TNEB LIMITED TANGEDCO TANTRANSCO

BULLETIN

APRIL - 2018

CONTENTS Page No

1. PART - I

NEWS & NOTES ... ... ... 2

2. PART - II

GENERAL ADMINISTRATION & SERVICES ... ... ... 9

3. PART - III

FINANCE ... ... ... 20

4. PART - IV

TECHNICAL ... ... ... 25

5. INDEX ... ... ... 49

Page 2: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

NEWS & NOTESPART – I

I. GENERATION / RELIEF PARTICULARS:The Generation / Relief particulars for the month of April 2018 were as follows:

Sl.No. Particulars In Million UnitsI. TNEB GENERATION (Gross)

Hydro 260.098Thermal 2810.159Gas 150.681Wind 0.120TNEB TOTAL 3221.058

II NETT PURCHASES FROM CGS 3349.761III PURCHASES

IPP 178.615Windmill Private 228.798CPP, Co-generation & Bio-Mass (Provisional) 22.000Solar (Private) 287.804Through Traders (nett purchase) 2022.526TOTAL PURCHASES 2739.743

IV Total Wheeling Quantum by HT consumers 726.706Total Wheeling Quantum to Other States by Pvt. Generators 7.680Total TNEB Power generation for sale 0.711Total Wheeling 734.386Power Sale by TANGEDCO (Exchange) (-) 0.711Power Sale by TANGEDCO(STOA under Bilateral) 0.000Power Sale by Private Generators (Exchange) (-) 3.841Power Sale by Private Generators (Bilateral) (-) 3.839Power blance under SWAP 72.000

V TOTAL (TNEB Own Gen+Purchase + wheeling quantum+SWAP) 10109.268VI Load shedding & Power cut relief (Approx) 0VII Less energy used for Kadamparai pump 51.620

Less Aux. consumption for Hydro, Thermal & Gas 217.727VIII AVERAGE PER DAY REQUIREMENT 337IX DETAILS OF NETT PURCHASES FROM CGS & OTHER REGIONS:

Neyveli TS-I 239.908Neyveli TS-I Expansion 146.392Neyveli TS-II Expansion 45.329NTPL 242.207Neyveli TS-II Stage-1 113.024Neyveli TS-II Stage-2 189.979MAPS APS 90.348Kaiga APS 140.990Kudankulam NPCIL Unit 1 & 2 351.530Ramagundam NTPC (Stage 1 & 2) 333.560Ramagundam NTPC (Stage 3) 77.364Eastern region 18.363

Page 3: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

3

X DETAILS OF PURCHASES FROM IPPsPPN Power Generating Company Pvt. Ltd., (-) 0.502TAQA Neyveli Power Company Pvt. Ltd., (STCMS) 108.798Lanco Tanjore Power Company Ltd., (ABAN) 38.632Pioneer Power Ltd., (Penna) 31.687TOTAL 178.615

XI DETAILS OF OTHER PURCHASESThrough Traders 2022.526CPPs 1.000Co-generation 20.000Bio-Mass 1.000Wind Mill (Pvt.) 228.798Solar (Pvt.) 287.804TOTAL 2561.128

XII SWAP POWER RETURN / BANKING BY TNEB 72.000XIII Maximum Sustained Grid demand met in MW/Date 15411 27.04.2018

Maximum consumption reached in M.U./Date 355.733 27.04.2018

XIV. STORAGE POSITION:The Storage equivalent in M.U.as on 01.05.2018 is compared with that of the storage

equivalent as on the same day last year as below (Figs. In MU):-Sl. Name of the Group As on 1st of As on 1st ofNo. the month this the month Difference

year (2018) previous year(2017)

1. Nilgiris 451.385 287.730 163.6552. P.A.P. 31.030 11.100 19.9303. Periyar 9.811 0.000 9.8114. Papanasam & Servalar 0.242 1.179 - 1.4215. Suruliyar 9.304 0.029 9.2756. Kodayar 138.836 41.910 96.9267. Total Excluding Mettur 640.125 341.948 298.1778. For Mettur 6.240 0.000 6.240

Superintending Engineer/LD & GO.

Talcher Stage-II NTPC 308.771Kudgi STPS, NTPC 129.965Simhadri Stage-II NTPC 169.564Vallur NTECL 711.826Solar bundled NVVN Power from NTPC stations 2.581Inter State Deviation Settlement Mechanism (Provisional) 36.060Intra State Deviation Settlement Mechanism (Provisional) 2.000TOTAL NET PURCHASES 3349.761

Page 4: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

4

PERFORMANCE OF THERMAL STATIONS FOR APRIL 2018.i) TUTICORIN TPS (5 x 210 MW):

The details of generation at Tuticorin T.P.S. during April 2018 were as follows:Unit Availability Factor (%) Generation in MU Plant Load Factor (%)

I (210 MW) 100.00 129.570 85.70 II (210 MW) 100.00 147.040 97.20III (210 MW) 100.00 146.800 97.10

IV (210 MW) 97.00 141.140 93.30V (210 MW) 100.00 147.510 97.60

STATION 99.40 712.06 94.18

ii) METTUR TPS - I (4 x 210 MW):The details of generation at Mettur T.P.S. during April 2018 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (210 MW) 100.00 150.734 99.69 II (210 MW) 100.00 151.078 99.92III (210 MW) 96.93 143.514 94.92

IV (210 MW) 100.00 149.318 98.76STATION 99.23 594.644 98.32

iii) NORTH CHENNAI TPS - I (3 x 210 MW):The details of generation at North Chennai T.P.S. during April 2018 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (210 MW) 92.19 133.590 88.35II (210 MW) 87.39 127.745 84.49III (210 MW) 99.82 145.310 96.10

STATION 93.13 406.645 89.65

V) METTUR TPS - II (1 x 600 MW):The details of generation at Mettur T.P.S.-II during April 2018 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (600 MW) 84.51 330.110 76.41

STATION 84.51 330.110 76.41

VI) NORTH CHENNAI TPS - II (2 x 600 MW):The details of generation at North Chennai T.P.S.-II during April 2018 were as follows:

Unit Availability Factor (%) Generation in MU Plant Load Factor (%) I (600 MW) 93.58 369.096 85.44II (600 MW) 98.33 397.604 92.04

STATION 95.96 766.700 88.74

Page 5: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

5

GENERAL :S.No. Details T.T.P.S. M.T.P.S.-I N.C.T.P.S.-I M.T.P.S-II N.C.T.P.S.-II1. Specific Coal

Consumption (Kg./kwhr.) 0.759 0.708 0.685 0.704 0.7402. Specific Oil

Consumption (ml/kwhr.) 0.090 0.002 0.660 0.500 0.5003. Auxiliary Consumption (%) 7.70 8.24 8.49 6.45 5.58

Superintending Engineer/Betterment Thermal.

COAL PARTICULARS FOR APRIL 2018 : S.No. Particulars TTPS. MTPS. M.T.P.S. NCTPS. NCTPS. ETPS.

I II (1x600 I II (2x600MW) MW)

(in lakh tonnes)1. Coal to be supplied (*) (Ind. coal) 4.21 3.40 1.93 2.58 3.86 1.552. Coal Receipt (Ind. coal) 3.59 3.13 1.60 2.51 4.21 --

(Imp coal) 1.49 0.86 0.38 0.94 0.30 --(SCCL coal) 0.00 0.00 0.00 0.00 0.00 --

3. Coal consumption (Ind. coal) 3.83 3.28 1.92 2.91 1.82 --(Imp coal) 1.57 0.94 0.41 0.94 0.41 --(SCCL coal) 0.00 0.00 0.00 0.00 --

4. Coal stock as on (Ind. coal) 0.55 0.61 0.60 0.61 0.0630.04.2018 (Imp coal) 0.21 0.02 0.11 0.21 0.00

(SCCL coal) 0.00 0.00 0.00 0.00 --

(*) As per Fuel Supply Agreement signed by TANGEDCO with MCL, ECL & WCL.Note: Ind coal - Indigenous coal , imp coal - Imported coal

SCCL coal : Singareni coal collieries Ltd., coal.

Superintending Engineer/M/Coal.∗ ∗ ∗

Page 6: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

6

STA

TEM

EN

T-A

STA

TEM

ENT

SH

OW

ING

TH

E D

ETA

ILS

OF

PO

STS

CR

EATE

D D

UR

ING

TH

E M

ON

TH O

FAP

RIL

20

18

.

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

satio

n of

the

post

s.Period

(8)

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

sation

of t

hepo

st.

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

sation

of t

hepo

sts.

Cre

atio

n of

4 p

osts

of S

pl.G

r.For

eman

Dri

ver

an

d H

V D

river

to e

ach

Gen

erati

on

C

ircl

es

as

per

th

ew

orkl

oad

sett

lem

ent.

Purp

ose

(7)

Cre

atio

n of

one

pos

t of A

EE/E

lect

rica

lin

SLD

C/Ch

enna

i.

Cre

atio

n of

27

post

s fo

r th

e 2x

660

Uda

ngud

i Sup

ercr

itica

l The

rmal

Pow

erPr

ojec

t Sta

ge-I

for

the

yea

r 20

18-

2019

.

1AE

E/El

ecl.

Nam

e of

the

Post

No.

of

Post

Spl.G

r.For

eman

Driv

erH

V D

river

4 4

(5)

(6) 1 1 2 1 1 4 2 2 1 4 2 2 1 1 1 1 27

SE/C

ivil

SE/

Mec

hl.

EE/C

ivil

EE/M

echl

.EE

/Ele

cl.

AEE/

Civi

lAE

E/M

echl

.AE

E/El

ecl.

Acc

ts.O

ffic

erAE

/Civ

ilAE/

Mec

hl.

AE/E

lecl

.H

ead

D’m

anAcc

ts.

Sup

vr.

Asst

.(Ad

m.)

Ass

t. (

Acc

ts.)

Cl.I

I-Te

ch.

SLD

C/Ch

enna

i

Cla

ss /

Cad

re

Cl.I

II-R

WE

(4)

Nam

e of

the

Circ

le

Gen

erat

ion

Circl

es/

Kund

ah,

Kada

mpa

rai,

Tiru

nelv

eli &

Erod

e.

(3)

Cl.I-

Tech

.

Cl.I

I-Te

ch.

Cl.II

-Acc

ts.

Cl.I

I-Te

ch.

Cl.I

II-P

ro.

Uda

ngud

iSTP

P Sta

ge-I

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.72

,(Ad

m.B

r)D

t.02

.04.

2018

2.

Ref

eren

ce in

whi

ch t

hepo

sts

wer

eC

reat

ed

(Per

.) F

BTA

NG

EDCO

Pro.

No.

9,(A

dm.B

r)D

t.02

.04.

2018

Sl.

No. 1.

(2)

(1)

(Per

.) F

BTA

NG

EDCO

Pro.

No.

13,

(S.B

)D

t.07

.04.

2018

.

3.

Page 7: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

7

* *

*

(8)

(7)

(5)

(6)

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

satio

n of

the

post

s.

Cre

atio

n of

pos

ts t

o th

e 33

/11

KV

SS a

t Jol

arpe

t in

Vani

yam

badi

Div

isio

nin

Thi

rupa

thur

ED

C.

Line

Ins

pect

orW

irem

anFi

eld

Ass

ista

nt

4 2 2 8

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

satio

n of

the

post

s.

Cre

atio

n of

pos

ts t

o th

e 33

/11

KV

(Ou

tdoor)

SS

at

Ed

ayap

att

i in

Usi

lam

patt

i Div

isio

n in

Mad

urai

ED

C

Line

Ins

pect

orW

irem

anFi

eld

Ass

ista

nt

4 2 2 8

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

satio

n of

the

post

s.

