00308 32 06 1 89-004 Dust Collection System for CM Screw Receiving 2007 59:010; CAM na Point
LM06 Reject Lime Processing 005 EQPT00309 32 07 1 Front End Loader Dump to High pH Pond 2007 63:010 Wet Suppression Fugitive
LM07 Clinker Reclaim 003 EQPT00055 12 01 1 89-800H Clinker Receiving Hopper to 89-800 Belt Conveyor 1997 63:010 84-018 (DC) Fugitive
LM07 Clinker Reclaim 003 EQPT00310 12 03 1 Front End Loader to Clinker Hopper 1997 63:010 84-018 (DC) Fugitive
LM08 Lime Loadout 004 EQPT00100 13 01 1 94-540 Railcar Loadout Spout (Lime) 1974 63:010 89-829 (DC) Fugitive
LM08 Lime Loadout 004 EQPT00104 14 01 1 89-045 Truck Loadout for Lime Rejects 1995 63:010 89-858 (DC) Fugitive
LM08 Lime Loadout 004 EQPT00105 14 02 1 94-002 Barge Loadout 1995 63:010 94-837 (DC) Fugitive
LM08 Lime Loadout 004 EQPT00106 14 03 1 94-003 Truck Loadout 1995 63:010 94-833 (DC) Fugitive
HY01 Hydration Plant Conveyor Transfers 006 EQPT00060 21 02 1 90-050 Belt Conveyor Transfer to Hydrate Feed Bins #1 & #2 1980 63:010 Shrouded Fugitive
HY01 Hydration Plant Filter Systems 006 EQPT00311 20 20 1 90-138A Bin Vent Collector on 90-135 (Hydrator #1 Feed Bin) 1980 59:010 na Point
HY01 Hydration Plant Filter Systems 006 EQPT00312 20 21 1 90-138B Bin Vent Collector on 90-133 (Hydrator #2 Feed Bin) 1980 59:010 na Point
HY01 Hydration Plant Filter Systems 006 EQPT00125 21 18 1 90-128 Dust Collection System for Classifier Operations 1980 59:010 na Point
HY01 Hydration Plant Hydrator System 006 EQPT00116 21 12 1 Hydrator/Scrubber System 1980 59:010 na Point
HY02 Hydrate Bins to Loadout Loadout Transfers 006 EQPT00134 21 25 1 90-172 Truck Loadout 1980 63:010 90-170 (DC) Fugitive
HY02 Hydrate Bins to Loadout Loadout Transfers 006 EQPT00135 21 27 1 90-124LS Reject Truck Loadout 1980 63:010 90-303 (DC) Fugitive
HY02 Hydrate Bins to Loadout Loadout Transfers 006 EQPT00313 21 28 1 90-307 Truck Loadout 1980 63:010 90-215 (DC) Fugitive
HY02 Hydrate Bins to Loadout Loadout Transfers 006 EQPT00136 27 01 1 90-221LS Railcar Loadout 2002 63:010 90-221 (DC) Fugitive
![Page 42: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/42.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 6 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
HY02 Hydrate Bins to Loadout Storage Bin Vent Filter Systems
006 EQPT00314 21 32 1 90-139A Bin Vent Collector on 90-222 (#3 Product Storage Bin)
1980 59:010 na Point
HY02 Hydrate Bins to Loadout Storage Bin Vent Filter Systems
006 EQPT00315 21 33 1 90-139B Bin Vent Collector on 90-223 (#2 Product Storage Bin)
1980 59:010 na Point
HY02 Hydrate Bins to Loadout Storage Bin Vent Filter Systems
006 EQPT00316 21 34 1 90-139C Bin Vent Collector on 90-224 (#1 Product Storage Bin)
1980 59:010 na Point
HY02 Hydrate Bins to Loadout Dust Collection Systems
006 EQPT00132 21 23 1 90-215 Dust Collection System for #3 Product Bin Truck Loadout
1980 59:010 na Point
HY02 Hydrate Bins to Loadout Dust Collection Systems
006 EQPT00317 21 31 1 90-170 Dust Collection System for #1 & #2 Product Bin Truck Loadout
1980 59:010 na Point
HY02 Hydrate Bins to Loadout Dust Collection Systems
006 EQPT00318 21 35 1 90-303 Dust Collection System for Hydrate Reject Loadout 1980 59:010 na Point
HY02 Hydrate Bins to Loadout Dust Collection Systems
006 EQPT00253 22 09 1 91-209 Dust Collection System for Hydrate Bagging Operation 1980 59:010 na Point
HY02 Hydrate Bins to Loadout Dust Collection Systems
006 EQPT00319 27 02 1 90-221 Dust Collection System for 90-221LS Railcar Loadout 2002 59:010 na Point
HY03 Lime Pulverizer System 006 EQPT00109 21 05 1 90-137 Dust Collection System for Mill Feed Bin 1980 59:010 na Point
HY03 Lime Pulverizer System 006 EQPT00112 21 08 1 90-142 Dust Collection System for Mill 1980 59:010 na Point
RD01 Haul Roads AREA00012 23 01 1 Haul Roads (Paved) 1995 63:010 Wet Suppression Fugitive
RD01 Haul Roads AREA00015 25 01 1 Haul Roads (Unpaved) 2003 63:010 Wet Suppression Fugitive
EN01 Stationary Engines EQPT00332 34 06 1 Kiln 1 Pony Motor Engine 2018 NESHAP ZZZZ;NSPS IIII
na Point
EN01 Stationary Engines EQPT00331 34 07 1 Kiln 2 Pony Motor Engine 2015 NESHAP ZZZZ;NSPS IIII
na Point
EN01 Stationary Engines EQPT00330 34 08 1 Kiln 3 Pony Motor Engine 2015 NESHAP ZZZZ;NSPS IIII
na Point
EN01 Stationary Engines EQPT00329 34 09 1 Kiln 4 Pony Motor Engine 2015 NESHAP ZZZZ;NSPS IIII
na Point
EN01 Stationary Engines EQPT00328 34 10 1 Kiln 5 Pony Motor Engine 2015 NESHAP ZZZZ;NSPS IIII
na Point
EN02 Stationary Emergency-Use Engines (NSPS IIII Applicable)
34 11 1 Mine Escape Shaft Emergency Generator 2006 NESHAP ZZZZ;NSPS IIII
na Point
EN03 Stationary Emergency-Use Engines (NSPS JJJJ
34 12 1 Kiln BMS Emergency Generator 2017 NESHAP ZZZZ;NSPS JJJJ
na Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-3 EQPT00333 35 01 1 Transfer to BE-06103 Bucket Elevator 2016 59:010 DC-06108 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-3 EQPT00334 35 02 1 Upper Section of BE-06103 Bucket Elevator 2016 59:010 DC-06108 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-3 EQPT00335 35 03 1 SN-06104 Screen 2016 59:010 DC-06108 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-3 EQPT00336 35 04 1 Transfer from SN-06104 Screen to BC-06113 Belt Conveyor 2016 59:010 DC-06108 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-3 EQPT00338 35 05 1 Transfer from BC-06113 Belt Conveyor to BE-06118 Bucket Elevator
2016 59:010 DC-06116 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00339 35 06 1 Lower Section of BE-06118 Bucket Elevator 2016 59:010 DC-06116 Point
![Page 43: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/43.jpg)
APPENDIX BEmission Unit Inventory
CarmeuseBlack River Plant
Page: 7 of 7Printed: 2/22/2019
EmisGroup
IDTitle V Section B,Emission Group Name
Title V Section B,Emission Subgroup
Dwg#
KyEIS Equipment
ID
KyEIS Source
ID
KyEIS Process
IDEmission Unit and KyEIS Equipment/SourceDescription
Constr/ModifcDate
ApplicableRegulations Control Description
Emission Type
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00340 35 07 1 Upper Section of BE-06118 Bucket Elevator 2016 59:010 DC-06116 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 STOR00042 35 08 1 BN-06120 Quick Lime Bin #1 with Integrated Passive Bin Vent Filter (DC-06121)
2016 59:010 na Vent
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 STOR00043 35 09 1 BN-06125 Quick Lime Bin #2 with Integrated Passive Bin Vent Filter (DC-06126)
2016 59:010 na Vent
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00341 35 10 1 Transfer from BN-06120 Quick Lime Bin #1 to BC-22101 Belt Conveyor
2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00342 35 11 1 Transfer from BN-06125 Quick Lime Bin #2 to BC-22101 Belt Conveyor
2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00343 35 12 1 Transfer from BC-22101 Belt Conveyor to CR-22102 Crusher 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00344 35 13 1 Transfer from CR-22102 Crusher to BE-21101 Bucket Elevator 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00345 35 14 1 Lower Section of BE-21101 Bucket Elevator 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00346 35 15 1 Upper Section of BE-21101 Bucket Elevator 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00347 35 16 1 Transfer to BN-21103 Crushed Lime Surge Bin 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00348 35 17 1 Transfer to BN-25104 Rejects Bin 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Quick Lime Handling and Storage
C-7 EQPT00349 35 18 1 Upper Section of BE-25107 Bucket Elevator 2016 59:010 DC-21105 Point
SH01 South Hydrate Plant Hydrator and Drying C-7 EQPT00352 35 19 1 HY-23101 Hydrator System with Integrated Process Filter (DC-23103)
2016 59:010 na Point
SH01 South Hydrate Plant Hydrator and Drying C-7 COMB00012 35 20 1 ML-23116 Mill Dryer with Integrated Process Filter (DC-23119) 2016 59:010 na Point
SH01 South Hydrate Plant Hydrate Storage and Loadout
C-7 STOR00045 35 22 1 BN-25111 Hydrate Bin #1 with Integrated Bin Vent Filter (DC-25112)
2016 59:010 na Vent
SH01 South Hydrate Plant Hydrate Storage and Loadout
C-7 STOR00046 35 23 1 BN-25123 Hydrate Bin #2 with Integrated Bin Vent Filter (DC-25124)
2016 59:010 na Vent
SH01 South Hydrate Plant Hydrate Storage and Loadout
C-7 EQPT00357 35 24 1 Truck Loadout from Hydrate Bin #1 with Spout Filter (DC-25120)
2016 59:010 DC-25120 Vent
SH01 South Hydrate Plant Hydrate Storage and Loadout
C-7 EQPT00358 35 25 1 Truck Loadout from Hydrate Bin #2 with Spout Filter (DC-25132)
2016 59:010 DC-25132 Vent
SH02 South Hydrate Hot Air Heater Hot Air Heater for Hydrator System
C-7 COMB00011 35 21 1 HU-23128 Gas-Fired Hot Air Heater for Hydrator System 2016 59:015;NESHAP DDDDD
na Point
![Page 44: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/44.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants
APPENDIX C: PROCESS FLOW DIAGRAMS
FigureC‐1:LimestoneSystem
FigureC‐2:CoalReceivingSystem
FigureC‐3:LimeHandling–KilnstoStorage
FigureC‐4:LimeHandling–StoragetoLoadout
FigureC‐5:KilnDustSystems
FigureC‐6:HydratePlant
FigureC‐7:SouthHydratePlant
![Page 45: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/45.jpg)
To trucks
Black River Plant | Butler, KY
Figure C-1 Limestone System
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 191801.0026
BARGE
STONE DUMP HOPPERS
Lime Barge Loadout
93-102LS
30" BC-52-301
SMALL KILN FEED
LARGE KILN FEED
KILN #3 KILN #2 KILN #1
24" BC-81-12124" BC-82-12224" BC-83-228
01-35
01-31
01-30
01-27
01-26
24" BC-83-224 24" BC-82-112
24" BC-81-111
#5PREHEATER
#3STONE BIN
#1STONE BIN
#4PREHEATER
#2STONE BIN
30" BC-52-30201-01 01-02
01-04
01-03100 PILE
200 PILE
42" BC-51-100
RIVERSIDE STOCKPILE
RIVERSIDE STOCKPILE
RIVERSIDE STOCKPILE
CONE CRUSHER
CONE CRUSHER
SURGE BIN
02-16
33-01
01-11
01-32
31-01 31-04 31-07
01-0602-01
02-07 02-08
01-08
01-09
03-01
29-0105-02
31-02
Dump Hoppers
20-01 04-01
33-07
02-10
02-02
02-05
Lime Storage to HydrateLM03
Mine to Stockpile TransfersLS01
30" TC-51-208
30" BC-52-302
02-15
02-18
02-20
Lime System BuildingsLM02
31-03
Limestone Screening and CrushingLS03
Limestone StockpilesLS02
29-03
29-04
Kiln Limestone Feed SystemLS04
36" BC-51-202
30" BC-51-207
24" BC-51-205
24" BC-51-206
24" TC-51-203
Dual Screw Classifier51-303
Transfer House 3Deg Tower
KILN #5 KILN #4
24" BC-82 13224" BC-82-131
30" BC-52-30430" BC-52-125
30" BC-52-303
42" BC-51-200
42" BC-51-201
36" BC-51-202
Transfer House from Screening Building to Stockpiles
Screening Building
Crusher Building
Kilns 1, 2 & 3Discharge Building
DC 93-11142" BC-93-101
DC 93-112
DC 90-014
42"BC-93-10242" BC-93-100
42" BC‐14‐102
42" BC‐14‐200
DC 90-014
DC 90-014
21-01
Limestone Loadout OperationsLS05
Lime to Existing
Hydrate Plant (Figure C-6)
Lime from 94-808on DWG. 002
01-12
01-16
01-15
1/2x150 MESH
![Page 46: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/46.jpg)
Black River Plant | Butler, KY
Figure C-2 Coal System
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 191801.0026
#3COAL BIN
#2COAL BIN
#1COAL BIN
#4COAL BIN
#5COAL BIN
TRUCK DUMP HOPPER
06-01
#1COAL SILO
#2COAL SILO
#3COAL SILO
#4COAL SILO
06-03
06-05
28-05
28-0328-02
28-01
28-0706-07
06-09
06-1806-11
06-12
06-1630" BC‐54‐808
30" BC‐54‐807
30" BC‐54‐806 30" BC‐54‐805
36" BC‐54‐821
36" BC‐54‐803
30" BC‐54‐804
Coal Receiving and StorageCL01
ON LAND ON RIVERWORK BARGE/PLATFORM BARGE
BARGEUNLOADER
BARGEHOPPER
30" BC‐54‐802
![Page 47: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/47.jpg)
KILN #3 KILN #2 KILN #1
24" BC-89-811
24" BC-89-812
24" BC-89-813
24" BC-89-815
24" BC-89-816
24" BC-89-814
DC 89-021
DC89-848
DC89-848
DC89-021
KILN #5
KILN #4
SCREEN SCREEN
SCREENSCREEN
SCREENROLL CRUSHER
SCREEN
FOR SILO WITHDRAWLS, SEE FIGURE C-4
FOR SILO WITHDRAWLS, SEE FIGURE C-4
94-863
24" BC-89-801
24" BC-89-802
DC 84-018
26" BC-89-800
24" BC-89-805
24" BC-89-806
24" BC-89-804 24" BC-89-818
24" BC-89-817
24" BC-89-809(57-809)
24" BC-89-810(57-810)
24" BC-89-821
ROLLCRUSHER
BE-8
9-83
0
18" SC-89-833
18" SC-89-831
18" SC-89-877
18" SC-89-832
18" SC-89-834
DC84-018
DC84-018
DC84-018
DC84-018 DC
84-018
DC84-018
DC 89-848
89-82589-824
DC89-850
DC89-850
89-823
DC89-851
89-826
DC 89-851
89-828
DC89-850
DC 89-850
DC 89-850
DC89-851
DC89-858
DC 89-861 DC 89-85089-827 DC 89-858
DC 89-858DC 89-861
89-839
89-829DC 89-857 DC 89-856 DC 89-855
DC89-857
DC89-857
DC89-856
DC89-855
FORCONTINUATIONSEE FIGURE C-4
24" BC-94-804
DC84-018
DC 89-846
DC 89-847
DC89-850
DC89-851
DC89-850
DC89-858
DC89-858
DC89-858
DC89-858
DC89-861
DC89-861
DC89-861
12" SC-89-863
DC89-857
DC89-856
DC89-855
DC89-857
DC89-857
DC89-855
DC89-856
DC89-857
DC89-857
DC89-851
DC89-846
DC89-021
DC89-021
DC89-858
FROMSCREW CNVR.
(ON C-4)
BE-8
9-83
5
10" SC-84-018C
24" RC-89-820
24" BC-89-822
17-41
17-32 17-27
17-1017-1317-17
07-0108-01
11-01
10-01
09-01
16-11
12-01
ClinkerReclaimLM-07
12-03
#14 SILO
#13 SILO
#12 SILO
#11 SILO
#7 BIN#8 BIN#9 BIN#10 BIN
#5 BIN#4 BIN #6 BIN#3 BIN#2 BIN#1 BINREJECTS
BIN89-045
32-16
24" BC-83-303
DC84-018
24" BC-89-803
12" SC-89-860
DC89-848
(On Enclosure)
DC89-848
(On Enclosure)
DC89-848
(On Enclosure)
DC89-848
(On Enclosure)
17-05
BC-06113
Black River Plant | Butler, KY
Figure C-3Kilns to Storage
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 161801.0040
Transfer House 1(expanded as part of South
Hydrate Plant Project)
SCREENSN-06104
SC-06106
BE-0
6103
Continues onFigure B-3
(South Hydrate Plant)
DC-06108
E-1(7,200 cfm)
33-03
Lime System BuildingsLM02
Kilns 1, 2 & 3Discharge Building
33-01
Kilns 4 & 5Discharge Building
33-02
ProductStorage SIlos
33-06
ProductStorage Buildings
33-05
Transfer House 233-04
Lime Dust CollectionSystems (PSD)
LM01
Lime Dust CollectionSystems (Non-PSD)
LM04
South Hydrate PlantSH01
(Construction TBD)
Oversize(+2½)
Overs BinBN-06105
Fines(under 1/8)
PebbleLime
35-01
35-02
35-03
35-04
![Page 48: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/48.jpg)
Black River Plant | Butler, KYFigure C-4
Storage to Loadouts
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 191801.0026
#14 SLO #13 SLO #12 SLO
18–0118–06
94–83494–834 94–83494–834 94–834
94–835 94–835 94–835
94–834
94–835 94–83594–835DC
33-06
DC DC DCDC
DC
DC
DCDC DC DC DC
#11 SLO
1 2 3 1 1 12 2 23 3 3
18-09
x
42" BC-94-801DC
94–836
42" BC-94-805
DC94–855
DC94-835
94-835DC
DC
DC
DC DC DC
DC DC DC DC
DCDC
DC DC
DC
DC DC
DC DC
DC
DCDC
DC
DC
DC DC
DC94-832
DC94-832
DC94-832
DC94-838
DC
DC94-837
DC94-837
DC
DC
DC94-832
DC
DC94-832
33-05
94-832
94-83294-836
94-836
DC94-836
DC94-836
24 BC-94-804(OUT OF SERVICE)
FOR CONTINUATIONSEE DWG. 001
DC94-832
8" SC-94-836-3
18-24 18-30DC
94-832
94-828SCREEN
30" BC-94-806
18" SC-94-86494-832
18-27
DC94-838
DC94-838
94-838DC
94-837
DC94-83714-02
42" BC-94-802
30" BC-94-550
LOADING SPOUT94-002
BARGE LOADING
RAIL LOADING
RAIL LOADSPOUT (LIME)
04-540
FOR CONTINUATIONSEE DWG. 004
DC94-828
94-852DC
13-01
DC94-832
DC94-832
94-832
20" SC-94-853
20" SC-94-855
20" PC-94-505
3D” BC-94-807
TO FINES BINSVIA BUCKET ELEVATOR 89-835
(ON DWG. 001)
SCREEN94-827
20" SC-94-832-1
DC94-832
18-16
94-831 94-831
94-83194-831 94-831 94-831 94-831 94-831
94-831
94-83294-832
94-83294-832 94-832 94-832
94-832DC
16“ SC-94-825
DC94-832
24" BC‐94‐811 24" BC‐94‐810
30" BC‐94‐805
94-83216" SC‐94‐826
16" SC‐94‐820
16" SC‐94‐819
16" SC‐94‐81816" SC‐94‐817
18-22
#10 BIN #9 BIN #1 BIN#8 BIN #7 BIN #3 BIN#2 BIN #4 BIN #5 BIN
TO FINES BINSVIA BUCKET
ELEVATOR 89‐835(ON DWG. 001)
94-831
94-832
94-831
#6 BIN
REJECTBIN
89-045
TRUCK LOADOUT
LOADING SPOUT
DC89-858
14-01
LOADING SPOUT
89-832 94-833
DC94-83314-0394-003
TRUCK HATCHOPENING AREA
ENCLOSEDTRUCK LOADINGSINGLE STATION
30" BC-94-809
DC94-829
DC94-833
24" BC-94-813
94-837
x x x
Lime System BuildingsLM02
Lime Loadout OperationsLM08
TRUCK HATCHCLOSING AREA
Lime Dust CollectionSystems (PSD)
LM01
DC94-833
![Page 49: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/49.jpg)
Black River Plant | Butler, KY
Figure C-5 Dust Systems
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 191801.0026
KILN #4BAGHOUSEB4‐001
KILN #5BAGHOUSEB5‐001
KILN #4BAGHOUSE
84-001
KILN #5BAGHOUSE
85-001
63-266BLOWER
DC 63-270
32-08
KILN#1 BAGHOUSE
81–221
KILN #1& #2
DUST BIN63 - 261
DC63-400
DC63-264
32-09 32-10
32-13
32-11LOADINGSPOUT
63-261LS
TOUNDERGROUND
SLURRYMIX TANK
63-358
DC63-271
REJECT LIME STOCKPILE
REJECT LIME STOCKPILE
REJECT LIME STOCKPILE
REJECT LIME STOCKPILE
32-01
32-02
32-03
32-04
32-07
WATER FROMUNDERGROUND
HIGH pH POND
TO UNDERGROUND
SLURRY MIX TANK
32-0532-06
ENCLOSEDHOPPER
DC89-004
38" SC-89-005
TO UNDERGROUND
FINES
DUST FROM K5 DUST TRAP
LOADINGSPOUT63-353LS
32-12
32-14
KILN #3DUST BIN
B3-353
DC63-354 32-15
KILN#2 BAGHOUSE
83–322
KILN#3 BAGHOUSE
83–342
KILN#4 & #5 DUST BIN
63–269
Reject Lime StockpilesLM05
Reject Lime ProcessingLM06
Lime Dust CollectionSystems (PSD)
LM01Lime Dust CollectionSystems (Non-PSD)
LM04
DC63-272
TRUCK LOADOUT
TRUCK LOADOUT
![Page 50: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/50.jpg)
Black River Plant | Butler, KY
Figure C-6 Hydrate Plant
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 191801.0026
#3 PRODUCT STORAGE
#2 PRODUCT STORAGE
DC90-139A
DC90–139B
21-28LOADING SPOUT
90-307
TRUCK LOADOUT
DC90-215
DC90-215
21-23
20" SC-90-21922-09
HYDRATEOPERATION
DC90-128
LIME
LIME
PULVERIZEDOPERATION
DC90-137
21-05
21-08
DC90-142
PULVERIZED LIME
21-32 21-33
#1 PRODUCT STORAGE
21-31
DC90-170
14" SC-90-203
20" SC-90-219A
21-25
DC
91-209
DC90-170
SHIPPINGHYDRATEBAGGING
OPERATION
TRUCK LOADOUT
LOADING SPOUT90-172LS
LOADING SPOUTDUST COLLECTOR
90-221 LOADING SPOUT90-221LS
RAIL LOADOUT
27-01
DC90-221
27-02
20" SC-90-220
21-34DC90-139C
21-12SCRUBBER
21-18
HYDRATOR#2 FEED BIN
HYDRATOR#1 FEED BIN
DCDC90-138A 90-138B
20-2120-20
21-02
21-35
DC
90-303
REJECTS BIN90-124
14" SC-90-124
DC90-303
TRUCK LOADOUT
LOADING SPOUT90-124LS
21-27
Hydration PlantHY01
Lime Pulverizer SystemHY03
Hydrate Bins to LoadoutHY02
![Page 51: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/51.jpg)
CrusherCR-22102
SC-21110
SC-21111
HydratorHY-23101
Mill Dryer
ML-23116
DC-21105
SC-25102
SC-25110
SC-25109
Rejects ContainerBN-23110
DC-23103(2,800 cfm) Loadout
spout with filter
DC-25120(1,500 cfm)
Air Blower
DC-25112(2,000 cfm)
DC-25124(2,000 cfm)
DC-23119(20,500 cfm)
DC-06126DC-06121
DC-06116Cartridge Filter
(2,100 cfm)
Clean Ambient Air
Natural Gas
Clean Hot Air
Water
South Hydrate PlantSH01
(Construction TBD)
SC-21102
SC-23107
Air HeaterHU-23128
Black River Plant | Butler, KY
Figure C-7South Hydrate Plant 1
1717 Dixie Hwy, Ste. 900Covington, KY 41011
File:Carmeuse Black River PFDs (Permit Renewal) 2019-0222 1124 PS.vsdx
Project No: 161801.0040
Passive Bin Vent Filters
Pebble Lime
Crushed Quicklime
Emergency Relief Vent
Clean Hot Air(No Emissions)
Process Filter
Loadout spout with
filterDC-25132(1,500 cfm)
E-2
E-4E-3
E-6
E-5
E-9
E-10
E-12 E-13
BC-22101
BE-0
6118
Rejects BinBN-25104
CombustionAir
CombustionGas
Quick LimeBin 1
BN-06120
Quick LimeBin 2
BN-06125
Quicklime
E-8
Wet Hydrate
Dried HydrateIn Hot Air Stream
Crushed Quicklime Surge BinBN-21103
Quicklime
RejectHydrate
Hydrate
Hydrate Bin 1
BN-25111
Air Blower
E-11
Hydrate Bin 2
BN-25123Hydrate
Hydrate Hydrate
(5,500 cfm)
35-05
35-07
35-06
35-08 35-09
35-10 35-11 35-12
35-13
35-14
35-15
35-16
35-17
35-18
35-19
35-2035-21
35-22 35-23
35-24 35-25
Wet Reject Hydrate
![Page 52: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/52.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants
APPENDIX D: DEP7007 APPLICATION FORMS
7007AI–AdministrativeInformation
7007N–EmissionsandStackInformation
![Page 53: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/53.jpg)
Page _1_ AI of _4_ AI
(Revised 11/08)
Commonwealth of Kentucky
Energy and Environment Cabinet
Department for Environmental Protection
Division for Air Quality 300 Sower Blvd, 2nd Floor
Frankfort, Kentucky 40601
(502) 564-3999
http://www.air.ky.gov/
PERMIT APPLICATION
The completion of this form is required under Regulations 401 KAR 52:020, 52:030, and 52:040 pursuant
to KRS 224. Applications are incomplete unless accompanied by copies of all plans, specifications, and
drawings requested herein. Failure to supply information required or deemed necessary by the division to
enable it to act upon the application shall result in denial of the permit and ensuing administrative and
legal action. Applications shall be submitted in triplicate.
DEP7007AI
Administrative
Information
Enter if known
AFS Plant ID#
21-191-00002 (AI 3400)
Agency Use Only
Date Received
Log#
Permit#
1) APPLICATION INFORMATION
Note: The applicant must be the owner or operator. (The owner/operator may be individual(s) or a corporation.)
Name: Carmeuse Lime & Stone, Inc.
Title: NA Phone:
(If applicant is an individual)
Mailing Address: Carmeuse Lime & Stone
Company
Street or P.O. Box: 9043 Highway 154
City: Butler State: KY Zip Code: 41006
Is the applicant (check one): Owner Operator Owner & Operator Corporation/LLC* LP**
* If the applicant is a Corporation or a Limited Liability Corporation, submit a copy of the current Certificate of Authority from the
Kentucky Secretary of State.
** If the applicant is a Limited Partnership, submit a copy of the current Certificate of Limited Partnership from the Kentucky Secretary
of State.
Person to contact for technical information relating to application:
Name: Kris Milner, P.E.
Title: Environmental Area Manager Phone: 859-472-8100
2) OPERATOR INFORMATION
Note: The applicant must be the owner or operator. (The owner/operator may be individual(s) or a corporation.)
Name: Michael Klenda
Title: Surface Site Operations Manager Phone: 859-472-8223
Mailing Address: Carmeuse Lime & Stone
Company
Street or P.O. Box: 9043 Highway 154
City: Butler State: KY Zip Code: 41006
![Page 54: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/54.jpg)
Page _2_ AI of _4_ AI
(Revised 11/08)
DEP7007AI
(Continued)
3) TYPE OF PERMIT APPLICATION
For new sources that currently do not hold any air quality permits in Kentucky and are required to obtain a permit prior to construction
pursuant to 401 KAR 52:020, 52:030, or 52:040.
Initial Operating Permit (the permit will authorize both construction and operation of the new source)
Type of Source (Check all that apply): Major Conditional Major Synthetic Minor Minor
For existing sources that do not have a source-wide Operating Permit required by 401 KAR 52:020, 52:030, or 52:040.
Type of Source (Check all that apply): Major Conditional Major Synthetic Minor Minor
(Check one only)
Initial Source-wide Operating Permit Modification of Existing Facilities at Existing Plant
Construction of New Facilities at Existing Plant
Other (explain)
For existing sources that currently have a source-wide Operating Permit.
Type of Source (Check all that apply): Major Conditional Major Synthetic Minor Minor
Current Operating Permit # V-14-002 R6
Administrative Revision (describe type of revision requested, e.g. name change):
Permit Renewal Significant Revision Minor Revision Off-Permit Change
Addition of New Facilities Modification of Existing Facilities
For all construction and modification requiring a permit pursuant to 401 KAR 52:020, 52:030, or 52:040.
Proposed Date for Start Proposed date for
of Construction or Modification: na Operation Start-up: na
4) SOURCE INFORMATION
Source Name: Carmeuse Lime & Stone Black River Operation
Source Street Address: 9043 Highway 154
City: Butler Zip Code: 41006 County: Pendleton
Primary Standard Industrial
Classification (SIC) Category: Lime Primary SIC #: 3274
Property Area Number of
(Acres or Square Feet): 1,200 Acres (Surface) Employees: ≈ 200
Description of Area Surrounding Source (check one):
Commercial Area Residential Area Industrial Area Industrial Park Rural Area Urban Area
Approximate Distance to Nearest
Residence or Commercial Property: < 0.5 miles
UTM or Standard Location Coordinates: (Include topographical map showing property boundaries)
UTM Coordinates: Zone 16 Horizontal (km) 739.6 Vertical (km) 4302.2
Standard Coordinates: Latitude Degrees Minutes Seconds
Longitude Degrees Minutes Seconds
![Page 55: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/55.jpg)
Page _3_ AI of _4_ AI
(Revised 11/08)
DEP7007AI
(Continued)
4) SOURCE INFROMATION (CONTINUED)
Is any part of the source located on federal land? Yes No
What other environmental permits or registrations does this source currently hold in Kentucky?
Water Withdrawal Permit 0886; Water Quality Certification WQ401
DOWWRB- Floodplain Management 19671
KPDES Permit KY0045284
What other environmental permits or registrations does this source need to obtain in Kentucky?
5) OTHER REQUIRED INFORMATION
Indicate the type(s) and number of forms attached as part of this application.
DEP7007A Indirect Heat Exchanger, Turbine, Internal DEP7007R Emission Reduction Credit
Combustion Engine DEP7007S Service Stations
DEP7007B Manufacturing or Processing Operations DEP7007T Metal Plating & Surface Treatment Operations
DEP7007C Incinerators & Waste Burners DEP7007V Applicable Requirements & Compliance
DEP7007F Episode Standby Plan Activities
DEP7007J Volatile Liquid Storage DEP7007Y Good Engineering Practice (GEP) Stack Height
DEP7007K Surface Coating or Printing Operations Determination
DEP7007L Concrete, Asphalt, Coal, Aggregate, Feed, DEP7007AA Compliance Schedule for Noncomplying
Corn, Flour, Grain, & Fertilizer Emission Units
DEP7007M Metal Cleaning Degreasers DEP7007BB Certified Progress Report
1 DEP7007N Emissions, Stacks, and Controls Information DEP7007CC Compliance Certification* Refer to CY2018 Submittal DEP7007P Perchloroethylene Dry Cleaning Systems DEP7007DD Insignificant Activities
Check other attachments that are part of this application.
