tl9000 and the process approach
TRANSCRIPT
Copyright 2016 QuEST Forum. All Rights Reserved.
TL9000 and the “Process Approach”
Utilizing P-D-C-A Value Stream Mapping to Expose, Exploit and Eradicate Non-Value-Added Time and Space
Jeff Bostow
Copyright 2016 QuEST Forum. All Rights Reserved.
• Definition of the “Process Approach”– Defining a normative view of a “Process” (Reference: ISO 9001 Auditing Practices Group Guidance and ISO/TC 176 SC 2/N1290)
– Demonstrating a “P-D-C-A application” of the “Process Approach”– Using a “condensed SIPOC” to visualize “Value-Added,” vs. “Non-Value- Added” (N-V-A) Time and Space
• Expose, Exploit, and Eradicate N-V-A Time and Space – Utilizing the Value-Stream Map to understand the differences between
Value-Added and Non-Value-Added activities– Defining “In-Process” and “End-of-Process” Control Measurements– Completing the Quality Management System
Copyright 2016 QuEST Forum. All Rights Reserved.
ISO subcommittee responsible for ISO 9001
What is the “Process Approach?”
Reference: ISO/TC 176 SC 2/N1290
What is a “process?”The “Process Approach” integrates processes into a complete system to achieve
strategic and operational objectives.
The “Process Approach” and P-D-C-A
Plan Set objectives and build processes necessary to deliver results.
Do Implement what was planned.
Check Monitor and measure processes and results against the objectives.
Act Take actions to improve results.
PDC
A
Copyright 2016 QuEST Forum. All Rights Reserved.
ISO 9001 Auditing Practices Group:Guidance on “Processes”
The “SIPOC” Model
Copyright 2016 QuEST Forum. All Rights Reserved.
Identify and Select the Priority Work Process
Document the Work Process
Identify Customer & External Provider Requirements
Develop Indicators & Build the Quality Management
System (QMS)
Implement the Quality Management System (QMS)
N
Identify & Remove Special Cause Variation
Is The
ProcessStable?
A
Is The
ProcessCapable?
Is The
ProcessFlexible?
N
Y
Y
Investigate Common Cause Variation &
Change the Process
Y
B
Redesign the Process
N
Standardize & Replicate
The “Process Approach”and P-D-C-A
Plan
A B
Do
Check
PDC
A
ActAnd
= =Improving
ProcessStability
ImprovingProcess
Capability
Copyright 2016 QuEST Forum. All Rights Reserved.6
This is the Primary/Core Process Name This is the “Interested Party” (The direct Consumer) All Products/Services
Delivered On-Time and Accurately per SLA Req’ts.
Start
Request Product or Service Delivery
Customer(Interested Party)
Receive and Enter Customer Request
Order Entry
Arethese data
usable?
Y
N
N
YFix and proceed to
next value-add step.
Customer’s Request Data
Customer Request Data
Finalize the Order Requirements
Perform Quality Control Inspection
Completed Customer’s Product/Service Order
Are these errors
Fixable?
Error-laden Customer Request Data
Repaired Request
Data Errors
Order ProcessingOrder
Inspection
Inspected Product/Service
Prep for Shipping
and/or Service Delivery
Ship/Deliver toCustomer
Shipped/Delivered Customer’s Product/Service Order
Take Receipt of theProduct Shipment
and/or Service Delivery & Remit Final Payment
Order Shipping
End
KBI-1: % of Products/Services not Delivered On-Time. KBI-2: % of Products/Services Not Delivered Accurately per SLAs.