Cre

ati

on

of

post

s to

th

e n

ewco

mp

ute

r b

ase

d p

ow

er fa

ilu

rere

dres

sal c

entr

e w

ith 1

912

call

faci

lity

in N

amak

kal E

DC.

AE/

Ele

ctri

cal

Fiel

d Ass

ista

nt1 4

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

sation

of t

hepo

sts.

Cre

atio

n of

pos

ts t

o th

e 33

/11

KV

SS a

t Kar

umat

ham

patt

y in

Som

anur

Div

isio

n in

Coi

mba

tore

ED

C/S

outh

.

4 2 2 8

Line

Ins

pect

orW

irem

anFi

eld

Ass

ista

nt

For

a pe

riod

of

one

year

fro

mth

e d

ate

of

utili

sation

of t

hepo

sts.

Cre

atio

n of

pos

ts t

o th

e 33

/11

KV

SS a

t Vad

aval

li in

Neg

amam

Div

isio

nin

Coi

mba

tore

ED

C/S

outh

.

4 2 2 8

Line

Ins

pect

orW

irem

enFi

eld

Ass

ista

nt

(4)

(3)

Thiru

path

urED

CCl

.III

-RW

ECl

.IV-

RW

E

Mad

urai

ED

CCl

.III

-RW

ECl

.IV-

RW

E

Nam

akka

lED

CC

l.II-

Tech

.Cl

.IV-

RW

E

Cl.I

II-R

WE

Cl.I

V-RW

ECo

imba

tore

EDC/S

outh

Cl.I

II-R

WE

Cl.I

V-RW

E

Coim

bato

reED

C/S

outh

(2)

(1)

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.75

,(Ad

m.B

r)D

t.19

.04.

2018

6.

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.76

,(Ad

m.B

r)D

t.20

.04.

2018

7.

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.77

,(Ad

m.B

r)D

t.20

.04.

2018

.

8.

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.74

,(Ad

m.B

r)D

t.19

.04.

2018

5.

(Per

.) C

MD

TAN

GED

CO

Pro

.N

o.73

,(Ad

m.B

r)D

t.19

.04.

2018

4.

Page 8: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

8

Chi

ef E

ngin

eer/

Pers

onne

l*

* *

STA

TEM

ENT-

BS

TATE

MEN

T S

HO

WIN

G T

HE

DET

AIL

S O

F P

OS

TS A

BO

LIS

HED

DU

RIN

G T

HE

MO

NTH

OF

AP

RIL

20

18

.Pu

rpos

ePe

riod

Nam

e of

the

Post

No.

of

Post

Cla

ss /

Cad

reN

ame

of t

heCirc

leRef

eren

ce in

whi

ch t

hepo

sts

wer

eab

olis

hed

Sl.

No.

- N

IL -

Page 9: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

GENERAL ADMN. & SERVICESPART – II

Memo.No.021842/61/G.56/G.562/2018, (Adm.Br.) dated : 02.04.2018.

Sub : TANGEDCO - Part-Time conservancy Workers - Pay Bandrevised from Rs.1300-3000+Rs.300/- (Grade Pay) toRs.4100-12500 with notional effect from 01.12.2015(Fixation on 01.01.2016) and monetary effect from01.10.2017 - Pay Matrix - Orders issued.

Ref : 1. (Per.) (FB) TANGEDCO Proceedings No.11, (Adm.Br.),dated 02.08.2011.

2. (Per.) (FB) TANGEDCO Proceedings No.2, (Adm.Br.),dated 23.01.2014.

3. (Per.) CMD TANGEDCO Proceedings No.37, (Adm.Br.),dated 12.02.2018.

4. Memorandum of Settlement Under Section 12(3) ofthe Industrial Disputes Act 1947 Dated 22.02.2018.

5. (Per.) (FB) TANGEDCO Proceedings No.6, dated the 19th

March 2018.-----

In continuation to the orders issued vide proceedings (Per.) (F.B.) TANGEDCOProceedings No.6, dated the 19th March 2018 revising the Pay Band of Part-TimeConservancy Workers from Rs.1300-3000+Rs.300/- (Grade Pay) to Rs.4100-12500with notional effect from 01.12.2015 (fixed on 01.01.2016) and monetary effectfrom 01.10.2017, the Chief Engineers and Superintending Engineers are instructed tofix the revised pay to the part time conservancy workers as per the pay matrixenclosed herewith.

All other conditions issued in the proceedings cited in the references remainunaltered.

M.Balasubramanian,Chief Engineer/Personnel.

ANNEXUREPAY MATRIX FOR PART - TIME CONSERVANCY WORKERS

(Per.) (F.B.) TANGEDCO Proceedings No.6, dated the 19th March 2018.Memo.No.021842/61/G.56/G562/2018, dated 02.04.2018.

Pay Band Rs.1300-3000 Pay Band Rs.1300-3000Grade Pay 300 Grade Pay 300

Level Level1 4100 9 49002 4200 10 50003 4300 11 52004 4400 12 54005 4500 13 56006 4600 14 58007 4700 15 60008 4800 16 6200

Page 10: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

10

17 6400 29 900018 6600 30 930019 6800 31 960020 7000 32 990021 7200 33 1020022 7400 34 1050023 7600 35 1080024 7800 36 1110025 8000 37 1140026 8200 38 1170027 8400 39 1210028 8700 40 12500

//True Copy//

* * *Memo.(Per.) No.13475/A23/A231/2018-1, (BOSB) dated : 12.04.2018.

Sub : Establishment – TANGEDCO - Creation of 27 posts for theyear 2018-2019 for 2x660 MW Udangudi SupercriticalThermal Power Project Stage-I for co-ordination,supervision and monitoring of power project and CaptiveCoal Jetty works - Orders Issued - Amendment - Issued.

Ref : 1. (Per.)FB TANGEDCO Proceedings No.13, (SB),dated 07.04.2018.

2. From the Chief Engineer/Projects-II/Chennai U.O.No.CE/Projects II/SE/C/UP/EE/E/F.General/D.52/2018,dated 10.04.2018.

-----The following amendment is issued to (Per.)FB TANGEDCO Proceedings No13

(SB), dated 07.04.2018.

AMENDMENT“In para-4 (Sl.No.4) of the said proceedings, for the expression “ExecutiveEngineer/Civil/Division-II/Udangudi STPP Stage-I”, shall be read as“Executive Engineer/Civil/Division-I/Captive Coal Jetty and PipeConveyer System”2. The work allocation for the above amended post is annexed to this

Memorandum.

(By Order of the Board)R. Balaji,

Secretary.ANNEXURE

WORK ALLOCATION & DESIGNATION

Executive Engineer/Civil/Division-I/Captive Coal Jetty and Pipe Conveyer System:

EE/Civil will be in charge for all the civil works related to captive coal jetty andthe major civil works are given below.

Various studies includes Topographic survey, Geotechnical Investigation,Bathymetric survey, Physical Model Studies and other Site Development

Page 11: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

11

activates like Site clearance works Site grading, Fencing/Compound wall &Approach Bund for road, etc as per the specification

Jetty with two berths of total length 555 m and 25 m wide with two wings of180 m x 10 m. The width of the wings shall have to be suitably increased asper requirements of structures to be accommodated.

Breakwater of about 915 m length to protect jetty.

Approach Bridge of 10.10 m width for a distance of about 7.90 km for providingtwo streams of pipe conveyor, water line, electrical cables, cooling water outlet pipe for a distance about 1.30 km also for vehicle transport to attendmaintenance work at coal jetty and along the entire pipe conveyor systems.The approach bridge shall be widened by 4.25 m at every 500 m for bye-passing /parking a vehicle.

Maintenance Operations Jetty of 20m x 6m shall be provided near landfallpoint of Approach Bridge.

Civil, structural and architectural works for Coal handling systems, ConveyorGalleries/Trestles at jetty and Junction tower (JNT-I), etc as per the specification

All other buildings, structures and works necessary for construction, operationand maintenance of the Captive Jetty and coal handling system conforming to thespecification.

Scrutinizing the invoice and Billing of the entire project works respect of Civilworks and up keeping the records and participating in the site related Civil aspects,also arranging the site co-ordination meeting.

This division is subordinated by 4Nos. AEE/Civil 4 Nos. AE Civil & 2 Nos. TA/Civil.

//True Copy//

* * *Tamil Nadu Generation and Distribution Corporation Ltd - Settlement under section12 (3) of the Industrial Disputes Act, 1947 - Merger of Mazdoor posts with FieldAssistant posts – Orders – Issued.

(Administrative Branch)(Per.) (F.B.) TANGEDCO Proceedings No.10 Dated the 13 April 2018.

Panguni 30, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

1) (Per.) (F.B.) TANGEDCO Proceedings No.12 (Adm.Branch)dated 08.05.2013.

2) (Per.) (F.B.) TANGEDCO Proceedings No.13 (Adm. Branch)dated 08.05.2013.

3) (Per.) (F.B.) TANGEDCO Proceedings No.21 (Adm. Branch)dated 03.09.2016.

4) CE/Per. Memo No.003493/14/G.58/G582/2016-2,dated 03.09.2016.

5) Memorandum of Settlement under Section 12(3) of theIndustrial Disputes Act, 1947 dated 22.02.2018.

-----

Page 12: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

12

PROCEEDINGS:The Contract Labourers/Temporary Casual Labourers who have been directly

engaged by the Board on need basis on daily wages @ Rs.250/- (now Rs.380/-)based on the Court orders and as per the approval of the Committee constitutedvide (Per.) B.P (CH) No.9 (Adm. Branch) dated 09.01.2008, are absorbed as Mazdoor(Trainee) and subsequently they are posted as Mazdoors. Later on, as per the approvalof the Board, these Mazdoors are promoted as Field Assistants by relaxing theprescribed educational qualification (i.e.) ITI with NTC/NAC.

2) Besides this, certain individuals who have not possessed the minimumeducational qualification of 8th Std. pass are also appointed as Mazdoors oncompassionate grounds, based on the Court orders and as per the TANGEDCOProceedings 1st and 2nd read above.

3) Based on the demands of the Unions, a clause was included in theMemorandum of settlement secured with the Unions under section 12 (3) of the IDAct, 1947 dated 22.02.2018, and it has been agreed to merge the post of Mazdoorwith the post of Field Assistant.

4) While merging the post of Mazdoor with the post of Field Assistant, thefollowing procedure shall be followed:

i. The Mazdoors who have completed 58 yeas/relinquished their rights forpromotion as Field assistant shall be continued in service as Mazdoors till theirage of 60 years.

ii. The Mazdoors who were undergoing punishment for 3 years, as (Per.) B.P(F.B.) No.27 (Adm.Branch) dated 07.11.2002 shall be continued as Mazdoorsand after completion of the punishment period, they shall be posted as FieldAssistant subject to their eligibility.

iii. The Mazdoors who are not willing to join as Field Assistant shall be permittedto continue as Mazdoors till their age of 60 years after obtaining an undertakingfrom them.

iv. The remaining Mazdoors who have not completed 58 years shall be postedas Field Assistant by relaxing the prescribed educational qualification (i.e) ITIwith NTC/NAC.

5) The above orders shall take effect from the date of settlement (i.e.)22.02.2018.

6) Consequent to the merger of Mazdoor post with the Field Assistant post,there will be no further appointment/absorption of mazdoor in future, except thosewho are covered in para 4 (i) (ii) & (iii).

(By Order of the Board)M.Balasubramanian,

Chief Engineer/Personnel.* * *

Memo.(Per.) No.14307/A18/A183/2018-1, (BOSB) dated : 13.04.2018.