Required Data Supplemental Data
Map or Drawing Showing Location – Refer to Appendix A Stack Test Report
Process Flow Diagram and Description – Refer to Appendix C Certificate of Authority from the Secretary of State
(for Corporations and Limited Liability Companies)
Site Plan Showing Stack Data and Locations – Refer to Appendix A Certificate of Limited Partnership from the Secretary
of State (for Limited Partnerships)
Emission Calculation Sheets – Refer to N Form (Appendix D) Claim of Confidentiality (See 400 KAR 1:060)
Material Safety Data Sheets (MSDS) – Not Applicable Other (Specify)
Indicate if you expect to emit, in any amount, hazardous or toxic materials or compounds or such materials into the atmosphere from any
operation or process at this location.
Pollutants regulated under 401 KAR 57:002 (NESHAP) Pollutants listed in 401 KAR 63:060 (HAPS)
Pollutants listed in 40 CFR 68 Subpart F [112(r) pollutants] Other
Has your company filed an emergency response plan with local and/or state and federal officials outlining the measures that would be
implemented to mitigate an emergency release?
Yes No
Check whether your company is seeking coverage under a permit shield. If “Yes” is checked, applicable requirements must be identified on
Form DEP7007V. Identify any non-applicable requirements for which you are seeking permit shield coverage on a separate attachment to
the application.
Yes No A list of non-applicable requirements is attached
![Page 56: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/56.jpg)
Page _4_ AI of _4_ AI
(Revised 11/08)
DEP7007AI
(Continued)
6) OWNER INFORMATION
Note: If the applicant is the owner, write “same as applicant” on the name line.
Name: Same as applicant
Title: Phone:
Mailing Address:
Company
Street or P.O. Box:
City: State: Zip Code:
List names of owners and officers of your company who have an interest in the company of 5% or more.
Name Position (owner, partner, president, CEO, treasurer, etc.)
None
(attach another sheet if necessary)
7) SIGNATURE BLOCK
I, the undersigned, hereby certify under penalty of law, that I am a responsible official, and that I have personally
examined, and am familiar with, the information submitted in this document and all its attachments. Based on my inquiry
of those individuals with primary responsibility for obtaining the information, I certify that the information is on knowledge
and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false or incomplete
information, including the possibility of fine or imprisonment.
BY:
(Authorized Signature) (Date)
Michael Klenda Surface Site Operations Manager (Typed or Printed Name of Signatory) (Title of Signatory)
2/26/2019
![Page 57: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/57.jpg)
KyEISSource
ID#
KyEISProcess
ID# Emission Source DescriptionDate
Construct
HAPpresent
?SCCCode
SCCUnits
Fuel Ash
Content
FuelSulfur
Content
FuelHeat
ContentRatio
ApplicableRegulations
HourlyOperating
Rate(SCC
Units/hr)
AnnualOperating
Hours(hrs/yr)
HourlyOperating
Rate(SCC
Units/hr)
AnnualOperating
Rate(SCC
Units/yr)
AnnualOperating
Hours(hrs/yr)
KL01 - Rotary Kiln #107 01 1 Rotary Kiln #1 1970 Y 30501604 Tons Lime 61:020,
NESHAP 5A, CAM
30.5 8760 na na na
07 01 2 Pulverized Coal Burner 1970 Y 39000289 Tons Coal 7.6% 0.8% 12,935 Btu/lb 61:020, NESHAP 5A,
CAM
8.9 8760 na na na
07 01 3 Natural Gas - Startup 1970 Y 39000603 MMscf Natural Gas
neg. neg. 1,030 Btu/scf 61:020, NESHAP 5A,
CAM
0.2 8760 na na na
KL02 - Rotary Kiln #208 01 1 Rotary Kiln #2 1970 Y 30501604 Tons Lime 61:020,
NESHAP 5A, CAM
30.5 8760 na na na
08 01 2 Pulverized Coal Burner 1970 Y 39000289 Tons Coal 7.6% 0.8% 12,935 Btu/lb 61:020, NESHAP 5A,
CAM
8.9 8760 na na na
08 01 3 Natural Gas - Startup 1970 Y 39000603 MMscf Natural Gas
neg. neg. 1,030 Btu/scf 61:020, NESHAP 5A,
CAM
0.3 8760 na na na
MaximumOperating Parameters Permitted Operating Parameters
SECTION I. Emissions Unit and Emission Point Information
Commonwealth of KentuckyEnergy & Environmental Cabinet
Department for Environmental Protection
DIVISION FOR AIR QUALITY
DEP7007N
Emissions, Stacks, and Controls Information
Applicant Name: Log #Carmeuse Lime & Stone - Black River Plant
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _1__ N of _13__ N Revision 6/00
![Page 58: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/58.jpg)
KyEISSource
ID#
KyEISProcess
ID# Emission Source DescriptionDate
Construct
HAPpresent
?SCCCode
SCCUnits
Fuel Ash
Content
FuelSulfur
Content
FuelHeat
ContentRatio
ApplicableRegulations
HourlyOperating
Rate(SCC
Units/hr)
AnnualOperating
Hours(hrs/yr)
HourlyOperating
Rate(SCC
Units/hr)
AnnualOperating
Rate(SCC
Units/yr)
AnnualOperating
Hours(hrs/yr)
MaximumOperating Parameters Permitted Operating Parameters
SECTION I. Emissions Unit and Emission Point Information
KL03 - Rotary Kiln #309 01 1 Rotary Kiln #3 1974 Y 30501604 Tons Lime 61:020,
NESHAP 5A, CAM
65.0 8760 na na na
09 01 2 Pulverized Coal Burner 1974 Y 39000289 Tons Coal 7.6% 0.8% 12,935 Btu/lb 61:020, NESHAP 5A,
CAM
15.5 8760 na na na
09 01 3 Natural Gas - Startup 1974 Y 39000603 MMscf Natural Gas
neg. neg. 1,030 Btu/scf 61:020, NESHAP 5A,
CAM
0.4 8760 na na na
KL04 - Rotary Kiln #410 01 1 Rotary Kiln #4 1995 Y 30501604 Tons Lime 51:017, NSPS
HH, NESHAP 5A
46.0 8760 46 na na
10 01 2 Pulverized Coal Burner 1995 Y 39000289 Tons Coal 7.6% 0.8% 12,935 Btu/lb 51:017, NSPS HH, NESHAP
5A
9.6 8760 na na na
10 01 3 Natural Gas - Startup 1995 Y 39000603 MMscf Natural Gas
neg. neg. 1,030 Btu/scf 51:017, NSPS HH, NESHAP
5A
0.2 8760 na na na
KL05 - Rotary Kiln #511 01 1 Rotary Kiln #5 1995 Y 30501604 Tons Lime 51:017, NSPS
HH, NESHAP 5A
46.0 8760 46 na na
11 01 2 Pulverized Coal Burner 1995 Y 39000289 TonsCoal
7.6% 0.8% 12,935 Btu/lb 51:017, NSPS HH, NESHAP
5A
9.6 8760 na na na
11 01 3 Natural Gas - Startup 1995 Y 39000603 MMscf Natural Gas
neg. neg. 1,030 Btu/scf 51:017, NSPS HH, NESHAP
5A
0.3 8760 na na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _2__ N of _13__ N Revision 6/00
![Page 59: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/59.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
KL01 - Rotary Kiln #107 01 1 Rotary Kiln #1
PM na 0.239 lb/ton lime 2/7/2017 Stack Test- Method 5 na Baghouse 30.5 7.30 7.30 40.1 32.0 31.98 naPM10 na 0.276 lb/ton lime Assume 100% PM + Condensable na Baghouse 30.5 8.43 8.43 na 36.9 36.92 naPM2.5 na 0.252 lb/ton lime Assume 90% PM + Condensable na Baghouse 30.5 7.70 7.70 na 33.7 33.73 naCondensable PM na 0.037 lb/ton lime NPS Methodology na Baghouse 30.5 1.13 1.13 na 4.9 4.94 naSO2 07446-09-5 8.675 lb/ton lime 10/3/11-10/6/11 CEM Data na 30.5 264.59 na na 1,158.9 na naNOx 10102-44-0 6.515 lb/ton lime 10/3/11-10/6/11 CEM Data na 30.5 198.71 na na 870.3 na naCO 00630-08-0 5.495 lb/ton lime 10/3/11-10/6/11 CEM Data na 30.5 167.60 na na 734.1 na naVOC na 0.100 lb/ton lime Engineering Estimate na 30.5 3.05 na na 13.4 na na
CO2 124-38-9 3123.83 lb/ton lime 40 CFR 98 Table C-1 na 30.5 95,277 na na 417,313 na naCH4 74-82-8 0.183 lb/ton lime 40 CFR 98 Table C-2 na 30.5 5.58 na na 24.5 na naN2O na 0.027 lb/ton lime 40 CFR 98 Table C-3 na 30.5 0.81 na na 3.6 na naCO2e na 3135.93 lb/ton lime 40 CFR 98 Table A-2 na 30.5 95,646 na na 418,929 na naNote - Emission factors for PM, PM10, PM2.5, and SO2 are controlled emission factors. Therefore no control efficiency is used in calculating the controlled limited potential value shown for Process ID 1.
07 01 2 Pulverized Coal BurnerAntimony 07440-36-0 0.018 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.60E-01 1.60E-04 na 7.02E-01 7.02E-04 naArsenic 07740-38-2 0.410 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 3.65E+00 3.65E-03 na 1.60E+01 1.60E-02 naBeryllium 07440-41-7 0.021 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.87E-01 1.87E-04 na 8.19E-01 8.19E-04 naCadmium 07440-43-9 0.051 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 4.54E-01 4.54E-04 na 1.99E+00 1.99E-03 naChromium 07440-47-3 0.260 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 2.31E+00 2.31E-03 na 1.01E+01 1.01E-02 naFormaldehyde 00050-00-0 0.000 lb/ton Coal AP 42 Table 1.1-17 na 8.9 2.14E-03 2.14E-03 na 9.36E-03 na naHCl 07647-01-0 2.056 lb/ton Coal 11/07 stack test (K2) na 8.9 1.83E+01 1.83E+01 na 8.02E+01 na naLead 07439-92-1 0.004 lb/ton Coal NLA Test na Baghouse 99.9% 8.9 3.51E-02 3.51E-05 na 1.54E-01 1.54E-04 naManganese 07439-96-5 0.490 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 4.36E+00 4.36E-03 na 1.91E+01 1.91E-02 naMercury 07439-97-6 0.051 lb/ton Coal NLA Test na Baghouse 99.9% 8.9 4.58E-01 4.58E-04 na 2.00E+00 2.00E-03 naNickel 07440-02-0 0.280 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 2.49E+00 2.49E-03 na 1.09E+01 1.09E-02 naSelenium 07782-49-2 1.300 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.16E+01 1.16E-02 na 5.07E+01 5.07E-02 na
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _3__ N of _13__ N Revision 6/00
![Page 60: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/60.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
07 01 3 Natural Gas - StartupCO 00630-08-0 84.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 18.90 na na 82.8 na naNOx 10102-44-0 100.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 22.50 na na 98.6 na naPM na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na Baghouse 99.9% 0.2 1.71 na na 7.5 na naPM10 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na Baghouse 99.9% 0.2 1.71 na na 7.5 na naPM2.5 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na Baghouse 99.9% 0.2 1.71 na na 7.5 na naSO2 07446-09-5 0.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 0.14 na na 0.6 na naVOC na 5.5 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.24 na na 5.4 na naHexane na 1.8 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.41 na na 1.8 na naToluene na 0.00340 lb/MMscf AP-42 Table 1.4-3 na 0.2 7.65E-04 na na 3.35E-03 na naFormaldehyde na 0.07500 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.02 na na 0.1 na na
CO2 00124-38-9 120,396 lb/MMscf 40 CFR 98, Subpart C, Table C-1 na 0.2 27,089.01 na na 118,650 na naCH4 00074-82-8 2.27076 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.51 na na 2.24 na naN2O 10024-97-2 0.22708 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.05 na na 0.22 na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _4__ N of _13__ N Revision 6/00
![Page 61: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/61.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
KL02 - Rotary Kiln #208 01 1 Rotary Kiln #2
PM na 0.066 lb/ton lime 8/2016 Stack Test (100% coal) na Baghouse 30.5 2.02 2.02 40.1 8.8 8.83 naPM10 na 0.108 lb/ton lime Assume 100% Filterable PM + Condensable na Baghouse 30.5 3.30 3.30 na 14.5 14.47 naPM2.5 na 0.098 lb/ton lime Assume 90% of PM10 na Baghouse 30.5 2.97 2.97 na 13.0 13.03 naCondensable PM na 0.042 lb/ton lime 8/2016 Stack Test (100% coal) na Baghouse 30.5 1.29 1.29 na 5.6 5.64 naSO2 07446-09-5 8.163 lb/ton lime 8/2016 Stack Test (100% coal) na 30.5 248.97 na na 1,090.5 na naNOx 10102-44-0 3.275 lb/ton lime 8/2016 Stack Test (100% coal) na 30.5 99.90 na na 437.6 na naCO 00630-08-0 3.176 lb/ton lime 8/2016 Stack Test (100% coal) na 30.5 96.87 na na 424.3 na naVOC na 0.054 lb/ton lime 8/2016 Stack Test (100% coal) na 30.5 1.64 na na 7.2 na na
CO2 124-38-9 3123.83 lb/ton lime 40 CFR 98 Table C-1 na 30.5 95,277 na na 417,313 na naCH4 74-82-8 0.183 lb/ton lime 40 CFR 98 Table C-2 na 30.5 5.58 na na 24.5 na naN2O na 0.027 lb/ton lime 40 CFR 98 Table C-3 na 30.5 0.81 na na 3.6 na naCO2e na 3135.93 lb/ton lime 40 CFR 98 Table A-2 na 30.5 95,646 na na 418,929 na naNote - Emission factors for PM, PM10, PM2.5, and SO2 are controlled emission factors. Therefore no control efficiency is used in calculating the controlled limited potential value shown for Process ID 1.
08 01 2 Pulverized Fuel BurnerAntimony 07440-36-0 0.018 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.60E-01 1.60E-04 na 7.02E-01 7.02E-04 naArsenic 07740-38-2 0.410 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 3.65E+00 3.65E-03 na 1.60E+01 1.60E-02 naBeryllium 07440-41-7 0.021 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.87E-01 1.87E-04 na 8.19E-01 8.19E-04 naCadmium 07440-43-9 0.051 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 4.54E-01 4.54E-04 na 1.99E+00 1.99E-03 naChromium 07440-47-3 0.260 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 2.31E+00 2.31E-03 na 1.01E+01 1.01E-02 naFormaldehyde 00050-00-0 0.000 lb/ton Coal AP 42 Table 1.1-17 na 8.9 2.14E-03 2.14E-03 na 9.36E-03 na naHCl 07647-01-0 2.056 lb/ton Coal 11/07 stack test (K2) na 8.9 1.83E+01 1.83E+01 na 8.02E+01 na naLead 07439-92-1 0.004 lb/ton Coal NLA Test na Baghouse 99.9% 8.9 3.51E-02 3.51E-05 na 1.54E-01 1.54E-04 naManganese 07439-96-5 0.490 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 4.36E+00 4.36E-03 na 1.91E+01 1.91E-02 naMercury 07439-97-6 0.051 lb/ton Coal NLA Test na Baghouse 99.9% 8.9 4.58E-01 4.58E-04 na 2.00E+00 2.00E-03 naNickel 07440-02-0 0.280 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 2.49E+00 2.49E-03 na 1.09E+01 1.09E-02 naSelenium 07782-49-2 1.300 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 8.9 1.16E+01 1.16E-02 na 5.07E+01 5.07E-02 na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _5__ N of _13__ N Revision 6/00
![Page 62: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/62.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
08 01 3 Natural Gas - StartupCO 00630-08-0 84.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 18.90 na na 82.8 na naNOx 10102-44-0 100.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 22.50 na na 98.6 na naPM na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM10 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM2.5 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naSO2 07446-09-5 0.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 0.14 na na 0.6 na naVOC na 5.5 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.24 na na 5.4 na naHexane na 1.8 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.41 na na 1.8 na naToluene na 0.00340 lb/MMscf AP-42 Table 1.4-3 na 0.2 7.65E-04 na na 3.35E-03 na naFormaldehyde na 0.07500 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.02 na na 0.1 na na
CO2 00124-38-9 120,396 lb/MMscf 40 CFR 98, Subpart C, Table C-1 na 0.2 27,089.01 na na 118,649.9 na naCH4 00074-82-8 2.27076 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.51 na na 2.24 na naN2O 10024-97-2 0.22708 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.05 na na 0.22 na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _6__ N of _13__ N Revision 6/00
![Page 63: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/63.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
KL03 - Rotary Kiln #309 01 1 Rotary Kiln #3
PM na 0.073 lb/ton lime 9/27/2016 Stack Test na Baghouse 65.0 4.71 4.71 33.8 20.6 20.64 naPM10 na 0.110 lb/ton lime Assume 100% PM + Condensable na Baghouse 65.0 7.12 7.12 na 31.2 31.17 naPM2.5 na 0.102 lb/ton lime Assume 90% PM + Condensable na Baghouse 65.0 6.65 6.65 na 29.1 29.11 naCondensable PM na 0.037 lb/ton lime NPS Methodology na Baghouse 65.0 2.41 2.41 na 10.5 10.53 naSO2 07446-09-5 3.010 lb/ton lime 10/22-30/11 CEM data na 65.0 195.65 na na 856.9 na naNOx 10102-44-0 3.210 lb/ton lime 10/22-30/11 CEM data na 65.0 208.65 na na 913.9 na naCO 00630-08-0 6.060 lb/ton lime 10/22-30/11 CEM data na 65.0 393.90 na na 1,725.3 na naVOC na 0.100 lb/ton lime Engineering Estimate na 65.0 6.50 na na 28.5 na na
CO2 124-38-9 2840.05 lb/ton lime 40 CFR 98 Table C-1 na 65.0 184,603 na na 808,563 na naCH4 74-82-8 0.150 lb/ton lime 40 CFR 98 Table C-2 na 65.0 9.72 na na 42.6 na naN2O na 0.022 lb/ton lime 40 CFR 98 Table C-3 na 65.0 1.41 na na 6.2 na naCO2e na 2849.94 lb/ton lime 40 CFR 98 Table A-2 na 65.0 185,246 na na 811,378 na naNote - Emission factors for PM, PM10, PM2.5, and SO2 are controlled emission factors. Therefore no control efficiency is used in calculating the controlled limited potential value shown for Process ID 1.
09 01 2 Pulverized Fuel BurnerAntimony 07440-36-0 0.018 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 2.79E-01 2.79E-04 na 1.22E+00 1.22E-03 naArsenic 07740-38-2 0.410 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 6.35E+00 6.36E-03 na 2.78E+01 2.78E-02 naBeryllium 07440-41-7 0.021 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 3.26E-01 3.26E-04 na 1.43E+00 1.43E-03 naCadmium 07440-43-9 0.051 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 7.90E-01 7.91E-04 na 3.46E+00 3.46E-03 naChromium 07440-47-3 0.260 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 4.03E+00 4.03E-03 na 1.77E+01 1.77E-02 naFormaldehyde 00050-00-0 0.000 lb/ton Coal AP 42 Table 1.1-17 na 15.5 3.72E-03 3.72E-03 na 1.63E-02 na naHCl 07647-01-0 2.516 lb/ton Coal 11/07 stack test (K2) na 15.5 3.90E+01 3.90E+01 na 1.71E+02 na naLead 07439-92-1 0.005 lb/ton Coal NLA Test na Baghouse 99.9% 15.5 7.47E-02 7.48E-05 na 3.27E-01 3.27E-04 naManganese 07439-96-5 0.490 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 7.59E+00 7.60E-03 na 3.33E+01 3.33E-02 naMercury 07439-97-6 0.063 lb/ton Coal NLA Test na Baghouse 99.9% 15.5 9.75E-01 9.75E-04 na 4.27E+00 4.27E-03 naNickel 07440-02-0 0.280 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 4.34E+00 4.34E-03 na 1.90E+01 1.90E-02 naSelenium 07782-49-2 1.300 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 15.5 2.02E+01 2.02E-02 na 8.83E+01 8.83E-02 na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _7__ N of _13__ N Revision 6/00
![Page 64: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/64.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
09 01 3 Natural Gas - StartupCO 00630-08-0 84.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 18.90 na na 82.8 na naNOx 10102-44-0 100.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 22.50 na na 98.6 na naPM na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM10 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM2.5 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naSO2 07446-09-5 0.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 0.14 na na 0.6 na naVOC na 5.5 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.24 na na 5.4 na naHexane na 1.8 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.41 na na 1.8 na naToluene na 0.00340 lb/MMscf AP-42 Table 1.4-3 na 0.2 7.65E-04 na na 3.35E-03 na naFormaldehyde na 0.07500 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.02 na na 0.1 na na
CO2 00124-38-9 120,396 lb/MMscf 40 CFR 98, Subpart C, Table C-1 na 0.2 27,089.01 na na 118,649.9 na naCH4 00074-82-8 2.27076 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.51 na na 2.24 na naN2O 10024-97-2 0.22708 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.05 na na 0.22 na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _8__ N of _13__ N Revision 6/00
![Page 65: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/65.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
KL04 - Rotary Kiln #410 01 1 Rotary Kiln #4
PM na 0.030 lb/ton lime 7/2015 Stack Test na Baghouse 46.0 1.38 1.38 13.20 6.0 6.03 naPM10 na 0.170 lb/ton lime Assume 100% Filterable PM + Condensable na Baghouse 46.0 7.82 7.82 na 34.2 34.24 naPM2.5 na 0.153 lb/ton lime Assume 90% of PM10 na Baghouse 46.0 7.03 7.03 na 30.8 30.81 naCondensable PM na 0.140 lb/ton lime 6/2016 Stack Test on Kiln #5; 100% Coal Scenario na Baghouse 46.0 6.44 6.44 na 28.2 28.20 naSO2 07446-09-5 0.291 lb/ton lime 7/2015 Stack Test na 46.0 13.40 na 22.97 58.7 na naNOx 10102-44-0 2.021 lb/ton lime 7/2015 Stack Test na 46.0 92.95 na 128.33 407.1 na naCO 00630-08-0 0.598 lb/ton lime 7/2015 Stack Test na 46.0 27.50 na 91.67 120.4 na naVOC na 0.091 lb/ton lime 6/2016 Stack Test on Kiln #5; 100% Coal Scenario na 46.0 4.16 na na 18.2 na na
CO2 124-38-9 2,682 lb/ton lime 40 CFR 98 Table C-1 na 46.0 123,358 na na 540,308 na naCH4 74-82-8 0.131 lb/ton lime 40 CFR 98 Table C-2 na 46.0 6.02 na na 26.4 na naN2O na 0.019 lb/ton lime 40 CFR 98 Table C-3 na 46.0 0.88 na na 3.8 na naCO2e na 2,690 lb/ton lime 40 CFR 98 Table A-2 na 46.0 123,756 na na 542,052 na naNote - Emission factors for PM, PM10, PM2.5, and SO2 are controlled emission factors. Therefore no control efficiency is used in calculating the controlled limited potential value shown for Process ID 1.
10 01 2 Pulverized Fuel BurnerAntimony 07440-36-0 0.018 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 1.73E-01 1.73E-04 na 7.57E-01 7.57E-04 naArsenic 07740-38-2 0.410 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 3.94E+00 3.94E-03 na 1.72E+01 1.72E-02 naBeryllium 07440-41-7 0.021 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.02E-01 2.02E-04 na 8.83E-01 8.83E-04 naCadmium 07440-43-9 0.051 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 4.90E-01 4.90E-04 na 2.14E+00 2.14E-03 naChromium 07440-47-3 0.260 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.50E+00 2.50E-03 na 1.09E+01 1.09E-02 naFormaldehyde 00050-00-0 0.000 lb/ton Coal AP 42 Table 1.1-17 na 9.6 2.30E-03 na na 1.01E-02 na naHCl 07647-01-0 1.438 lb/ton Coal 11/07 stack test (K2) na 9.6 1.38E+01 na na 6.04E+01 na naLead 07439-92-1 0.006 lb/ton Coal NLA Test na Baghouse 99.9% 9.6 5.29E-02 5.29E-05 na 2.32E-01 2.32E-04 naManganese 07439-96-5 0.490 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 4.70E+00 4.70E-03 na 2.06E+01 2.06E-02 naMercury 07439-97-6 0.072 lb/ton Coal NLA Test na Baghouse 99.9% 9.6 6.90E-01 6.90E-04 na 3.02E+00 3.02E-03 naNickel 07440-02-0 0.280 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.69E+00 2.69E-03 na 1.18E+01 1.18E-02 naSelenium 07782-49-2 1.300 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 1.25E+01 1.25E-02 na 5.47E+01 5.47E-02 na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _9__ N of _13__ N Revision 6/00
![Page 66: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/66.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
10 01 3 Natural Gas - StartupCO 00630-08-0 84.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 18.90 na na 82.8 na naNOx 10102-44-0 100.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 22.50 na na 98.6 na naPM na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM10 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM2.5 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naSO2 07446-09-5 0.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 0.14 na na 0.6 na naVOC na 5.5 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.24 na na 5.4 na naHexane na 1.8 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.41 na na 1.8 na naToluene na 0.00340 lb/MMscf AP-42 Table 1.4-3 na 0.2 7.65E-04 na na 3.35E-03 na naFormaldehyde na 0.07500 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.02 na na 0.1 na na
CO2 00124-38-9 120,396 lb/MMscf 40 CFR 98, Subpart C, Table C-1 na 0.2 27,089.01 na na 118,649.9 na naCH4 00074-82-8 2.27076 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.51 na na 2.24 na naN2O 10024-97-2 0.22708 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.05 na na 0.22 na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _10__ N of _13__ N Revision 6/00
![Page 67: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/67.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
KL05 - Rotary Kiln #511 01 1 Rotary Kiln #5
PM na 0.023 lb/ton lime 6/2018 Stack Test; Cofire Scenario (Assume PM = F na Baghouse 46.0 1.04 1.04 13.20 4.6 4.57 naPM10 na 0.170 lb/ton lime 6/2018 Stack Test; 82% Gas Scenario na Baghouse 46.0 7.80 7.80 na 34.2 34.17 naPM2.5 na 0.153 lb/ton lime Assume 90% of PM10 na Baghouse 46.0 7.02 7.02 na 30.8 30.75 naCondensable PM na 0.147 lb/ton lime 6/2018 Stack Test; Cofire Scenario na Baghouse 46.0 6.76 6.76 na 29.6 29.59 naSO2 07446-09-5 0.182 lb/ton lime 6/2018 Stack Test; Cofire Scenario na 46.0 8.35 na 22.97 36.6 na naNOx 10102-44-0 1.929 lb/ton lime 6/2018 Stack Test; Cofire Scenario na 46.0 88.74 na 128.33 388.7 na naCO 00630-08-0 0.688 lb/ton lime 6/2018 Stack Test; Cofire Scenario na 46.0 31.66 na 91.67 138.7 na naVOC na 0.160 lb/ton lime 6/2018 Stack Test; Cofire Scenario na 46.0 7.34 na na 32.2 na na
CO2 124-38-9 2,682 lb/ton lime 40 CFR 98 Table C-1 na 46.0 123,358 na na 540,308 na naCH4 74-82-8 0.131 lb/ton lime 40 CFR 98 Table C-2 na 46.0 6.02 na na 26.4 na naN2O na 0.019 lb/ton lime 40 CFR 98 Table C-3 na 46.0 0.88 na na 3.8 na naCO2e na 2,690 lb/ton lime 40 CFR 98 Table A-2 na 46.0 123,756 na na 542,052 na naNotes1. Emission factors for PM, PM10, PM2.5, and SO2 are controlled emission factors. Therefore no control efficiency is used in calculating the controlled limited potential value shown for Process ID 1.
11 01 2 Pulverized Fuel BurnerAntimony 07440-36-0 0.018 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 1.73E-01 1.73E-04 na 7.57E-01 7.57E-04 naArsenic 07740-38-2 0.410 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 3.94E+00 3.94E-03 na 1.72E+01 1.72E-02 naBeryllium 07440-41-7 0.021 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.02E-01 2.02E-04 na 8.83E-01 8.83E-04 naCadmium 07440-43-9 0.051 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 4.90E-01 4.90E-04 na 2.14E+00 2.14E-03 naChromium 07440-47-3 0.260 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.50E+00 2.50E-03 na 1.09E+01 1.09E-02 naFormaldehyde 00050-00-0 0.000 lb/ton Coal AP 42 Table 1.1-17 na 9.6 2.30E-03 na na 1.01E-02 na naHCl 07647-01-0 1.438 lb/ton Coal 11/07 stack test (K2) na 9.6 1.38E+01 na na 6.04E+01 na naLead 07439-92-1 0.006 lb/ton Coal NLA Test na Baghouse 99.9% 9.6 5.29E-02 5.29E-05 na 2.32E-01 2.32E-04 naManganese 07439-96-5 0.490 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 4.70E+00 4.70E-03 na 2.06E+01 2.06E-02 naMercury 07439-97-6 0.072 lb/ton Coal NLA Test na Baghouse 99.9% 9.6 6.90E-01 6.90E-04 na 3.02E+00 3.02E-03 naNickel 07440-02-0 0.280 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 2.69E+00 2.69E-03 na 1.18E+01 1.18E-02 naSelenium 07782-49-2 1.300 lb/ton Coal AP 42 Table 1.1-18 na Baghouse 99.9% 9.6 1.25E+01 1.25E-02 na 5.47E+01 5.47E-02 na
2. Emission factors provided for Kiln #5 criteria pollutant emissions are based on June 5, 2018 performance test, during which Kiln #5 was operated in cofiring mode. This is currently the primary operating mode for the kiln, however, during a small portion of the year the kiln is fired at 100% coal. To account for the varied emissions profile of the kiln during different operating modes, a weighted average emission factor will be submitted in each subsequent KDAQ Emission Survey.