Order Inspection
Perform Quality Control Inspection
Inspected Product/Service
Order Shipping / Delivery
CustomerRequest
DataEntry
1
Processing
ProductCompliance
Review
Product/Service
Ship/Delv’y
CustomerReceipt &
Remittance
ProductCompliance
ReviewProduct/Service
Ship/Delv’y
P1
P1
Number ofMinutes
fromCustomer Request
To Order Finalization
X-Bar, R Chart
P2
Number ofMinutes
FromOrder
Finalization toOrder Ship
X-Bar, R Chart
P2
KB I-2
KB I-1
Percentage (%) of Products/Services
NOT Delivered On-TimeQuality Indicator
Chart
KBI1
KBI2
Percentage (%) of Products/Services
NOT Delivered AccuratelyPer SLAs
Quality IndicatorChart
2
3
4
5
6
7
Date:
Sub-
Grou
pSi
ze
12345
Sum
Mean
Range
AVERAGE
RANGE
k 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Variables Control Chart(X,R)
Process Name: Core Priority Process Process Step(s): Customer- Request-to-Order Completion Process Indicator: Elapsed Time from Request to Ord. Complete
Customer: External Formula: Shewhart Constants for sub-groups 2-10 Unit of Measurement: Whole Minutes Frequency of Measurement: Daily
8/124
24.4
25282123
122
7
8/229
24.4
26212026
122
8
8/32126252125
118
23.6
5
8/42625252724
127
25.4
3
8/52421292625
125
25.0
8
8/62323262726
125
25.0
4
8/7 8/8 8/9 8/10 8/11 8/12 8/13 8/14 8/15 8/16 8/172627242428
129
25.8
4
2122222424113
22.6
3
2026242325118
23.6
6
2122282425
120
24.0
7
2726242324
124
24.8
4
2826262425
129
25.8
4
2625262425
126
25.2
2
2125232325117
23.4
4
2026242324117
23.4
6
2627232323
122
24.4
4
2825262824131
26.2
4
2126252524
121
24.2
5
8/18 8/19 8/20 8/21 8/22 8/23 8/24 8/25 8/26 8/27 8/28 8/29 8/30 8/312326262724
126
25.2
4
2624262522
123
24.6
4
2926252428
132
26.4
5
2126232322115
23.0
5
2625272526129
25.8
2
2324242522118
23.6
3
2322252427121
24.2
5
2621252523120
24.0
5
2321252526
2327272524126
25.2
4
2326282825130
26.0
5
2526262824129
25.8
4
120
24.0
5
272624
24124
24.8
4
23
LCL = 21.95
X = 24.66
21
22
23
24
25
26
28UCL = 27.37
29
27
20
3
7
9
6
8
54
LCL = 0 (N/A)
R = 4.7
UCL = 9.94
Number of Minutes fromCustomer Request
To Order Finalization
P1
Date: 8/31/16By: J. BostowSource: CTL22 minutes =
Specification Limit (SL)
0
10
20
30
40
19.5 20.5 21.5 22.5 23.5 24.5 25.5 26.5 27.5
3
12
7
21
2729
32
11
Num
ber o
f Min
utes
from
Cus
tom
er R
eque
stTo
Ord
er F
inal
izatio
n
50
Histogram (Frequency Distribution of Variables Data)
28.5
10
3
29.5
P1
n = 155x = 24.63s = 2.03
Time in Minutes
Copyright 2016 QuEST Forum. All Rights Reserved.
KBI-1: % of Products/Services Not Delivered On-Time.
% > Interested
Party Agreed-Upon
Service Level Agreements
(Valid Requirement)
0
10
20
30
40
50
Days
5 10 15 20 25 30
Date: 8/31/16By: J. BostowSource: CTL
GOOD
Copyright 2016 QuEST Forum. All Rights Reserved.
Summary• The “Process Approach” is a mandatory requirement embedded in the TL 9000 R6.0 Standard.
• Utilizing Deming’s P-D-C-A Cycle ensures continuous development and continuous improvement.
• The Condensed S-I-P-O-C Value Stream Mapping aids in visualizing Non-Value-Added time/space when
properly constructed.
Summary (Con’t.)• All Processes should ask and ANSWER, “Are we stable, capable and flexible?”
• The correct tool for demonstrating compliance to the “stability” question with variables data is the X-bar, R Chart.
• The correct tool for demonstrating compliance to the “capability” question with variables data is the Histogram.
• If your core process is “flexible,” STANDARDIZE and REPLICATE. Then…cycle back to P-D-C-A for continuous development and continuous improvement.
Copyright 2016 QuEST Forum. All Rights Reserved.
TL9000 and the “Process Approach”
Utilizing P-D-C-A Value Stream Mapping to Expose, Exploit and Eradicate Non-Value-Added Time and Space
Jeff Bostow