Sub : Revision of Pension/Family Pension relating to theemployees who retired/died while in service before01.12.2015 Amendment - Issued.

Ref : (Per.) CMD TANGEDCO Proceedings No.52, (SB),dated 02.03.2018.

-----

Page 13: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

13

In the reference cited, among others, the following orders have been issued:

para 10(i) Pensioners/ Family Pensioners upto 30th November, 2015 entitledto revision of Pension/Family Pension in terms of clause (II) of paragraph 3,such Pensioner/Family Pensioner after re-fixation of Pension/Family Pension withreference to clause (I) of paragraph 3 of this order may apply to the PensionSanctioning Authority concerned in the office in which the employee of TANGEDCOlast served who is competent to process and forward pension proposal to theChief Internal Audit Officer/Audit Branch in the prescribed form as at Annexure-Iappended to this order in triplicate. The Pension Sanctioning Authority concernedshall revise both the Pension and Family Pension of the existing pensioner/familypensioner with reference to paragraph 3 of this order.

para 10(ii) In respect of Family Pensioners, even if they are unable to furnish allthe particulars in the application form, the Pension Sanctioning Authority shallaccept such applications and process with the available data.

para 10(iii) On receipt of application in triplicate, the competent authority shallverify the net qualifying service already certified at the time of initial sanction ofpension. He shall fix the revised pension admissible with reference to minimumof the level pay of first Cell in the Pay Matrix relating to the post held by thepensioner at the time of retirement and net qualifying service in the applicationform itself. He shall also communicate copy of the statement to the pensioner/family pensioner. The Chief Internal Audit Officer/Audit Branch shall verify thecorrectness of the revised pension and make payment as specified inparagraph-3 above after making necessary entries in records maintained in hisoffice.

2. It has been brought to the notice that, the above process of furnishing theapplications to the Pension Sanctioning Authorities and in turn forwarding the sameto the Chief Internal Audit Officer/Audit Branch for authorization causes undue delay.The Pensioners’ Association have, therefore, requested to issue modified instructionsdispensing with submission of applications as ordered. The same has been examinedand it has been decided to issue necessary amendment to this effect.

3. Accordingly, the following amendment is issued to (Per.) CMD TANGEDCOProceedings No.52, (SB) dated 02.03.2018:

AMENDMENTFor the expression in para 10 (i), (ii) and (iii), the following expression shall

be substituted:

para 10(i) Pensioners/ Family Pensioners upto 30th November, 2015 entitledto revision of pension/family pension in terms of clause (II) of paragraph 3, suchpensioner/family pensioner after re-fixation of pension/family pension withreference to clause (I) of paragraph 3 of this order may apply to theChief Internal Audit Officer/Audit Branch in the prescribed form as at Annexure-Iappended to this order in triplicate. The Chief Internal Audit Officer/Audit Branchshall revise both the pension and family pension of the existing pensioner/familypensioners with reference to paragraph 3 of this order.

para 10(ii) In respect of family pensioners, even if they are unable to furnish allthe particulars in the application form, the Chief Internal Audit Officer/Audit Branchshall accept such applications and process with the available data.

Page 14: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

14

para 10(iii) On receipt of application in triplicate, the Chief Internal Audit Officer/Audit Branch shall verifty the net qualifying service already certified at the timeof initial sanction of pension. He shall fix the revised pension admissible withreference to minimum of the level pay or first cell in the pay matrix relating tothe post held by the pensioner at the time of retirement and net qualifyingservice in the application form itself. He shall also communicate a copy of thestatement to the pensioner/family pensioner and make payment as specified inparagraph 3 above after making necessary entries in records maintained in hisoffice.

and

Para 10 (iv) and para (v) remain unaltered.

(By Order of the Chairman - cum - Managing Director)R. Balaji,

Secretary.* * *

PENSION - Dearness Allowance to Pensioners and Family Pensioners Revised rates ofDearness Allowance from 1st January, 2018 – Orders – Issued.

(Secretariat Branch)(Per.) CMD TANGEDCO Proceedings No.74 Dated the 17th April 2018.

Chithirai 4, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

i) (Per.) CMD TANGEDCO Proceedings No.52 (SB)dated 02.03.2018.

ii) G.O.Ms.No.126 Finance (Pension) Department,dated 11.04.2018.

-----PROCEEDINGS:

In the proceedings first read above, among other things, orders were issuedallowing 5% of Dearness Allowance to the Pensioners/Family Pensioners of TamilNadu Generation and Distribution Corporation Limited with effect from 01.07.2017.In the Government Order second read above, orders were issued revising the rate ofDearness Allowance from 5% to 7% payable to its Pensioners/Family Pensionerswith effect from 1st January, 2018. It has been decided to extend the same benefit tothe Pensioners/Family Pensioners of TANGEDCO.

2. Accordingly, it is hereby ordered that the Pensioners/Family Pensioners ofTamil Nadu Generation and Distribution Corporation Limited, be paid Dearness Allowancewith effect from 1st January, 2018 at the following rates:

Date from which Revised rate of Dearness Allowancepayable (per month)

1st January,2018 7% of Pension/Family Pension.3. Consequent on increase in the rate of Dearness Allowance from 5% to 7%

the arrears for the period from 01.01.2018 to 31.03.2018, as ordered in para-2above, shall be paid to the Pensioners/Family Pensioners along with the pension forthe month of 04/2018 payable in 05/2018.

Page 15: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

15

4. The amount of Dearness allowance involving a fraction of a rupee shall berounded off to the next higher rupee, if such fraction is 50 paise and above and shallbe ignored if it is less than 50 paise.

5. In the case of divisible family pension, the Dearness Allowance shall also bepaid proportionately.

(By Order of the Chairman - cum - Managing Director)R. Balaji,

Secretary.* * *

Pension - Sanction of revised rates of Dearness Allowance to the Exgratia beneficiariesof TANGEDCO – Orders – Issued.

(Secretariat Branch)(Per.) CMD TANGEDCO Proceedings No.76 Dated the 19th April 2018.

Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

1. (Per.) FB TANGEDCO Proceedings No.144, (SB)dated 06.06.2017.

2. G.O.Ms.No.53, Finance (Pension) Department,dated 19.02.2018.

-----PROCEEDINGS:

In the Proceedings first read above, orders have been issued sanctioningDearness Allowance at the rate of 248% and 256% with effect from 1st July 2016and 1st January, 2017 respectively, to the Contributory Provident Fund/Non-pensionable establishment beneficiaries of TANGEDCO who are in receipt of Exgratiapayment of Rs.645/- per month plus Dearness Exgratia with effect from 04.06.2013.The Government of Tamil Nadu, in the Government Order second read above, haveissued orders sanctioning Dearness Allowance to the Exgratia beneficiaries with effectfrom 01.07.2017. After careful consideration of the orders of the Government, it hasbeen decided to adopt the same.

2. Accordingly, it is hereby ordered that the Dearness Allowance to the Exgratiabeneficiaries of TANGEDCO, be enhanced with effect from 01.07.2017 at the ratementioned below:

Date from which Revised rate of Dearness Allowancepayable (per month)

1st July, 2017 260% 3. The Exgratia beneficiaries of TANGEDCO are entitled for the arrears of

Dearness Allowance at the rate ordered in para-2 above with effect from 01.07.2017.The payment shall be made immediately.

Vikram kapur,Chairman - cum - Managing Director.

* * *

Page 16: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

16

Memo. No.17047/A3/A31/2018-1, (BOSB) dated : 20.04.2018.

Sub : TANGEDCO - Deduction of donation to Trade Union -Contribution from members of Central Organization ofTamil Nadu Electricity Employees towards deduction ofdonation from the revised pay payable in June 2018 –Orders Issued.

Ref : i) (Per.) B.P. (Ch) No.111 (SB) dated 09.05.2007.ii) From the General Secretary/Central Organization of

Tamil Nadu Electricity Employees representationdate 21.03.2018.

-----

In the Board’s Proceedings cited, detailed guidelines were issued for deductionof Annual Union Subscription and Donation from the salary of the willing employees.In the standard Terms and conditions annexed to the Board’s Proceedings, it hasbeen ordered that subscription shall be deducted from the Pay bill for May payable inJune and donation shall be deducted from the pay bill for November payable inDecember, every year.

2. The Central Organization of Tamil Nadu Electricity Employees has made arequest for the deduction of donation of Rs.1000/- from the revised pay payable inJune 2018 of their member.

3. The request of the Central Organization of Tamil Nadu Electricity Employeeshas been accepted. Accordingly, it is hereby ordered that a sum of Rs.1000/- (Rupeesone thousand only) towards Donation shall be deducted from the revised pay payablein June 2018 from the Willing Members of Central Organization of Tamil Nadu ElectricityEmployees who made specific written authorization. The Board shall not undertaketo go into the disputes arising out of forced obtaining of signature/duplication/forgeryof membership, as already ordered in condition 5 of the standard terms and conditionsissued in (Per) B.P. (Ch) No.111 (SB) dated 09.05.2007 for effecting the recovery.

4. The deduction of donation in respect of Central Organization of Tamil NaduElectricity Employees shall be made in the Head of Account No.44-456.

(By Order of the Chairman - cum - Managing Director)R. Balaji,

Secretary.* * *

Establishment - TANGEDCO - Delegation of Powers - Sanction of estimate andexecution of supply, laying and maintenance works of LAN Cable for ComputerNetworks and Optical Fibre Cable (OFC) in Headquarters - Delegation of monetarypowers to Chief Engineer/Information Technology/Chennai Enhancement – Orders –Issued.

(Secretariat Branch)(Per.) FB TANGEDCO Proceedings No.14 Dated the 23rd April 2018.

Chithirai 10, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Page 17: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

17

i) (Per) FB TANGEDCO Proceedings No.37, (SB)dated 25.07.2014.

ii) Extract from the Minutes of the 78th Board Meeting ofTANGEDCO held on 28.03.2018.

-----PROCEEDINGS:

In the proceedings read above, orders were issued delegating powers to theChief Engineer/Information Technology to sanction the estimate and execute theNew LAN Cable Laying and maintenance works of Computer Networks in Headquarterswith monetary powers not exceeding Rs.2.00 Lakhs per annum.

2. The Chief Engineer/Information Technology has stated that the supply andlaying of new LAN Cable as well as troubleshooting of existing LAN Cable works arebeing dealt with in the Computer Centre by utilizing the above monetary powers, forproviding the Internet/Intranet connectivity to the new/existing nodes in theHeadquarters Offices. In the present Scenario, the users of computer network haveincreased manifold, which in turn increased the need for laying of new cables andtroubleshooting of existing faulty LAN Cables. Moreover, due to ageing factor, it hasbeen proposed to change the LAN Network Cable by core Ethernet Switches, CoreSwitches etc. and to use Optical Fibre Cable (OFC) to connect the core switches inthe new proposed LAN network architecture, so as to attend and rectify the failure infuture.

3. Further, the critical servers like Online Payment Server, Email Server and itsrelated hardware and network equipments housed in the Legacy data centre wereshifted to R-APDRP Data Centre by connecting through Fibre Optic Cable laid betweenthem, so as to maintain uninterrupted connectivity in the Headquarters premises. As,the existing monetary powers of the Chief Engineer/Information Technology isinsufficient to meet the requirement of the users of Headquarters Offices, theChief Engineer has proposed to enhance the existing annual limit for sanction ofestimate and execution of supply, laying and maintenance works of LAN Cable forcomputer works in Headquarters from Rs.2.00 Lakhs Rs.5.00 Lakhs per annum andto delegate the above monetary powers of Rs.5.00 Lakhs for new supply, laying andmaintenance works of Optical Fibre Cable (OFC) with accessories at Headquarters.The Board has approved the above proposal.