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _11__ N of _13__ N Revision 6/00
![Page 68: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/68.jpg)
KyEISSource
ID #Process
ID(s) Pollutant CAS#
EmissionFactorBasis
Cont.Equip. #
ControlDevice
ControlEfficiency
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
UncontrolledUnlimitedPotential
ControlledLimited
Potential Allowable
SECTION I. Emission Units and Emission Point Information (continued)
Emission Factors Control Equipment HourlyOperating
Rate(SCC
Units/hr)
Hourly (lb/hr) Emissions Annual (tons/yr) Emissions
UncontrolledEmission Factor(lb/SCC Units)
DEP7007N(continued)
11 01 3 Natural Gas - StartupCO 00630-08-0 84.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 18.90 na na 82.8 na naNOx 10102-44-0 100.0 lb/MMscf AP-42 Table 1.4-1, 07/98 na 0.2 22.50 na na 98.6 na naPM na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM10 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naPM2.5 na 7.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.71 na na 7.5 na naSO2 07446-09-5 0.6 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 0.14 na na 0.6 na naVOC na 5.5 lb/MMscf AP-42 Table 1.4-2, 07/98 na 0.2 1.24 na na 5.4 na naHexane na 1.8 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.41 na na 1.8 na naToluene na 0.00340 lb/MMscf AP-42 Table 1.4-3 na 0.2 7.65E-04 na na 3.35E-03 na naFormaldehyde na 0.07500 lb/MMscf AP-42 Table 1.4-3 na 0.2 0.02 na na 0.1 na na
CO2 00124-38-9 120,396 lb/MMscf 40 CFR 98, Subpart C, Table C-1 na 0.2 27,089.01 na na 118,649.9 na naCH4 00074-82-8 2.27076 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.51 na na 2.24 na naN2O 10024-97-2 0.22708 lb/MMscf 40 CFR 98, Subpart C, Table C-2 na 0.2 0.05 na na 0.22 na na
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _12__ N of _13__ N Revision 6/00
![Page 69: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/69.jpg)
KyEISSource
ID # Stack DescriptionHeight
(ft)Diameter
(ft)
VentHeight
(ft)Vertical
CoordinateHorizontalCoordinate
CollectionMethod Code
Flowrate(acfm)
Temperature(F)
ExitVelocity(ft/sec)
07 01 Rotary Kiln #1 102 8.00 4,302,092.88 739,511.96 IMI 68,500 349 22.7208 01 Rotary Kiln #2 150 5.79 4,302,081.01 739,512.13 IMI 108,200 322 68.5009 01 Rotary Kiln #3 77 44.8 4,302,047.83 739,517.76 IMI 246,000 306 2.6010 01 Rotary Kiln #4 120 7.50 4,302,042.48 739,576.41 IMI 153,800 341 58.0211 01 Rotary Kiln #5 120 7.50 4,302,028.66 739,588.29 IMI 181,900 423 68.61
Stack Physical Data Stack Geographic Data Stack Gas Stream Data
SECTION II. Stack Information
DEP7007N(continued)
Division Use Only: F___ Reviewer __________ Supervisor __________ Page _13__ N of _13__ N Revision 6/00
![Page 70: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/70.jpg)
Carmeuse Lime & Stone – Black River Plant | Title V Permit Application Trinity Consultants
APPENDIX E: SUGGESTED TITLE V PERMIT REVISIONS
TextofSuggestedTitleVPermitRevisions
![Page 71: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/71.jpg)
Version: 3-8-18
TABLE OF CONTENTS SECTION ISSUANCE PAGE A. PERMIT AUTHORIZATION Revision 6 1 B. EMISSION POINTS, EMISSIONS UNITS, APPLICABLE Revision 6 2
REGULATIONS, AND OPERATING CONDITIONS C. INSIGNIFICANT ACTIVITIES Revision 6 113 D. SOURCE EMISSION LIMITATIONS AND TESTING Renewal 114
REQUIREMENTS E. SOURCE CONTROL EQUIPMENT REQUIREMENTS Renewal 115 F. MONITORING, RECORDKEEPING, AND REPORTING Revision 6 116
REQUIREMENTS G. GENERAL PROVISIONS Revision 6 119
Permit Permit Type
Activity# Complete Date
Issuance Date
Summary of Action
V-14-002 Renewal APE20120003 10/27/2012 8/26/2014 Renewal V-14-002
R1 Minor
revision APE20140002 11/26/2014 2/25/2015 Construction of new
baghouse LM04, EU 32-16V-14-002
R2 Minor
revision APE20150001 4/14/2015 8/14/2015 Replace Five Diesel-fired
generators V-14-002
R3 Significant Revision
APE20160001 APE20150002 APE20150003
4/12/2016 11/23/2016 Construction of a New Hydrate Plant, Duct Change
for Kiln #4, New Storage Pile, and the Replacement of Bin Vent Filter on Kiln #4 &
#5 Dust BinV-14-002
R4 Minor
Revision APE20170001 2/22/2017 6/1/2017 Construction of Multichannel
Burners for Rotary Kiln #4 and Rotary Kiln #5
V-14-002 R5
Minor Revision
APE20170002 5/31/2017 8/21/2017 Addition of a New Emergency Generator for
Multichannel Burners V-14-002
R6 Minor
Revision APE20180002 6/6/2018 10/28/2018 Modification of Existing
Testing Requirement
![Page 72: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/72.jpg)
Permit Number: V-14-002 R6 Page: 1 of 124 SECTION A - PERMIT AUTHORIZATION
Pursuant to a duly submitted application the Kentucky Energy and Environment Cabinet (Cabinet) hereby authorizes the operation of the equipment described herein in accordance with the terms and conditions of this permit. This permit has been issued under the provisions of Kentucky Revised Statutes (KRS) Chapter 224 and regulations promulgated pursuant thereto. The permittee shall not construct, reconstruct, or modify any affected facilities without first submitting a complete application and receiving a permit for the planned activity from the permitting authority, except as provided in this permit or in 401 KAR 52:020, Title V Permits. Issuance of this permit does not relieve the permittee from the responsibility of obtaining any other permits, licenses, or approvals required by the Cabinet or any other federal, state, or local agency.
![Page 73: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/73.jpg)
Permit Number: V-14-002 R6 Page: 2 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS
LIMESTONE: LS01 – Mine to Stockpile Transfers
EU # Description Design
Capacity(ton/hr)
Date Constructed or Last Modified
Controls
01-01 14-101 Belt Conveyor Transfer to 14-
102 Belt Conveyor 1,250 1974 Water Spray
01-02 14-102 Belt Conveyor Transfer to 14-
200 Reversing Belt Conveyor 1,250 1974
Moist Material
01-04 14-200 Reversing Belt Conveyor
Transfer to Stockpiles 1,250 1995
Moist Material
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with the 1. Operating Limitations above.
3. Testing Requirements: Not applicable.
![Page 74: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/74.jpg)
Permit Number: V-14-002 R6 Page: 3 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements: Conduct visual observations monthly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements: a. Maintain a log of visual observations as required under 4. Specific Monitoring
Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed and the results of the follow-up visual observations. [401 KAR 52:020, Section 10]
b. Maintain a log of routine and non-routine maintenance activities performed on the water spray system associated with EU 01-01. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements. 7. Specific Control Equipment Operating Conditions:
Water sprays shall be applied on EU 01-01 when applicable; to ensure that limestone material being conveyed is sufficiently moist to control fugitive emissions. [401 KAR 50:055, Section 2]
![Page 75: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/75.jpg)
Permit Number: V-14-002 R6 Page: 4 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIMESTONE: LS02 – Limestone Stockpiles
EU # Description Date Constructed or Last Modified
Controls
01-03 Limestone Stockpile (42,000 tons) (8 × x0
ROM) (Encompassing both the 100 Pile and 200 Pile Combined)
1995 Moist Material
01-08 Small Kiln Feed Stockpile (½ ×1)
(All Sections) 1995 Moist Material
01-12 Large Kiln Feed Stockpile (2½ × 1)
(All Sections) 1995 Moist Material
01-16 ½ × 150 Mesh Stockpiles 1995 Moist Material
31-01 Riverside Stone Stockpile #1 2001 Moist Material
31-04 Riverside Stone Stockpile #2 2001 Moist Material
31-07 Riverside Stone Stockpile #3 2001 Moist Material
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway. [401 KAR 63:010, Section 4]
2. Emission Limitations: No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
![Page 76: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/76.jpg)
Permit Number: V-14-002 R6 Page: 5 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations and 4. Specific Monitoring Requirements.
3. Testing Requirements:
Not Applicable 4. Specific Monitoring Requirements:
Inspect each stockpile and conduct visual observations at least once per month during daylight hours. If the stockpile is determined to have the potential to generate fugitive emissions (e.g. stockpiles are very dry, with no crust and wind speed is substantial enough to disturb the material) or visible emissions observed, take preventative actions to mitigate the potential for fugitive emissions (e.g. misting the stockpile) and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
Maintain a log of stockpile inspections and visual observations as required under 4. Specific Monitoring Requirements indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed and the results of the follow-up visual observations. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 77: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/77.jpg)
Permit Number: V-14-002 R6 Page: 6 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIMESTONE: LS03 – Limestone Screening and Crushing
EU # Description Design
Capacity(ton/hr)
Date Constructed or Last Modified
Controls
Limestone Conveyor Transfers
01-06 51-100 Belt Conveyor Transfer to
51-201 Belt Conveyor 1,250 1974 Moist Material
01-09 51-206 Belt Conveyor Transfer to
Small Kiln Feed Stockpile 240 1995 Moist Material
01-11 51-208 Tripper Conveyor Transfer
to Large Kiln Feed Stockpile 775 1995 Moist Material
01-15 51-204 Radial Stacker Transfer to 1/2 × x150 Mesh Stockpile or 51-
221 Limestone Screen 210 1995 Moist Material
02-01 51-200 Belt Conveyor Transfer to
51-201 Belt Conveyor 1,250 1995 Moist Material
02-07 51-304 Cone Crusher Transfer to
51-201 Belt Conveyor 500 1995 Moist Material
02-08 51-305 Cone Crusher Transfer to
51-201 Belt Conveyor 500 1995 Moist Material
02-12 51-203 Belt Conveyor Transfer to
51-204 Radial Stacker 210 1995 Moist Material
Limestone Processing Buildings
02-02 Screening Building Operations 1,790 1995 Moist Material Inside Building
02-05 Crusher Building Operations 540 1995 Moist Material Inside Building
02-10 Transfer House from Screening
Building to Stockpiles 1,015 1995
Moist Material Inside Building
APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(qqq) 40 C.F.R. 60.670 to 60.676, Tables 1 to 3 (Subpart OOO), Standards of Performance for Nonmetallic Mineral Processing Plants 1. Operating Limitations:
Not applicable
![Page 78: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/78.jpg)
Permit Number: V-14-002 R6 Page: 7 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2. Emission Limitations:
a. Fugitive emissions from the exterior conveyor transfer points shall not exceed 10% opacity. [40 CFR 60.672(b)]
b. Fugitive emissions from the openings of the Limestone Processing Buildings listed shall not exceed 7% opacity. [40 CFR 60.672(e)(1)] Compliance Demonstration Method: Compliance shall be demonstrated by with 3. Testing Requirements and 4. Specific Monitoring Requirements.
3. Testing Requirements:
a. In determining compliance with the particulate matter standards in 40 CFR 60.672(b) or 40 CFR 60.672(e)(1), the owner or operator shall use EPA Reference Method 9 of Appendix A-4 of this part and the procedures in 40 CFR 60.11, with the following additions [40 CFR 60.675 (c)(1)]: 1) The minimum distance between the observer and the emission source shall be 4.57
meters (15 feet). 2) The observer shall, when possible, select a position that minimizes interference from
other fugitive emission sources (e.g., road dust). The required observer position relative to the sun (EPA Reference Method 9 of Appendix A-4 of this part, Section 2.1) must be followed.
b. When determining compliance with the fugitive emissions standard, the duration of the
EPA Reference Method 9 (40 CFR part 60, Appendix A-4) observations must be 30 minutes (five 6-minute averages). Compliance with the applicable fugitive emission limits in Table 3 of 40 CFR 60, Subpart OOO must be based on the average of the five 6-minute averages. [40 CFR 60.675(e)(3)]
c. If the building encloses only affected facilities that commenced construction, modification, or reconstruction before April 22, 2008, and the owner or operator has previously conducted an initial EPA Reference Method 22 (40 CFR part 60, Appendix A-7) performance test showing zero visible emissions, then the owner or operator has demonstrated compliance with the opacity limit in 40 CFR 60.672(e)(1). If the owner or operator has not conducted an initial performance test for the building before April 22, 2008, then the owner or operator must conduct an initial EPA Reference Method 9 (40 CFR part 60, Appendix A-4) performance test according to this section and 40 CFR 60.11 to show compliance with the opacity limit in 40 CFR 60.672(e)(1). This test shall be conducted within 180 days following the issuance of permit V-14-002. [40 CFR 60.675(d)(2)]
4. Specific Monitoring Requirements:
Conduct visual observations weekly monthly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference
Commented [A1]: Carmeuse is proposing to change the monitoring frequency from weekly to monthly to be consistent with Lime MACT provisions for Processed Stone Handling systems and the other limestone material handling operations at the plant. Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 79: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/79.jpg)
Permit Number: V-14-002 R6 Page: 8 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Method 9 reading. If visible emissions are observed, conduct an EPA Reference Method 9 (40 CFR 60, Appendix A) reading immediately, then take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements: Maintain records of visual emission observations and EPA Reference Method 9 readings required under 4. Specific Monitoring Requirements indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed and the results of the follow-up visual observation. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 80: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/80.jpg)
Permit Number: V-14-002 R6 Page: 9 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIMESTONE: LS04 – Kiln Limestone Feed System
EU # Description Design
Capacity(ton/hr)
Date Constructed or Last Modified
Controls
Feed Piles to Stone Bins/Preheaters:
01-32 52-215 Belt Conveyor Transfer to #3
Stone Bin 875 1995 Moist Material
02-15 52-301 Belt Conveyor Transfer to
52-302 Belt Conveyor 875 1995 Moist Material
02-16
52-302 Belt Conveyor Transfer to 52-303 Belt Conveyor or 52-215 Belt
Conveyor or #1 Stone Bin or #2 Stone Bin
875 1995 Moist Material
02-18 52-303 Belt Conveyor Transfer to
52-304 Belt Conveyor or #4 Preheater
875 1995 Moist Material
02-20 52-304 Belt Conveyor Transfer to #5
Preheater 875 1995 Moist Material
Stone Bins/Preheaters to Kilns:
01-26 81-121 Belt Conveyor Transfer to
81-131 Belt Conveyor 50 1974 Moist Material
01-27 81-131 Belt Conveyor Transfer to
Kiln # 1 50 1974 Moist Material
01-30 82-122 Belt Conveyor Transfer to
82-132 Belt Conveyor 50 1974 Moist Material
01-31 82-132 Belt Conveyor Transfer to
Kiln # 2 50 1974 Moist Material
01-35 83-228 Belt Conveyor Transfer to
Kiln # 3 125 1976 Moist Material
Lime Storage Building:
33-01 Kilns 1, 2 & 3 Discharge Building enclosing Belt Conveyor Transfers
83-224, 82-112 and 81-111 NA 1974 Moist Material
![Page 81: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/81.jpg)
Permit Number: V-14-002 R6 Page: 10 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
APPLICABLE REGULATIONS: 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 1. Operating Limitations:
a. Prepare and follow a written operations, maintenance, and monitoring (OM&M) plan. The plan must include items listed in 40 CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
b. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
c. The units must be in compliance with the opacity and visible emission (VE) limits of 40 CFR 63, Subpart AAAAA during the times specified in 40 CFR 63.6(h)(1). [40 CFR 63.7100(b)]
d. While the conveyers are in operation, maintain the affected source according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR 63.7100 (c)]
e. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP) according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)]
2. Emission Limitations: a. There must be no VE from each building (EU 33-01). [40 CFR 63.7090(a), Table 1]
Compliance Demonstration Method: Compliance with the visible emissions limit shall be demonstrated through 4. Specific Monitoring Requirements b.
b. Fugitive emissions from the conveyor transfer points outside the buildings shall not exceed
10% opacity. [40 CFR 63.7090(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through 3. Testing Requirements a. and 4. Specific Monitoring Requirements a.
3. Testing Requirements: a. Conduct a performance test within 5 years following the initial performance test and within
5 years following each subsequent performance test thereafter from each listed emission unit and the building using EPA Reference Methods 5, 9 or 17. [40 CFR 63.7111].
b. Testing must be conducted in accordance with the following [40 CFR 63.7112]: 1) The EPA Reference Method 9 (Appendix A to part 60 of this chapter) test duration for
each emission unit must be for at least 3 hours, but the 3-hour test may be reduced to 1 hour if, during the first 1-hour period, there are no individual readings greater than 10
![Page 82: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/82.jpg)
Permit Number: V-14-002 R6 Page: 11 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
percent opacity and there are no more than three readings of 10 percent during the first 1-hour period.
2) The performance test for a building must be conducted according to the specifications below, while all affected Processed Stone Handling (PSH) operations within the building are operating; the performance test for each affected building must be at least 75 minutes, with each side of the building and roof being observed for at least 15 minutes. i. The minimum distance between the observer and the emission source shall be
4.57 meters (15 feet). ii. The observer shall, when possible, select a position that minimizes interference
from other fugitive emission sources (e.g., road dust). The required observer position relative to the sun must be followed.
iii. If wet suppression is used to control Particulate Matter (PM) from PSH operations, a visible mist is sometimes generated by the spray. The water mist must not be confused with particulate matter emissions and is not considered VE. When a water mist of this nature is present, emissions must be observed at a point in the plume where the mist is no longer visible.
c. Performance tests shall not be conducted during periods of startup, shutdown, or
malfunction. [40 CFR 63.7112(c)]
4. Specific Monitoring Requirements: a. For each PSH operation subject to an opacity limitation as required in Table 1 of
40 CFR 63, Subpart AAAAA, or any vents from buildings subject to an opacity limitation [40 CFR 63.7121(e)]: 1) Conduct a monthly 1-minute VE check of each emission unit in accordance with 40
CFR 63.7121(e); the check must be conducted while the affected source is in operation; 2) If no VE are observed in 6 consecutive monthly checks for any emission unit, the
frequency of VE checking may decrease from monthly to semi-annually for that emission unit; if VE are observed during any semiannual check, resume VE checking of that emission unit on a monthly basis and maintain that schedule until no VE are observed in 6 consecutive monthly checks;
3) If no VE are observed during the semiannual check for any emission unit, the frequency of VE checking may decrease from semi-annually to annually for that emission unit; if VE are observed during any annual check, resume VE checking of that emission unit on a monthly basis and maintain that schedule until no VE are observed in 6 consecutive monthly checks; and
4) If VE are observed during any VE check, conduct a 6-minute test of opacity in accordance with EPA Reference Method 9 of appendix A to part 60 of this chapter; begin the EPA Reference Method 9 test within 1 hour of any observation of VE and the 6-minute opacity reading must not exceed the applicable opacity limit.
b. For any building subject to a VE limit, according to item 8 of Table 1 of 40 CFR 63.7121(e)]:
![Page 83: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/83.jpg)
Permit Number: V-14-002 R6 Page: 12 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) Conducting a monthly VE check of the building, in accordance with the specifications in 40 CFR 63.7112(k); the check must be conducted while all the enclosed PSH operations are operating;
2) The check for each affected building must be at least 5 minutes, with each side of the building and roof being observed for at least 1 minute;
3) If no VE are observed in 6 consecutive monthly checks of the building, the frequency of checking may decrease from monthly to semi-annually for that affected source; if VE are observed during any semi-annual check, resume checking on a monthly basis and maintain that schedule until no VE are observed in 6 consecutive monthly checks; and
4) If no VE are observed during the semi-annual check, the frequency of checking may decrease from semi-annually to annually for that affected source; and if VE are observed during any annual check, resume checking of that emission unit on a monthly basis and maintain that schedule until no VE are observed in 6 consecutive monthly checks (the source is in compliance if no VE are observed during any of these checks).
5. Specific Recordkeeping Requirements:
a. Records shall be kept as required under 40 CFR 63.7132: 1) A copy of each notification and report submitted to comply with 40 CFR 63,
Subpart AAAAA, including all documentation supporting any Initial Notification or Notification Compliance Status submitted in accordance with the requirements in 40 CFR 63.10(b)(2)(xiv). [40 CFR 63.7132(a)(1)]
2) The records in 40 CFR 63.6(e)(3)(iii) through (v) related to startup, shutdown and malfunction. [40 CFR 63.7132(a)(2)]
3) Records of performance tests, performance evaluations, and opacity and VE observations as required in 40 CFR 63.10(b)(2)(viii). [40 CFR 63.7132(a)(3)]
4) Records in 40 CFR 63.6(h)(6) must be kept for VE observations. [40 CFR 63.7132 (b)] 5) Records required by Tables 5 and 6 of 40 CFR 63, Subpart AAAAA, must be kept to
show continuous compliance with each emission limitation that applies to the facility. [40 CFR 63.7132(c)]
6) Records must be kept which document the basis for the initial applicability determination as required under 40 CFR 63.7081. [40 CFR 63.7132(d)]
b. Keep a log of all visual observations, any EPA Reference Method 9 and 22 tests performed, and any corrective actions taken. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 84: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/84.jpg)
Permit Number: V-14-002 R6 Page: 13 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIMESTONE: LS05 – Limestone Loadout Operations
EU # Description Date Constructed or Last Modified
Controls
03-01 93-102 Belt Conveyor and Barge Loadout 2007 Moist Material
04-01 93-110 Stone Dump Hoppers Transfer to 93-
100 Belt Conveyor 2007 Moist Material
05-02 93-100 Belt Conveyor Transfer to 93-101
Belt Conveyor (When in Limestone Service)1995 Moist Material
31-02 Limestone Transfers via Front End Loader to
93-110 Stone Dump Hoppers 2007 Moist Material
31-03 Limestone Transfers via Front End Loader to
Trucks 2007 Moist Material
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway. [401 KAR 63:010, Section 4] 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with the 4. Specific Monitoring Requirements.
![Page 85: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/85.jpg)
Permit Number: V-14-002 R6 Page: 14 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
3. Testing Requirements: Not Applicable 4. Specific Monitoring Requirements: Conduct visual observations monthly during daylight hours. If visible emissions are observed,
take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements: Maintain a log of visual observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed and the results of the follow-up visual observation. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements: See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 86: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/86.jpg)
Permit Number: V-14-002 R6 Page: 15 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
COAL SYSTEM: CL01 – Coal Receiving and Storage
EU # Description Design
Capacity(ton/hr)
Date Constructed
or Last Modified
Controls
Receiving of Coal From Trucks
06-01 Coal Receiving Hoppers at Truck Dump 900 1995 Moist Material
06-03 54-801 Belt Conveyor Transfer to 54-
802 Reversing Belt Conveyor or #2 Silo 450 1995 Moist Material
06-05 54-802 Reversing Belt Conveyor
Transfer to #1 Silo, #2 Silo, or #3 Silo 450 1995 Moist Material
Receiving of Coal From Barges
28-01 Barge Receiving Hopper 700 2006 Moist Material
28-02 54-101 Belt Conveyor Transfer to 54-
102 Belt Conveyor 700 2006 Moist Material
28-03 54-102 Belt Conveyor Transfer to 54-
103 Belt Conveyor 700 2006 Moist Material
28-05 54-103 Belt Conveyor Transfer to 54-
802 Reversing Belt Conveyor or #4 Silo 700 2006 Moist Material
Conveying of Coal from Storage Silos to Bins
06-07 54-803 Belt Conveyor Transfer to 54-
804 Belt Conveyor 450 1995 Moist Material
06-09 54-804 Belt Conveyor Transfer to 54-805 or 54-806 Belt Conveyors or #2
Coal Bin 450 1995 Moist Material
06-11 54-806 Belt Conveyor Transfer to 54-
807 Belt Conveyor or #3 Coal Bin 450 1995 Moist Material
06-12 54-807 Belt Conveyor Transfer to 54-
808 Belt Conveyor or #4 Coal Bin 450 1995 Moist Material
06-16 54-808 Belt Conveyor Transfer to #5
Coal Bin 450 1995 Moist Material
06-18 54-805 Belt Conveyor Transfer to #1
Coal Bin 450 1995 Moist Material
28-07 54-821 Belt Conveyor Transfer to 54-
803 Belt Conveyor 450 1995 Moist Material
![Page 87: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/87.jpg)
Permit Number: V-14-002 R6 Page: 16 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(gg) 40 C.F.R. 60.250 to 60.258 (Subpart Y), Standards of Performance for Coal Preparation and Processing Plants 1. Operating Limitations:
Not applicable 2. Emission Limitations:
An owner or operator shall not cause to be discharged into the atmosphere from any coal processing and conveying equipment, coal storage system, or coal transfer and loading system processing coal constructed, reconstructed, or modified on or before April 28, 2008, gases which exhibit 20% opacity or greater. [40 CFR 60.254(a)] Compliance Demonstration Method: Compliance shall be demonstrated with 3. Testing Requirements and 4. Specific Monitoring Requirements.
3. Testing Requirements: a. The owner or operator must determine compliance with the applicable opacity standards as specified below. [40 CFR 60.257(a)]
1) EPA Reference Method 9 of appendix A-4 of this part and the procedures in 40 CFR 60.11 must be used to determine opacity, with the exceptions specified in paragraphs 40 CFR 60.257 (a)(1)(i) and (ii). i. The duration of the EPA Reference Method 9 of appendix A-4 of this part
performance test shall be 1 hour (ten 6-minute averages). ii. If, during the initial 30 minutes of the observation of an EPA Reference Method 9
of appendix A-4 of this part performance test, all of the 6-minute average opacity readings are less than or equal to half the applicable opacity limit, then the observation period may be reduced from 1 hour to 30 minutes.
2) To determine opacity for fugitive coal dust emissions sources, the additional requirements specified in paragraphs 40 CFR 60.257(a)(2)(i) through (iii) must be used. i. The minimum distance between the observer and the emission source shall be 5.0
meters (16 feet), and the sun shall be oriented in the 140-degree sector of the back. ii. The observer shall select a position that minimizes interference from other fugitive
coal dust emissions sources and make observations such that the line of vision is approximately perpendicular to the plume and wind direction.
iii. The observer shall make opacity observations at the point of greatest opacity in that portion of the plume where condensed water vapor is not present. Water vapor is not considered a visible emission.
3) A visible emissions observer may conduct visible emission observations for up to three fugitive, stack, or vent emission points within a 15-second interval if the following conditions specified in paragraphs (a)(3)(i) through (iii) of this section are met. i. No more than three emissions points may be read concurrently. ii. All three emissions points must be within a 70 degree viewing sector or angle in
front of the observer such that the proper sun position can be maintained for all three points.
![Page 88: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/88.jpg)
Permit Number: V-14-002 R6 Page: 17 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
iii. If an opacity reading for any one of the three emissions points is within 5 percent opacity from the applicable standard (excluding readings of zero opacity), then the observer must stop taking readings for the other two points and continue reading just that single point.
4. Specific Monitoring Requirements: Conduct visual observations monthly during daylight hours. If visible emissions are
observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Perform a qualitative visual observation of the opacity of emissions from each transfer point on a weekly basis and maintain a log of the observations. If visible emissions from any transfer point are observed, then an EPA Reference Method 9 (40 CFR 60, Appendix A) reading shall be conducted immediately and take corrective action. After corrective actions have been complete, conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
Maintain a log of visual emission observations and EPA Reference Method 9 readings required under 4. Specific Monitoring Requirements indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed and the results of the follow-up visual observations. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
Commented [A2]: Carmeuse is proposing to change the monitoring frequency from weekly to monthly to be consistent with the limestone material handling operations at the plant, which also have a low potential for visible emissions. Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 89: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/89.jpg)
Permit Number: V-14-002 R6 Page: 18 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROTARY LIME KILNS: KL01 - Rotary Kiln #1 Emission Unit 07-01 Rotary Kiln #1 Description: Fuller Kiln – 10'6" × 300' Construction Commenced: 1970 Maximum Rated Input Capacity: 61 tons/hour of limestone Primary Fuel: Pulverized Coal; Maximum Firing Rate: 8.9 tons/hr Secondary Fuels: Natural Gas, Glycerin Startup Fuels: Natural Gas Controls: Reverse-Air Baghouse (Wheelabrator No. 613, Model 360 Series 11.5) APPLICABLE REGULATIONS: 401 KAR 61:020, Existing process operations. 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter. Requirements of this subpart are satisfied by applicability of 40 CFR 63, Subpart AAAAA. 1. Operating Limitations:
a. Maintain and operate the FF such that the BLDS or PM detector alarm condition does not exist for more than 5 percent of the total operating time in a 6-month period; and comply with the requirements in 40 CFR 63.7113(d) through (f) and Table 5 of Subpart AAAAA. In lieu of a BLDS or PM detector, maintain the FF such that the 6-minute average opacity for any 6-minute block period does not exceed 15 percent; and comply with the requirements in 40 CFR 63.7113(f) and (g) and Table 5 to Subpart AAAAA. [40 CFR 63.7090(b)]
b. Prepare and implement a written OM&M plan. The plan must include items listed in 40 CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
c. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
d. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP)
according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)]
e. Always operate and maintain the affected source, including air pollution control and monitoring equipment, according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR 63.7100 (c)]
![Page 90: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/90.jpg)
Permit Number: V-14-002 R6 Page: 19 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2. Emission Limitations: a. Emissions of particulate matter shall not exceed 0.12 lb/ton of stone feed (lb/tsf). Weighted
average PM emissions may be determined according to Equation 2 in 40 CFR 63.7112 and must not exceed 0.12 lb/tsf. [40 CFR 63.7090(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3 Testing Requirements.
b. Emissions of particulate matter shall not exceed the emission rate calculated by the
following equations: [401 KAR 61:020 Section 3(2)(a)]
For process weight rates in excess of 30 ton/hr, E = 55.0P0.11 - 40 Where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr. Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements.
c. No person shall cause, suffer, allow or permit any continuous emission into the open air from a control device or stack associated with any affected facility which is equal to or greater than forty (40) percent opacity. [401 KAR 61:020, Section 3(1)(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through the 4. Specific Monitoring Requirements.
d. The unit must be in compliance with the emission limitations of 40 CFR 63,
Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)].
3. Testing Requirements: a. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 5 years following the initial performance test and within 5 years following each subsequent performance test thereafter. [40 CFR 63.7111 and 401 KAR 50:045] 1) Performance tests may not be conducted during periods of startup, shutdown, or malfunction, as specified in 40 CFR 63.7(e)(1). [40 CFR 63.7112(c)] 2) Three separate test runs must be conducted for each required performance test, as
specified in 40 CFR 63.7(e)(3). Each test run must last at least one hour. [40 CFR 63.7112(d)]
3) Calculate PM emissions from performance tests in accordance with the provisions in 40 CFR 63.7112(e), (f) and (g). 4) Performance test results must be documented in complete test reports that contain the information required by 40 CFR 63.7112 paragraphs (h)(1) through (10) of this section, as well as all other relevant information. The plan to be followed during testing must be made available to the Administrator at least 60 days prior to testing. [40 CFR 63.7112(h)]
![Page 91: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/91.jpg)
Permit Number: V-14-002 R6 Page: 20 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
5) The permittee must establish any applicable 3-hour block average operating limit indicated in Table 2 of 40 CFR 63, Subpart AAAAA according to the applicable requirements in Table 3 of 40 CFR 63, Subpart AAAAA and 40 CFR 63.7112 paragraphs (j)(1) through (4) of this section. [40 CFR 63.7112(j)]
4. Specific Monitoring Requirements:
a. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the differential pressure across the kiln baghouse to ensure that pressure does not drop outside the pressure drop range documented in the OM&M Plan. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
b. Following a reading outside of the pressure drop range specified in the OM&M: 1) Maintenance personnel shall inspect the monitoring system, baghouse, and operations
immediately; and take correction action as soon as practicable. 2) Upon completed corrective action, the permittee shall immediately conduct an EPA
Reference Method 9 opacity reading on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
c. If a bag leak detection system or PM detector is not utilized, conduct a VE check daily
(minimum of 6-minutes) in accordance with EPA Reference Method 9 of Appendix A to 40 CFR Part 60. Record the opacity observed in an observation log. The reading shall be performed by a representative of the permittee certified in Visible Emissions Evaluation. Maintain a list of all individuals who are certified EPA Reference Method 9 Visible Emissions Evaluators. [40 CFR 63.7121(f)]
d. If the opacity reading is greater than fifteen (15) percent from the stack during the daily VE check, then initiate an inspection of the equipment and make repairs if necessary. [401 KAR 52:020, Section 10]
e. For each emission unit equipped with an add-on air pollution control device, inspect each capture/collection and closed vent system at least once each calendar year to ensure that each system is operating in accordance with the operating requirements in Item 6 of Table 2 of 40 CFR 63 Subpart AAAAA and record the results of each inspection. [40 CFR 63.7113 (f)]
f. Except for monitor malfunctions, associated repairs, required quality assurance or control
activities (including, as applicable, calibration checks and required zero adjustments), the permittee must monitor continuously (or collect data at all required intervals) at all times that the emission unit is operating. [40 CFR 63.7120(b)]
g. Data recorded during system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and high-level adjustments, periods of non-operation of the process unit (or portion thereof), resulting in cessation of the emissions to which the monitoring applies; and start-ups, shutdowns, and malfunctions may not be used either in
Commented [A3]: Carmeuse is proposing to remove the requirement to conduct an immediate Method 9 reading due to a differential pressure excursion. Refer to rationale provided in the application report.
