TMEA One Stop Border Posts (OSBP) Tanzania Country Programme. Development Partners Dar es Salaam, 15 May 2013. 10 %. in total value of exports from EAC region. What are expected r esults by 2016. 25 %. increase in intra-regional exports, compared to total exports in region. 15 %. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

TMEA One Stop Border Posts (OSBP) Tanzania Country Programme

Development Partners

Dar es Salaam, 15 May 2013

Page 2: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

What are expected results by 2016

10% in total value of exports from EAC region

25% increase in intra-regional exports, compared to total exports in region

15% reduction in average time to import or export a container from Mombasa or Dar es Salaam to Burundi or Rwanda

30% decrease in average time a truck takes to cross selected borders

Estimated value of benefits = $7 billion, or $14 return for every $1 invested

Page 3: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

The Concept of OSBPs

Reduce delays at border posts, result reduction in costs

Juxtaposed SystemsFormalities carried out in the exit country or

country of entry.

Page 4: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com4

Delays at Borders Average delays 3 to 5 days

Page 5: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Concept of a OSBP

The key to OSPBs is traffic flow management

Page 6: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Legal basis for OSBP in place

Integrated Border Management implemented Infrastructure improved

Bilateral Agreements in place.

- Operating procedures agreed. - Greater transparency and sharing of information between agencies.- Reduced cross border transit time

- Buildings and layout fit for purpose - Reduced congestion.

Reduced Cross Border transit time

OSBP Components

Page 7: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

The TMEA OSBP Programme

TMEA OSBP programme is part of the larger TMEA Economic Corridor Programme. •5 integrated programmes:

– OSBPs / IBM programme– Trade Facilitation-Transport– Trade Facilitation-Non Transport– Infrastructure– ICT for Trade and Transport Facilitation

•TMEA is funding 7 OSBPs, 4 in Tanzania: Holili/Taveta (TZ/KE), Mutukula (TZ/UG), Kabanga/Kobero (TZ/BU) and Tunduma/Nakonde (TZ/ZM).

7

Page 8: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

The TMEA OSBP Programme

• TMEA is funding 7 OSBPs in East Africa• 4 in Tanzania

– Holili/Taveta (TZ/KE)– Mutukula (TZ/UG)– Kabanga/Kobero (TZ/BU)– Tunduma/Nakonde (TZ/ZM).

8

Page 9: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Other OSBPs in Tanzania

• World Bank -- Horohoro (TZ/KE) and Sirari (TZ/KE)• AfDB/JICA -- Namanga (TZ/KE) • JICA - Rusumo Falls (TZ/RW)

Regional OSBP activities coordinated through a multi-donor task force established by TMEA

National OSBP activities coordinated and managed through a national OSBP Committee overseen by MEAC

9

Page 10: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

How to Achieve the Objectives

Enhance national and bilateral collaboration among border control agencies

Implement OSBP controls Implement Integrated Border Management (IBM),

including IT, inspection facilities and office equipment Simplify and integrate border clearance processes Encourage processing of documents before arrival of

goods at the border (i.e. pre-lodgement) Improve infrastructure, including staff housing where

funding allows.

10

Page 11: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Steps for Developing OSBPs

• Enable consultations and bilateral agreements between governments

• Conduct relevant technical studies• Establish key committees and sub-committees• Resolve pre-construction issues, e.g. land

compensation• Resolve Construction issues• Implement IBM during beginning of construction

phase

11

Page 12: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Progress to Date

TUNDUMA:• Bilateral agreement signed in 2010• Survey of traffic volumes and a schematic design carried

out in 2011• Schematic design approved by OSBP Steering

Committees of Tanzania and Zambia in February 2011• Cadastral survey to demarcate the area to be occupied

by the OSBP completed in 2012• Design and Supervise contract to be awarded

12

Page 13: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Conditions at TundumaTunduma Examination Yard Roadside Congestion

13

Page 14: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Congestion at TundumaDue to:•No parking on the Zambia side resulting in trucks cleared by TRA having to wait on the Tunduma side of the border•Only one gate for crossing the border in both directions•The road is too narrow for modern container traffic. Immediate Solution:•Pre-arrival processing of documents by the Zambian Revenue Authority (ZRA)Possible Solution:•Find alternative remote parking for trucks bound for Zambia where pre-clearance could be conducted.

14

Page 15: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Progress to DateHolili:• Construction to be completed by mid-June 2013• Construction of Taveta OSBP on the Kenya side will be completed in

October 2013• Tanzanian and Kenyan border agencies will relocate to new building

on Tanzania side in June 2013• OSBP arrangements will start in July on a pilot basis until

construction of Taveta OSBP is completed.Kabanga:• Construction contract awarded, expected completion December

2014• OSBP arrangements will commence using shared facilities at

Kabanga/Kobero in June 2013.

15

Page 16: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

HoliliHolili Administration Holili Inspection facility

16

Page 17: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Progress to DateMutukula:•Construction to be completed by August 2013•Tanzanian and Ugandan border agencies will relocate to new building in August 2013•Construction on the Uganda side will be completed in the last quarter of 2014•OSBP arrangements with Mutukula (UG) will start in August on a pilot basis until construction on the Ugandan side is completed.

17

Page 18: TMEA One Stop Border Posts (OSBP)  Tanzania Country Programme

www.trademarkea.com

Asante Sana!

18