4. Accordingly, TANGEDCO hereby directs that the monetary powers of theChief Engineer/Information Technology for sanction of estimate and execution ofsupply, laying and maintenance works of LAN Cable for computer networks inHeadquarters be enhanced from Rs.2.00 Lakhs to Rs.5.00 Lakhs (Rupees five lakhsonly) per annum and to delegate the above said monetary powers of Rs.5.00 Lakhsto the Chief Engineer/Information Technology for new supply, laying and maintenanceworks of Optical Fibre Cable (OFC) with accessories at Headquarters.

(By Order of the Board)R. Balaji,

Secretary.* * *

B.B.2 (Apr 18)

Page 18: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

18

Memo. No.14980/A3/A31/2018-1, (BOSB) dated : 26.04.2018.

Sub : TANGEDCO - Deduction of donation to Trade Union -Contribution from members of Tamil Nadu Electricity BoardEngineers’ Union towards deduction of special donation (inlieu of Wage Revision) from the revised pay payable in July2018 – Orders issued.

Ref : i.) (Per.) B.P. (Ch) No.111 (SB) dated 09.05.2007.ii) From the General Treasurer/Tamil Nadu Electricity BoardEngineers’ Union representation date 12.03.2018.

-----In the Board’s Proceedings cited, detailed guidelines were issued for deduction

of Annual Union Subscription and Donation from the salary of the willing employees.In the standard Terms and conditions annexed to the Board’s Proceedings, it hasbeen ordered that subscription shall be deducted from the Pay bill for May payable inJune and donation shall be deducted from the pay bill for November payable inDecember, every year.

2. The Tamil Nadu Electricity Board Engineers’ Union has made a request for thededuction of special donation of Rs.1000/- from the salary of their members of theirUnion for the month of June 2018 payable on July 2018 as special donation (in lieu ofWage Revision).

3. The request of the Tamil Nadu Electricity Board Engineers’ Union has beenaccepted. Accordingly, it is hereby ordered that a sum of Rs.1000/- (Rupees onethousand only) towards Special Donation (in lieu of Wage Revision) shall be deductedfrom the revised pay of June 2018 payable in July 2018 from the Willing Membersof Tamil Nadu Electricity Board Engineers’ Union who made specific writtenauthorization. The Board shall not undertake to go into the disputes arising out offorced obtaining of signature/duplication/forgery of membership, as already orderedin condition 5 of the standard terms and conditions issued in (Per) B.P. (Ch) No.111(SB) dated 09.05.2007 for effecting the recovery.

4. The deduction of donation in respect of above Union shall be made in theHead of Account No.44-460.

(By Order of the Chairman - cum - Managing Director)R. Balaji,

Secretary.* * *

Memo. No.21625/A22/A221/2018-1, (BOSB) dated : 30.04.2018.

Sub : TANGEDCO - Implementation of a proper informant system- Payment of cash Reward to the informants who giveinformation about power theft etc. - Sanction of amount– Orders issued.

Ref : i) M e m o . ( P e r ) N o . 5 9 2 5 5 / A 2 2 / A 2 2 1 / 2 0 1 4 - 1 ,Dt.14.08.2014.

ii) M e m o . ( P e r ) N o . 2 4 7 8 5 / A 2 2 / A 2 2 1 / 2 0 1 7 - 1 ,Dt.15.05.2017.

iii) From the Additional Director General of Police/Vigilance/Chennai-2 U.O.No.021/PS/ADGP/Vig/Cash Reward/2018, dated 12.04.2018.

-----

Page 19: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

19

In the memorandum second cited, orders were issued sanctioning an amountof Rs.6,00,000/- for the financial year (2017-2018) for disbursement to the informantsto motivate them to given information about power theft etc., in order to enforcevigilance and augment the Board’s revenue.

2. Now, the Additional Director General of Policy/Vigilance/Chennai has requestedto allot an amount of Rs.6,00,000/- for the financial year (2018-2019) in order toenforce Vigilance and augment the Board’s revenue.

3. The Under Secretary/General, Secretariat Branch shall make necessaryarrangements for sanction of an amount of Rs.6,00,000/- (Rupees Six lakhs only)for the financial year (2018-2019) subject to Budget Provisions, for disbursement tothe informants.

4. The said account shall be maintained by the Private Secretary to the AdditionalDirector General of Police/Vigilance/TANGEDCO. The unspent amount, if any, shall beremitted to the Account head mentioned in para-5 below.

5. The expenditure is debitable to “TANGEDCO -Funds-Revenue Expenses-76-Reward for Secret Information on theft of energy-76.127”.

(By Order of the Chairman - cum - Managing Director)R. Balaji,

Secretary.* * *

Page 20: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

TANTRANSCO - Financial assistance of REC for RTL of Additional loan of Rs.51776.22lakhs - Transmission scheme under P:SI (Trans) category sanctioned by RuralElectrification Corporation Ltd., (REC Ltd.,) New Delhi - acceptance of Loan - Approvedby the Borrowing Committee - Orders - Issued.

(Accounts Branch)

(Per) CH TANTRANSCO Proceedings No.07 Dated the 03rd April 2018.Panguni -20, Heyvilambi Varudam,Thiruvalluvar Aandu: 2049.

READ:

1. REC/T&D/CHN/Sanction/P:SI(Trans)/2016-17/691,dated 22.11.2016.

2. REC/T&D/CHN/Sanction/P:SI(Trans)/2017-18/637,dated 28.02.2018.

3. Approved by the Borrowing Committee on 23.03.2018.-----

PROCEEDINGS:The Rural Electrification Corporation Limited (REC Ltd.), New Delhi has sanctioned

financial assistance of REC for RTL of Additional loan of Rs.51776.22 lakhs (schemecode TN-TD-TRM-333-2017-13485-A1) for Establishment of 765 kV SS at Ariyalurand erection of associated 765 kv & 400 kv lines in General Construction Circle ofTrichy Region of Tamil Nadu. The details of the scheme is as follows:

Details SchemeName of the scheme Additional Loan amount of Rs.51776.22 lakhs

(Additional loan scheme code No. TN-TD-TRM-333- 2017-13485-A1) for Establishment of765 kV SS at Ariyalur and erection of associated765 kv & 400 kv lines in General ConstructionCircle of Trichy Region of Tamil Nadu.

GCC GCC/TrichyOriginal Loan Scheme Code No. TN-TD-TRM-333-2016-10144Addional Loan Scheme Code No. TN-TD-TRM-333-2017-13485-A1Category P:SISub category TransmissionOriginal Project Cost based on DPR-A 142099.32Revised Project Cost incl.IDC 199628.46baded on RCE-BDifference in Project Cost (C=B-A) 57529.13Original Loan sanctioned -D(90% of A) 127889.39Additional Loan sanctioned inclIDC-E (90% of C) 51776.22Revised Total Loan (F=D+E) 179665.61Extent of financing (% of loan to 90%cost may be given)

FINANCEPART – III

Page 21: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

21

2. TERMS AND CONDITIONS:It has been stated that all the terms and conditions of REC remain unchanged

as stipulated in their earlier sanction letter dated 22.11.2016 which is as follows:Amount : Rs.51776.22 Lakhs (Rupees fifty one thousand seven hundred

seventy six lakhs and twenty two thousand only)Rate of interest : The interest shall be charged on the loan at the rate prevailing on

the date of each disbursement as per REC’s latest loan policycircular. Presently the applicable interest rate is 10% p.a.

Tenure : 18 years including 5 years moratorium for repayment of principal.Repayment : 13 years after the moratorium period of 5 years in thirteen annual

equal instalments.Validity of sanction : Within 6 months from the date of sanction.Security : Mortgage/Hypothecation of Future assets so created out of(TANTRANSCO”s loan amount sanctioned for the project subject to the valueOPTION) being 110% of the loan amount so sanctioned. The security by

way of creation of charges on FUTURE ASSETS ONLY shall beaccepted subject to the loan amount being restricted to 90% ofthe project cost.

3. After careful consideration, the Tamil Nadu Transmission Corporation Ltd.,have approved and accept Rs.51776.22 Lakhs (Rupees fifty one thousand sevenhundred seventy six lakhs and twenty two thousand only) for Establishment of 765kV SS at Ariyalur and erection of associated 765 kv & 400 kv lines in GeneralConstruction Circle of Trichy Region of Tamil Nadu sanctioned by the Rural ElectrificationCorporation Limited (REC Ltd.,) New Delhi and accepting all terms and conditionsmentioned in REC sanction letter dated 28.02.2018.

4. The following resolutions may also be passed as requested by RuralElectrification Corporation Limited.

RESOLUTIONSI. RESOLVED that the Tamil Nadu Transmission Corporation Ltd.,

(TANTRANSCO) do accept the Term Loan of Rs.51776.22 Lakhs (Rupees fifty onethousand seven hundred seventy six lakhs and twenty two thousand only) for 01 no.Transmission scheme under P:SI (Trans) category sanctioned by Rural ElectrificationCorporation Ltd., (REC Ltd.,) New Delhi and also the terms and conditions as stipulatedby the REC Ltd., New Delhi, vide sanction letter dated 22.11.2016 and dt.28.02.2018.

II. RESOLVED FURTHER that the Chairman/TANTRANSCO be and is herebyauthorized to accept any special conditions that may be stipulated by REC Ltd., andthat such acceptable terms and conditions may be communicated to REC byChief Financial Controller/TANTRANSCO on behalf of the Chairman/TANTRANSCO.

III. RESOLVED FURTHER that the Chief Financial Controller/TANTRANSCObe and is hereby authorized to execute relevant loan documents, any amendments,such certificates and other writings and create security by way of creation of chargeson future assets on behalf of the TANTRANSCO.

IV. RESOLVED FURTHER that the common seal of the company be affixedon the security documents and any other related documents as may be required byREC in the presence of any one of the Directors and the Company Secretary.

B.B.3 (Apr 18)

Page 22: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

22

V. RESOLVED FURTHER that the Company Secretary/TANTRANSCO be andis hereby authorised to file the charges created with Registrar of Companies (ROC)within 30 days from the date of execution of loan documents.

(By Order of the Chairman/TANTRANSCO)

K.Muthupandian, Chief Financial Controller/TANTRANSCO

* * *TANTRANSCO - Financial assistance of REC for RTL of Rs.5784.88 lakhs for 01 no. -Transmission scheme under P:SI (Trans) category sanctioned by Rural ElectrificationCorporation Ltd., (REC Ltd.,) New Delhi - Acceptance of Loan - Approved by theBorrowing Committee - Orders - Issued.

(Accounts Branch)

(Per) CH TANTRANSCO Proceedings No.08 Dated the 20th April 2018.Chithirai-7, Vilambi Varudam,Thiruvalluvar Aandu: 2049.

READ:

1. REC/T&D/CHN/Sanction/P:SI(Trans)/2017-18/445,dated 25.10.2017.

2. Approved by the Borrowing Committee on 12.04.2018.-----

PROCEEDINGS:The Rural Electrification Corporation Limited (REC Ltd.), New Delhi has sanctioned

financial assistance of Rs.5784.88 lakhs (Rupees Five Thousand Seven HundredEighty Four Lakhs and Eighty Eight Thousand only) for 1 No. Transmission schemeunder P:SI (Trans) category. The details of the scheme are as follows:

Details Scheme - 1Name of the scheme Establishment of Selvapuram (Puttuvikki)

230/110 KV SS at Perur with 2 x 100 MVA,230/110 KV auto transformers with associated230 KV & 110 KV lines in GCC/Coimbatore.