![Page 92: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/92.jpg)
Permit Number: V-14-002 R6 Page: 21 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
data averages or calculations of emission or operating limits; or in fulfilling a minimum data availability requirement. The permittee must use all the data collected during all other periods in assessing the operation of the control device and associated control system. [40 CFR 63.7120(c)]
h. The amount of material placed in the kiln (ton), amount of lime produced from the kiln
(tons), amount of coal and glycerin, source-wide natural gas consumed and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10].
5. Specific Recordkeeping Requirements:
a. Maintain records of inspection of each capture/collection and closed vent system as required by 40 CFR 63.7113(f).
b. Maintain records of all routine and non-routine maintenance activities performed on the dust collection system. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
c. Keep records of performance tests and performance evaluation. [40 CFR 63.7132(a)(3)]
d. Keep visual observation records and EPA Reference Method 9 observation records, and
any inspections and repair records in a designated paper or electronic logbook. Records shall be maintained for five years. [401 KAR 52:020, Section 10]
e. Performance test results must be documented in complete test reports that contain the
information below, as well as all other relevant information. The plan to be followed during testing must be made available to the Division at least 60 days prior to testing. [40 CFR 63.7112(h)] 1) A brief description of the process and the air pollution control system; 2) Sampling location description(s); 3) A description of sampling and analytical procedures and any modifications to standard
procedures; 4) Test results, including opacity; 5) Quality assurance procedures and results; 6) Records of operating conditions during the test, preparation of standards, and
calibration procedures; 7) Raw data sheets for field sampling and field and laboratory analyses; 8) Documentation of calculations; 9) All data recorded and used to establish operating limits; and
10) Any other information required by the test method.
f. Maintain records of the differential pressure readings on the kiln baghouse taken once per shift in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective
![Page 93: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/93.jpg)
Permit Number: V-14-002 R6 Page: 22 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
actions taken when readings outside the appropriate range are recorded. [401 KAR 52:020, Section 10]
g. Maintain records of the amount of material placed in the kiln (ton), amount of lime produced from the kiln (ton) processed, amount of coal and glycerin, source-wide natural gas consumed and hours of operation on a monthly basis. [401 KAR 52:020, Section 10].
6. Specific Reporting Requirements:
a. The prepared and implemented written OM&M plan must be submitted to the Division for review and approval as part of the application for a 40 CFR part 70 or 40 CFR part 71 permit. Any subsequent changes to the plan must be submitted to the applicable permitting authority for review and approval. Pending approval by the field office of an initial or amended plan, the facility shall comply with the provisions of the submitted plan. Each plan must contain the following information: [40 CFR 63.7100(d)] 1) Process and control device parameters to be monitored to determine compliance, along
with established operating limits or ranges, as applicable, for each emission unit. 2) A monitoring schedule for each emission unit. 3) Procedures for the proper operation and maintenance of each emission unit and each
air pollution control device used to meet the applicable emission limitations and operating limits in Tables 1 and 2 of 40 CFR 63, Subpart AAAAA, respectively.
4) Procedures for the proper installation, operation, and maintenance of monitoring devices or systems used to determine compliance, including: i. Calibration and certification of accuracy of each monitoring device; ii. Performance and equipment specifications for the sample interface, parametric
signal analyzer, and the data collection and reduction systems; iii. Ongoing operation and maintenance procedures in accordance with the general
requirements of 40 CFR 63.8(c)(1), (3), and (4)(ii); and iv. Ongoing data quality assurance procedures in accordance with the general
requirements of 40 CFR 63.8(d). 5) Procedures for monitoring process and control device parameters. 6) Corrective actions to be taken when process or operating parameters or add-on control
device parameters deviate from the operating limits specified in Table 2 of 40 CFR 63, Subpart AAAAA, including: i. Procedures to determine and record the cause of a deviation or excursion, and the
time the deviation or excursion began and ended; and ii. Procedures for recording the corrective action taken, the time corrective action was
initiated, and the time and date the corrective action was completed. 7) A maintenance schedule for each emission unit and control device that is consistent
with the manufacturer's instructions and recommendations for routine and long-term maintenance.
b. The permittee must report each instance in which the unit did not meet each operating limit, opacity limit, and VE limit in Tables 2 and 6 of 40 CFR 63, Subpart AAAAA that applies. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations of 40 CFR 63, Subpart AAAAA. These deviations must be reported according to the requirements in 40 CFR 63.7131.[40 CFR 63.7121(b)]
![Page 94: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/94.jpg)
Permit Number: V-14-002 R6 Page: 23 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. The permittee must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in 40 CFR 63.7130(e). [40 CFR 63.7114(c)]
7. Specific Control Equipment Operating Conditions:
a. The baghouse shall be operated to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and standard operating practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection system shall be maintained. [401 KAR 52:020, Section 10]
![Page 95: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/95.jpg)
Permit Number: V-14-002 R6 Page: 24 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROTARY LIME KILNS: KL02 - Rotary Kiln #2 Emission Unit 08-01 Rotary Kiln #2 Description: Fuller Kiln – 10'6" × 300' Construction Commenced: 1970 Maximum Rated Input Capacity: 61 tons/hour of Limestone Primary Fuel: Pulverized Coal; Maximum Firing Rate: 8.9 tons/hr Secondary Fuels: Natural Gas, Glycerin Startup Fuels: Natural Gas Controls: Pulse Jet Baghouse (Redi-Cam) 2003 APPLICABLE REGULATIONS: 401 KAR 61:020, Existing process operations. 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter. Requirements of this subpart are satisfied by applicability of 40 CFR 63, Subpart AAAAA. 1. Operating Limitations:
a. Maintain and operate the FF such that the BLDS or PM detector alarm condition does not exist for more than 5 percent of the total operating time in a 6-month period; and comply with the requirements in 40 CFR 63.7113(d) through (f) and Table 5 of Subpart AAAAA. In lieu of a BLDS or PM detector, maintain the FF such that the 6-minute average opacity for any 6-minute block period does not exceed 15 percent; and comply with the requirements in 40 CFR 63.7113(f) and (g) and Table 5 to Subpart AAAAA. [40 CFR 63.7090(b)]
Compliance Demonstration Method: Demonstrate continuous compliance by installing, maintaining, calibrating and operating a continuous opacity monitoring system (COMS) as required by 40 CFR part 63, subpart A, General Provisions and according to PS-1 of appendix B to part 60 of this chapter, except as specified in 40 CFR 63.7113(g)(2); and collecting the COMS data at a frequency of at least once every 15 seconds, determining block averages for each 6-minute period and demonstrating for each 6-minute block period the average opacity does not exceed 15 percent.
b. Prepare and implement a written OM&M plan. The plan must include items listed in 40
CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
![Page 96: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/96.jpg)
Permit Number: V-14-002 R6 Page: 25 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
d. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP)
according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)] e. Always operate and maintain the affected source, including air pollution control and
monitoring equipment, according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR 63.7100 (c)]
2. Emission Limitations:
a. Emissions of particulate matter shall not exceed 0.12 lb/ton of stone feed (lb/tsf). Weighted average PM emissions may be determined according to Equation 2 in 40 CFR 63.7112 and must not exceed 0.12 lb/tsf. [40 CFR 63.7090(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements.
b. Emissions of particulate matter shall not exceed the emission rate calculated by the
following equations: [401 KAR 61:020 Section 3(2)(a)]
For process weight rates in excess of 30 ton/hr, E = 55.0P0.11 - 40 Where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr. Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements.
c. No person shall cause, suffer, allow or permit any continuous emission into the open air from a control device or stack associated with any affected facility which is equal to or greater than forty (40) percent opacity. [401 KAR 61:020, Section 3(1)(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through the 4. Specific Monitoring Requirements.
d. The unit must be in compliance with the emission limitations of 40 CFR 63, Subpart
AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
3. Testing Requirements: a. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 5 years following the initial performance test and within 5 years following each subsequent performance test thereafter. [40 CFR 63.7111 and 401 KAR 50:045]
![Page 97: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/97.jpg)
Permit Number: V-14-002 R6 Page: 26 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) Performance tests may not be conducted during periods of startup, shutdown, or malfunction, as specified in 40 CFR 63.7(e)(1). [40 CFR 63.7112(c)]
2) Three separate test runs must be conducted for each required performance test, as specified in 40 CFR 63.7(e)(3). Each test run must last at least one hour. [40 CFR 63.7112(d)]
3) Calculate PM emissions from performance tests in accordance with the provisions in 40 CFR 63.7112(e), (f) and (g).
4) Performance test results must be documented in complete test reports that contain the information required by 40 CFR 63.7112 paragraphs (h)(1) through (10) of this section, as well as all other relevant information. The plan to be followed during testing must be made available to the Administrator at least 60 days prior to testing. [40 CFR 63.7112(h)]
5) The permittee must establish any applicable 3-hour block average operating limit indicated in Table 2 of 40 CFR 63 Subpart AAAAA according to the applicable requirements in Table 3 of 40 CFR 63 Subpart AAAAA and 40 CFR 63.7112 paragraphs (j)(1) through (4) of this section. [40 CFR 63.7112(j)]
4. Specific Monitoring Requirements: a. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the
differential pressure across the kiln baghouse to ensure that pressure does not drop outside the pressure drop range documented in the OM&M Plan. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
b. Following a reading outside of the pressure drop range specified in the OM&M:
1) Maintenance personnel shall inspect the monitoring system, baghouse, and operations immediately; and take correction action as soon as practicable.
2) Upon completed corrective action, the permittee shall immediately verify compliance with the opacity limit via COMS on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
c. For each COMS used to monitor an add-on air pollution control device, the facility must meet the requirements in paragraphs (g)(1) and (2) of this section. [40 CFR 63.7113(g)]
1) Install the COMS at the outlet of the control device. 2) Install, maintain, calibrate, and operate the COMS as required by 40 CFR part 63,
subpart A, General Provisions and according to Performance Specification (PS)-1 of appendix B to part 60 of this chapter. Facilities that operate COMS installed on or before February 6, 2001, may continue to meet the requirements in effect at the time of COMS installation unless specifically required to re-certify the COMS by their permitting authority.
![Page 98: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/98.jpg)
Permit Number: V-14-002 R6 Page: 27 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
d. For each emission unit equipped with an add-on air pollution control device, inspect each capture/collection and closed vent system at least once each calendar year to ensure that each system is operating in accordance with the operating requirements in Item 6 of Table 2 of 40 CFR 63 Subpart AAAAA and record the results of each inspection. [40 CFR 63.7113 (f)]
e. Except for monitor malfunctions, associated repairs, required quality assurance or control activities (including, as applicable, calibration checks and required zero adjustments), the permittee must monitor continuously (or collect data at all required intervals) at all times that the emission unit is operating. [40 CFR 63.7120(b)]
f. Data recorded during system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and high-level adjustments, periods of non-operation of the process unit (or portion thereof), resulting in cessation of the emissions to which the monitoring applies; and start-ups, shutdowns, and malfunctions may not be used either in data averages or calculations of emission or operating limits; or in fulfilling a minimum data availability requirement. The permittee must use all the data collected during all other periods in assessing the operation of the control device and associated control system. [40 CFR 63.7120(c)]
g. The amount of material placed in the kiln (ton), amount of lime produced from the kiln (ton)
processed, amount of coal and glycerin consumed, source-wide natural gas fuel usage and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10].
5. Specific Recordkeeping Requirements:
a. Maintain records of inspection of each capture/collection and closed vent system as required by 40 CFR 63.7113(f).
b. Maintain records of all routine and non-routine maintenance activities performed on the dust collection system. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
c. Keep records of performance tests and performance evaluation. [40 CFR 63.7132(a)(3)]
d. Keep visual observation records and EPA Reference Method 9 observation records, and
any inspections and repair records in a designated paper or electronic logbook. Records shall be maintained for five years. [401 KAR 52:020, Section 10]
e. Performance test results must be documented in complete test reports that contain the
information below, as well as all other relevant information. The plan to be followed during testing must be made available to the Division at least 60 days prior to testing. [40 CFR 63.7112(h)] 1) A brief description of the process and the air pollution control system; 2) Sampling location description(s);
![Page 99: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/99.jpg)
Permit Number: V-14-002 R6 Page: 28 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
3) A description of sampling and analytical procedures and any modifications to standard procedures;
4) Test results, including opacity; 5) Quality assurance procedures and results; 6) Records of operating conditions during the test, preparation of standards, and
calibration procedures; 7) Raw data sheets for field sampling and field and laboratory analyses; 8) Documentation of calculations; 9) All data recorded and used to establish operating limits; and 10) Any other information required by the test method.
f. Maintain records of the COM data on the kiln baghouse. Records shall, at a minimum,
include the date and time of the reading and the opacity reading value. Records shall also include information on any corrective actions taken when the opacity exceeded the opacity trigger level. [401 KAR 52:020, Section 10]
g. Maintain records of the differential pressure readings on the kiln baghouse taken once per shift in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [401 KAR 52:020, Section 10]
h. Maintain records of the amount of material placed in the kiln (ton), amount of lime
produced from the kiln (tons), amount of coal, glycerin, source-wide natural gas consumed and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
a. The prepared and implemented written OM&M plan must be submitted to the Division for review and approval as part of the application for a 40 CFR part 70 or 40 CFR part 71 permit. Any subsequent changes to the plan must be submitted to the applicable permitting authority for review and approval. Pending approval by the field office of an initial or amended plan, the facility shall comply with the provisions of the submitted plan. Each plan must contain the following information: [40 CFR 63.7100(d)] 1) Process and control device parameters to be monitored to determine compliance, along
with established operating limits or ranges, as applicable, for each emission unit. 2) A monitoring schedule for each emission unit. 3) Procedures for the proper operation and maintenance of each emission unit and each
air pollution control device used to meet the applicable emission limitations and operating limits in Tables 1 and 2 of 40 CFR 63, Subpart AAAAA, respectively.
4) Procedures for the proper installation, operation, and maintenance of monitoring devices or systems used to determine compliance, including: i. Calibration and certification of accuracy of each monitoring device; ii. Performance and equipment specifications for the sample interface, parametric
signal analyzer, and the data collection and reduction systems;
![Page 100: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/100.jpg)
Permit Number: V-14-002 R6 Page: 29 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
iii. Ongoing operation and maintenance procedures in accordance with the general requirements of 40 CFR 63.8(c)(1), (3), and (4)(ii); and
iv. Ongoing data quality assurance procedures in accordance with the general requirements of 40 CFR 63.8(d).
5) Procedures for monitoring process and control device parameters. 6) Corrective actions to be taken when process or operating parameters or add-on control
device parameters deviate from the operating limits specified in Table 2 of 40 CFR 63, Subpart AAAAA, including: i. Procedures to determine and record the cause of a deviation or excursion, and the
time the deviation or excursion began and ended; and ii. Procedures for recording the corrective action taken, the time corrective action was
initiated, and the time and date the corrective action was completed. 7) A maintenance schedule for each emission unit and control device that is consistent
with the manufacturer's instructions and recommendations for routine and long-term maintenance.
b. The permittee must report each instance in which the unit did not meet each operating limit,
opacity limit, and VE limit in Tables 2 and 6 of 40 CFR 63, Subpart AAAAA that applies. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations of 40 CFR 63, Subpart AAAAA. These deviations must be reported according to the requirements in 40 CFR 63.7131.[40 CFR 63.7121(b)]
c. The permittee must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in 40 CFR 63.7130(e). [40 CFR 63.7114(c)]
7. Specific Control Equipment Operating Conditions:
a. The baghouse shall be operated to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and standard operating practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection system shall be maintained. [401 KAR 52:020, Section 10]
![Page 101: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/101.jpg)
Permit Number: V-14-002 R6 Page: 30 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROTARY LIME KILNS: KL03 - Rotary Kiln #3 Emission Unit 09-01 Rotary Kiln #3 Description: Allis-Chalmers Kiln – 14'6" × 400'6" Construction Commenced: 1974 Maximum Rated Input Capacity: 130 tons/hour of limestone Primary Fuel: Pulverized Coal; Maximum Firing Rate: 15.5 tons/hr Secondary Fuels: Natural Gas, Glycerin Startup Fuels: Natural Gas Controls: Reverse-Air Baghouse (American Air) APPLICABLE REGULATIONS: 401 KAR 61:020, Existing process operations. 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter. Requirements of this subpart are satisfied by applicability of 40 CFR 63, Subpart AAAAA. 1. Operating Limitations:
a. Maintain and operate the FF such that the BLDS or PM detector alarm condition does not exist for more than 5 percent of the total operating time in a 6-month period; and comply with the requirements in 40 CFR 63.7113(d) through (f) and Table 5 of Subpart AAAAA. In lieu of a BLDS or PM detector, maintain the FF such that the 6-minute average opacity for any 6-minute block period does not exceed 15 percent; and comply with the requirements in 40 CFR 63.7113(f) and (g) and Table 5 to Subpart AAAAA. [40 CFR 63.7090(b)]
b. Prepare and implement a written OM&M plan. The plan must include items listed in 40
CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
c. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
d. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP)
according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)] e. Always operate and maintain the affected source, including air pollution control and
monitoring equipment, according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR 63.7100 (c)]
![Page 102: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/102.jpg)
Permit Number: V-14-002 R6 Page: 31 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2. Emission Limitations: a. Emissions of particulate matter shall not exceed 0.12 lb/ton of stone feed (lb/tsf). Weighted
average PM emissions may be determined according to Equation 2 in 40 CFR 63.7112 and must not exceed 0.12 lb/tsf. [40 CFR 63.7090(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements.
b. Emissions of particulate matter shall not exceed the emission rate calculated by the
following equations: [401 KAR 61:020 Section 3(2)(a)]
For process weight rates in excess of 30 ton/hr, E = 55.0P0.11 - 40 Where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr. Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements.
c. No person shall cause, suffer, allow or permit any continuous emission into the open air from a control device or stack associated with any affected facility which is equal to or greater than forty (40) percent opacity. [401 KAR 61:020, Section 3(1)(a)]
Compliance Demonstration Method: Compliance shall be demonstrated through the 4. Specific Monitoring Requirements.
d. The unit must be in compliance with the emission limitations of 40 CFR 63, Subpart
AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)].
3. Testing Requirements: a. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 5 years following the initial performance test and within 5 years following each subsequent performance test thereafter. [40 CFR 63.7111 and 401 KAR 50:045] 1) Performance tests may not be conducted during periods of startup, shutdown, or
malfunction, as specified in 40 CFR 63.7(e)(1). [40 CFR 63.7112(c)] 2) Three separate test runs must be conducted for each required performance test, as
specified in 40 CFR 63.7(e)(3). Each test run must last at least one hour. [40 CFR 63.7112(d)]
3) Calculate PM emissions from performance tests in accordance with the provisions in 40 CFR 63.7112(e), (f) and (g).
4) Performance test results must be documented in complete test reports that contain the information required by 40 CFR 63.7112 paragraphs (h)(1) through (10) of this section, as well as all other relevant information. The plan to be followed during testing must be made available to the Administrator at least 60 days prior to testing. [40 CFR 63.7112(h)]
![Page 103: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/103.jpg)
Permit Number: V-14-002 R6 Page: 32 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
5) The permittee must establish any applicable 3-hour block average operating limit indicated in Table of 40 CFR 63, Subpart AAAAA according to the applicable requirements in Table 3 of 40 CFR 63, Subpart AAAAA and 40 CFR 63.7112 paragraphs (j)(1) through (4) of this section. [40 CFR 63.7112(j)]
4. Specific Monitoring Requirements: a. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the
differential pressure across the kiln baghouse to ensure that pressure does not drop outside the pressure drop range documented in the OM&M Plan. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
b. Following a reading outside of the pressure drop range specified in the OM&M:
1) Maintenance personnel shall inspect the monitoring system, baghouse, and operations immediately; and make needed repairs as soon as practicable.
2) Upon completed corrective action, the permittee shall immediately conduct EPA Reference Method 9 opacity reading on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
c. If a bag leak detection system or PM detector is not utilized, conduct a VE check daily
(minimum of 6-minutes) in accordance with EPA Reference Method 9 of Appendix A to 40 CFR Part 60. Record the opacity observed in an observation log. The reading shall be performed by a representative of the permittee certified in Visible Emissions Evaluation. Maintain a list of all individuals who are certified EPA Reference Method 9 Visible Emissions Evaluators. [40 CFR 63.7121(f)]
d. If the opacity reading is greater than fifteen (15) percent from the stack during the daily VE check, then initiate an inspection of the equipment and make repairs if necessary. [401 KAR 52:020, Section 10]
e. For each emission unit equipped with an add-on air pollution control device, inspect each
capture/collection and closed vent system at least once each calendar year to ensure that each system is operating in accordance with the operating requirements in Item 6 of Table 2 of 40 CFR 63 Subpart AAAAA and record the results of each inspection. [40 CFR 63.7113(f)]
f. Except for monitor malfunctions, associated repairs, required quality assurance or control
activities (including, as applicable, calibration checks and required zero adjustments), the permittee must monitor continuously (or collect data at all required intervals) at all times that the emission unit is operating. [40 CFR 63.7120(b)]
g. Data recorded during system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and high-level adjustments, periods of non-operation of the process unit (or portion thereof), resulting in cessation of the emissions to which the monitoring applies; and start-ups, shutdowns, and malfunctions may not be used either in
Commented [A4]: Carmeuse is proposing to remove the requirement to conduct an immediate Method 9 reading due to a differential pressure excursion. Refer to rationale provided in the application report.
![Page 104: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/104.jpg)
Permit Number: V-14-002 R6 Page: 33 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
data averages or calculations of emission or operating limits; or in fulfilling a minimum data availability requirement. The permittee must use all the data collected during all other periods in assessing the operation of the control device and associated control system. [40 CFR 63.7120(c)]
h. The amount of material placed in the kiln (ton), amount of lime produced from the kiln (tons), amount of coal and glycerin, source-wide natural gas consumed and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
a. Maintain records of inspection of each capture/collection and closed vent system as required by 40 CFR 63.7113(f).
b. Maintain records of all routine and non-routine maintenance activities performed on the dust collection system. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
c. Keep records of performance tests and performance evaluation. [40 CFR 63.7132(a)(3)]
d. Keep visual observation records and EPA Reference Method 9 observation records, and
any inspections and repair records in a designated paper or electronic logbook. Records shall be maintained for five years. [401 KAR 52:020, Section 10]
e. Performance test results must be documented in complete test reports that contain the
information below, as well as all other relevant information. The plan to be followed during testing must be made available to the Division at least 60 days prior to testing. [40 CFR 63.7112(h)] 1) A brief description of the process and the air pollution control system; 2) Sampling location description(s); 3) A description of sampling and analytical procedures and any modifications to standard
procedures; 4) Test results, including opacity; 5) Quality assurance procedures and results; 6) Records of operating conditions during the test, preparation of standards, and
calibration procedures; 7) Raw data sheets for field sampling and field and laboratory analyses; 8) Documentation of calculations; 9) All data recorded and used to establish operating limits; and
10) Any other information required by the test method.
f. Maintain records of the differential pressure readings on the kiln baghouse taken once per shift in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective
![Page 105: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/105.jpg)
Permit Number: V-14-002 R6 Page: 34 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
actions taken when readings outside the appropriate range are recorded. [401 KAR 52:020, Section 10]
g. Maintain records of the amount of material placed in the kiln (ton), amount of lime produced from the kiln (ton) processed, amount of coal and glycerin, source-wide natural gas consumed and hours of operation on a monthly basis. [401 KAR 52:020, Section 10].
6. Specific Reporting Requirements:
a. The prepared and implemented written OM&M plan must be submitted to the Division for review and approval as part of the application for a 40 CFR part 70 or 40 CFR part 71 permit. Any subsequent changes to the plan must be submitted to the applicable permitting authority for review and approval. Pending approval by the field office of an initial or amended plan, the facility shall comply with the provisions of the submitted plan. Each plan must contain the following information: [40 CFR 63.7100(d)] 1) Process and control device parameters to be monitored to determine compliance, along
with established operating limits or ranges, as applicable, for each emission unit. 2) A monitoring schedule for each emission unit. 3) Procedures for the proper operation and maintenance of each emission unit and each
air pollution control device used to meet the applicable emission limitations and operating limits in Tables 1 and 2 of 40 CFR 63, Subpart AAAAA, respectively.
4) Procedures for the proper installation, operation, and maintenance of monitoring devices or systems used to determine compliance, including: i. Calibration and certification of accuracy of each monitoring device; ii. Performance and equipment specifications for the sample interface, parametric
signal analyzer, and the data collection and reduction systems; iii. Ongoing operation and maintenance procedures in accordance with the general
requirements of 40 CFR 63.8(c)(1), (3), and (4)(ii); and iv. Ongoing data quality assurance procedures in accordance with the general
requirements of 40 CFR 63.8(d). 5) Procedures for monitoring process and control device parameters. 6) Corrective actions to be taken when process or operating parameters or add-on control
device parameters deviate from the operating limits specified in Table 2 of 40 CFR 63, Subpart AAAAA, including: i. Procedures to determine and record the cause of a deviation or excursion, and the
time the deviation or excursion began and ended; and ii. Procedures for recording the corrective action taken, the time corrective action was
initiated, and the time and date the corrective action was completed. 7) A maintenance schedule for each emission unit and control device that is consistent
with the manufacturer's instructions and recommendations for routine and long-term maintenance.
b. The permittee must report each instance in which the unit did not meet each operating limit, opacity limit, and VE limit in Tables 2 and 6 of 40 CFR 63, Subpart AAAAA that applies. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations of 40 CFR 63, Subpart AAAAA. These deviations must be reported according to the requirements in 40 CFR 63.7131. [40 CFR 63.7121(b)]
![Page 106: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/106.jpg)
Permit Number: V-14-002 R6 Page: 35 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. The permittee must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in 40 CFR 63.7130(e). [40 CFR 63.7114(c)]
7. Specific Control Equipment Operating Conditions:
a. The baghouse shall be operated to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and standard operating practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection system shall be maintained. [401 KAR 52:020, Section 10]
![Page 107: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/107.jpg)
Permit Number: V-14-002 R6 Page: 36 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROTARY LIME KILNS: KL04 - Rotary Kiln #4 Emission Unit 10-01 Rotary Kiln #4 Description: KVS Kiln – 17' × 200' Construction Commenced: 1995 Maximum Rated Input Capacity: 110 tons/hour of Limestone Primary Fuels: Pulverized Coal; (Maximum Firing Rate: 9.6 tons/hr); Natural Gas (Maximum Firing Rate: 0.24 MMscf/hr) Secondary Fuel: Glycerin Startup Fuels: Natural Gas Controls: Pulse-Jet Baghouse [Model: Amerex (7) Module RP-14-304 D6 (16 × 9)] APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(qq) 40 C.F.R. 60.340 to 60.344 (Subpart HH), Standards of Performance for Lime Manufacturing Plants 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 401 KAR 51:017, Prevention of significant deterioration, (C-93-032). 1. Operating Limitations:
a. Lime production from Rotary Kiln #4 shall not exceed 46 tons per hour. [401 KAR 51:017, C-93-032] Compliance Demonstration Method: Compliance shall be demonstrated through 4. Specific Monitoring Requirements i.
b. The only solid fuel permissible in the kiln is coal. [401 KAR 51:017, C-93-032]
1) Coal with less than an average heating value of either 12,900 Btu/lb or the average for the coal burned during a prior passing compliance demonstration for nitrogen oxide (NOx), carbon monoxide (CO), particulate (PM), and sulfur dioxide (SO2), whichever is lower, shall not be burned. For the purposes of this condition, average heating value is defined as the weighted average heating value in the coal from all shipments received in each month on a dry weight basis. Coal with less than a minimum average heating value of 12,900 Btu/lb for each shipment shall not be burned as fuel unless the nitrogen oxide (NOx), carbon monoxide (CO), particulate (PM), and sulfur dioxide (SO2) emission limits are not exceeded. Average is defined as the average heating value of shipments received in each month.
2) Coal with more than an average sulfur content of either 0.9% or the average for the coal burned during a prior passing compliance demonstration for NOx, CO, PM, and SO2, whichever is higher, shall not be burned. For the purposes of this condition, average sulfur content is defined as the weighted average sulfur content
Commented [A5]: Carmeuse is proposing a clarification on the heating value and sulfur content averaging methodology for coal shipments. Refer to application report for additional discussion. Carmeuse is also requesting the PSD language from the prior permit (V-05-003 R1) be brought forward to the renewed permit for clarification.
![Page 108: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/108.jpg)
Permit Number: V-14-002 R6 Page: 37 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
in the coal from all shipments received in each month on a dry weight basis. Coal with more than an average sulfur content of 0.9% for each shipment shall not be burned as fuel unless the NOx, CO, PM, and SO2 emission limits are not exceeded. Average is defined as the average sulfur content of shipments received in each month.
Compliance Demonstration Method: In determining compliance with the sulfur content limitation and heating value of the coal, the permittee may obtain certification from the supplier or test one sample of coal as received or shipped in. When the facility combusts coal with an average heating value less than allowed12,900 Btu/lb or a sulfur content more than 0.9% sulfurallowed, the facility shall submit a protocol within 30 days of fuel receiptthe end of the month the excursion occurs to conduct performance testing to demonstrate compliance with nitrogen oxide, carbon monoxide, particulate, and sulfur dioxide emission limits are not exceeded.
c. Maintain and operate the FF such that the BLDS or PM detector alarm condition does not exist for more than 5 percent of the total operating time in a 6-month period; and comply with the requirements in 40 CFR 63.7113(d) through (f) and Table 5 of Subpart AAAAA. In lieu of a BLDS or PM detector maintain the FF such that the 6-minute average opacity for any 6-minute block period does not exceed 15 percent; and comply with the requirements in 40 CFR 63.7113(f) and (g) and Table 5 to Subpart AAAAA. [40 CFR 63.7090(b)]
Compliance Demonstration Method: Demonstrate continuous compliance by installing, maintaining, calibrating and operating a COMS as required by 40 CFR part 63, subpart A, General Provisions and according to PS-1 of appendix B to part 60 of this chapter, except as specified in 40 CFR 63.7113(g)(2); and collecting the COMS data at a frequency of at least once every 15 seconds, determining block averages for each 6-minute period and demonstrating for each 6-minute block period the average opacity does not exceed 15 percent.
d. Prepare and implement a written OM&M plan. The plan must include items listed in 40
CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
e. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
f. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP)
according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)] g. Always operate and maintain the affected source, including air pollution control and
monitoring equipment, according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR 63.7100 (c)]
2. Emission Limitations:
![Page 109: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/109.jpg)
Permit Number: V-14-002 R6 Page: 38 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
a. Particulate Matter Emissions: 1) Shall not exceed 0.12 lb/ton of stone feed (lb/tsf). Weighted average PM emissions may
be determined according to Equation 2 in 40 CFR 63.7112 and must not exceed 0.12 lb/tsf. [40 CFR 63.7090(a) and 401 KAR 51:017]
Compliance Demonstration Method: Compliance shall be demonstrated through 3. Testing Requirements c.
2) The permittee shall not exceed 0.60 lb/ton of stone feed (lb/tsf). [40 CFR 60.342]
Compliance Demonstration Method: Compliance shall be demonstrated by meeting the requirements of 2. Emission Limitations a.(1).
b. Sulfur dioxide emissions shall not exceed 22.97 lb/hr. [401 KAR 51:017, C-93-032]
c. Nitrogen dioxide emissions shall not exceed 128.33 lb/hr. [401 KAR 51:017, C-93-032] d. Carbon monoxide emissions shall not exceed 91.67 lb/hr. [401 KAR 51:017, C-93-032]
Compliance Demonstration Method: 1. Compliance with 2. Emission Limitations b., c., and d. shall be demonstrated through
performance testing required under 3. Testing Requirements d. and e.
2. When required for comparison with the particulate matter emission limit, emission rates shall be calculated using the following equation:
E = (csQsd) / PK, where E = emission rate of particulate matter, lb/ton of stone feed cs = concentration of particulate matter, g/dscf Qsd = volumetric flow rate of effluent gas, dscf/hr P = stone feed rate, ton/hr K = conversion factor, 7000gr/lb
In determining the particulate matter concentration (cs) and the volumetric flow rate
(Qsd) of the effluent gas: a) EPA Reference Method 5 shall be used at negative-pressure fabric filters
and other types of control devices and b) EPA Reference Method 5 D shall be used at positive-pressure fabric filters.
The sampling time and sample volume for each run shall be at least 60 minutes and 31.8 dscf. The stone feed rate for each run shall be determined using the monitoring device specified in 3. Testing Requirements b.
![Page 110: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/110.jpg)
Permit Number: V-14-002 R6 Page: 39 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
e. Visible emissions discharged into the atmosphere shall not exceed 15% opacity when exiting from a dry emission control device. [40 CFR 60.342(a)(2), 401 KAR 51:017, C-93-032]
Compliance Demonstration Method: Compliance shall be demonstrated through monitoring required under 4. Specific Monitoring Requirements b.
f. The unit must be in compliance with the emission limitations of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
3. Testing Requirements:
a. Testing shall be conducted in accordance with 401 KAR 50:045, Performance Tests, the testing shall be conducted under conditions representative of maximum emissions potential under anticipated operating conditions at the pollutant-specific emissions unit.
b. For the purpose of conducting a performance test, install, calibrate, maintain, and operate
a device for measuring the mass rate of stone feed to each rotary lime kiln. The measuring device used must be accurate to within 5 percent of the mass rate over its operating range. [40 CFR 60.343(d)] The mass rate of stone feed may be calculated for each 24-hour block period based on the lime production, multiplied by a suitable factor to arrive at the equivalent stone feed rate. The methodology for defining the stone feed to lime production factor shall be established during particulate matter performance tests.
c. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 5 years following the initial performance test and within 5 years following each subsequent performance test thereafter. [40 CFR 63.7111 and 401 KAR 50:045] 1) Performance tests may not be conducted during periods of startup, shutdown, or
malfunction, as specified in 40 CFR 63.7(e)(1). [40 CFR 63.7112(c)] 2) Three separate test runs must be conducted for each required performance test, as
specified in 40 CFR 63.7(e)(3). Each test run must last at least one hour. [40 CFR 63.7112(d)]
3) Calculate PM emissions from performance tests in accordance with the provisions in 40 CFR 63.7112(e), (f) and (g).
4) Performance test results must be documented in complete test reports that contain the information required by 40 CFR 63.7112 paragraphs (h)(1) through (10) of this section, as well as all other relevant information. The plan to be followed during testing must be made available to the Administrator at least 60 days prior to testing. [40 CFR 63.112(h)]
5) The permittee must establish any applicable 3-hour block average operating limit indicated in Table 2 to this 40 CFR 63, Subpart AAAAA t according to the applicable requirements in Table 3 of 40 CFR 63, Subpart AAAAA and 40 CFR 63.112 paragraphs (j)(1) through (4) of this section. [40 CFR 63.112(j)]
![Page 111: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/111.jpg)
Permit Number: V-14-002 R6 Page: 40 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
d. Performance testing in accordance with EPA Reference Method 6C for sulfur dioxide, EPA Reference Method 7E for nitrogen oxide, and EPA Reference Method 10 for carbon monoxide as specified in 401 KAR 50:015 shall be conducted once per permit life (or once every five years) and as required by the Division. [401 KAR 50:045, Section 1]
e. During Performance performance testing, the facility shall obtain one representative fuel
sample per hour. These samples collectively shall be analyzed for the percent sulfur content and heating value (Btu/lb) on a dry basis. [401 KAR 50:045, Section 1]
4. Specific Monitoring Requirements:
a. The owner or operator shall install, calibrate, maintain and operate a continuous monitoring system to monitor and record the opacity of a representative portion of the gases discharged into the atmosphere from each kiln. The span of this system shall be set at 40 percent (40%) opacity. [40 CFR 60.343(a)]
b. For each COMS used to monitor an add-on air pollution control device, meet the requirements in paragraphs (g)(1) and (2) of this section. [40 CFR 63.7003(g)] 1) Install the COMS at the outlet of the control device. 2) Install, maintain, calibrate, and operate the COMS as required by 40 CFR part 63,
subpart A, General Provisions and according to Performance Specification (PS)-1 of appendix B to part 60 of this chapter. Facilities that operate COMS installed on or before February 6, 2001, may continue to meet the requirements in effect at the time of COMS installation unless specifically required to re-certify the COMS by their permitting authority.
c. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the
differential pressure across the kiln baghouse to ensure that pressure does not drop outside the pressure drop range documented in the OM&M Plan. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
d. Following a reading outside of the pressure drop range specified in the OM&M:
1) Maintenance personnel shall inspect the monitoring system, baghouse, and operations immediately; and make needed repairs as soon as practicable.
2) Upon completed corrective action, the permittee shall immediately verify compliance with the opacity limit via COMS on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
e. If a bag leak detection system or PM detector is not utilized, conduct a VE check daily
(minimum of 6-minutes) in accordance with EPA Reference Method 9 of Appendix A to 40 CFR Part 60. Record the opacity observed in an observation log. The reading shall be performed by a representative of the permittee certified in Visible Emissions Evaluation. Maintain a list of all individuals who are certified EPA Reference Method 9 Visible Emissions Evaluators. [40 CFR 63.7121(f)]
![Page 112: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/112.jpg)
Permit Number: V-14-002 R6 Page: 41 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
f. For each emission unit equipped with an add-on air pollution control device, inspect each capture/collection and closed vent system at least once each calendar year to ensure that each system is operating in accordance with the operating requirements in Item 6 of Table 2 of 40 CFR 63 Subpart AAAAA and record the results of each inspection. [40 CFR 63.7113(f)]
g. Except for monitor malfunctions, associated repairs, required quality assurance or control activities (including, as applicable, calibration checks and required zero adjustments), the permittee must monitor continuously (or collect data at all required intervals) at all times that the emission unit is operating. [40 CFR 63.7120(b)]
h. Data recorded during system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and high-level adjustments, periods of non-operation of the process unit (or portion thereof), resulting in cessation of the emissions to which the monitoring applies; and start-ups, shutdowns, and malfunctions may not be used either in data averages or calculations of emission or operating limits; or in fulfilling a minimum data availability requirement. The permittee must use all the data collected during all other periods in assessing the operation of the control device and associated control system. [40 CFR 63.7120(c)]
i. The amount of material placed in the kiln (ton), amount of lime produced from the kiln (tons), amount of coal and glycerin, natural gas consumed and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10]
j. In the absence of certification of the sulfur content of the coal from the supplier, the owner or operator shall obtain representative samples from each delivery of coal. These samples collectively shall be analyzed for the percent sulfur content and heating value (Btu/lb). [401 KAR 51:017, C-93-032]
k. The permittee shall monitor and calculate annual NOx, PM/PM10 and PM2.5 emissions from
emission unitsRotary Kiln #4 and #5 and maintain a record of the annual emissions, in tons per year on a calendar year basis for Five five (5) years following resumption of regular operations after the modification authorized by V-14-002 R4 (i.e., installation of multichannel burners). The source shall submit a report to the Division if: [401 KAR 51:017, Section 16(5). Source Obligation]
1) The annual NOx, PM/PM10 and PM2.5 emissions, in tons per year, from this the proposed projectmodification exceeds the baseline actual emissions for the project by a significant amount for NOx, PM/PM10 and PM2.5; and
2) The NOx, PM/PM10 and PM2.5 emissions differ from the projected actual emissions as submitted in the application for Kiln #4 and #5 respectively.
5. Specific Recordkeeping Requirements:
a. Maintain records of inspection of each capture/collection and closed vent system as required by 40 CFR 63.7113(f).
b. Keep records of performance tests and performance evaluation. [40 CFR 63.7132(a)(3)]
Commented [A6]: Carmeuse requests that this clause be added so that it is clear what modification is being referred to in the permit condition.
![Page 113: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/113.jpg)
Permit Number: V-14-002 R6 Page: 42 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. Keep visual observation records and EPA Reference Method 9 observation records, and
any inspections and repair records in a designated paper or electronic logbook. Records shall be maintained for five years. [401 KAR 52:020, Section 10]
d. Performance test results must be documented in complete test reports that contain the information below, as well as all other relevant information. The plan to be followed during testing must be made available to the Division at least 60 days prior to testing. [40 CFR 63.7112(h)] 1) A brief description of the process and the air pollution control system; 2) Sampling location description(s); 3) A description of sampling and analytical procedures and any modifications to standard
procedures; 4) Test results, including opacity; 5) Quality assurance procedures and results; 6) Records of operating conditions during the test, preparation of standards, and
calibration procedures; 7) Raw data sheets for field sampling and field and laboratory analyses; 8) Documentation of calculations; 9) All data recorded and used to establish operating limits; and
10) Any other information required by the test method.
e. Maintain records of the differential pressure readings on the kiln baghouse taken in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [401 KAR 52:020, Section 10]
f. Maintain records of all routine and non-routine maintenance activities performed on the
baghouse. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
g. During all periods of startup, shutdown, or malfunction of the baghouse, keep a record of
any days when any air emissions were visible from the stack associated with the baghouse. [401 KAR 52:020, Section 10]
h. Maintain records of the amount of material placed in the kiln (ton), amount of lime
produced from the kiln (ton) processed, amount of coal and glycerin, natural gas consumed and hours of operation on a monthly basis. [401 KAR 52:020, Section 10].
i. Records of the heat content (Btu/lb) and sulfur content (percent) of coal sampled each
month shall be maintained. [401 KAR 51:017, C-93-032]
j. In accordance with the requirements of 401 KAR 51:017, Section 16 (5)(a), for the Kiln #4 and #5 Burner Change Project covered by Permit V-14-002 R4, the permittee shall:
![Page 114: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/114.jpg)
Permit Number: V-14-002 R6 Page: 43 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) Maintain a copy of the permit application covering the project that includes: [401 KAR 51:017 Section 16 (5)(b)]
i. A description of the project. ii. Identification of the emission units for which emissions of a regulated NSR
pollutant could be affected by the project; and iii. A description of the applicability test used to determine that the project is not a
major modification for any regulated NSR pollutant. The description should include baseline actual emissions, projected actual emissions, the amount of emissions exclude in calculating projected actual emissions and an explanations for why that amount was excluded, and any applicable netting calculations.
2) Calculate and maintain record of the annual NOx, PM/PM10 and PM2.5 emissions, in tons per year, on a calendar year basis for five years following commencement of operation of multichannel burners on both Kiln #4 and #5. [401 KAR 51:017 Section 16 (5) (c) (2)]
i. The Permittee shall report to the Division if the annual NOx, PM/PM10 orPM2.5 emissions, in tons per year, from Kiln #4 and #5, exceeds the baseline actual emissions by a significant amount and the emissions differ from the preconstruction projection as documented and maintained pursuant to Condition 5.j.1. [401 KAR 51:017 Section 16 (5) (e) (1)]
ii. The report shall be submitted to the Division with 60 days after the end of the year and shall contain the name, address, and telephone number of the major stationary source; the annual NOx emissions calculated; and any other information the Permittee wishes to include in the report. [401 KAR 51:017 Section 16 (5) (e) (2)]
6. Specific Reporting Requirements:
a. The prepared and implemented written OM&M plan must be submitted to the Division for review and approval as part of the application for a 40 CFR part 70 or 40 CFR part 71 permit. Any subsequent changes to the plan must be submitted to the applicable permitting authority for review and approval. Pending approval by the field office of an initial or amended plan, the facility shall comply with the provisions of the submitted plan. Each plan must contain the following information: [40 CFR 63.7100(d)] 1) Process and control device parameters to be monitored to determine compliance, along
with established operating limits or ranges, as applicable, for each emission unit. 2) A monitoring schedule for each emission unit. 3) Procedures for the proper operation and maintenance of each emission unit and each
air pollution control device used to meet the applicable emission limitations and operating limits in Tables 1 and 2 of 40 CFR 63, Subpart AAAAA, respectively.
4) Procedures for the proper installation, operation, and maintenance of monitoring devices or systems used to determine compliance, including: i. Calibration and certification of accuracy of each monitoring device; ii. Performance and equipment specifications for the sample interface, parametric
signal analyzer, and the data collection and reduction systems; iii. Ongoing operation and maintenance procedures in accordance with the general
requirements of 40 CFR 63.8(c)(1), (3), and (4)(ii); and iv. Ongoing data quality assurance procedures in accordance with the general
requirements of 40 CFR 63.8(d).
![Page 115: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/115.jpg)
Permit Number: V-14-002 R6 Page: 44 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
5) Procedures for monitoring process and control device parameters. 6) Corrective actions to be taken when process or operating parameters or add-on control
device parameters deviate from the operating limits specified in Table 2 of 40 CFR 63, Subpart AAAAA, including: i. Procedures to determine and record the cause of a deviation or excursion, and the
time the deviation or excursion began and ended; and ii. Procedures for recording the corrective action taken, the time corrective action was
initiated, and the time and date the corrective action was completed. 7) A maintenance schedule for each emission unit and control device that is consistent
with the manufacturer's instructions and recommendations for routine and long-term maintenance.
b. The permittee must report each instance in which the unit did not meet each operating
limit, opacity limit, and VE limit in Tables 2 and 6 of 40 CFR 63, Subpart AAAAA that applies. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations of 40 CFR 63, Subpart AAAAA. These deviations must be reported according to the requirements in 40 CFR 63.7131.[40 CFR 63.7121(b)]
c. The permittee must submit the Notification of Compliance Status containing the results
of the initial compliance demonstration according to the requirements in 40 CFR 63.7130(e). [40 CFR 63.7114(c)]
d. Submit reports of excess emissions of all 6-minute periods during which the average
opacity of the visible emissions from any lime kiln utilizing a continuous monitoring system is greater than 15 percent. [40 CFR 60.343(e)]
7. Specific Control Equipment Operating Conditions:
a. The baghouse shall be operated to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and/or standard operating practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection systems shall be maintained. [401
KAR 52:020, Section 10]
![Page 116: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/116.jpg)
Permit Number: V-14-002 R6 Page: 45 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROTARY LIME KILNS: KL05 – Rotary Kiln #5 Emission Unit 11-01 Rotary Kiln #5 Description: KVS Kiln – 17' × 200' Construction Commenced: 1995 Maximum Rated Capacity: 110 tons/hour of stone Primary Fuels: Pulverized Coal- (Maximum Firing Rate: 9.6 tons/hr); Natural Gas (Maximum Firing Rate: 0.24 MMscf/hr) Secondary Fuel: Glycerin Startup Fuel: Natural Gas Controls: Pulse-Jet Baghouse [Model: Amerex (7) Module RP-14-304 D6 (16 × 9)] APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(qq) 40 C.F.R. 60.340 to 60.344 (Subpart HH), Standards of Performance for Lime Manufacturing Plants 401 KAR 63:002, Section 2(4)(ffff) 40 C.F.R. 63.7080 to 63.7143, Tables 1 to 8 (Subpart AAAAA), National Emission Standards for Hazardous Air Pollutants for Lime Manufacturing Plants 401 KAR 51:017, Prevention of significant deterioration, (C-93-032). 1. Operating Limitations:
a. Lime production from Rotary Kiln #5 shall not exceed 46 tons per hour. [401 KAR 51:017, C-93-032] Compliance Demonstration Method: Compliance shall be demonstrated through 4. Specific Monitoring Requirements g.
b. The only solid fuel permissible in the kiln is coal. [401 KAR 51:017, C-93-032]
1) Coal with less than an average heating value of either 12,900 Btu/lb or the average for the coal burned during a prior passing compliance demonstration for nitrogen oxide (NOx), carbon monoxide (CO), particulate (PM), and sulfur dioxide (SO2), whichever is lower, shall not be burned. For the purposes of this condition, average heating value is defined as the weighted average heating value in the coal from all shipments received in each month on a dry weight basis. Coal with less than a minimum average heating value of 12,900 Btu/lb for each shipment shall not be burned as fuel unless the nitrogen oxide, carbon monoxide, particulate, and sulfur dioxide emission limits are not exceeded. Average is defined as the average heating value per shipment. Average is defined as the average of shipments received in each month.
2) Coal with more than an average sulfur content of either 0.9% or the average for the coal burned during a prior passing compliance demonstration for NOx, CO,
Commented [A7]: Carmeuse is proposing a clarification on the heating value and sulfur content averaging methodology for coal shipments. Refer to application report for additional discussion. Carmeuse is also requesting the PSD language from the prior permit (V-05-003 R1) be brought forward to the renewed permit for clarification.
![Page 117: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/117.jpg)
Permit Number: V-14-002 R6 Page: 46 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
PM, and SO2, whichever is higher, shall not be burned. For the purposes of this condition, average sulfur content is defined as the weighted average sulfur content in the coal from all shipments received in each month on a dry weight basis. Coal with more than an average sulfur content of 0.9% for each shipment shall not be burned as fuel unless the nitrogen oxide, carbon monoxide, particulate, and sulfur dioxide emission limits are not exceeded. Average is defined as the average of shipments received in each month.
Compliance Demonstration Method: In determining compliance with the sulfur content limitation and heating value of the coal, the permittee may obtain certification from the supplier or test one sample of coal as received or shipped in. When the facility combusts coal with an average heating value less than 12,900 Btu/lballowed or a sulfur content more than 0.9% sulfurallowed, the facility shall submit a protocol within 30 days of fuel receiptthe end of the month the excursion occurs to conduct performance testing to demonstrate compliance with nitrogen oxide, carbon monoxide, particulate, and sulfur dioxide emission limits are not exceeded.
c. Maintain and operate the FF such that the BLDS or PM detector alarm condition does not exist for more than 5 percent of the total operating time in a 6-month period; and comply with the requirements in 40 CFR 63.7113(d) through (f) and Table 5 of Subpart AAAAA. In lieu of a BLDS or PM detector maintain the FF such that the 6-minute average opacity for any 6-minute block period does not exceed 15 percent; and comply with the requirements in 40 CFR 63.7113(f) and (g) and Table 5 to Subpart AAAAA. [40 CFR 63.7090(b)]
Compliance Demonstration Method: Demonstrate continuous compliance by installing, maintaining, calibrating and operating a COMS as required by 40 CFR part 63, subpart A, General Provisions and according to PS-1 of appendix B to part 60 of this chapter, except as specified in 40 CFR 63.7113(g)(2); and collecting the COMS data at a frequency of at least once every 15 seconds, determining block averages for each 6-minute period and demonstrating for each 6-minute block period the average opacity does not exceed 15 percent.
d. Prepare and implement a written OM&M plan. The plan must include items listed in 40
CFR 63.7100(d) and the corrective actions to be taken when required in Table 5 of 40 CFR 63, Subpart AAAAA. [40 CFR 63.7090(b)]
e. The unit must be in compliance with the operating limits of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
f. The permittee must develop a written startup, shutdown, and malfunction plan (SSMP)
according to the provisions in 40 CFR 63.6(e)(3). [40 CFR 63.7100(e)] g. Always operate and maintain the affected source, including air pollution control and
monitoring equipment, according to the provisions in 40 CFR 63.6(e)(1)(i). [40 CFR
![Page 118: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/118.jpg)
Permit Number: V-14-002 R6 Page: 47 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
63.7100 (c)]
2. Emission Limitations: a. Particulate Matter Emissions:
1) Shall not exceed 0.12 lb/ton of stone feed (lb/tsf). Weighted average PM emissions may be determined according to Equation 2 in 40 CFR 63.7112 and must not exceed 0.12 lb/tsf. [40 CFR 63.7090(a) and 401 KAR 51:017] Compliance Demonstration Method: Compliance shall be demonstrated through performance testing required under 3. Testing Requirements c.
2) The permittee shall not exceed 0.60 lb/ton of stone feed (lb/tsf). [40 CFR 60.342]
Compliance Demonstration Method: Compliance shall be demonstrated by meeting the requirements of 2. Emission Limitations a. (1).
b. Sulfur dioxide emissions shall not exceed 22.97 lb/hr. [401 KAR 51:017, C-93-032]
c. Nitrogen dioxide emissions shall not exceed 128.33 lb/hr. [401 KAR 51:017, C-93-032]
d. Carbon monoxide emissions shall not exceed 91.67 lb/hr. [401 KAR 51:017, C-93-032]
Compliance Demonstration Method: 1. Compliance with 2. Emission Limitations b., c., and d shall be demonstrated through
performance testing required under 3. Testing Requirements d. and e.
2. When required for comparison with the particulate matter emission limit, emission rates shall be calculated using the following equation:
E = (csQsd) / PK, where E = emission rate of particulate matter, lb/ton of stone feed cs = concentration of particulate matter, g/dscf Qsd = volumetric flow rate of effluent gas, dscf/hr P = stone feed rate, ton/hr K = conversion factor, 7000gr/lb
In determining the particulate matter concentration (cs) and the volumetric flow rate
(Qsd) of the effluent gas: a) EPA Reference Method 5 shall be used at negative-pressure fabric filters and other
types of control devices and b) EPA Reference Method 5 D shall be used at positive-pressure fabric filters.
The sampling time and sample volume for each run shall be at least 60 minutes and
![Page 119: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/119.jpg)
Permit Number: V-14-002 R6 Page: 48 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
31.8 dscf. The stone feed rate for each run shall be determined using the monitoring device specified in 3. Testing Requirements b.
e. Visible emissions discharged into the atmosphere shall not exceed 15% opacity when
exiting from a dry emission control device. [40 CFR 60.342(a)(2), 401 KAR 51:017, C-93-032]
Compliance Demonstration Method: Compliance shall be demonstrated through 4. Specific Monitoring Requirements b.
f. The unit must be in compliance with the emission limitations of 40 CFR 63, Subpart AAAAA at all times, except during periods of startup, shutdown, and malfunction. [40 CFR 63.7100(a)]
3. Testing Requirements: a. Within 180 days of installing a multichannel burner in either Kiln #4 or Kiln #5 (whichever
is completed first), the permittee shall conduct a performance tests to validate the emissions information provided in the permit application for Permit V-14-002 R4. The performance tests shall be conducted while co-firing coal and natural gas at the highest gas substitution rate achievable during the test. [Permit V-14-002 R4; 401 KAR 50:045]
b. Testing shall be conducted in accordance with 401 KAR 50:045, Performance Tests, the
testing shall be conducted under conditions representative of maximum emissions potential under anticipated operating conditions at the pollutant-specific emissions unit.
c. For the purpose of conducting a performance test, install, calibrate, maintain, and operate
a device for measuring the mass rate of stone feed to each rotary lime kiln. The measuring device used must be accurate to within 5 percent of the mass rate over its operating range. [40 CFR 60.343(d)] The mass rate of stone feed may be calculated for each 24-hour block period based on the lime production, multiplied by a suitable factor to arrive at the equivalent stone feed rate. The methodology for defining the stone feed to lime production factor shall be established during particulate matter performance tests.
d. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 5 years following the initial performance test and within 5 years following each subsequent performance test thereafter. [40 CFR 63.7111 and 401 KAR 50:045] 1) Performance tests may not be conducted during periods of startup, shutdown, or
malfunction, as specified in 40 CFR 63.7(e)(1). [40 CFR 63.7112(c)] 2) Three separate test runs must be conducted for each required performance test, as
specified in 40 CFR 63.7(e)(3). Each test run must last at least one hour. [40 CFR 63.7112(d)]
3) Calculate PM emissions from performance tests in accordance with the provisions in 40 CFR 63.7112(e), (f) and (g).
![Page 120: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/120.jpg)
Permit Number: V-14-002 R6 Page: 49 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4) Performance test results must be documented in complete test reports that contain the information required by 40 CFR 63.7112 paragraphs (h)(1) through (10) of this section, as well as all other relevant information. The plan to be followed during testing must be made available to the Administrator at least 60 days prior to testing. [40 CFR 63.112(h)]
5) The permittee must establish any applicable 3-hour block average operating limit indicated in Table 2 of 40 CFR 63, Subpart AAAAA according to the applicable requirements in Table 3 of 40 CFR 63, Subpart AAAAA and 40 CFR 63.112 paragraphs (j)(1) through (4) of this section. [40 CFR 63.112(j)]
e. Performance testing in accordance with EPA Reference Method 6C for sulfur dioxide, EPA
Reference Method 7E for nitrogen oxide, and EPA Reference Method 10 for carbon monoxide as specified in 401 KAR 50:015 shall be conducted once per permit life (or once every five years) and as required by the Division. [401 KAR 50:045, Section 1]
f. During Performance performance testing, the facility shall obtain one representative fuel sample per hour. These samples collectively shall be analyzed for the percent sulfur content and heating value (Btu/lb) on a dry basis. [401 KAR 50:045, Section 1]
4. Specific Monitoring Requirements:
a. The owner or operator shall install, calibrate, maintain and operate a continuous monitoring system to monitor and record the opacity of a representative portion of the gases discharged into the atmosphere from each kiln. The span of this system shall be set at 40 percent (40%) opacity. [40 CFR 60.343(a)]
b. For each COMS used to monitor an add-on air pollution control device, meet the
requirements in paragraphs (g)(1) and (2) of this section. [40 CFR 63.7003(g)] 1) Install the COMS at the outlet of the control device. 2) Install, maintain, calibrate, and operate the COMS as required by 40 CFR part 63, subpart A, General Provisions and according to Performance Specification (PS)-1 of appendix B to part 60 of this chapter. Facilities that operate COMS installed on or before February 6, 2001, may continue to meet the requirements in effect at the time of COMS installation unless specifically required to re-certify the COMS by their permitting authority.
c. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the
differential pressure across the kiln baghouse to ensure that pressure does not drop outside the pressure drop range documented in the OM&M Plan. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
d. Following a reading outside of the pressure drop range specified in the OM&M:
1) Maintenance personnel shall inspect the monitoring system, baghouse, and operations immediately; and make needed repairs as soon as practicable.
![Page 121: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/121.jpg)
Permit Number: V-14-002 R6 Page: 50 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2) Upon completed corrective action, the permittee shall immediately verify compliance with the opacity limit via COMS on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
e. If a bag leak detection system or PM detector is not utilized, conduct a VE check daily
(minimum of 6-minutes) in accordance with EPA Reference Method 9 of Appendix A to 40 CFR Part 60. Record the opacity observed in an observation log. The reading shall be performed by a representative of the permittee certified in Visible Emissions Evaluation. Maintain a list of all individuals who are certified EPA Reference Method 9 Visible Emissions Evaluators. [40 CFR 63.7121(f)]
f. For each emission unit equipped with an add-on air pollution control device, inspect each capture/collection and closed vent system at least once each calendar year to ensure that each system is operating in accordance with the operating requirements in Item 6 of Table 2 of 40 CFR 63 Subpart AAAAA and record the results of each inspection. [40 CFR 63.7113(f)]
g. Except for monitor malfunctions, associated repairs, required quality assurance or control activities (including, as applicable, calibration checks and required zero adjustments), the permittee must monitor continuously (or collect data at all required intervals) at all times that the emission unit is operating. [40 CFR 63.7120(b)]
h. Data recorded during system breakdowns, repairs, preventive maintenance, calibration
checks, and zero (low-level) and high-level adjustments, periods of non-operation of the process unit (or portion thereof), resulting in cessation of the emissions to which the monitoring applies; and start-ups, shutdowns, and malfunctions may not be used either in data averages or calculations of emission or operating limits; or in fulfilling a minimum data availability requirement. The permittee must use all the data collected during all other periods in assessing the operation of the control device and associated control system. [40 CFR 63.7120(c)]
i. The amount of material placed in the kiln (ton), amount of lime produced from the kiln
(tons), amount of coal and glycerin, natural gas consumed and hours of operation shall be monitored and recorded on a monthly basis. [401 KAR 52:020, Section 10]
j. In the absence of certification of the sulfur content of the coal from the supplier, the
owner or operator shall obtain representative samples from each delivery of coal. These samples collectively shall be analyzed for the percent sulfur content and heating value (Btu/lb). [401 KAR 51:017, C-93-032]
k. The permittee shall monitor and calculate annual NOx, PM/PM10 and PM2.5 emissions from
emission unitsRotary Kiln #4 and #5 and maintain a record of the annual emissions, in tons per year on a calendar year basis for Five five (5) years following resumption of regular operations after the modification authorized by V-14-002 R4 (i.e., the installation of multichannel burners). The source shall submit a report to the Division if: [401 KAR 51:017, Section 16(5). Source Obligation]
Commented [A8]: Carmeuse requests that this clause be added so that it is clear what modification is being referred to in the permit condition.
![Page 122: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/122.jpg)
Permit Number: V-14-002 R6 Page: 51 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) The annual NOx, PM/PM10 and PM2.5 emissions, in tons per year, from this the modificationproposed project exceeds the baseline actual emissions for the project by a significant amount for NOx, PM/PM10 and PM2.5; and
2) The NOx, PM/PM10 and PM2.5 emissions differ from the projected actual emissions as submitted in the application for Kiln #4 and #5 respectively.
5. Specific Recordkeeping Requirements: a. Maintain records of inspection of each capture/collection and closed vent system as
required by 40 CFR 63.7113(f).
b. Keep records of performance tests and performance evaluation. [40 CFR 63.7132(a)(3)]
c. Keep visual observation records and EPA Reference Method 9 observations, any inspections and repair records in a designated logbook. Records shall be maintained for five years. [401 KAR 52:020, Section 10]
d. Performance test results must be documented in complete test reports that contain the
information below, as well as all other relevant information. The plan to be followed during testing must be made available to the Division at least 60 days prior to testing. [40 CFR 63.7112(h)] 1) A brief description of the process and the air pollution control system; 2) Sampling location description(s); 3) A description of sampling and analytical procedures and any modifications to standard
procedures; 4) Test results, including opacity; 5) Quality assurance procedures and results; 6) Records of operating conditions during the test, preparation of standards, and
calibration procedures; 7) Raw data sheets for field sampling and field and laboratory analyses; 8) Documentation of calculations; 9) All data recorded and used to establish operating limits; and
10) Any other information required by the test method.
e. Maintain records of the differential pressure readings on the kiln baghouse taken once per shift in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [401 KAR 52:020, Section 10]
f. Maintain records of all routine and non-routine maintenance activities performed on the baghouse. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
g. During all periods of startup, shutdown, or malfunction of the baghouse, keep a record of
any days when any air emissions were visible from the stack associated with the baghouse. [401 KAR 52:020, Section 10]
![Page 123: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/123.jpg)
Permit Number: V-14-002 R6 Page: 52 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
h. Maintain records of the amount of material placed in the kiln (ton), amount of lime
produced from the kiln (tons), amount of coal, glycerin, natural gas consumed and hours of operation on a monthly basis. [401 KAR 52:020, Section 10].
i. Maintain records of the heat content (Btu/lb) and sulfur content (percent) of coal sampled each month shall be maintained. [401 KAR 51:017, C-93-032]
j. In accordance with the requirements of 401 KAR 51:017, Section 16 (5)(a), for the Kiln #4 and #5 Burner Change Project covered by Permit V-14-002 R4, the permittee shall: 1) Maintain a copy of the permit application covering the project that includes:
[401 KAR 51:017, Section 16 (5)(b)] i. A description of the project. ii. Identification of the emission units for which emissions of a regulated NSR
pollutant could be affected by the project; and iii. A description of the applicability test used to determine that the project is not a
major modification for any regulated NSR pollutant. The description should include baseline actual emissions, projected actual emissions, the amount of emissions exclude in calculating projected actual emissions and an explanations for why that amount was excluded, and any applicable netting calculations.