District/Region GCC/CoimbatoreScheme Code No. TN-TD-TRM-333-2017-13194Category P:SISub category TransmissionCost of the project (Rs.in Lakhs) 6427.64IDC if any in Rs.Lakhs NILTotal cost including IDC 6427.64Loan amount sanctioned 5784.88IDC if any (lakhs) NILTotal Loan 5784.88Cost escalation % sanctioned if NILExtent of financing (%of loan to

cost may be given) 90%

Page 23: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

23

2. TERMS AND CONDITIONS:The terms and conditions for the above term loan of financial assistance of REC

for Rs.5784.88 lakhs (Rupees Five Thousand Seven Hundred Eighty Four Lakhs andEighty Eight Thousand only) for Establishment of Selvapuram (Puttuvikki) 230/110KV SS at Perur with 2x100 MVA, 230/110 KV auto transformers with associated 230KV & 110KV lines in GCC/Coimbatore as stipulated by the REC Ltd., New Delhi, intheir letter dated 25.10.2017 is as follows:

Amount : Rs.5784.88 lakhs (Rupees Five Thousand Seven Hundred EightyFour Lakhs and Eighty Eight Thousand only)

Rate of interest : The interest shall be charged on the loan as per the prevailingcategory of the utililty/Borrower at the rate prevailing on thedate of each disbursement, subject to interest reset as per REC’slatest loan policy circular. The interest rate applicable at presentis 10%.

Tenure : 18 years including 3 years moratorium for repayment of principal.Repayment : 15 years after the moratorium period of 3 years in Fifteen annual

equal instalments.Validity of sanction : Within 6 months from the date of sanction.Security : Mortgage/Hypothecation of future assets so created out of loan(TANTRANSCO amount sanctioned for the project subject to the value beingOPTION) 110% of the loan amount so sanctioned. The security by way of

creation of charges on FUTURE ASSETS ONLY shall be acceptedsubject to the loan amount being restricted to 90% of theproject cost.

3. After careful consideration, the Tamil Nadu Transmission Corporation Ltd.,have approved and accept Rs.5784.88 lakhs (Rupees Five Thousand Seven HundredEighty Four Lakhs and Eighty Eight Thousand only) for Establishment of Selvapuram(Puttuvikki) 230/110KV SS at Perur with 2x100 MVA, 230/110 KV auto transformerswith associated 230KV & 110KV lines in GCC/Coimbatore sanctioned by the RuralElectrification Corporation Limited (REC Ltd.,) New Delhi and accepting all terms andconditions mentioned in REC sanction letter dated 25.10.2017.

4. The following resolutions have also been passed.

RESOLUTIONSI. RESOLVED that the Tamil Nadu Transmission Corporation Ltd.,

(TANTRANSCO) do accept the Term Loan of Rs.5784.88 lakhs (Rupees Five ThousandSeven Hundred Eighty Four Lakhs and Eighty Eight Thousand only) for 01 no.Transmission scheme under P:SI (Trans) category sanctioned by Rural ElectrificationCorporation Ltd., (REC Ltd.,) New Delhi and also the terms and conditions as stipulatedby the REC Ltd., New Delhi, vide sanction letter dated 25.10.2017.

II. RESOLVED FURTHER that the Chairman/TANTRANSCO be and is herebyauthorized to accept any special conditions that may be stipulated by REC Ltd., andthat such acceptable terms and conditions may be communicated to REC byChief Financial Controller/TANTRANSCO on behalf of the Chairman/TANTRANSCO.

III. RESOLVED FURTHER that the Chief Financial Controller/TANTRANSCObe and is hereby authorized to execute relevant loan documents, any amendments,such certificates and other writings and create security by way of creation of chargeson future assets on behalf of the TANTRANSCO.

Page 24: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

24

IV. RESOLVED FURTHER that the common seal of the company be affixedon the security documents and any other related documents as may be required byREC in the presence of any one of the Directors and the Company Secretary.

V. RESOLVED FURTHER that the Company Secretary/TANTRANSCO be andis hereby authorised to file the charges created with Registrar of Companies (ROC)within 30 days from the date of execution of loan documents.

(By Order of the Chairman/TANTRANSCO)

K.Muthupandian, Chief Financial Controller/TANTRANSCO

* * *

Page 25: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

TECHNICAL PART – IV

TANGEDCO - MM I - Specification No. M 25/2017-2018 - Procurement of 7/3.15mmAAA Rabbit conductor for DDUGJY & agriculture - Schemes and regular works - Placingof Orders - Approved.

(Technical Branch)

(Per.) FB TANGEDCO Proceedings No.34, Dated the 03rd April 2018.Panguni 20, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Item No.14 of Extract from Minutes of the 78th Boardmeeting of TANGEDCO held on 28.03.2018.

-----PROCEEDINGS:

Approval has been accorded for the following in respect of Tender specificationNo.M 25/2017-2018 toward procurement of 7/3.15mm AAA Rabbit conductor forDDUGJY & agriculture - Schemes and part of regular works.

1. To restrict and place Rate Contract Order on M/s. APAR Industries Ltd.,Vadodara for a total quantity of 31,535 Kms of 7/3.15 mm AAA conductoragainst tendered quantity of 52,555 Kms at the total all inclusive value ofRs.93,43,75,743/- (Rupees Ninety Three Crores Forty Three Lakhs SeventyFive Thousand Seven Hundred and Forty Three only) with Board’s commercialterms as discussed in para 12 of Board Note.

2. To update the Ex-works price on the dated of issue of Rate Contract.

(By Order of the Board)V.Gopalakrishnan,

Chief Engineer/Material Management.

* * *Procurement of 600 Kms of 11KV, 3x300 sq.mm UG XLPE Aluminium Power Cables- For conversion of existing HT lines in to UG cable in the extended area of ChennaiCity with financial assistance from M/s. PFC (Ltd) and balance IPDS scheme works -placing of Orders - Approved.

(Technical Branch)

Per. (FB) TANGEDCO Proceedings No.35, Dated the 03rd April 2018.Panguni 20, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Item No.12 of Extract from minutes of the 78th Boardmeeting of TANGEDCO held on 28.03.2018.

-----

Page 26: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

26

PROCEEDINGS:

The Board of Tamil Nadu Generation and Distribution Corporation Ltd approvedthe proposal in respect of Open Tender Specification No.M-33/2017-2018, for placingpurchase orders on the six eligible tenderers as detailed below for the procurement of600 Kms of 11KV, 3x300 sq.mm UG XLPE Aluminium Power Cable for conversion ofexisting HT lines in to UG cable in the extended area of Chennai City with financialassistance from M/s.PFC (Ltd) and balance IPDS scheme at a total all inclusive valueof Rs.92,74,80,000/- (Rupees Ninety two Crores seventy four lakhs and eightythousand only) with the Board’s commercial terms.

Sl. Name of the firm Quantity All Inclusive Total Value inNo. in Kms price per Km

Rs. P. Rs. P.1. M/s. Sinco Communication (India) 60 15,45,800 9,27,48,000/-

Pvt Ltd., Delhi L1 (New Entrant)2. M/s. Sterlite Power Transmission 108 15,45,800 16,69,46,400/-

Limited., New Delhi L23. M/s. Dynamic Cables Ltd, Jaipur L3 108 15,45,800 16,69,46,400/-4. M/s. KEC Internation Limited., 108 15,45,800 16,69,46,400/-

Chennai L45. M/s. Polycab Wires Pvt Ltd., 108 15,45,800 16,69,46,400/-

Mumbai L56. M/s. Gupta Power Infrastructure 108 15,45,800 16,69,46,400/-

Ltd., Bhubanewar L6Total 600 92,74,80,000.00

(By Order of the Board)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *Gas Turbine Schemes - Valuthur Gas Turbine Power Station - Supply, installation &commissioning of Bently Nevada 3500 Temperature and Vibration Monitoring systemfor upgrading the existing 3300 system in Gas Booster Compressor #1, in ValuthurGas Turbine Power Station/Phase-I by M/s. GE Oil & Gas India Pvt. Ltd., Pune, undersingle tender proprietory basis - Approved - Regarding.

(Technical Branch)

(Per.) F.B. TANGEDCO Proceedings No.37, Dated the 03rd April 2018.Panguni 20, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Approval of the Board obtained on 28.03.2018.-----

PROCEEDINGS:

Tamil Nadu Generation & Distribution Corporation Ltd., (TANGEDCO) Board hadapproved the following proposal.

“To accept the offer of M/s. GE Oil & Gas India Pvt, Ltd., Pune, for the supply,installation & commissioning of Bently Nevada 3500 Temperature and Vibration

Page 27: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

27

Monitoring system for upgrading the existing 3300 system in Gas Booster Compressor#1, in Valuthur Gas Turbine Power Station/Phase-I, at a total value toRs.63,85,339/- (Rupees Sixty Three Lakhs Eighty Five Thousand ThreeHundred and Thirty Nine only) inclusive of all taxes under single tender system,proprietory basis.”

(By Order of the Board)K.Natarajan,

Chief Engineer/Gas Turbine Schemes.

* * *Mettur Thermal Power Station I - Unit IV - R&M of ESP inclusive of refurbishment ofthe existing ESP and augmentation of additional ESP to achieve the desired SPM levelas per the revised Environmental norms - Under single Tender system/Proprietarybasis- Proposal to place order on M/s. Bharat Heavy Electricals Ltd., Chennai - ApprovalAccorded - Orders Issued - Regarding.

(Technical Branch)

Per. FB TANGEDCO Proceedings No.33, Dated the 03rd April 2018.Panguni 20, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Approval of the Board of TANGEDCO in its 78th meetingheld on 28.03.2018 vide Item No.13.

-----PROCEEDINGS:

Approval is accorded to place orders on M/s. Bharat Heavy Electricals Ltd.,Chennai for R&M of ESP inclusive of refurbishment of the existing ESP and augmentationof additional ESP to achieve the desired SPM level as per the revised Environmentalnorms in Unit IV of Mettur Thermal Power Station I at a cost of Rs.58,15,06,128/-(Rupees fifty eight crores fifteen lakhs six thousand one hundred and twenty eightonly) inclusive of taxes and duties under Single Tender System/Proprietary/Publicsector with the terms and conditions as discussed in the Note.

(By Order of the Board of TANGEDCO)M.Dhanapal,

Chief Engineer/Mechl./Thermal Stations.

* * *MM-II -e-Tender Specification No.M-06/2017-2018-Procurement of 1050 Nos. of63 KVA/22KV/433V Distribution Transformers Energy Efficient Level-2 under TwoPart Open Tender Rate Contract System - Award of Purchase Orders - Approval -Accorded.

(Technical Branch)

(Per.) F.B TANGEDCO Proceedings No.38, Dated the 04th April 2018.Panguni 21, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

The Item No.10, approval of TANGEDCO Board, accordedin its 78th meeting held on 28.03.2018.

-----

Page 28: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

28

PROCEEDINGS:The Tamil Nadu Generation and Distribution Corporation Ltd., accorded approval

for the following proposal:a) To place purchase orders with quantity as requested by the firms vide their

letters dated 20/22.01.2018 as tabulated below:Sl. Name of the Firm Quantity All Inclusive Total Value inNo. proposed to Price/Unit

be allottedas revised

by the firmsin Nos. Rs. P. Rs. P.