2) Calculate and maintain record of the annual NOx, PM/PM10 and PM2.5 emissions, in tons per year, on a calendar year basis for five years following commencement of operation of multichannel burners on both Kiln #4 and #5. [401 KAR 51:017 Section 16 (5) (c) (2)]
i. The Permittee shall report to the Division if the annual NOx, PM/PM10 orPM2.5 emissions, in tons per year, from Kiln #4 and #5, exceeds the baseline actual emissions by a significant amount and the emissions differ from the preconstruction projection as documented and maintained pursuant to Condition 5.j.1. [401 KAR 51:017 Section 16 (5) (e) (1)]
ii. The report shall be submitted to the Division with 60 days after the end of the year and shall contain the name, address, and telephone number of the major stationary source; the annual NOx emissions calculated; and any other information the Permittee wishes to include in the report. [401 KAR 51:017 Section 16 (5) (e) (2)]
6. Specific Reporting Requirements:
a. The prepared and implemented written OM&M plan must be submitted to the Division for review and approval as part of the application for a 40 CFR part 70 or 40 CFR part 71 permit. Any subsequent changes to the plan must be submitted to the applicable permitting authority for review and approval. Pending approval by the field office of an initial or amended plan, the facility shall comply with the provisions of the submitted plan. Each plan must contain the following information: [40 CFR 63.7100(d)] 1) Process and control device parameters to be monitored to determine compliance, along
with established operating limits or ranges, as applicable, for each emission unit. 2) A monitoring schedule for each emission unit. 3) Procedures for the proper operation and maintenance of each emission unit and each
air pollution control device used to meet the applicable emission limitations and
![Page 124: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/124.jpg)
Permit Number: V-14-002 R6 Page: 53 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
operating limits in Tables 1 and 2 of 40 CFR 63, Subpart AAAAA, respectively. 4) Procedures for the proper installation, operation, and maintenance of monitoring
devices or systems used to determine compliance, including: i. Calibration and certification of accuracy of each monitoring device; ii. Performance and equipment specifications for the sample interface, parametric
signal analyzer, and the data collection and reduction systems; iii. Ongoing operation and maintenance procedures in accordance with the general
requirements of 40 CFR 63.8(c)(1), (3), and (4)(ii); and iv. Ongoing data quality assurance procedures in accordance with the general
requirements of 40 CFR 63.8(d). 5) Procedures for monitoring process and control device parameters. 6) Corrective actions to be taken when process or operating parameters or add-on control
device parameters deviate from the operating limits specified in Table 2 of 40 CFR 63, Subpart AAAAA, including: i. Procedures to determine and record the cause of a deviation or excursion, and the
time the deviation or excursion began and ended; and ii. Procedures for recording the corrective action taken, the time corrective action was
initiated, and the time and date the corrective action was completed. 7) A maintenance schedule for each emission unit and control device that is consistent
with the manufacturer's instructions and recommendations for routine and long-term maintenance.
b. Submit reports of excess emissions of all 6-minute periods during which the average opacity of the visible emissions from any lime kiln utilizing a continuous monitoring system is greater than 15 percent. [40 CFR 60.343(e)]
c. The permittee must submit the Notification of Compliance Status containing the results of the initial compliance demonstration according to the requirements in 40 CFR 63.7130(e). [40 CFR 63.7114(c)]
d. The permittee must report each instance in which the unit did not meet each operating limit,
opacity limit, and VE limit in Tables 2 and 6 of 40 CFR 63, Subpart AAAAA that applies. This includes periods of startup, shutdown, and malfunction. These instances are deviations from the emission limitations of 40 CFR 63, Subpart AAAAA. These deviations must be reported according to the requirements in 40 CFR 63.7131.[40 CFR 63.7121(b)]
7. Specific Control Equipment Operating Conditions:
a. The baghouse shall be operated to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and standard operating practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection systems shall be maintained.
[401 KAR 52:020, Section 10]
![Page 125: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/125.jpg)
Permit Number: V-14-002 R6 Page: 54 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM01 – Lime Dust Collection Systems (PSD)
EU # Description Date Constructed or
Last Modified
Kiln Discharge to Lime Storage
16-11 84-018 Dust Collection System for Kiln 4 & 5 Discharge Conveyors
1995
17-05 89-858 Dust Collection System for Lime Bins and Truck Loadout
1998, replaced 2014
17-10 89-855 Dust Collection System for Silo #11 Feed Conveyors 1995
17-13 89-856 Dust Collection System for Silo #12 Feed Conveyors 1995
17-17 89-857 Dust Collection System for Silo #13 Feed Conveyors 1995
17-27 89-850 Dust Collection System for Lime Screening Area 1995
17-32 89-861 Dust Collection System for Lime Bins and Screens 1998, replaced 2014
17-41 89-851 Dust Collection System for Lime Screening and Bucket Elevator
1995
Lime Storage to Loadout
18-01 94-835 Dust Collection System for #13 & #14 Kiln Run Silo Transfer to 94-801
1995
18-06 94-834 Dust Collection System for #11 & # 12 Kiln Run Silo Transfer to 94-803
1995
18-09 94-836 Dust Collection System for Kiln Silo Discharge Conveyors
1995
18-16 94-832 Dust Collection System for Product Bin Discharge Conveyors and Screens
1995
18-22 94-831 Dust Collection System for Product Bin Discharge Conveyors
1995
18-24 94-829 Dust Collection System for Lime Railcar Loadout 1995
18-27 94-837 Dust Collection System for Lime Barge Loadout 1995
18-30 94-833 Dust Collection System for Lime Truck Loadout 1995
Kiln 4 and 5 Dust Bin
32-08 63-270 Bin Vent Collector System for Kiln 4 & 5 Dust Bin 1995
APPLICABLE REGULATIONS: 401 KAR 59:010, New process operations
![Page 126: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/126.jpg)
Permit Number: V-14-002 R6 Page: 55 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
401 KAR 51:017, Prevention of significant deterioration, (C-93-032). 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter 1. Operating Limitations:
a. Except as provided in 1. Operating Limitations b, processes may not operate without corresponding control device also in operation. [401 KAR 52:020, Section 10]
b. During periods of maintenance on a dust collection system (either planned or taken in response to a malfunction) when its associated conveyor systems inside a building must remain in operation, the following provisions apply: 1) For any set of dust collection systems serving a given lime handling building (that is
defined in LM02), only one of those systems can be taken offline at a time for maintenance if an associated conveyor system inside the building remains in operation. This restriction does not apply if actions are being taken in response to a malfunction.
2) During a malfunction of any dust collection system that is part of a set of dust collection systems serving a given lime handling building, all scheduled maintenance for that set shall be postponed until the malfunctioned system is repaired and operating as intended.
3) Periods of maintenance shall be conducted as expeditiously as possible. The time during which a dust collection system serving an active conveyor is offline for a discrete maintenance event shall not exceed 24 hours.
4) During times of maintenance when a dust collection system must be temporarily shut down while an associated conveyer system inside a building remains in operation, the facility shall: i. Continuously perform visual emissions evaluations consistent with procedures
specified in EPA Reference Method 9 from varying vantage points covering the building in which the operating conveyor system is located. If any visible emissions are observed, take appropriate action to mitigate emissions and initiate a formal EPA Reference Method 9 opacity test. These tests shall continue until there are again no visible emissions observed. Any readings recorded above the 7% opacity standard shall be documented in the semiannual report. Begin visual observations prior to the dust collector being taken offline and before maintenance activities commence. Continue the observations until the dust collector has returned to normal operation.
ii. If any EPA Reference Method 9 reading exceeds 7% opacity, the dust collector shall be brought back online immediately if possible, or all operations that emit PM captured by that baghouse (conveyers, bins, loadouts, screening area, screens, bucket elevators, and silo transfers) shall be immediately shutdown.
iii. The Division may waive the requirement to shutdown upon a demonstration that the cause(s) of the opacity has been identified and corrected immediately. [401 KAR 52:020, Section 10]
2. Emission Limitations: a. Emissions from each listed emission unit except 18-27 shall not exceed 7% opacity.
![Page 127: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/127.jpg)
Permit Number: V-14-002 R6 Page: 56 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Emissions from 18-27 (94-937 Dust Collection System for Lime Barge Loadout) shall not exceed 15% opacity. [401 KAR 51:017, C-93-032]
Compliance Demonstration Method: Compliance with the opacity limit is demonstrated through performance testing required under 3. Testing Requirements.
b. The opacity of emissions from the Dust Collection Systems shall not exceed twenty percent (20%). [401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: Compliance with 1. Operating Limitations and 2. Emissions Limitations a.
c. Emissions of particulate matter from each dust collection system shall not exceed 0.02 gr/acfm. [401 KAR 51:017, C-93-032]
Compliance Demonstration Method: See 3. Testing Requirements.
d. Emissions of particulate matter from each listed emission unit shall not exceed the rate
calculated by the following equations: [401 KAR 59:010, Section 3 (2)]
For process weight rates up to 30 ton/hr, E = 3.59P0.62 For process weight rates in excess of 30 ton/hr, E = 17.31P0.16
where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr. For the purposes of this calculation, the process rate of conveyor systems served by the dust collection system should be used. Compliance Demonstration Method: Compliance with 2. Emission Limitation c.
3. Testing Requirements: a. Except as provided in 3. Testing Requirements b, within 180 days of issuance of permit
V-14-002, conduct initial performance tests using EPA Reference Method 5 to measure the particulate matter and EPA Reference Method 9 to determine opacity from each of the dust collection systems. [401 KAR 50:045]
b. In lieu of conducting performance testing on all listed emission units, the facility has the option of conducting representative testing. Representative determinations shall be based on the material to be captured, design flowrate (acfm), fabric filter material, cleaning method, cleaning frequency, and air-to-cloth ratio. The proposed limited set of representative units shall be documented in the test protocol submitted to the Division for approval in accordance with 401 KAR 50:045.
The selected limited set of representative units shall not be tested as the representative unit for performance testing conducted during the next permit lifetime.
Commented [A9]: Carmeuse requests that Conditions 3.a to 3.c be removed as these conditions covered a one-time testing obligation that was satisfied in the prior permit term.
![Page 128: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/128.jpg)
Permit Number: V-14-002 R6 Page: 57 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements:
a. Monitor the overall processing rate (tons/hour) for conveying systems served by the dust collections systems between the kiln discharge and lime storage, as defined by total combined kiln production rate on a monthly basis. [401 KAR 52:020, Section 10]
b. Monitor the overall process rate (tons/hour) for the conveying systems served by the dust
collection systems between lime storage and load out, as defined by amount of combined mass of lime loaded out by truck, rail, and barge. [401 KAR 52:020, Section 10]
c. Install, calibrate, maintain, and operate a monitoring device to continuously monitor the differential pressure across the dust collection system baghouses to ensure that pressure does not drop outside the pressure drop range listed in the table below. Personnel will monitor the differential pressure reading across the baghouse once per shift and at least once every twelve hours of operation, except when the unit is not in operation. [401 KAR 61:005, Section 3(6)]
EU # Indicator Ranges
16-11 1.5”-7.5”
17-05 0.6”-7.5”
17-10 1.5”-7.5”
17-13 1.5”-7.5”
17-17 1.5”-7.5”
17-27 1.5”-7.5”
17-32 0.6”-7.5”
17-41 1.5”-7.5”
18-01 1.5”-7.5”
18-06 1.5”-7.5”
18-09 1.5”-7.5”
18-16 1.5”-7.5”
18-22 1.5”-7.5”
18-24 1.5”-7.5”
18-27 1.5”-7.5”
18-30 1.5”-7.5”
32-08 1.5”-7.5”
d. Following a reading outside of the pressure drop range:
![Page 129: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/129.jpg)
Permit Number: V-14-002 R6 Page: 58 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) Maintenance personnel shall inspect the baghouse and operations immediately; and make needed repairs as soon as practicable.
2) Upon completed corrective action, the permittee shall immediately conduct an EPA Reference Method 9 opacity reading on the dust collection system serviced and ensure pressure drop has returned to normal range. [401 KAR 52:020, Section 10]
e. Conduct a daily visual observation of the exhaust point of each dust collection system. If
visible emissions are observed, take corrective action and conduct visual observation using EPA Reference Method 9.Conduct visual observations daily during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. [401 KAR 52:020, Section 10]
f. For emission units 17-05, 18-24, 18-27, and 18-30, at least once per day prior to loading truck, barge or rail (if any are loaded any time that day), the person(s) responsible for the loading operations shall inspect and document that the curtains are present, the loading sock has no holes or tears, and the dust collection system is operational. If the curtain is damaged, loading shall be delayed until the curtain is repaired or temporary measures to control emission are taken. On days when the loadout system is not operated, no inspection is required
5. Specific Recordkeeping Requirements: a. Maintain records of the differential pressure readings on the dust collection systems taken
in an electronic format. Records shall, at a minimum, include the date and time of the reading, and the reading value. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [40 CFR Part 64, 401 KAR 52:020, Section 10]
b. Maintain records of all dust collection systems inspections, repair activities or corrective
actions performed on the dust collection systems due to malfunction. These records shall include, at a minimum, the date, and the name of the person or organization performing the repair or corrective action, and a description of the repair or corrective action completed. [401 KAR 52:020, Section 10]
c. Maintain records of visible emission observations required under Conditions 4.e indicating
for each observation the date and time, name of observer, standing position in location to the emission point, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed and corrective actions taken to mitigate any visible emissions observed. [40 CFR Part 64, 401 KAR 52:020, Section 10]
d. Maintain records of EPA Reference Method 9 readings required under Conditions 4.e
indicating for each reading the date and time, name of observer, standing position in location to the building, weather conditions, result of the EPA Reference Method 9 reading, suspected or known cause of opacity and corrective actions taken to mitigate the emissions observed. [40 CFR Part 64, 401 KAR 52:020, Section 10]
Commented [A10]: Carmeuse is proposing to remove the requirement to conduct an immediate Method 9 reading due to a differential pressure excursion. Refer to rationale provided in the application report.
Commented [A11]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 130: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/130.jpg)
Permit Number: V-14-002 R6 Page: 59 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
e. Maintain records of the total combined kiln production rate and the amount of combined mass of lime loaded out by truck, rail, and barge (tons/month) on a monthly. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements: a. Within thirty (30) days of the final date of issuance of permit V-14-002, the permittee shall
submit operation maintenance, and malfunction plan for the dust collection systems and bin vent collector system to the Florence Field Office. The plan shall include as a minimum: 1) Facility's written instructions for the operation and maintenance of the dust collection
systems and bin vent collector system. 2) A schedule and methods to maintain the dust collection systems and bin vent collector
system. 3) A schedule and methods to detect needed repair of the dust collection systems and bin
vent collector system. 4) A schedule and methods to detect malfunctions in the dust collection systems and bin
vent collector system. 5) Method of keeping records of Items (1-4).
[401 KAR 52:020, Section 10] b. See Section F - Monitoring, Recordkeeping, and Reporting Requirements
7. Specific Control Equipment Operating Conditions: a. The dust collection systems shall be operated to maintain compliance with permitted
emission limitations, consistent with operation maintenance, and malfunction plan required. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection system shall be maintained. [401 KAR 52:020, Section 10]
![Page 131: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/131.jpg)
Permit Number: V-14-002 R6 Page: 60 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM02 – Lime System Buildings
EU # Description Date Constructed or Last Modified
33-02 Kilns 4 & 5 Discharge Building 1995
33-03 Transfer House 1 from Kiln to Storage 1995
33-04 Transfer House 2 from Kiln to Storage 1995
33-05 Product Storage Building 1995
33-06 Product Storage Silos 1995
33-07 Transfer House 3 Deg Tower 1995
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 401 KAR 51:017, Prevention of significant deterioration, (C-93-032). 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling.
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway. [401 KAR 63:010, Section 4] 2. Emission Limitations:
a. No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
![Page 132: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/132.jpg)
Permit Number: V-14-002 R6 Page: 61 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
b. Fugitive emissions from the openings of the Lime System Buildings listed shall not exceed 7% opacity. [401 KAR 51:017; C-93-032]
Compliance Demonstration Method: Compliance shall be demonstrated through 4. Specific Monitoring Requirements.
3. Testing Requirements: Not applicable
4. Specific Monitoring Requirements: Conduct visual observations daily during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Conduct visible emissions observations of the entire exterior of the building daily. Visible emissions shall be observed during daylight hours. If visible emissions are observed, conduct EPA Reference Method 9 immediately and take corrective action. After corrective actions have been complete, conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements: a. Maintain records of visible emission observations required under 4. Specific Monitoring
Requirements indicating for each observation the date and time, name of observer, standing position in location to the building, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, and corrective actions taken to mitigate any visible emissions observed. [401 KAR 52:020, Section 10]
b. Maintain records of EPA Reference Method 9 readings required under 4. Specific Monitoring Requirements indicating for each reading the date and time, name of observer, standing position in location to the building, weather conditions, the EPA Reference Method 9 reading, suspected or known cause of opacity and corrective actions taken to mitigate the emissions observed. [401 KAR 52:020, Section 10]
c. Maintain records of all inspections of the lime conveyor systems inside the listed buildings indicating the date and time, name of inspector, a description of any repairs needed and the date when such repairs were completed. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
Report any visible emissions, the date and time of visible emissions, and opacity values of all EPA Reference Method 9 tests completed in semiannual monitoring reports.
7. Specific Control Equipment Operating Conditions: Openings in the lime system buildings shall be kept closed at all times except for entry and exit or for conducting maintenance activities. [401 KAR 50:055, Section 2]
Commented [A12]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 133: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/133.jpg)
Permit Number: V-14-002 R6 Page: 62 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM03 – Lime Storage to Hydrate
EU # Description Date Constructed or Last Modified
Controls
Belt Conveyor Transfers (Partially Enclosed):
20-01 94-550 Belt Conveyor Transfer to 93-100 Belt Conveyor
1980 93-111 Dust Collection System
29-01 93-100 Belt Conveyor (In Lime Service) Transfer to 93-101 Belt Conveyor
1974 93-112 Dust Collection System
Dust Collection Systems:
21-01 90-014 Dust Collection System for DEG Tower Conveyors
1980
29-03 93-111 Dust Collection System for 94-550 Belt Conveyor Transfer
2006
29-04 93-112 Dust Collection System for 93-100 Belt Conveyor Transfer (When in Lime Service)
2006
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions, applies to EU 20-01 and 29-01 401 KAR 59:010, New process operations, applies to EU 21-01, 29-03 and 29-04 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter. 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling.
![Page 134: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/134.jpg)
Permit Number: V-14-002 R6 Page: 63 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
b. No one shall allow earth or other material being transported by truck or earth moving equipment to be deposited onto a paved street or roadway. [401 KAR 63:010, Section 4]
2. Emission Limitations: a. No person shall cause or permit the discharge of visible fugitive dust emissions beyond the
lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)] Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
b. Emissions of particulate matter from the Dust Collection Systems listed shall not exceed
the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates in excess of 30 ton/hr, E = 17.31P0.16 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
21-01, 29-03, 29-04 300
c. The opacity of emissions from the Dust Collection Systems shall not exceed twenty
percent. [401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: The emission units are considered to be in compliance with process weight rule limits and opacity limit when the Dust Collection Systems are operating and properly maintained.
3. Testing Requirements:
Testing shall be conducted at such times as may be requested by the Cabinet in accordance with 401 KAR 50:045, Section 4.
4. Specific Monitoring Requirements:
a. Monitor the amount of lime conveyed (tons/month) to the hydrate plant on a monthly basis. [401 KAR 52:020, Section 10]
b. Comply with the requirements specified below for the listed dust collection systems to
meet applicable particulate matter Compliance Assurance Monitoring Requirements. [40 CFR 64]
![Page 135: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/135.jpg)
Permit Number: V-14-002 R6 Page: 64 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Particulate Matter CAM Approach for LM 03:
Differential Pressure: Visible Emissions:Indicator: Measurement of the resistance of
flow across the fabric filter as the gas passes through the filter and filter cake.
Opacity of emissions are related to the size and concentration of particles in the exhaust gas.
Measurement Approach:
Personnel will monitor the differential pressure across the fabric filter. Alternatively, the permittee may install, calibrate, maintain and operate a monitoring device to continuously monitor the differential pressure across the fabric filter.
A qualitative visual observation (QVO) is conducted daily by knowledgeable observers.
Indicator Range:
While the unit is operating, the indicator range is 1.5”to 9.0”.
While operating, a daily QVO will be completed. Presence of visible emissions will trigger an immediate determination of opacity using EPA Reference Method 9
Excursion defined:
An excursion is defined as a manually recorded differential pressure reading outside the indicator range.
An excursion is defined as visible emissions equal to or greater than 20 percent opacity for any fifteen (15) second interval using the procedures of EPA Reference Method 9.
Excursion Follow-up:
Following an excursion, the permittee shall conduct a physical inspection of the fabric filter to determine and immediately correct any revealed performance issues.
Following an excursion, the permittee will implement corrective measures. Any maintenance and repairs will be performed on the control device to restore the dust collection systems to operate consistent with good engineering practices.
QA/QC Procedures:
Differential pressure across the fabric filter is read using a manometer or similar type gauge. If necessary, the gauge shall be recalibrated to zero when the dust collection system is shut down for maintenance.
The person responsible for making QVO and Reference EPA Reference Method 9 observations will be certified in accordance with EPA Reference Method 9.
Monitoring Frequency:
Personnel will monitor the differential pressure across the fabric filter once per shift or at least once every twelve hours of operation, except when the unit is not in operation.
Daily
![Page 136: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/136.jpg)
Permit Number: V-14-002 R6 Page: 65 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Differential Pressure: Visible Emissions: Data
Collection Procedures:
The source data from each monitoring device shall record a data point every minute from each control device during operation. The 15-minute average will not include periods of startup or shutdown.
Daily QVOs shall be maintained and shall include the time and date of the assessment, an indication of any visible emissions and the name of the person conducting the QVO.
5. Specific Recordkeeping Requirements:
a. Maintain records of visible emission observations required under 4. Specific Monitoring Requirements b indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed, and the results of the EPA Reference Method 9 readings. [40 CFR Part 64, 401 KAR 52:020, Section 10]
b. Maintain records of belt conveyor inspections indicating for each inspection the date and
time, name of inspector, a description of any repairs needed and the date when such repairs were completed. [401 KAR 52:020, Section 10]
c. Maintain records of the differential pressure readings on the dust collection systems.
Records shall, at a minimum include the date and time of the reading, the data collection method, the differential pressure range, the reading value, and, for direct observations, the person collecting the reading. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [40 CFR Part 64, 401 KAR 52:020, Section 10]
d. Maintain records of all routine and non-routine maintenance activities performed on the
dust collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
e. Maintain records of amount of lime conveyed (tons/month) to the hydrate plant on a
monthly basis. [401 KAR 52:020, Section 10]. 6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements 7. Specific Control Equipment Operating Conditions:
a. The dust collection systems shall be operated to maintain compliance with permitted emission limitations, consistent with good engineering practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection systems shall be maintained.
[401 KAR 52:020, Section 10]
![Page 137: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/137.jpg)
Permit Number: V-14-002 R6 Page: 66 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM04 – Lime Dust Collection Systems (Non-PSD)
EU # Description Date Constructed or Last Modified
Controls
Loading Spouts:
32-11 63-261LS Kiln 1 & 2 Dust Bin Loading Spout
1974 63-271 Dust Collection System
32-12 63-353LS Kiln 3 Dust Bin Loading Spout 1974 63-272 Dust Collection System
Dust Collection Systems:
32-09 63-400 Dust Collection System for Kiln 1 & 2 Dust Bin and Transfers
2011
32-10 63-264 Dust Collection System for Kiln 1 & 2 Dust Bin and Transfers
1974
32-13 63-271 Dust Collection System for Kiln 1 & 2 Dust Bin Loading Spout
2004
32-14 63-272 Dust Collection System for Kiln 3 Dust Bin Loading Spouts
2004
32-15 63-354 Dust Collection System for Kiln 3 Dust Bin and Transfers
2004
32-16 89-848 Dust Collection System for Lime Transfers
2015
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions; applies to EU 32-11 and 32-12 401 KAR 59:010, New process operations; applies to EU 32-09, 32-13, 32-14, 32-15 and 32-16 401 KAR 61:020, Existing process operations; applies to EU 32-10 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts.
![Page 138: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/138.jpg)
Permit Number: V-14-002 R6 Page: 67 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling.
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway. [401 KAR 63:010, Section 4] 2. Emission Limitations:
a. No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)] Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
b. Emissions of particulate matter from the Dust Collection Systems (EU 32-09, 32-13, 32-
14, 32-15 and 32-16) shall not exceed the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates in excess of 30 ton/hr, E = 17.31P0.16 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
32-13, 32-14 80
32-09 46.5
32-15 48
32-16 218
c. The opacity of emissions from the Dust Collection Systems shall not exceed twenty
percent. [401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: The dust collection systems are considered to be in compliance with process weight rule limits and opacity limit when they are operating and properly maintained.
d. Emissions of particulate matter from EU 32-10, shall not exceed the rate calculated by the following equations: [401 KAR 61:020, Section 3] For process weight rates in excess of 30 ton/hr, E = 55.0P0.11-40
![Page 139: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/139.jpg)
Permit Number: V-14-002 R6 Page: 68 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
32-10 46.5
e. The opacity of emissions from the Loading Spouts and one Dust Collection system
(EU 32-11, 32-12 and 32-10) shall not exceed 40 percent (40%) based on a 6-minute average.
Compliance Demonstration Method: These emission units are considered to be in compliance with process weight rule limits and opacity limit when the filter systems of the dust collection system or the systems associated with the loading spouts are operating and properly maintained.
3. Testing Requirements: a. Testing shall be conducted at such times as may be requested by the Cabinet in accordance
with 401 KAR 50:045, Section 4.
b. Conduct a performance test in accordance with EPA Reference Method 5 for particulate matter within 6 months of operation EU 32-16. During the performance testing, the facility shall verify accuracy of the suggested indicator pressure drop range of 1.5”-10.5” for 40 CFR 64, CAM in 4. Specific Monitoring Requirements b. Testing shall be conducted in accordance with 401 KAR 50:045, Performance Tests, and shall be conducted under conditions representative of maximum emissions potential under anticipated operating conditions at the pollutant-specific emissions unit.
4. Specific Monitoring Requirements:
a. Monitor the overall process rate (tons/hour) for the Kiln 1, 2 & 3 Dust Bin and Transfers, as defined by total mass of material loaded out to trucks from the dust bins on a monthly basis. [401 KAR 52:020, Section 10]
b. Comply with the requirements specified below for the listed dust collections systems to
meet applicable particulate matter Compliance Assurance Monitoring requirements. [40 CFR 64]
Particulate Matter CAM Approach for LM04: Differential Pressure: Visible Emissions:
Indicator: Measurement of the resistance of flow across the fabric filter as the gas passes through the filter and filter cake.
Opacity of emissions are related to the size and concentration of particles in the exhaust gas.
Commented [A13]: Performance testing for EU 32-16 has been completed and compliance has been demonstrated.
![Page 140: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/140.jpg)
Permit Number: V-14-002 R6 Page: 69 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Differential Pressure: Visible Emissions: Measurement Approach:
Personnel will monitor the differential pressure across the fabric filter. Alternatively, the permittee may install, calibrate, maintain and operate a monitoring device to continuously monitor the differential pressure across the fabric filter.
A qualitative visual observation (QVO) is conducted daily by knowledgeable observers.
Indicator Range:
While the unit is operating, the indicator ranges are: 32-09: 1.5” to 7.5” 32-10: 1.0” to 7.0” 32-13: 1.5” to 9.0” 32-14: 1.5” to 9.0” 32-15: 1.0” to 7.0” 32-16: 1.5” to 10.5”
While operating, a daily QVO will be complete. Presence of visible emissions will trigger an immediate determination of opacity using EPA Reference Method 9
Excursion defined:
An excursion is defined as a manually recorded differential pressure reading outside the indicator range.
An excursion is defined as visible emissions equal to or greater than 20 percent opacity for any fifteen (15) second interval using the procedures of EPA Reference Method 9.
Excursion Follow-up:
Following an excursion, the permittee shall conduct a physical inspection of the fabric filter to determine and immediately correct any revealed performance issues.
Following an excursion, the permittee will implement corrective measures. Any maintenance and repairs will be performed on the control device to restore the dust collection systems to operate consistent with good engineering practices.
QA/QC Procedures:
Differential pressure across the fabric filter is read using a manometer or similar type gauge. If necessary, the gauge shall be recalibrated to zero when the dust collection system is shut down for maintenance.
The person responsible for making QVO and Reference EPA Reference Method 9 observations will be certified in accordance with EPA Reference Method 9.
Monitoring Frequency:
Personnel will monitor the differential pressure across the fabric filter once per shift and at least once every twelve hours of operation, except when not in operation.
Daily
![Page 141: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/141.jpg)
Permit Number: V-14-002 R6 Page: 70 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Differential Pressure: Visible Emissions: Data Collection Procedures:
The source data from each monitoring device shall record a data point every minute from each control device during operation. The 15-minute average will not include periods of startup or shutdown.
Daily QVOs shall be maintained and shall include the time and date of the assessment, an indication of any visible emissions and the name of the person conducting the QVO.
c. For emission units 32-11 and 32-12, at least once per day prior to loading trucks (if trucks are loaded any time that day), the person(s) responsible for the loading operations shall inspect and document that the curtains are present, the loading sock has no holes or tears, and the dust collection system is operational. If the curtain is damaged, loading shall be delayed until the curtain is repaired or temporary measures to control emission are taken. On days when a truck loadout system is not operated, no inspection is required.
5. Specific Recordkeeping Requirements: a. Maintain records of visible emission observations required under 4. Specific Monitoring
Requirements b indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed and results of the EPA Reference Method 9 readings. [40 CFR Part 64, 401 KAR 52:020, Section 10]
b. Maintain records of inspections of loadout curtains, loading socks, and dust collection systems indicating for each the date and time, name of inspector, a description of any repairs needed and the date when such repairs were completed. [401 KAR 52:020, Section 10]
c. Maintain records of the differential pressure readings on the dust collection systems.
Records shall, at a minimum include the date and time of the reading, the data collection method, the differential pressure range, the reading value, and, for direct observations, the person collecting the reading. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [40 CFR Part 64, 401 KAR 52:020, Section 10]
d. Maintain records of all routine and non-routine maintenance activities performed on the
dust collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
e. Maintain records of the mass of material loaded out to trucks from the dust bins
(tons/month) for the Kiln 1, 2 & 3 Dust Bin and Transfers on a monthly basis. [401 KAR 52:020, Section 10].
![Page 142: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/142.jpg)
Permit Number: V-14-002 R6 Page: 71 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
6. Specific Reporting Requirements: See Section F - Monitoring, Recordkeeping, and Reporting Requirements
7. Specific Control Equipment Operating Conditions:
a. The dust collection systems shall be operated to maintain compliance with permitted emission limitations, consistent with good engineering practices. [401 KAR 50:055, Section 2]
b. Records regarding the maintenance of the dust collection systems shall be maintained.
[401 KAR 52:020, Section 10]
![Page 143: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/143.jpg)
Permit Number: V-14-002 R6 Page: 72 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM05 – Reject Lime Stockpiles
EU # Description Date
Constructed or Last Modified
Controls
32-01 Reject Lime Stockpile 2007 Wet Suppression
32-02 Reject Lime Stockpile (Reject Bunker) 2007 Wet Suppression
32-03 Reject Lime Stockpile (South of Hydrate Plant) 2007 Wet Suppression
32-04 Reject Lime Stockpile (South of Kiln #5) 2007 Wet Suppression
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions. 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
3. Testing Requirements:
Not applicable
![Page 144: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/144.jpg)
Permit Number: V-14-002 R6 Page: 73 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements: Inspect each stockpile and conduct visual observations at least once per week. If the stockpile is determined to have the potential to generate fugitive emissions (e.g. stockpiles are very dry, with no crust and wind speed is substantial enough to disturb the material) or visible emissions observed, take preventative actions to mitigate the potential for fugitive emissions (e.g. misting the stockpile), and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
Maintain a log of stockpile inspections and visible observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed, and results of the follow-up visual observation. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements: a. When a change in the location of one of the reject lime stockpiles is necessary, notify the
Division’s Central Office and Florence Regional Office in writing indicating the new location and date when the change will occur.
b. See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
7. Specific Control Equipment Operating Conditions:
Wet suppression shall be applied when applicable, to ensure that reject lime material being stockpiled is sufficiently moist to control fugitive emissions. [401 KAR 50:055, Section 2]
![Page 145: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/145.jpg)
Permit Number: V-14-002 R6 Page: 74 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM06 – Reject Lime Processing
EU # Description Date Constructed or Last Modified
Controls
32-05 89-005 CM Screw Receiving Hopper 2007 89-004 Dust Collection System
32-07 Front End Loader Dump to High pH Pond 2007 Not applicable
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
3. Testing Requirements: Not applicable 4. Specific Monitoring Requirements:
Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
![Page 146: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/146.jpg)
Permit Number: V-14-002 R6 Page: 75 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
5. Specific Recordkeeping Requirements: Maintain a log of visual observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed, and the results of the follow-up visual observations. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 147: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/147.jpg)
Permit Number: V-14-002 R6 Page: 76 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM06 – Reject Lime Processing (continued)
EU # Description Date Constructed or
Last Modified
32-06 89-004 Dust Collection System for CM Screw Receiving conveyor
2007
APPLICABLE REGULATIONS: 401 KAR 59:010, New process operations; applies to the CM Screw Receiving conveyor. 40 CFR 64, Compliance Assurance Monitoring (CAM) for particulate matter. 1. Operating Limitations: Not applicable 2. Emission Limitations:
a. Emissions of particulate matter shall not exceed the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)]
For process weight rates up to 30 ton/hr, E = 3.59P0.62 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
32-06 20
b. The opacity of emissions from Emission Unit 32 06 shall not exceed twenty percent (20%).
[401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: The unit is considered to be in compliance with process weight rule limits and opacity limit when the Dust Collection system is operating and properly maintained.
3. Testing Requirements: Testing shall be conducted at such times as may be requested by the Cabinet in accordance
with 401 KAR 50:045, Section 4. 4. Specific Monitoring Requirements:
a. Monitor the estimated processing rate on a monthly basis. [401 KAR 52:020, Section 10] b. Comply with the requirements specified below to meet applicable particulate matter
Compliance Assurance Monitoring requirements [40 CFR 64]:
![Page 148: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/148.jpg)
Permit Number: V-14-002 R6 Page: 77 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Particulate Matter CAM Approach for LM06, EU 32-06: Differential Pressure: Visible Emissions:
Indicator: Measurement of the resistance of flow across the fabric filter as the gas passes through the filter and filter cake.
Opacity of emissions are related to the size and concentration of particles in the exhaust gas.
Measurement Approach:
Personnel will monitor the differential pressure across the fabric filter. Alternatively, the permittee may install, calibrate, maintain and operate a monitoring device to continuously monitor the differential pressure across the fabric filter.
A qualitative visual observation (QVO) is conducted daily by knowledgeable observers.
Indicator Range:
While the unit is operating, the indicator range is 1.5” to 9.0”.
While operating, a daily QVO will be completed. Presence of visible emissions will trigger an immediate determination of opacity using EPA Reference Method 9
Excursion defined:
An excursion is defined as a differential pressure reading outside the indicator range.
An excursion is defined as visible emissions equal to or greater than 20 percent opacity for any fifteen (15) second interval using the procedures of EPA Reference Method 9.
Excursion Follow-up:
Following an excursion, the permittee shall conduct a physical inspection of the fabric filter to determine and immediately correct any revealed performance issues.
Following an excursion, the permittee will implement corrective measures. Any maintenance and repairs will be performed on the control device to restore the dust collection systems to operate consistent with good engineering practices.
QA/QC Procedures:
Differential pressure across the fabric filter is read using a manometer or similar type gauge. If necessary, the gauge shall be recalibrated to zero when the dust collection system is shut down for maintenance.
The person responsible for making QVO and Reference EPA Reference Method 9 observations will be certified in accordance with EPA Reference Method 9.
Monitoring Frequency:
Personnel will monitor the differential pressure across the fabric filter once per shift and at least once every twelve hours of operation, except when not in operation.
Daily
![Page 149: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/149.jpg)
Permit Number: V-14-002 R6 Page: 78 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Differential Pressure: Visible Emissions: Data
Collection Procedures:
The source data from each monitoring device shall record a data point every minute from each control device during operation. The 15-minute average will not include periods of startup or shutdown.
Daily QVOs shall be maintained and shall include the time and date of the assessment, an indication of any visible emissions and the name of the person conducting the QVO. EPA Reference Method 9 results will be documented in the format shown in Figure 9-1of Reference EPA Reference Method 9.
5. Specific Recordkeeping Requirements:
a. Maintain records of visible emission observations required under 4. Specific Monitoring Requirements b indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed and results of the EPA Reference Method 9 readings. [40 CFR Part 64, 401 KAR 52:020, Section 10]
b. Maintain records of the differential pressure readings on the dust collection systems.
Records shall, at a minimum include the date and time of the reading, the data collection method, the differential pressure range, the reading value, and, for direct observations, the person collecting the reading. Records shall also include information on any corrective actions taken when readings outside the appropriate range are recorded. [40 CFR Part 64, 401 KAR 52:020, Section 10]
c. Maintain records of all routine and non-routine maintenance activities performed on the
dust collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
d. Records of material received and processed shall be maintained on a monthly basis. [401
KAR 52:020, Section 10]
6. Specific Reporting Requirements: See Section F - Monitoring, Recordkeeping, and Reporting Requirements
![Page 150: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/150.jpg)
Permit Number: V-14-002 R6 Page: 79 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM07 – Clinker Reclaim
EU # Description Date Constructed or Last Modified
Controls
12-01 89-800H Clinker Receiving Hopper to 89-800 Belt Conveyor
1997 84-018 Dust Collection System
12-03 Front End Loader to Clinker Hopper 1997 84-018 Dust Collection System
* The 84-018 Dust Collection Systems are included in the Section B of the permit for LM01–Lime Dust Collection Systems. All applicable regulations pertaining to these dust collection systems are included in that Section B.
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
3. Testing Requirements: Not applicable
![Page 151: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/151.jpg)
Permit Number: V-14-002 R6 Page: 80 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements: Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
Maintain a log of visual observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed, and the results of the follow-up visual observation. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 152: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/152.jpg)
Permit Number: V-14-002 R6 Page: 81 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
LIME: LM08 – Lime Loadout
EU # Description Date Constructed or Last Modified
Controls*
13-01 94-540 Railcar Loadout Spout (Lime) 1974 89-829 Dust Collection System
14-01 89-045 Truck Loadout for Lime Rejects 1995 89-858 Dust Collection System
14-02 94-002 Barge Loadout 1995 94-837 Dust Collection System
14-03 94-003 Truck Loadout 1995 94-833 Dust Collection System
* The 89-829, 89-858, 94-837, and 94-833 Dust Collection Systems are included in the Section B of the permit for LM01–Lime Dust Collection Systems. All applicable regulations pertaining to these dust collection systems are included there.
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
![Page 153: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/153.jpg)
Permit Number: V-14-002 R6 Page: 82 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
3. Testing Requirements: Not applicable 4. Specific Monitoring Requirements:
Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
Maintain a log of visual observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, corrective actions taken to mitigate any emissions observed, and the results of the follow-up visual observation. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 154: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/154.jpg)
Permit Number: V-14-002 R6 Page: 83 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
HYDRATE: HY01 – Hydration Plant
EU # Description Date Constructed or Last Modified
Controls
Conveyor Transfers
21-02 90-050 Belt Conveyor Transfer to Hydrate Feed Bins #1 & #2
1980 Shrouded
Bin Vent and Dust Collection Systems:
20-20
90-138A Bin Vent Collector on 90-135 (Hydrator #1 Feed Bin)
1980
20-21 90-138B Bin Vent Collector on 90-133 (Hydrator #2 Feed Bin)
1980
21-18 90-128 Dust Collection System for Classifier Operations
1980
Hydrator:
21-12 Hydrator/Scrubber System 1980
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions; applies to EU 21-02 401 KAR 59:010, New process operations; applies to EU 20-20, 20-21, 21-18 and 21-12 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4].
![Page 155: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/155.jpg)
Permit Number: V-14-002 R6 Page: 84 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2. Emission Limitations: a. No person shall cause or permit the discharge of visible fugitive dust emissions beyond the
lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)] Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
b. Emissions of particulate matter from the Bin Vent and Dust Collection Systems and the Hydrator shall not exceed the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates up to 30 ton/hr, E = 3.59P0.62 For process weight rates in excess of 30 ton/hr, E = 17.31P0.16 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
20-20, 20-21 300
21-18, 21-12 30
Compliance Demonstration Method: 1. The bin vent filters and dust collection systems are considered to be in compliance with
process weight rule limits and the opacity limit when the filter systems are operating and properly maintained.
2. The Hydrator/Scrubber system is considered to be in compliance with process weight rule limits and the opacity limit when properly operated.
c. The opacity of emissions from the Bin Vent and Dust Collection Systems and the Hydrator
shall not exceed twenty percent (20%). [401 KAR 59:010, Section 3 (1)]
3. Testing Requirements: Testing shall be conducted at such times as may be requested by the cabinet in accordance with
401 KAR 50:045, Section 4. 4. Specific Monitoring Requirements:
a. Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Perform a qualitative visual observation (QVO) of the stack of the dust collection system and bin vent collectors on a weekly basis. The permittee shall maintain a log of the observations. If visible emissions from the stack are observed, then opacity shall be determined by EPA Reference Method 9 as detailed in 40 CFR 60, Appendix A. If the opacity reading is greater than twenty (20) percent then initiate an inspection of the equipment and make repairs if necessary. [401 KAR 52:020, Section 10]
Commented [A14]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 156: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/156.jpg)
Permit Number: V-14-002 R6 Page: 85 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
b. Monitor the material received and processed (tons/month) on a monthly basis. [401 KAR
52:020, Section 10] 5. Specific Recordkeeping Requirements:
a. Maintain a log of visual emission observations required under 4. Specific Monitoring Requirements a indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed, and the results of the EPA Reference Method 9 readings. [401 KAR 52:020, Section 10]
b. Maintain records of all routine and non-routine maintenance activities and inspections performed on the bin vents and dust collection systems. These records shall include, at a minimum, the date and time, the name(s) of the person or organization performing the maintenance or inspections, and a description of the maintenance completed or repairs needed and the date when such repairs were completed.. [401 KAR 52:020, Section 10]
c. Records of material received and processed (tons/month) shall be maintained on a monthly
basis. [401 KAR 52:020, Section 10] 6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements. 7. Specific Control Equipment Operating Conditions:
a. Each dust collection system shall be operated when controlled emission units are in operation to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and good operating practices. [401 KAR 50:055, Section 2]
b. Maintain a log of routine and non-routine maintenance activities performed on the dust
collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
![Page 157: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/157.jpg)
Permit Number: V-14-002 R6 Page: 86 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
HYDRATE: HY02 – Hydrate Bins to Loadout
EU # Description Date Constructed or Last Modified
Controls
Loadout Transfers:
21-25 90-172 Truck Loadout 1980 90-170 Dust Collection System
21-27 90-124LS Reject Truck Loadout 1980 90-303 Dust Collection System
21-28 90-307 Truck Loadout 1980 90-215 Dust Collection System
27-01 90-221LS Railcar Loadout 2004 90-221 Dust Collection System
Storage Bin Vent Filter System:
21-32 90-139A Bin Vent Collector on 90-222 (#3 Product Storage Bin)
1980
21-33 90-139B Bin Vent Collector on 90-223 (#2 Product Storage Bin)
1980
21-34 90-139C Bin Vent Collector on 90-224 (#1 Product Storage Bin)
1980
Dust Collection Systems:
21-23 90-215 Dust Collection System for #3 Product Bin Truck Loadout
1980
21-31 90-170 Dust Collection System for #1 & #2 Product Bin Truck Loadout
1980
21-35 90-303 Dust Collection System for Hydrate Reject Loadout
1980
22-09 91-209 Dust Collection System for Hydrate Bagging Operation
1980
27-02 90-221 Dust Collection System for 90-221LS Railcar Loadout
1980
APPLICABLE REGULATIONS: 401 KAR 59:010, New process operations 1. Operating Limitations:
Not applicable
![Page 158: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/158.jpg)
Permit Number: V-14-002 R6 Page: 87 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
2. Emission Limitations: a. Emissions of particulate matter from the Bin Vent and Dust Collection Systems and the
Hydrator shall not exceed the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates up to 30 ton/hr, E = 3.59P0.62 For process weight rates in excess of 30 ton/hr, E = 17.31P0.16 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
21-25, 21-28, 27-01, 21-23, 21-31, 21-35, 22-09, 27-02
100
21-27 85
21-32, 21-33, 21-34 30
b. The opacity of emissions from the Bin Vent Collectors and Dust Collection Systems and
shall not exceed twenty percent (20%). [401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: This emission unit is considered to be in compliance with process weight rule limits and opacity limit when the dust collection system associated with the unit is operating and properly maintained.
3. Testing Requirements: Testing shall be conducted at such times as may be requested by the cabinet in accordance with
401 KAR 50:045, Section 4. 4. Specific Monitoring Requirements:
a. Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Perform a qualitative visual observation (QVO) of the dust collection system and bin vent collectors on a weekly basis. The permittee shall maintain a log of the observations. If visible emissions from the stack are observed, then opacity shall be determined by EPA Reference Method 9 as detailed in 40 CFR 60, Appendix A. If the opacity reading is greater than twenty (20) percent then initiate an inspection of the equipment and make repairs if necessary. [401 KAR 52:020, Section 10]
b. Monitor the material received and processed (tons/month) on a monthly basis. [401 KAR
52:020, Section 10]
Commented [A15]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 159: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/159.jpg)
Permit Number: V-14-002 R6 Page: 88 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. For emission units 21-25, 21-27, 21-28 and 27-01, at least once per day prior to loading
trucks or rail (if any are loaded any time that day), the person(s) responsible for the loading operations shall inspect and document that the curtains are present, the loading sock has no holes or tears, and the dust collection system is operational. If the curtain is damaged, loading shall be delayed until the curtain is repaired or temporary measures to control emission are taken. On days when a loadout system is not operated, no inspection is required.
5. Specific Recordkeeping Requirements: a. Maintain a log of visual emission observations required under 4. Specific Monitoring
Requirements a indicating or each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed, and the results of the EPA Reference Method 9 readings. [401 KAR 52:020, Section 10]
b. Maintain records of all routine and non-routine maintenance activities and inspections
performed on the bin vents and dust collection systems. These records shall include, at a minimum, the date and time, the name(s) of the person or organization performing the maintenance or inspections, and a description of the maintenance completed or repairs needed and the date when such repairs were completed.. [401 KAR 52:020, Section 10]
c. Maintain records of the total amount of material loaded out by truck or rail (tons/month)
on a monthly basis. [401 KAR 52:020, Section 10] 6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
7. Specific Control Equipment Operating Conditions: a. Each dust collection system shall be operated when controlled emission units are in
operation to maintain compliance with permitted emission limitations, consistent with manufacturer’s specifications and good operating practices. [401 KAR 50:055, Section 2]
b. Maintain a log of routine and non-routine maintenance activities performed on the dust
collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
![Page 160: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/160.jpg)
Permit Number: V-14-002 R6 Page: 89 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
HYDRATE: HY03 – Lime Pulverizer System
EU # Description Date Constructed or Last Modified
21-05 90-137 Dust Collection System for Mill Feed Bin 1980
21-08 90-142 Dust Collection System for Mill 1980
APPLICABLE REGULATIONS: 401 KAR 59:010, New process operations 1. Operating Limitations: Not applicable 2. Emission Limitations:
a. Emissions of particulate matter from the listed emission units shall not exceed the rate calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates up to 30 ton/hr, E = 3.59P0.62 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
21-05, 21-08 30
Compliance Demonstration Method: The dust collection systems are considered to be in compliance with process weight rule limits and opacity limit when the filter systems are operating and properly maintained.
b. The opacity of emissions from the listed emission units shall not exceed twenty percent (20%). [401 KAR 59:010, Section 3 (1)]
3. Testing Requirements: Testing shall be conducted at such times as may be requested by the cabinet in accordance with
401 KAR 50:045, Section 4. 4. Specific Monitoring Requirements:
a. Conduct visual observations weekly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Perform a qualitative visual observation (QVO) of the stack of the dust collection system on a weekly basis. The permittee shall maintain a log of the observations. If visible emissions from the stack are observed, then opacity shall be determined by EPA Reference Method 9 as detailed in 40 CFR 60, Appendix A. If the opacity reading is greater
![Page 161: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/161.jpg)
Permit Number: V-14-002 R6 Page: 90 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
than twenty percent then initiate an inspection of the equipment and make repairs if necessary. [401 KAR 52:020, Section 10]
b. Monitor the lime material processed through the lime pulverizer system (tons/month) on a
monthly basis. [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements: a. Maintain a log of visual emission observations required under 4. Specific Monitoring
Requirements a indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed, and results of the EPA Reference Method 9 readings.
b. Maintain records of all routine and non-routine maintenance activities and inspections
performed on the bin vents and dust collection systems. These records shall include, at a minimum, the date and time, the name(s) of the person or organization performing the maintenance or inspections, and a description of the maintenance completed or repairs needed and the date when such repairs were completed.. [401 KAR 52:020, Section 10]
c. Maintain records of the lime material processed through the lime pulverizer system
(tons/month) on a monthly basis. [401 KAR 52:020, Section 10] 6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
Commented [A16]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 162: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/162.jpg)
Permit Number: V-14-002 R6 Page: 91 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
SOUTH HYDRATE: SH01 – South Hydrate Plant
EU # Description Date Constructed Controls
Quick Lime Handling and Storage
35-01 Transfer [From BC 89-815 to Bucket Elevator (35-02)]
2016 DC-06108 Dust Collector
35-02 Bucket Elevator BE-06103 2016
35-03 Screen SN-06104 2016
35-04 Transfer [From Screen (35-03) to Conveyor (35-05)]
2016
36-01 Fines Conveyor (SC-06106) [From Screen (35-04) to Lime Dust Collection Systems]
2016 Enclosed
36-02 Overs Bin (BN 06105) 2016 Enclosed
35-05 Belt Conveyor BC-06113 [To Bucket Elevator(35-06)]
2016 DC-06116 Cartridge Filter
35-06 Bucket Elevator BE-06118 (Lower Section) 2016
35-07 Bucket Elevator BE-06118 (Upper Section) 2016
35-08 Quick Lime Bin #1 BN-06120 Integrated Passive Bin Vent Filter (DC-06121)
2016 Inherent Vent Filter
35-09 Quick Lime Bin #2 BN-06125 Integrated Passive Bin Vent Filter (DC-06126)
2016 Inherent Vent Filter
35-10 Transfer BN-06120 [From Lime Bin #1 to Belt Conveyor (35-12)]
2016 DC-21105 Dust Collector
35-11 Transfer BN-06125 [From Lime Bin #2 to Belt Conveyor (35-12)]
2016
35-12 Belt Conveyor BC-22101[From Bins to Crusher]
2016
35-13 Crusher CR-22102 2016
35-14 Bucket Elevator BE-21101 (Lower Section) 2016
35-15 Conveyor and Transfer Points (SC-21102) [From Bucket Elevator to Surge Bin]
2016
35-16 Crushed Quicklime Surge Bin(BN-21103) 2016
35-17 Rejects Bin BN-25104 [From Conveyor SC-25102]
2016
![Page 163: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/163.jpg)
Permit Number: V-14-002 R6 Page: 92 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
EU # Description Date Constructed Controls
Quick Lime Handling and Storage
35-18 Bucket Elevator BE-25107[From Conveyor SC-25102 to Conveyor SC-25110 or SC-
25109]
2016 DC-21105 Dust Collector
Hydrator and Drying
36-03 Conveyor (SC-21110) (Quicklime)[From Quicklime Bin to Conveyor (SC-21111)]
2016 Enclosed
36-04 Conveyor (SC-21111) (Quicklime) [From Conveyor (SC-21110) to Hydrator]
2016 Enclosed
35-19 Hydrator System HY-23101 with Integrated Process Filter (DC-23103)
2016 Inherent Process Filter
36-05 Conveyor (SC-23107) (Wet Hydrate) [From Hydrator to Rejects Container (BN-23110)]
2016 Enclosed
36-06 Rejects Container (Wet Hydrate) [From Conveyor (SC-23107)]
2016 Enclosed
35-20 Mill Dryer (ML-23116) with Integrated Process Filter (DC-23119)
2016 Inherent Process Filter
36-07 Conveyor (SC-25102) [To Rejects Bin (35-17) or Bucket Elevator (35-18)]
2016 Enclosed
Hydrate Storage and Loadout
36-08 Conveyor (SC-25109) [To Hydrate Bin (35-22)]
2016 Enclosed
36-09 Conveyor (SC-25110) [To Hydrate Bin (35-23)]
2016 Enclosed
35-22 Hydrate Bin #1 (BN-25111) with Integrated Bin Vent Filter (DC-25112)
2016 Inherent Bin Vent Filter
35-23 Hydrate Bin #2 (BN-25123) with Integrated Bin Vent Filter (DC-25124)
2016 Inherent Bin Vent Filter
35-24 Truck Loadout from Hydrate Bin #1 with Spout Filter
2016 DC-25120 Spout Filter
35-25 Truck Loadout from Hydrate Bin #2 with Spout Filter
2016 DC-25132 Spout Filter
APPLICABLE REGULATIONS: 401 KAR 59:010, New process operations
![Page 164: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/164.jpg)
Permit Number: V-14-002 R6 Page: 93 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1. Operating Limitations: To preclude the applicability of 401 KAR 51:017, the controls listed shall be operated at all
times the associated equipment is in operation. [Permit V-14-002 R3] 2. Emission Limitations: a. Emissions of particulate matter from the affected facilities shall not exceed the rate
calculated by the following equations: [401 KAR 59:010, Section 3 (2)] For process weight rates up to 30 ton/hr, E = 3.59P0.62 For process weight rates in excess of 30 ton/hr, E = 17.31P0.16 where E is the rate of emission in lb/hr and P is the process weight rate in ton/hr
EU # Design Process
Weight Rates (tons/hr)
35-01 to 35-03 42
35-04 to 35-09 35
35-10 to 35-16, 35-19 9
35-17 to 35-18, 35-20 to 35-23
11
35-24 to 35-25 100
b. The opacity of emissions from the affected facilities shall not exceed twenty percent (20%).
[401 KAR 59:010, Section 3 (1)]
Compliance Demonstration Method: The emission points listed above are considered to be in compliance with process weight rule limits and the opacity limit when the control devices are operating and properly maintained.
3. Testing Requirements: a. Testing shall be conducted at such times as may be requested by the cabinet in
accordance with 401 KAR 50:045, Section 4. b. Conduct a performance test in accordance with EPA Reference Method 5 for particulate
matter within 180 days of initial operation for the following emission units to verify PM emission factors. Testing shall be conducted in accordance with 401 KAR 50:045, Performance Tests, and shall be conducted under conditions representative of maximum emissions potential under anticipated operating conditions. [401 KAR 50:055, General Compliance Requirements, 401 KAR 59:005, Section 2 (2), and 401 KAR 50:045, Section 1]
![Page 165: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/165.jpg)
Permit Number: V-14-002 R6 Page: 94 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
EU # Stack/Control Device to Test
35-01 to 35-04 DC-06108 Dust Collection System
35-05 to 35-0707 DC-21105 Dust Collection System
35-10 Integrated Process Filter DC-23103
35-11 Integrated Process Filter DC-23119
4. Specific Monitoring Requirements:
a. Conduct visual observations weekly monthly during daylight hours. If visible emissions are observed, take corrective action and conduct a follow-up visual observation. If visible emissions are observed after the corrective action, conduct an EPA Reference Method 9 reading. Perform a qualitative visible observation (QVO) of the stack or vent for each affected facility on a weekly basis. The permittee shall maintain a log of the observations. If visible emissions from the stack are observed, then opacity shall be determined by EPA Reference Method 9 as detailed in 40 CFR 60, Appendix A. If the opacity reading is greater than twenty (20) percent, take corrective action and conduct a follow up EPA Reference Method 9 determination. If visible emissions are still in excess of the opacity limit after corrective action, the process shall be shut down and shall not operate again for production purposes until repairs have been made that result in opacity determined to be in compliance by EPA Reference Method 9. If the opacity limit is not exceeded, the process may continue to operate. [401 KAR 52:020, Section 10].
b. Monitor the material received and processed (tons/month) on a monthly basis. [401 KAR
52:020, Section 10]. c. Install, calibrate, maintain and operate according to manufacturer’s specification a
monitoring device to determine the differential pressure across the following filter systems. This monitoring device shall be read and the reading records at least once daily during operation of the unit.
EU # Filter System
35-01:04 DC-06108 Dust Collection System
35-05:07 DC-21105 Dust Collection System
35-10 Integrated Process Filter DC-23103
35-11 Integrated Process Filter DC-23119
d. For emission units 35-24 and 35-25, at least once per day prior to loading the trucks (if
any trucks are loaded any time that day), the person(s) responsible for the loading operations shall inspect and document that the curtains are present, the loading sock has no holes or tears, and the dust collection system is operational. If the curtain is damaged, loading shall be delayed until the curtain is repaired or temporary measures
Commented [A17]: Carmeuse is requesting the visible emissions monitoring language in the permit be standardized and immediate Method 9 readings be removed. Refer to application report for additional discussion.
![Page 166: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/166.jpg)
Permit Number: V-14-002 R6 Page: 95 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
to control emission are taken. On days when the truck loadout system is not operated, no inspection is required
5. Specific Recordkeeping Requirements: a. Maintain a log of visual emission observations required under 4. Specific Monitoring
Requirements a indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any visible emissions observed, corrective actions taken to mitigate any visible emissions observed, and the results of EPA Reference Method 9 readings. [401 KAR 52:020, Section 10]
b. Maintain records of the differential pressure readings required in 4. Specific Monitoring
Requirements c Records shall, at a minimum, include the date and time of the reading, and the reading value. [401 KAR 52:020, Section 10]
c. Maintain log of all inspections of bin vents and dust collection systems indicating for
each the date and time, name of inspector, a description of any repairs needed and the date when such repairs were completed. [401 KAR 52:020, Section 10]
d. Records of material received and processed (tons/month) shall be maintained on a
monthly basis. [401 KAR 52:020, Section 10] 6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements. 7. Specific Control Equipment Operating Conditions: a. Each dust collection system shall be operated consistent with manufacturer’s
specifications and good operating practices when emission units are in operation to maintain compliance with permitted emission limitations. [401 KAR 50:055, Section 2]
b. Maintain a log of routine and non-routine maintenance activities performed on the dust
collection systems. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
![Page 167: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/167.jpg)
Permit Number: V-14-002 R6 Page: 96 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
SOUTH HYDRATE: SH02 – Hot Air Heater
EU # Description Date Constructed
Hot Air Heater for Hydrator System
35-21 Natural Gas-Fired Hot Air Heater (9.55 MMBtu/hr) (HU-23128) (For Hydrator System)
2016
APPLICABLE REGULATIONS: 401 KAR 59:015, New indirect heat exchangers 401 KAR 63:002, Section 2(4)(iiii) 40 C.F.R. 63.7480 to 63.7575, Tables 1 to 13 (Subpart DDDDD), National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters 1. Operating Limitations: a. The permittee must meet each work practice standard in Table 3 to 40 CFR 63, Subpart
DDDDD that applies to the affected facility except as provided under 40 CFR 63.7522. [40 CFR 63.7500(a)(1)]
b. At all times, the permittee must operate and maintain the Hot Air Heater (EU 35-21),
including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Division that may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. [40 CFR 63.7500(a)(3)]
c. The permittee must demonstrate initial compliance with the applicable work practice
standards in Table 3 to 40 CFR 63, Subpart DDDDD, applicable to the Hot Air Heater (EU 35-21) within the applicable annual, biennial, or 5-year schedule as specified in 40 CFR 63.7515(d) following the initial compliance date specified in 40 CFR 63.7495(a). Thereafter, complete the applicable annual, biennial, or 5-year tune-up as specified in 40 CFR 63.7515(d). [40 CFR 63.7510 (g)]
d. The permittee must conduct a biennial performance tune-up for the Hot Air Heater (EU
35-21) according to 40 CFR 63.7540(a)(11). Each biennial tune-up specified in 40 CFR 63.7540(a)(11) must be no more than 25 months after the previous tune-up. For a new or reconstructed affected source, (as defined in 40 CFR 63.7490) the first biennial tune-up must be no later than 25 months after the initial startup of the new or reconstructed affected source. [40 CFR 63.7515(d)]
e. The permittee must conduct a tune-up of Hot Air Heater (EU 35-21) biennially to
demonstrate continuous compliance as specified: [40 CFR 63.7540(a)(10)]
![Page 168: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/168.jpg)
Permit Number: V-14-002 R6 Page: 97 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) As applicable, inspect the burner, and clean or replace any components of the burner as necessary (the burner inspection may be performed any time prior to the tune-up or delay the burner inspection until the next scheduled unit shutdown). Units that produce electricity for sale may delay the burner inspection until the first outage, not to exceed 36 months from the previous inspection. At units where entry into a piece of process equipment or into a storage vessel is required to complete the tune-up inspections, inspections are required only during planned entries into the storage vessel or process equipment;
2) Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available;
3) Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly (the permittee may delay the inspection until the next scheduled unit shutdown);
4) Optimize total emissions of CO. This optimization should be consistent with the manufacturer's specifications, if available,
5) Measure the concentrations in the effluent stream of CO in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made (measurements may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made). Measurements may be taken using a portable CO analyzer; and
6) Maintain on-site and submit, if requested by the Division, a report containing the information in paragraphs (a)(10)(vi)(A) through (C) of this section,
i. The concentrations of CO in the effluent stream in parts per million by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tune-up of the boiler or process heater;
ii. A description of any corrective actions taken as a part of the tune-up; and iii. The type and amount of fuel used over the 12 months prior to the tune-up, but
only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel used by each unit.
f. If the unit is not operating on the required date for a tune-up, the tune-up must be conducted
within 30 calendar days of startup. [40 CFR 63.7540(a)(13)]
2. Emission Limitations: a. Particulate matter (PM) emissions shall not exceed 0.56 lb/MMBtu actual heat input, based
on three hour average. [401 KAR 59:015, Section 5] b. Sulfur dioxide (SO2) emissions shall not exceed 3.0 lb/MMBtu actual heat input, based on
a twenty four hour average. [401 KAR 59:015, Section 5] c. Visible emissions from the shall not exceed twenty (20) percent opacity, based on a six-
minute average, except as follows: [401 KAR 59:015, Section 4 (2)]
![Page 169: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/169.jpg)
Permit Number: V-14-002 R6 Page: 98 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
1) A maximum of forty (40) percent opacity shall be allowed for a maximum of six (6) consecutive minutes in any sixty (60) consecutive minutes during fire box cleaning or soot blowing; and [401 KAR 59:015, Section 4(2)]
2) For emissions from an affected facility caused by building a new fire, emissions during the period required to bring the boiler up to operating conditions shall be allowed, if the method used is recommended by the manufacturer and the time does not exceed the manufacturer's recommendations.