1. M/s. Associated Transformers 100 162000.00 16200000.00P Ltd., Dindigul.

2. M/s. Hindusthan Transformers, 100 162000.00 16200000.00Chennai.

3. M/s. Sri Thirumala Fabricators, 100 162000.00 16200000.00Chennai.

4. M/s. Sarayu Engineering, Dindigul. 100 162000.00 16200000.005. M/s. IPL Products, Chennai. 100 162000.00 16200000.006. M/s. SAP Industries, Chennai. 100 162000.00 16200000.007. M/s. Mohini Transformers Pvt. Ltd, 450 162000.00 72900000.00

Indore.Total 1050 17,01,00,000.00Total Value of Order Rs.17,01,00,000/- (Rupees Seventeen Crores and

One Lakh Only).b) To cancel the order of the tenderer who fails to keep up the delivery schedule

and to re-allocate the same quantity on such firms who successfully complete theirsupply within schedule.

(By Order of TANGEDCO Board)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *MM-II -e-Tender Specification No.M-19/2017-2018-Two Part Open Tender System -Procurement of 4500 Nos. of 100 KVA/22KV/433V Energy Efficient Level-2 DistributionTransformers - Award of Purchase Orders - Approval -Accorded.

(Technical Branch)

(Per.) F.B TANGEDCO Proceedings No.39, Dated the 04th April 2018.Panguni 21, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Item No.11 of Extract of the Minutes 78th of theTANGEDCO Board held on 28.03.2018.

-----PROCEEDINGS:

The Tamil Nadu Generation and Distribution Corporation Ltd., accorded approvalfor the following proposal:

Page 29: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

29

a) To place orders for a quantity of 450 Nos. of DTs on L1 quoted/evaluatedtenderer as originally offered by the firm, at an all-inclusive price of Rs.235528.00 foreach DT as tabulated below:

Sl. Name of the Firm Quantity All Inclusive Total Value inNo. proposed to Price/Unit

be allottedin Nos. Rs. P. Rs. P.

1. M/s. Paramount Industries, 450 235528.00 105987600.00Chennai.b) To place the order for a remaining quantity of 4050 Nos. of DTs to other

eligible 23 firms, at an all-inclusive price of Rs.299000.00 for each DT as tabulatedbelow:

Sl. Name of the Firm Quantity Quantity All Inclusive Value of orderNo. offered proposed Price

includingGST

Nos Nos Rs. P. Rs. P.1. M/s. Hindusthan Transformers 450 190 299000.00 56810000.00

Chennai.2. M/s. Bala Industries, Chennai. 450 190 299000.00 56810000.003. M/s. Supreme Power Equipments 450 190 299000.00 56810000.00

Ltd., Chennai.4. M/s. Associated Transformers 450 190 299000.00 56810000.00

Pvt Ltd, Dindigul.5. M/s. IPL Products, Chennai. 450 190 299000.00 56810000.006. M/s. SAP Industries, Chennai. 450 190 299000.00 56810000.007. M/s. Sarayu Engineering, 450 190 299000.00 56810000.00

Dindigul8. M/s. Danya Electric Co., 450 190 299000.00 56810000.00

Chennai.9. M/s Sri Thirumala Fabricators, 450 190 299000.00 56810000.00

Chennai.10. M/s. Sri Perfect Engineering, 2000 190 299000.00 56810000.00

Chennai.11. M/s. Sri Ramakrishna 2500 190 299000.00 56810000.00

Transformers, Tindivanam12. M/s. Tamil Nadu Transformers, 2000 190 299000.00 56810000.00

Ranipet.13. M/s. Suriya Electrical 950 140 299000.00 41860000.00

Enterprises, Chennai14. M/s. Sri Vinayaga Star 900 190 299000.00 56810000.00

Electricals, Chennai.15. M/s. Balaji Electrical works, 740 100 299000.00 29900000.00

Chennai16. M/s. Mohini Transformers P 1350 190 299000.00 56810000.00

Ltd, Indore17. M/s. Sakthi Transformers, 1000 100 299000.00 29900000.00

Chennai.

Page 30: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

30

18. M/s. Hindusthan Heavy 4500 190 299000.00 56810000.00Electricals Pvt Ltd, Coimbatore.

19. M/s. Industrial Heaters and 4500 190 299000.00 56810000.00Transformers, Coimbatore.

20. M/s. Electomeck Industries, 4500 190 299000.00 56810000.00Comibatore.

21. M/s. Durga Transformer Pvt. Ltd., 4500 190 299000.00 56810000.00Coimbatore.

22. M/s. Vivin Industries, Coimbatore. 4500 190 299000.00 56810000.0023. M/s. Sun Tech Transformers, 1000 1000 299000.00 29900000.00

RanipetTotal 4050 1210950000.00

Total Value of Order Rs.131,69,37,600.00/- (Rupees One Hundred andThirty one crores Sixty nine Lakhs Thirty seven thousand and six hundredonly).

c) To cancel the order of the tenderer who fails to keep up the delivery scheduleand to re-allocate the same quantity on such firms who successfully complete theirsupply within schedule.

(By Order of TANGEDCO Board)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *TANGEDCO - Erode Region - Salem EDC - Theft of Transformer Oil - Write off proposal- Approved - Regarding.

(Technical Branch)

Rt. CMD TANGEDCO Proceedings No.15, Dated the 10th April 2018.Panguni 27, Heyvilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

1. Chief Engineer/D/Erode Region’s Lr.No.015868/CE/D/ED/AEE/GL/F.Write off/D.818/2017, dated 12.10.2017.

2. CMD TANGEDCO’s Note approval dated 04.04.2018.-----

PROCEEDINGS:

Approval is hereby accorded to write off the following amounts towards thetheft of Transformer Oil listed below in Salem EDC of Erode Region.

Sl.No Circle & Division for theft occurrence Theft details Loss in Rs.1. Salem EDC/South Salem/Perumagoundampatty, About 260 Litres Rs.16,900/-

O&M Section, Perumagoundampatty SS XI of Transformer200 KVA/22KV DT. Oil

2. Salem EDC/South Salem/K.K Nagar O&M Section, About 260 Litres Rs.16,900/- Meyyanur SS VII 200KVA/ 22 KV DT. of Transformer Oil

(By Order of Chairman - cum - Managing Director)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *

Page 31: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

31

Coimbatore Region - Estimate for provision of one no. Compact Thermal ImageCamera for MRT Lab in Coimbatore Metro Electricity Distribution Circle - AdministrativeApproval - Orders - Issued.

(Technical Branch)

Rt. CMD TANGEDCO Proceedings No.17, Dated the 19th April 2018.Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

1. Chief Engineer/D/Coimbatore Region’s Lr.No.CE/D/CBE/AEE/Safety/F.T&P/D.430/2016, dated 03.10.2016,09.12.2016 & 02.04.2018.

2. CMD/TANGEDCO’s Note approval dated 13.04.2018.-----

PROCEEDINGS:

Approval is accorded for provision of one no. Compact Thermal Image Camerafor MRT Lab in Coimbatore Metro Electricity Distribution Circle of Coimbatore Regionfor an amount of Rs.2,87,850/- (Rupees Two Lakhs Eighty Seven ThousandEight Hundred and Fifty only) plus taxes as applicable.

(By Order of Chairman - cum - Managing Director)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *Vehicle - Procurement of 1 No. New, Diesel driven, mahindra Bolero plus, 9 seaternon AC BS IV, Power Steering vehicle for the use of Executive Engineer/MRT/Velloretowards replacement of Condemned Departmental Van bearing Registration No.TN23-D-4530 attached to AEE/MRT/Vellore under the control of Superintending Engineer/Vellore Electricity Distribution Circle/Vellore-Approval Accorded.

(Technical Branch)

(Per.) CMD TANGEDCO Proceedings No.148, Dated the 19th April 2018.Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Chairman cum Managing Director Note Orderdt.13.04.2018.

-----PROCEEDINGS:

“Administrative approval is hereby accorded for procurement of 1 No. New,Diesel driven, Mahindra Bolero Plus 9 seater non AC BS IV vehicle with Power steeringat a cost of Rs.7.50 Lakhs (approximate) for the use of Executive Engineer/MRT/Vellore towards replacement of condemned Departmental Van bearing RegistrationNo. TN-23-D-4530 attached to AEE/MRT/Vellore under the control of SuperintendingEngineer/Vellore Electricity Distribution Circle/Vellore at GeM rates through GeM/GeM

Page 32: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

32

rates outside GeM/rates as applicable to Government/Ex-show room price with waiverof EMD., SD and LD clauses.”

(By Order of Chairman - cum - Managing Director)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *Vehicle - Procurement of 1 No. New, Diesel driven, Mahindra Bolero LX Power + 2WD7 Seater non AC BS IV with Power steering towards replacement of the condemnedJeep bearing Regn.No.TN-41-H-9258 for the use of Executive Engineer/O&M/Negamam and attached to AEE/O&M/Negamam under the control of SuperintendingEngineer/Coimbatore (South) EDC/Coimbatore - Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.149, Dated the 19th April 2018.Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Chairman cum Managing Director Note Orderdated 13.04.2018.

-----PROCEEDINGS:

“Administrative approval is hereby accorded for procurement of 1 No. New,Diesel driven, Mahindra Bolero LX Power + 2WD 7 Seater non AC BS IV with Powersteering at a cost of Rs.6.25 Lakhs (approximate) at GeM rates through GeM/GeMrates outside GeM/rates as applicable to Government/Ex-show room with waiver ofEMD, SD and LD clauses towards replacement of the condemned Jeep bearingRegistration No. TN-41-H-9258 for the use of Executive Engineer/O&M/Negamamand attached to AEE/O&M/Negamam under the control of Superintending Engineer/Coimbatore (South) EDC/Coimbatore.”

(By Order of Chairman - cum - Managing Director)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *MTPS-II (1x600MW) - ES circle - C&I Division - Inspection and Servicing of DEH, MED& HP/LP Bypss system MOOG make servo valve during AOH 2018 - under singletender/proprietary/private sector - Administrative Approval - Accorded - Regarding.

(Technical Branch)

Per TANGEDCO Proceedings (CMD) No.150, Dated the 19th April 2018.Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD/TANGEDCO on 17.04.2018.-----

Page 33: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

33

PROCEEDINGS:Administrative approval accorded for the work of Inspection and servicing of

DEH, MEH & HP/LP Bypass system MOOG make servo valves during AOH 2018 bythe Original Equipment Manufacture M/s. Moog Motion Controls Pvt Ltd, Bangalorefor an amount of approximately Rs.5,59,250/- (Rupees Five lakhs fifty nine thousandtwo hundred and fifty only) including GST under single tender/proprietary/privatesector by Chief Engineer/MTPS-II.

(By Order of the CMD TANGEDCO)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *TTPS - ECHP I Division - Proposal for carrying out dismantling and devolution of6 Nos. Travelling Hoppers and Conveyor - 13 and its structures situated on theexisting Coal Jetty-I of TTPS due to upgradation of Coal Jetty-I by M/s. VOC PortTrust/Tuticorin - under open e-tender system - Administrative Approval Accorded.

(Technical Branch)

Per TANGEDCO Proceedings (CMD) No.152, Dated the 19th April 2018.Chithirai 6, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD/TANGEDCO on 16.04.2018.-----

PROCEEDINGS:Administrative approval is accorded for carrying out dismantling and devolution

of 6 Nos. Travelling Hoppers and Conveyor -13 and its structures situated on theexisting Coal Jetty-I of TTPS due to upgradation of Coal Jeety-I by M/s. VOC PortTrust/Tuticorin at an approximate total cost of Gross: Rs.58,71,453/- (Rupees Fiftyeight lakhs seventy one thousand four hundred and fifty three only) and the Nettcredit Amount to TANGEDCO for the value of old Asset: Rs.1,97,46,911/- (RupeesOne Crore Ninety seven lakhs forty six thousand nine hundred and eleven only)inclusive of all applicable taxes and other charges under open e-tender system by CE/TTPS.

(By Order of the CMD/TANGEDCO)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *TTPS - Procurement of One No. new bull dozer as replacement for the Coal HandlingSystem of Tuticorin Thermal Power Station under open e-tender system -Administrative Approval - Accorded.

(Technical Branch)

Per TANGEDCO Proceedings (CMD) No.153, Dated the 19th April 2018.Chithirai 06, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD on 13.04.2018.-----

Page 34: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

34

PROCEEDINGS:

Administrative approval is accorded towards procurement of One No. new bulldozer as replacement for the Coal Handling System of Tuticorin Thermal Power Stationat an approximate total cost of Rs.1,12,60,000/- (Gross) (Rupees One Crore TwelveLakhs and Sixty Thousand only) and Rs.95,68,450/- (Nett) (Rupees Ninety FiveLakhs Sixty Eight Thousand Four Hundred and Fifty only) inclusive taxes, transportationand risk insurance charges under Open e-Tender System by Chief Engineer/TTPS.

(By Order of the CMD/TANGEDCO)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *TTPS - Electrical System - MRT-I Division - Replacement of existing electromechanicaltype bus bar differential relays with latest version fully numerical based high impedancedifferential relays for bus bar protection at Switchyard I & II of TTPS - under opene-tender system - Administrative Approval Accorded.

(Technical Branch)

Per TANGEDCO Proceedings (CMD) No.154, Dated the 19th April 2018.Chithirai 06, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD on 13.04.2018.-----

PROCEEDINGS:

Administrative approval is accorded for replacement of existingelectromechanical type bus bar differential relays with latest version fully numericalbased high impedance differential relays for bus bar protection at Switchyard I & II ofTTPS at an approximate total cost of Gross: Rs.38,71,970/- (Rupees Thirtyeight lakhs seventy one thousand nine hundred and seventy only) and Nett:Rs.26,20,970/- (Rupees Twenty six lakhs twenty thousand nine hundred and seventyonly) inclusive of all applicable taxes and other charges under open e-tender systemby CE/TTPS.

(By Order of the CMD/TANGEDCO)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *MTPS-I 210 MW LMW Design Turbine - Capital overhaul of Unit III - Turbine andGenerator - Administrative Approval Accorded.

(Technical Branch)

(Per)TANGEDCO Proceedings (CMD) No.155, Dated the 19th April 2018.Chithirai 06, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD/TANGEDCO on 16.04.2018.-----

Page 35: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

35

PROCEEDINGS:

Administrative approval is accorded for carrying out Capital Overhauling of 210MW LMW design Turbine and Generator of Unit III/MTPS I during 2018-2019 at anapproximate cost of Rs.2,66,33,000/- (Rupees Two Crores sixty six lakhs and thirtythree thousand only) inclusive of GST under open tender/Two Part system.

(By Order of the Chairman - cum - Managing Director)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *Hydro - Tirunelveli Generation Circle - Maintenance of Water Supply arrangementsincluding cleaning of water tank and operation of Pump at filter house at PapanasamLower Camp and maintenance of Sanitation arrangements including cleaning of toilet,collection chambers, sewage line at Servalar Camp for a period of one year fromthe date of utilisation - Administrative Approval and Technical Sanction Accorded -Inclusion of Employees Provident Fund and miscellaneous Provisions (EPF & MP) andEmployees State Insurance (ESI) as per the directions of the Administrative Branch -Revision in the Estimate cost - Revised Administrative Approval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.18, Dated the 20th April 2018.Chithirai 02, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 13.04.2018.

-----PROCEEDINGS:

Revised Administrative Approval is hereby accorded for carrying out the followingcivil maintenance works pertaining to the Tirunelveli Generation Circle due to theaddition of the Employees Provident Fund & Miscellaneous Provision (EPF & MP) @13.36% and Employees State Insurance (ESI) @ 4.75% which have come into forcefrom 01.08.2017 as instructed by the Administrative Branch vide Memos. 01.08.2017and 17.10.2017.

(i) Maintenance of Water Supply arrangements including cleaning of water tankand operation of Pump at filter house at Papanasam Lower Camp for aperiod of one year from the date of utilisation at an estimated cost ofRs.2,73,300/- (Gross and Nett) (Rupees Two lakhs seventy three thousandand three hundred only).

(ii) Maintenance of Sanitation arrangements including cleaning of toilet, collectionchambers, sewage line at Servalar Camp for a period of one year from thedate of utilisation at an estimated cost of Rs.1,52,700/- (Gross and Nett)(Rupees One lakh fifty two thousand and seven hundred only).

(By Order of Chairman - cum - Managing Director)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *

Page 36: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

36

Hydro - Tirunelveli Generation Circle - Maintenance of Periodical sweeping and cleaningthe open drains excluding water supply and sanitation arrangements at PapanasamLower Camp, Maintenance of Sanitation arrangements including cleaning of toilet,collection chambers, sewage line at Papanasam Lower Camp, and Maintenance ofperiodical Sweeping and Cleaning the Open Drains excluding water supply and sanitationworks at Servalar Camp for a period of one year from the date of utilisation -Administrative Approval and Technical Sanction - Accorded - Inclusion of EmployeesProvident Fund and Miscellaneous Provisions (EPF & MP) and Employees State Insurance(ESI) as per the directions of the Administrative Branch - Revision in the Estimatecost - Revised Administrative Approval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.19, Dated the 20th April 2018.Chithirai 07, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 13.04.2018.

-----PROCEEDINGS:

Revised Administrative Approval is accorded for carrying out the following civilmaintenance works pertaining to the Tirunelveli Generation Circle due to the additionof the Employees Provident Fund & Miscellaneous Provision (EPF & MP) @ 13.36%and Employees State Insurance (ESI) @ 4.75% which have come into force from01.08.2017 as instructed by the Administrative Branch vide Memos. 01.08.2017and 17.10.2017.

(i) Tirunelveli Generation Circle-Maintenance of periodical sweeping and cleaningthe open drains excluding water supply and sanitation arrangements atPapanasam Lower Camp for a period of one year from the date of utilisationat an estimated cost of Rs.17,89,000/- (Gross and Nett) (Rupees Seventeenlakhs eighty nine thousand only).

(ii) Tirunelveli Generation Circle - Maintenance of Sanitation arrangements includingcleaning of toilet, collection chambers, sewage line at Papanasam LowerCamp for a period of one year from the date of utilisation at an estimatedcost of Rs.2,20,000/- (Gross and Nett) (Rupees Two lakhs twenty thousandonly).

(iii) Tirunelveli Generation Circle-Maintenance of periodical sweeping and cleaningthe open drains excluding water supply and sanitation works at ServalarCamp for a period of one year from the date of utilisation at an estimatedcost of Rs.13,10,100/- (Gross and Nett) (Rupees Thirteen lakhs ten thousandand one hundred only).

(By Order of Chairman - cum - Managing Director)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *

Page 37: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

37

TANGEDCO - World bank funded Dam Rehabilitation and Improvement project (DRIP)- Providing Technical Assistance service to assist the AEEs/Civil in execution of works,supervision, monitoring of the progress of works, taking level and measurementsetc., for DRIP works with Graduate Engineers (BE/Civil passed), for the civil sub-divisions of Papanasam and Kundah under the control of Superintending Engineer/Civil/DRIP/Madurai - In Principle Approval Accorded - Regarding.

(Technical Branch)

Per (CMD) TANGEDCO Proceedings No.161, Dated the 20th April 2018.Chithirai 07, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Chief Engineer/Civil Designs Note approved by theCMD/TANGEDCO, dated 13.04.2018.

-----PROCEEDINGS:

In Principle approval is hereby accorded, for outsourcing Technical Assistanceservice with 2 Nos Graduate Engineers (BE/Civil passed) periodically by e-tender andNational Shopping procedure of World Bank process to assist the AEEs/Civil, eachone for each civil sub-divisions, Papanasam and Kundah of Superintending Engineer/Civil/DRIP/Madurai under the control of Chief Engineer/Civil Designs, for DRIP worksat the rate not exceeding PWD schedule of rates for the corresponding year till projectcompletion of DRIP-I, for timely completion of DRIP works and to enable financialprogress which is reviewed in every meetings of DRIP, out of fund available inComponent III of DRIP, Rs.11.105 Crores.

(By Order of Chairman - cum - Managing Director/TANGEDCO)C. Ramesh,

Chief Engineer/Civil Designs.

* * *TTPS - ICHP Division - Proposal for carrying out condemnation and dismantling ofunused & Idle Conveyor 29B and its structures at TTPS - under open e-tender system- Administrative Approval Accorded.

(Technical Branch)

Per TANGEDCO Proceedings (CMD) No.164, Dated the 24th April 2018.Chithirai 11, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Note approved by the CMD/TANGEDCO on 19.04.2018.-----

PROCEEDINGS:

Administrative approval is accorded for carrying out dismantling and devolutionof unused & Idle Conveyor 29B and its structures of TTPS at an approximate totalcost of Gross: Rs.28,24,886/- (Rupees Twenty eight lakhs twenty four thousandeight hundred and eighty six only) and the Nett credit Amount to TANGEDCO for the

B.B.4 (Apr 18)

Page 38: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

38

value of old Asset: Rs.1,16,114/- (Rupees One lakh sixteen thousand one hundredand fourteen only) inclusive of all applicable taxes and other charges under opene-tender system by CE/TTPS.

(By Order of CMD/TANGEDCO)P.Sundar,

Chief Engineer/Mechl./Thermal Stations(i/c).

* * *Vehicle - Procurement of 1 No. New, Diesel driven, Force tempo traveller, T1, BSIV,3700 WB 17D, PS, Non AC Vehicle for the use of AEE/Special Maintenance/South/Coimbatore towards replacement of Condemned Departmental lorry (TATABENZ)bearing Registration No: TDE 4273 under the control of Superintending Engineer/CEDC/South/Coimbatore - Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.165, Dated the 24th April 2018.Chithirai 11, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Chairman cum Managing Director Note Orderdated 19.04.2018.

-----PROCEEDINGS:

“Administrative approval is hereby accorded for procurement of 1 No. New,Diesel driven, Force tempo traveller, T1, BSIV, 3700 WB 17D, PS, Non AC Vehicle at acost of Rs.10.00 Lakhs (approximate) against the Condemned Departmental lorry(TATABENZ) bearing Registration No.TDE 4273 attached to AEE/Special maintenance/South/Coimbatore under the control of Superintending Engineer/CEDC/South/Coimbatore at GeM rates through GeM/GeM/rates outside GeM/rates as applicableto Government/Ex-show room price with waiver of EMD., SD and LD clauses.”

(By Order of Chairman - cum - Managing Director)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *TANGEDCO - IT Wing - Provision of Broadband internet connection to the Chief Engineer/Civil ETPS Exp. Proj. & NCTPS Stage - III for the official use at NCTPS stage-III siteoffice building - Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.169, Dated the 24th April 2018.Chithirai 11, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CMD Note approval dated 13.04.2018.-----

Page 39: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

39

PROCEEDINGS:

TANGEDCO after careful consideration of the proposal of the Chief Engineer/IThereby approves the following:

To provide new BSNL broadband connection to the Chief Engineer/Civil ETPSExp. Proj. & NCTPS Stage-III for the official use at NCTPS stage-III site office buildingunder BSNL BBG Combo ULD 945 plan with unlimited download/upload limit, 10Mbpsup to 20GB, 2Mbps beyond bandwidth and 1/1 GB of free Email IDs/space with thefollowing expenditure.