Compliance Demonstration Method: Affected facilities are assumed to be in compliance with the PM, SO2, and visible emission
standards while burning natural gas.
3. Testing Requirements: Testing shall be conducted at such times as may be requested by the cabinet in accordance with
401 KAR 50:045, Section 4. 4. Specific Monitoring Requirements: Monitor the gas usage rate for the Hot Air Heater (MMscf/month) on a monthly basis. [401
KAR 52:020, Section 10] 5. Specific Recordkeeping Requirements: a. Maintain records of gas usage rate (MMscf/month) [401 KAR 52:020, Section 10]
b. Maintain a copy of each notification and report that submitted to comply with 40 CFR 63, Subpart DDDDD, including all documentation supporting any Initial Notification or Notification of Compliance Status or semiannual compliance report submitted, according to the requirements in 40 CFR 63.10(b)(2)(xiv). [40 CFR 63.77555(a)(1)]
c. Records of tune-ups and compliance reports, must be maintained in accordance with the
following: [40 CFR 63.7560] 1) Records must be in a form suitable and readily available for expeditious review,
according to 40 CFR 63.10(b)(1). 2) As specified in 40 CFR 63.10(b)(1), keep each record for 5 years following the date of
each occurrence, measurement, maintenance, corrective action, report, or record. 3) Keep each record on site, or they must be accessible from on site (for example, through
a computer network), for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record, according to 40 CFR 63.10(b)(1). Keep the records off site for the remaining 3 years.
6. Specific Reporting Requirements:
a. See Section F - Monitoring, Recordkeeping, and Reporting Requirements. b. As specified in 40 CFR 63.9(b)(4) and (5), the permittee must submit an Initial Notification not later than 15 days after the actual date of startup of the Hot Air Heater (EU 35-21). [40 CFR 63.7545(c)]
![Page 170: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/170.jpg)
Permit Number: V-14-002 R6 Page: 99 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. The permittee must submit a Notification of Compliance Status according to 40 CFR 63.9 h)(2)(ii). For the initial compliance demonstration, submit the Notification of Compliance Status before the close of business on the 60th day following the completion of all performance test and/or other initial compliance demonstrations according to 40 CFR 63.10(d)(2). The Notification of Compliance Status report must contain all the information: [40 CFR 63.7545(e)]
1) A description of the affected unit(s) including identification of which subcategories the unit is in, the design heat input capacity of the unit, a description of the add-on controls used on the unit to comply with this subpart, description of the fuel(s) burned, including whether the fuel(s) were a secondary material determined by the permittee or the EPA through a petition process to be a non-waste under 40 CFR 241.3 of this chapter, whether the fuel(s) were a secondary material processed from discarded non-hazardous secondary materials within the meaning of 40 CFR 241.3 of this chapter, and justification for the selection of fuel(s) burned during the compliance demonstration.
2) In addition to the information required in 40 CFR 63.9(h)(2), notification of compliance status must include the following certification(s) of compliance, as applicable, and signed by a responsible official: “This facility completed the required initial tune-up for all of the boilers and process heaters covered by 40 CFR part 63 subpart DDDDD at this site according to the procedures in 40 CFR 63.7540(a)(10)(i) through (vi).”
d. The permittee must submit to the Division all of the notifications in 40 CFR 63.7(b) and (c), 63.8(e), (f)(4) and (6), and 63.9(b) through (h) that apply to the Hot Air Heater (EU 35-21) by the dates specified. [40 CFR 63.7545(a)]
e. If the permittee switches fuels or makes a physical change to the unit and the fuel switch
or physical change resulted in the applicability of a different subcategory, the permittee must provide notice of the date upon which permittee switched fuels or made the physical change within 30 days of the switch/change. The notification must identify: [40 CFR 63.7545 (h)] 1) The name of the owner or operator of the affected source, as defined in 40 CFR
63.7490, the location of the source, the boiler(s) and process heater(s) that have switched fuels, were physically changed, and the date of the notice.
2) The currently applicable subcategory under this subpart. 3) The date upon which the fuel switch or physical change occurred. f. The permittee must submit each report in Table 9 to 40 CFR 63, Subpart DDDDD that
applies to the Hot Air Heater (EU 35-21). [40 CFR 63.7550(a)] g. The permittee must submit a signed statement in the Notification of Compliance Status
report that indicates that the permittee conducted a tune-up of the Hot Air Heater (EU 35- 21). [40 CFR 63.7530 (e)]
h. Unless the Division has approved a different schedule for submission of reports under
40CFR 63.10(a), the permittee must submit each report for the Hot Air Heater (EU 35-21), according to 40 CFR 63.7550(h), by the date in Table 9 to this subpart and according to
![Page 171: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/171.jpg)
Permit Number: V-14-002 R6 Page: 100 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
the requirements in 40 CFR 63.7550 (b)(1) through (4). For units that are subject only to a requirement to conduct subsequent annual, biennial, or 5-year tune-up according to 40 CFR 63.7540(a)(10), and not subject to emission limits or Table 4 operating limits, the permittee may submit only an annual as specified in 40 CFR 63.7550 (b)(1) through (4) of this section, instead of a semi-annual compliance report. [40 CFR 63.7550 (b)]
1) The first semi-annual compliance report must cover the period beginning on the compliance date that is specified for each boiler or process heater in 40 CFR 63.7495 and ending on June 30 or December 31, whichever date is the first date that occurs at least 180 days after the compliance date that is specified for the source in 40 CFR 63.7495. If submitting an annual, biennial, or 5-year compliance report, the first compliance report must cover the period beginning on the compliance date that is specified for each boiler or process heater in 40 CFR 63.7495 and ending on December 31 within 1, 2, or 5 years, as applicable, after the compliance date that is specified for the source in 40 CFR 63.7495.
2) The first annual compliance report must be postmarked or submitted no later than January 31.
3) Each subsequent annual compliance reports must cover the applicable 1-year periods from January 1 to December 31.
4) Each subsequent annual compliance reports must be postmarked or submitted no later than January 31.
i. The compliance report must contain the following information depending on how the
facility chooses to comply with the applicable requirements of 40 CFR 63, Subpart DDDDD: [40 CFR 63.7550(c)(1)]
1) Company and Facility name and address. 2) Process unit information, emissions limitations, and operating parameter limitations. 3) Date of report and beginning and ending dates of the reporting period. 4) The total operating time during the reporting period.
5) Include the date of the most recent tune-up for each unit subject to only the requirement to conduct an annual tune-up according to 40 CFR 63.7540(a)(10). Include the date of the most recent burner inspection if it was not done annually and was delayed until the next scheduled or unscheduled unit shutdown.
6) Statement by a responsible official with that official's name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report.
![Page 172: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/172.jpg)
Permit Number: V-14-002 R6 Page: 101 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ROADS: RD01 – Haul Roads
EU # Description Date Constructed or Last Modified
Controls
23-01 Haul Road and Yard Area (Paved) 1995 Wet Suppression
25-01 Haul Road and Yard Area (Coal) 2003 Wet Suppression
APPLICABLE REGULATIONS: 401 KAR 63:010, Fugitive emissions 1. Operating Limitations:
a. Reasonable precautions shall be taken to prevent particulate matter from becoming airborne. Such reasonable precautions shall include, when applicable, but not be limited to the following [401 KAR 63:010, Section 3]: 1) Application and maintenance of asphalt, water, or suitable chemicals on roads, material
stockpiles, and other surfaces which can create airborne dusts. 2) Installation and use of hoods, fans, and fabric filters to enclose and vent the handling
of dusty materials, or the use of water sprays or other measures to suppress the dust emissions during handling;
3) Maintenance of paved roadways in a clean condition; 4) The prompt removal of earth or other material from a paved street which earth or other
material has been transported thereto by trucking or other earth moving equipment or erosion by water;
5) Installation and use of compaction or other measures to suppress the dust emissions during handling
b. No one shall allow earth or other material being transported by truck or earth moving
equipment to be deposited onto a paved street or roadway [401 KAR 63:010, Section 4]. 2. Emission Limitations:
No person shall cause or permit the discharge of visible fugitive dust emissions beyond the lot line of the property on which the emissions originate. [401 KAR 63:010, Section 3(2)]
Compliance Demonstration Method: Compliance shall be demonstrated with 1. Operating Limitations.
3. Testing Requirements: Not applicable
![Page 173: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/173.jpg)
Permit Number: V-14-002 R6 Page: 102 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements: Inspect each haul road and conduct visual observations at least once per week. If a haul road is determined to have the potential to generate fugitive emissions (e.g. road surface contains loose material, and wind speed is substantial enough to disturb the material, visible emissions observed) preventative actions shall be taken to mitigate the potential for fugitive emissions (e.g. watering or cleaning to road). [401 KAR 52:020, Section 10]
5. Specific Recordkeeping Requirements:
a. Maintain a log of haul road and yard area inspections and visual observations as required under 4. Specific Monitoring Requirements, indicating for each observation the date and time, name of observer, standing position, weather conditions, whether any emissions were visible, the suspected or known cause of any fugitive emissions observed, and corrective actions taken to mitigate any emissions observed. [401 KAR 52:020, Section 10]
b. Maintain a log of routine and non-routine maintenance activities performed on the road
maintenance and cleaning equipment. These records shall include, at a minimum, the date, the name(s) of the person or organization performing the maintenance, and a description of the maintenance completed. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements:
See Section F - Monitoring, Recordkeeping, and Reporting Requirements. 7. Specific Control Equipment Operating Conditions:
Road maintenance and cleaning (including sweeping, watering and application of dust suppressants) shall be completed as required to ensure that haul roads are sufficiently moist or clean to control fugitive emissions. [401 KAR 50:055, Section 2]
![Page 174: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/174.jpg)
Permit Number: V-14-002 R6 Page: 103 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ENGINES: EN01 – Stationary Engines
EU # Description Date Constructed
34-06 Kiln 1 Pony Motor Engine; New Holland, Model F4HFE413D*A008, 119 bhp
20162018
34-07 Kiln 2 Pony Motor Engine; New Holland, Model F4HFE413D*A008, 119 bhp
2015
34-08 Kiln 3 Pony Motor Engine; New Holland, Model F4HFE413D*A008, 119 bhp
2015
34-09 Kiln 4 Pony Motor Engine; New Holland, Model F4HFE413D*A008, 119 bhp
2015
34-10 Kiln 5 Pony Motor Engine; New Holland, Model F4HFE413D*A008, 119 bhp
2015
APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(dddd) 40 C.F.R. 60.4200 to 60.4219, Tables 1 to 8 (Subpart IIII), Standards of Performance for Stationary Compression Ignition Internal Combustion Engines 401 KAR 63:002, Section 2(4)(eeee) 40 C.F.R. 63.6580 to 63.6675, Tables 1a to 8, and Appendix A (Subpart ZZZZ), National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines 1. Operating Limitations:
a. The facility must meet the requirements of 40 CFR 63, Subpart ZZZZ, by meeting the requirements of 40 CFR part 60 subpart IIII. No further requirements apply for such engines under this part. [40 CFR 63.6590(c)]
b.a.Beginning October 1, 2010, the owner and operator of stationary CI ICE subject to 40 CFR 60, Subpart IIII, with a displacement of less than 30 liters per cylinder that use diesel fuel must use diesel fuel that meets the requirements of 40 CFR 80.510(b) for non-road diesel fuel, except that any existing diesel fuel purchased (or otherwise obtained) prior to October 1, 2010, may be used until depleted. [40 CFR 60.4207(b)]
b. Except as permitted under 40 CFR 60.4211(g), the permittee must do all of the following to demonstrate compliance [40 CFR 60.4211(a)]: 1) Operate and maintain the stationary CI internal combustion engine and control device
according to the manufacturer's emission-related written instructions; 2) Change only those emission-related settings that are permitted by the manufacturer;
and 3) Meet the requirements of 40 CFR parts 89, 94 and/or 1068, as they apply.
Commented [A18]: Describes exemption criteria from Subpart ZZZZ requirements. This condition does not impose any additional requirements and for simplification it is recommended that this condition be removed.
![Page 175: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/175.jpg)
Permit Number: V-14-002 R6 Page: 104 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
c. If the engine and control device is not installed, configured, operated, and maintained according to the manufacturer's emission-related written instructions, or emission-related settings are changed in a way that is not permitted by the manufacturer, the permittee must keep a maintenance plan and records of conducted maintenance and must, to the extent practicable, maintain and operate the engine in a manner consistent with good air pollution control practice for minimizing emissions. In addition, conduct an initial performance test, according to 40 CFR 60.4212, to demonstrate compliance with the applicable emission standards within 1 year of startup, or within 1 year after an engine and control device is no longer installed, configured, operated, and maintained in accordance with the manufacturer's emission-related written instructions, or within 1 year after the emission-related settings are changed in a way that is not permitted by the manufacturer. [40 CFR 60.4211(g)(2)]
d. If the stationary CI internal combustion engine equipped with a diesel particulate filter to comply with the emission standards in §60.4204, the diesel particulate filter must be installed with a backpressure monitor that notifies the owner or operator when the high backpressure limit of the engine is approached. [40 CFR 60.4209(b)]
2. Emission Limitations: a. Owners and operators must comply with the emission standards for new CI engines in 40
CFR 60.4201. The engine must be certified to meet the certification emission standards for new nonroad CI engines in 40 CFR 89.112, 40 CFR 89.113, 40 CFR 1039.101, 40 CFR 1039.102, 40 CFR 1039.104, 40 CFR 1039.105, 40 CFR 1039.107, and 40 CFR 1039.115, as applicable, for all pollutants, for the same model year and maximum engine power. [40 CFR 60.4204(b)]
Compliance Demonstration Method: The permittee must comply by purchasing an engine certified to the emission standards in 40 CFR60.4204(b), as applicable, for the same model year and maximum (or in the case of fire pumps, NFPA nameplate) engine power. The engine must be installed and configured according to the manufacturer's emission-related specifications, except as permitted in 40 CFR 60.4211(g). [40 CFR 60.4211(c)]
b. The permittee must operate and maintain stationary CI ICE that achieve the emission
standards as required in 40 CFR 60.4204 over the entire life of the engine. [40 CFR 60.4206]
3. Testing Requirements: Not applicable 4. Specific Monitoring Requirements:
Not applicable
![Page 176: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/176.jpg)
Permit Number: V-14-002 R6 Page: 105 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
5. Specific Recordkeeping Requirements: If the stationary CI internal combustion engine is equipped with a diesel particulate filter, the owner or operator must keep records of any corrective action taken after the backpressure monitor has notified the owner or operator that the high backpressure limit of the engine is approached. [40 CFR 60.4214(c)]
6. Specific Reporting Requirements: See Section F - Monitoring, Recordkeeping, and Reporting Requirements for further requirements.
![Page 177: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/177.jpg)
Permit Number: V-14-002 R6 Page: 106 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ENGINES: EN02 – Stationary Emergency-Use CI Engines (NSPS Applicable)
EU # Description Date Constructed
34-0611 Mine Escape Shaft Emergency Generator; Kohler, Model 125RE0ZJB, 166 bhp
2006
APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(dddd) 40 C.F.R. 60.4200 to 60.4219, Tables 1 to 8 (Subpart IIII), Standards of Performance for Stationary Compression Ignition Internal Combustion Engines 401 KAR 63:002, Section 2(4)(eeee) 40 C.F.R. 63.6580 to 63.6675, Tables 1a to 8, and Appendix A (Subpart ZZZZ), National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines Note: D.C. Circuit Court [Delaware v. EPA, 785 F. 3d 1 (D.C. Cir. 2015)] has vacated the provisions in 40 CFR 60, Subpart IIII that contain the 100-hour exemption for operation of emergency engines for purposes of emergency demand response under 40 CFR 60.4211(f)(2)(ii)-(iii). The D.C. Circuit Court issued the mandate for the vacatur on May 4, 2016. 1. Operating Limitations:
a. Beginning October 1, 2010, owners and operators of stationary CI ICE subject to 40 CFR 60, Subpart IIII, with a displacement of less than 30 liters per cylinder that use diesel fuel must use diesel fuel that meets the requirements of 40 CFR 80.510(b) for non-road diesel fuel, except that any existing diesel fuel purchased (or otherwise obtained) prior to October 1, 2010, may be used until depleted. [40 CFR 60.4207(b)]
b. The owner or operator and must operate and maintain the stationary CI internal combustion
engine and control device according to the manufacturer's emission-related written instructions. [40 CFR 60.4211(a)(1)]
c. The emergency stationary ICE must be operated according to the requirements in
paragraphs (f)(1) through (3) of this section. In order for the engine to be considered an emergency stationary ICE under 40 CFR 60, Subpart IIII, any operation other than emergency operation, maintenance and testing, emergency demand response, and operation in nonemergency situations for 50 hours per year, as described in paragraphs (f)(1) through (3) of this section, is prohibited. If the engine is not operated according to the requirements in paragraphs (f)(1) through (3) of this section, the engine will not be considered an emergency engine under 40 CFR 60, Subpart IIII and must meet all requirements for non-emergency engines. [40 CFR 60.4211(f)] 1) There is no time limit on the use of emergency stationary ICE in emergency situations. 2) The permittee may operate the emergency stationary ICE for any combination of the
purposes specified in paragraphs (f)(2)(i) through (iii) of this section for a maximum
Commented [A19]: When KDAQ added the new pony motor engines to the permit as part of R2, the emission unit numbers used were inconsistent with what was in the application. Since KDAQ used IDs 34-06 and 34-07 for the Kiln #1 and #2 Pony Motor engines, the EU numbers for the Mine Escape Shaft Generator and BMS Generator should be revised to 34-11 and 34-12, respectively.
![Page 178: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/178.jpg)
Permit Number: V-14-002 R6 Page: 107 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
of 100 hours per calendar year. Any operation for non-emergency situations as allowed by paragraph (f)(3) of this section counts as part of the 100 hours per calendar year allowed by this paragraph (f)(2). i. Emergency stationary ICE may be operated for maintenance checks and readiness
testing, provided that the tests are recommended by federal, state or local government, the manufacturer, the vendor, the regional transmission organization or equivalent balancing authority and transmission operator, or the insurance company associated with the engine. The owner or operator may petition the Administrator for approval of additional hours to be used for maintenance checks and readiness testing, but a petition is not required if the owner or operator maintains records indicating that federal, state, or local standards require maintenance and testing of emergency ICE beyond 100 hours per calendar year.
3) Emergency stationary ICE may be operated for up to 50 hours per calendar year in non-emergency situations. The 50 hours of operation in non-emergency situations are counted as part of the 100 hours per calendar year for maintenance and testing and emergency demand response provided in paragraph (f)(2) of this section. Except as provided in paragraph (f)(3)(i) of this section, the 50 hours per calendar year for nonemergency situations cannot be used for peak shaving or non-emergency demand response, or to generate income for a facility to an electric grid or otherwise supply power as part of a financial arrangement with another entity. i. The 50 hours per year for nonemergency situations can be used to supply power as
part of a financial arrangement with another entity if all of the following conditions are met: A. The engine is dispatched by the local balancing authority or local transmission
and distribution system operator; B. The dispatch is intended to mitigate local transmission and/or distribution
limitations so as to avert potential voltage collapse or line overloads that could lead to the interruption of power supply in a local area or region.
C. The dispatch follows reliability, emergency operation or similar protocols that follow specific NERC, regional, state, public utility commission or local standards or guidelines.
D. The power is provided only to the facility itself or to support the local transmission and distribution system.
E. The owner or operator identifies and records the entity that dispatches the engine and the specific NERC, regional, state, public utility commission or local standards or guidelines that are being followed for dispatching the engine. The local balancing authority or local transmission and distribution system operator may keep these records on behalf of the engine owner or operator.
2. Emission Limitations:
Nitrogen oxide emissions shall not exceed 6.9 g/HP-hr as measured by a performance test conducted in accordance with 40 CFR 60.4212. [40 CFR 60.4205(a), Table 1]
3. Testing Requirements: Conduct an initial performance test according to 40 CFR 60.4212(a)-(e) to demonstrate compliance with the NOX emission standards. [40 CFR 60.4211(b)(5)]
![Page 179: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/179.jpg)
Permit Number: V-14-002 R6 Page: 108 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
4. Specific Monitoring Requirements: a. Install a non-resettable hour meter prior to startup of the engine. [40 CFR 60.4209(a)]. b. Monitor the amount of fuel used for the engine on a monthly basis. [401 KAR 52:020,
Section 10]
5. Specific Recordkeeping Requirements: Maintain records of the amount of fuel used for the engine on a monthly basis. [401 KAR 52:020, Section 10]
6. Specific Reporting Requirements: a. If the emergency stationary CI ICE operates or is contractually obligated to be available
for more than 15 hours per calendar year for the purposes specified in 40 CFR 60.4211(f)(2)(ii) and (iii) or that operates for the purposes specified in 40 CFR 60.4211(f)(3)(i), the permittee must submit an annual report according to the requirements in paragraphs (d)(1) through (3) of this section. [40 CFR 60.4214(d)] 1) The report must contain the following information:
i. Company name and address where the engine is located. ii. Date of the report and beginning and ending dates of the reporting period. iii. Engine site rating and model year. iv. Latitude and longitude of the engine in decimal degrees reported to the fifth decimal
place. v. Hours operated for the purposes specified in 40 CFR 60.4211(f)(2)(ii) and (iii),
including the date, start time, and end time for engine operation for the purposes specified in 40 CFR 60.4211(f)(2)(ii) and (iii).
vi. Number of hours the engine is contractually obligated to be available for the purposes specified in 40 CFR 60.4211(f)(2)(ii) and (iii).
vii. Hours spent for operation for the purposes specified in 40 CFR 60.4211(f)(3)(i), including the date, start time, and end time for engine operation for the purposes specified in 40 CFR 60.4211(f)(3)(i). The report must also identify the entity that dispatched the engine and the situation that necessitated the dispatch of the engine.
2) The first annual report must cover the calendar year 2015 and must be submitted no later than March 31, 2016. Subsequent annual reports for each calendar year must be submitted no later than March 31 of the following calendar year.
3) The annual report must be submitted electronically using the 40 CFR 60, Subpart IIII specific reporting form in the Compliance and Emissions Data Reporting Interface (CEDRI) that is accessed through EPA’s Central Data Exchange (CDX) (www.epa.gov/cdx). However, if the reporting form specific to 40 CFR 60, Subpart IIII is not available in CEDRI at the time that the report is due, the written report must be submitted to the Administrator at the appropriate address listed in 40 CFR 60.4.
b. See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 180: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/180.jpg)
Permit Number: V-14-002 R6 Page: 109 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
ENGINE: EN03 –Stationary Emergency-Use SI Engines (NSPS Applicable)
EU # Description Date Constructed
34-0712 Kiln BMS Emergency Generator; Kohler Model 20RESC, 27.1 bhp 2017
APPLICABLE REGULATIONS: 401 KAR 60:005, Section 2(2)(dddd) 40 C.F.R. 60.4200 to 60.4219, Tables 1 to 8 (Subpart IIII), Standards of Performance for Stationary Compression Ignition Internal Combustion Engines 401 KAR 60:005, Section 2(2)(eeee) 40 C.F.R. 60.4230 to 60.4248, Tables 1 to 4 (Subpart JJJJ), Standards of Performance for Stationary Spark Ignition Internal Combustion Engines 401 KAR 63:002, Section 2(4)(eeee) 40 C.F.R. 63.6580 to 63.6675, Tables 1a to 8, and Appendix A (Subpart ZZZZ), National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines Note: D.C. Circuit Court [Delaware v. EPA, 785 F. 3d 1 (D.C. Cir. 2015)] has vacated the provisions in 40 CFR 40 CFR 60, Subpart JJJJ that contain the 100-hour exemption for operation of emergency engines for purposes of emergency demand response under 40 CFR 60.4243(d)(2)(ii)-(iii)]. The D.C. Circuit Court issued the mandate for the vacatur on May 4, 2016. 1. Operating Limitations:
a. For engines built on or after July 1, 2008, the permittee must install a non-resettable hour meter prior to startup of the engine. [40 CFR 6360.4237(c)]
b. The permittee must operate the emergency stationary ICE according to the requirements in 40 CFR 60.4243(d)(1) through (3). In order for the engine to be considered an emergency stationary ICE under this subpart, any operation other than emergency operation, maintenance and testing, emergency demand response, and operation in non-emergency situations for 50 hours per year, as described in 40 CFR 60.4243(d)(1) through (3), is prohibited. If you do not operate the engine according to the requirements in 40 CFR 60.4243(d)(1) through (3), the engine will not be considered an emergency engine under this subpart and must meet all requirements for non-emergency engines. [40 CFR 6360.4243(d)] 1) There is no time limit on the use of emergency stationary ICE in emergency situations.
2) The permittee may operate your emergency stationary ICE for any combination of the purposes specified in 40 CFR 6360.4243(d)(2)(i) through (iii) for a maximum of 100 hours per calendar year. Any operation for non-emergency situations as allowed by in 40 CFR 6360.4243 (d)(3) counts as part of the 100 hours per calendar year allowed by this in 40 CFR 6360.4243(d)(2).
i) Emergency stationary ICE may be operated for maintenance checks and readiness
Commented [A20]: When KDAQ added the new pony motor engines to the permit as part of R2, the emission unit numbers used were inconsistent with what was in the application. Since KDAQ used IDs 34-06 and 34-07 for the Kiln #1 and #2 Pony Motor engines, the EU numbers for the Mine Escape Shaft Generator and BMS Generator should be revised to 34-11 and 34-12, respectively.
![Page 181: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/181.jpg)
Permit Number: V-14-002 R6 Page: 110 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
testing, provided that the tests are recommended by federal, state or local government, the manufacturer, the vendor, the regional transmission organization or equivalent balancing authority and transmission operator, or the insurance company associated with the engine. The owner or operator may petition the Administrator for approval of additional hours to be used for maintenance checks and readiness testing, but a petition is not required if the owner or operator maintains records indicating that federal, state, or local standards require maintenance and testing of emergency ICE beyond 100 hours per calendar year.
3) Emergency stationary ICE may be operated for up to 50 hours per calendar year in non-emergency situations. The 50 hours of operation in non-emergency situations are counted as part of the 100 hours per calendar year for maintenance and testing and emergency demand response provided in 40 CFR 6360.4243(d)(2). Except as provided in 40 CFR 6360.4243(d)(3)(i), the 50 hours per year for non-emergency situations cannot be used for peak shaving or non-emergency demand response, or to generate income for a facility to an electric grid or otherwise supply power as part of a financial arrangement with another entity.
i) The 50 hours per year for non-emergency situations can be used to supply power as part of a financial arrangement with another entity if all of the following conditions are met:
A) The engine is dispatched by the local balancing authority or local transmission and distribution system operator;
B) The dispatch is intended to mitigate local transmission and/or distribution limitations so as to avert potential voltage collapse or line overloads that could lead to the interruption of power supply in a local area or region.
C) The dispatch follows reliability, emergency operation or similar protocols that follow specific NERC, regional, state, public utility commission or local standards or guidelines.
D) The power is provided only to the facility itself or to support the local transmission and distribution system.
E) The owner or operator identifies and records the entity that dispatches the engine and the specific NERC, regional, state, public utility commission or local standards or guidelines that are being followed for dispatching the engine. The local balancing authority or local transmission and distribution system operator may keep these records on behalf of the engine owner or operator.
c. The permittee may operate the engines using propane for a maximum of 100 hours per year
as an alternative fuel solely during emergency operations, but must keep records of such use. If propane is used for more than 100 hours per year in an engine that is not certified to the emission standards when using propane, the owners and operators are required to conduct a performance test to demonstrate compliance with the emission standards of 40 CFR 60.4233. [40 CFR 60.4243 (e)]
2. Emission Limitations:
a. The permittee shall comply with the applicable emission standards in Table 1 of 40 CFR 60, Subpart JJJJ. [40 CFR 60.4233(d), Table 1]
![Page 182: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/182.jpg)
Permit Number: V-14-002 R6 Page: 111 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
Emission Standards NOx +HC CO g/HP-hr 10 387
b. The permittee must operate and maintain stationary SI ICE that achieve the emission
standards as required in 40 CFR 60.4233 over the entire life of the engine. [40 CFR 60.4234] Compliance Demonstration Method: 1. The engines purchased must be certified to the emission standards in Table 1 of 40 CFR
60, Subpart JJJJ for the same engine class, maximum engine power, the same model year and demonstrating compliance according to one of the methods specified in 40 CFR 60.4243 (a). [40 CFR 60.4243(b)(1)]
2. The permittee must operate and maintain the certified stationary SI internal combustion engine and control device according to the manufacturer's emission-related written instructions, the permittee must keep records of conducted maintenance to demonstrate compliance, but no performance testing is required if you are an owner or operator. The permittee must also meet the requirements as specified in 40 CFR part 1068, subparts A through D, as they apply. If the permittee adjusts engine settings according to and consistent with the manufacturer's instructions, the stationary SI internal combustion engine will not be considered out of compliance. [40 CFR 60.4243 (a)(1)]
3. Testing Requirements: Testing shall be conducted at such times as may be required by the Cabinet in accordance with 401 KAR 50:045
4. Specific Monitoring Requirements: The permittee shall monitor hours of operation for each unit on a monthly basis. [40 CFR 6360.4245(b)]
5. Specific Recordkeeping Requirements: a. The permittee must keep records of the information in 40 CFR 60.4245(a)(1) through (4) .
[40 CFR 60.4245 (a)] 1) All notifications submitted to comply with 40 CFR, Subpart JJJJ and all documentation
supporting any notification. 2) Maintenance conducted on the engine. 3) If the stationary SI internal combustion engine is a certified engine, documentation
from the manufacturer that the engine is certified to meet the emission standards and information as required in 40 CFR parts 90, 1048, 1054, and 1060, as applicable.
4) If the stationary SI internal combustion engine is not a certified engine or is a certified engine operating in a non-certified manner and subject to 40 CFR 60.4243(a)(2), documentation that the engine meets the emission standards.
b. The permittee must keep records of the hours of operation of the engine that is recorded
through the non-resettable hour meter. The permittee must document how many hours are
![Page 183: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/183.jpg)
Permit Number: V-14-002 R6 Page: 112 of 124 SECTION B- EMISSIONS UNITS, EMISSION POINTS, APPLICABLE REGULATIONS AND OPERATING CONDITIONS (CONTINUED)
spent for emergency operation, including what classified the operation as emergency and how many hours are spent for non-emergency operation. [40 CFR 60.4245 (b)]
c. The permittee shall maintain records of the hours of operation each engine uses propane as
an alternative fuel during emergency situations. [40 CFR 60.4243 (e)]
6. Specific Reporting Requirements: See Section F - Monitoring, Recordkeeping, and Reporting Requirements.
![Page 184: Title V Permit Renewal Application Carmeuse Lime & Stone ... · The coal handling operations at the Black River facility have the capacity to process more than 200 tons per day](https://reader034.vdocument.in/reader034/viewer/2022042601/5f8e881673b542197412a0aa/html5/thumbnails/184.jpg)
Permit Number: V-14-002 R6 Page: 113 of 124 SECTION C - INSIGNIFICANT ACTIVITIES
The following listed activities have been determined to be insignificant activities for this source pursuant to 401 KAR 52:020, Section 6. Although these activities are designated as insignificant the permittee must comply with the applicable regulation. Process and emission control equipment at each insignificant activity subject to an opacity standard shall be inspected monthly and a qualitative visible emissions evaluation made. Results of the inspection, evaluation, and any corrective action shall be recorded in a log.
Description Generally Applicable Regulation
Fuel Oil Storage Tanks: 3 tanks, 25 gallons each, 2 tanks, 40 gallons each, 1 tank, 139 gallons
None