I. One time expenditure : Rs.2,600/- (including modem)

II. Annual recurring charges : Charges prevailing from time to time for theabove plan.

The above Broadband connection has to be continued until TANGEDCO’s ownfiber connectivity is established.

The above expenditure is debitable to the account head “Revenue expenditureNo.76.117 (Internet Charges).”

(By Order of the CMD)S.Devikarani,

Chief Engineer/IT (i/c).

* * *TANGEDCO - Provision of non-OYT Landline connection for 25 Nos. of ExecutiveEngineer and provision of Broadband internet connection to all 36 Nos. of ExecutiveEngineer offices in General Construction Circle under the control of CE/TransmissionProjects - I & II those who are involved in e-tender/e-procurement process exclusively- Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.170, Dated the 24th April 2018.Chithirai 11, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CMD Note approval dated 13.04.2018.-----

PROCEEDINGS:

TANGEDCO after careful consideration of the proposal of the Chief Engineer/IThereby approves the following:

1. To provide a new Non-OYT landline connection to the 25 Nos. of ExecutiveEngineers offices under the control of CE/Transmission Projects-I & II andthose who are not having existing landline connection and involving e-tenderingactivities with the following expenditure:I. Non recurring expenditure: Installation and initial deposit charges: 25xRs.1000(each connection) = 25,000/-II. Recurring expenditure: Charges as per (Per) B.P (FB) No.36 (Sectt.Branch)dated 04.10.2010.

2. To provide new BSNL broadband connection to all 36 Nos. of Executive Engineer

Page 40: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

40

offices in General Construction Circle under the control of CE/TransmissionProjects - I & II those who are involved in e-tendering/e-procurement processexclusively under BSNL BBG Combo ULD 1199 plan with unlimited download/upload limit, 10 Mbps up to 40 GB, 2Mbps beyond bandwidth for Uploadingand downloading of documents or with any other service provider not exceedingthe expenditure limit of the above plan with the following expenditure.I. One time expenditure : Rs.2,600/- (including Modem)II. Annual recurring charges : Charges prevailing from time to time for the

above plan.3. The above Broadband connection has to be continued until TANGEDCO’s own

fiber connectivity is established.4. The above expenditure is debitable to the account head “Revenue expenditure

No.76.117 (Internet Charges).”

(By Order of the CMD)S.Devikarani,

Chief Engineer/IT (i/c).

* * *TANGEDCO - NCES - Establishment of Co-generation plants in 12 Nos. Co-operativeand public sector sugar mills in Tamil Nadu - Releasing of 10% retention amount forcompleted and operational Sugar mill Modernisation projects at 7 sugar mills in aphased manner - Waiver of liquidated damages (L.D) clause as a special case tillcompletion of all Co-generation Projects along with Sugar Mill Modernisation in orderto speed up the Co-generation Projects along with sugar mill modernisation at ArignarAnna, Tanjore and Perambalur - Approval Accorded.

(Technical Branch)

(Per) FB TANGEDCO Proceedings No.40, Dated the 25th April 2018.Chithirai 11, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Extract from the Board Note approved under circulationon 24.04.2018.

-----PROCEEDINGS:

The Tamil Nadu Generation and Distribution Corporation Limited after carefulconsideration, approves the following proposal in respect of establishment of 12Nos. Co-generation Plants in the existing Co-operative & Public Sector Sugar millsalong with Sugar mill Modernization in Tamil Nadu, to waive the liquidated damages(L.D) clause as a special case by superceding the approval already accorded vide B.P.No. (Per) CMD/TANGEDCO Proceedings No.321 Dated 02.08.2013 till completion ofall Co-generation Projects along with Sugar Mill Modernisation.

1. To waive the liquidated damages (L.D) clause in “toto”, as a special case tillcompletion of all Co-generation Projects along with Sugar Mill Modernisation,for releasing the retention amount of Rs.10.65 crores for completed andoperational sugar mill modernisation projects at 7 sugar mills, in order tospeed up the Co-generation Projects along with sugar mill modernaisation atArignar Anna, Tanjore and Perambalur, by superceding the approval already

Page 41: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

41

accorded vide B.P.No.(Per) CMD TANGEDCO Proceedings No.321,dated 02.08.2013, wherein, approval was accorded for extension of timewith levy of liquidated damages (L.D) upto March 2014 without Prejudice tothe other terms and conditions of the contract.

2. To release the retention amount of Rs.10.65 crores for completed andoperational sugar mill modernisation projects at 7 sugar mills viz Salem,Subramaniya siva, kallakurichi I, Kallakurichi II, Dharmapuri, Vellore andChengalrayan sugar mills after deducting Rs.1.70 crores for pending works(Work pending with 6 sugar Mills out of 7) in a phased manner based on theprogress in order to speed up the Co-generation Projects along with sugarmill modernisation at Arignar Anna, Tanjore and Perambalur on obtainingundertaking from M/s. WIL agreeing to utilize the above said Retention amountonly for Arignar Anna, Tanjore and Perambalur Co-generation projects alongwith sugar mill modernization or else the SD cum PG already submitted byM/s. WIL may be appropriated by TANGEDCO.

3. After release of first instalment, expenditure incurred in the site will be monitoredand accounted for every fortnight by the EPC consultant. Based on theprogress, subsequent instalment of retention amount may be released.

4. Out of Rs.10.65 crores, Rs.9.04 crores required for completion of ArignarAnna, Tanjore and Perambalur Co-generation projects along with sugar millmodernization and balance amount may be utilized for remaining 7Co-generation projects along with sugar mill modernization works.

All other terms & condition stipulated in the contract remain unaltered.

//By Order of the Board//M.Asokan,

Chief Engineer/NCES.

* * *Hydro - Tirunelveli Generation Circle - Improvement works to the 6G quarters (6Tenements) at Thekkadi Camp by replacing the existing damaged GI Sheet roofing bygalvanium colour coding sheet and allied Civil works - Administrative approval andTechnical Sanction accorded - Inclusion of employees Provident Fund and MiscellaneousProvisions (EPF & MP) and Employees State Insurance (ESI) as per the directions ofthe Administrative Branch - Revision in the E timate cost - Revised AdministrativeApproval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.20, Dated the 26th April 2018.Chithirai 13, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 21.04.2018.

-----PROCEEDINGS:

Revised Administrative approval is accorded for carrying out the “Improvementworks to the 6G quarters (6 Tenements) at Thekkadi Camp by replacing the existing

Page 42: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

42

damaged GI Sheet roofing by galvanium colour coding sheet and allied Civil works” atan estimated cost of Rs.16,25,000/-(Gross) & Rs.16,09,000/- (Nett) pertaining tothe Tirunelveli Generation Circle due to the revision in the PWD Schedule of Rates2017-2018 and addition of the Employees Provident Fund & Miscellaneous Provision(EPF & MP) @ 13.36% and Employees State Insurance (ESI) @ 4.75% which havecome into force from 01.08.2017 as instructed by the Administrative Branch videMemos. 01.08.2017 and 17.10.2017.

(By Order of Chairman - cum - Managing Director)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *Hydro - Generation Circle Tirunelveli - Maintenance of Sanitation arrangements includingcleaning of Toilets, Sewage Line, Collection chambers and Open drains includingperiodical sweeping, cleaning of drinking water collection tank and Water diversionbund at Suruliar Lower Camp & Periyar Lower Camp and Maintenance of sanitationarrangements including cleaning of toilet, sewage line, collection chambers and Opendrains including periodical sweeping, cleaning of drinking water colllection tank andWater diversion bund, maintenance of Highwavys, Manalar and Eravangalar Dam bycleaning of Gallery, Sweeping at the top of the Dam and taking dam water levels dailyat Eravangalar Dam is Suruliar Upper Camp for a period of one year from the dateof utilisation for the year 2018-2019 - Administrative Approval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.21, Dated the 26th April 2018.Chithirai 13, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 21.04.2018.

-----PROCEEDINGS:

Administrative Approval is accorded for the following works including EmployeesProvident Fund & Miscellaneous Provision (EPF & MP) @ 13.36%, Employees StateInsurance (ESI) @ 4.75% on the labour portion and Goods Service Tax @ 18%based on the Current Revision PWD Schedule of rates for the year 2017-2018.

(i) Tirunelveli Generation Circle-Maintenance of Sanitation arrangements and WaterSupply arrangements (viz.) Cleaning of Toilets, Sewage Line, Collectionchambers and Open drains including periodical sweeping, cleaning of drinkingwater collection tank and Water diversion bund at Suruliar Lower Camp fora period of one year from the date of utilisation for the year 2018-2019 at anestimated cost of Rs.6,95,000/- (Gross & Nett) (Rupees Six lakhs ninety fivethousand only).

(ii) Tirunelveli Generation Circle-Maintenance of Sanitation arrangements and WaterSupply arrangements (viz.) Cleaning of Toilets, Sewage Line, Collectionchambers and Open drains including periodical sweeping, cleaning of drinkingwater collection tank and Water diversion bund at Periyar Lower Camp for

Page 43: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

43

a period of one year from the date of utillisation for the year 2018-2019 atan estimated cost of Rs.15,39,000/- (Gross & Nett) (Rupees Fifteen lakhsthirty nine thousand only).

(iii) Tirunelveli Generation Circle-Maintenance of Sanitation arrangements includingcleaning of toilet, sewage line, collection chambers and Open drains includingperiodical sweeping, cleaning of drinking water collection tank and Waterdiversion bund, maintenance of Highwavys, Manalar and Eravangalar Dam bycleaning of Gallery, Sweeping at the top of the Dam and taking dam waterlevels daily at Eravangalar Dam in Suruliar Lower Camp for a period of oneyear from the date of utillisation for the year 2018-2019 at an estimatedcost of Rs.14,82,000/- (Gross & Nett) (Rupees Fourteen lakhs eighty twothousand only).

(By Order of Chairman - cum - Managing Director/TANGEDCO)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *Hydro - Tirunelveli Generation Circle - Maintenance of Kodayar Lower Camp andKodayar Upper Camp by periodical cleaning of collection chambers, branch sewerline, open drains, doors and windows repair works, toilet cleaning, maintenance ofwater supply arrangements, Inspection Bungalow premises, etc., for a period of oneyear from the date of utilisation for the year 2018-2019 - Administrative Approval -Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.22, Dated the 26th April 2018.Chithirai 13, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 21.04.2018.

-----PROCEEDINGS:

Administrative Approval is accorded for the following works including EmployeesProvident Fund & Miscellaneous Provision (EPF & MP) @ 13.36%, Employees StateInsurance (ESI) @ 4.75% on the labour portion and Goods Service Tax @ 18%based on the Current Revised PWD Schedule of rates for the year 2017-2018.

(i) Tirunelveli Generation Circle-Maintenance of Kodayar Lower Camp byperiodical cleaning of collection chambers, branch sewer line, open drains,doors and windows repair works, toilet cleaning, maintenance of water supplyarrangements, Inspection Bungalow premises, etc., for a period of one yearfrom the date of utillisation for the year 2018-2019 at an estimated cost ofRs.19,88,000/- (Gross & Nett) (Rupees Nineteen lakhs eighty eight thousandonly).

(ii) Tirunelveli Generation Circle-Maintenance of Kodayar Upper Camp byperiodical cleaning of collection chambers, branch sewer line, open drains,doors and windows repair works, toilet cleaning, maintenance of water supplyarrangements, etc., for a period of one year from the date of utillisation for

Page 44: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

44

the year 2018-2019 at an estimated cost of Rs.12,34,500/- (Gross & Nett)(Rupees Twelve lakhs thirty four thousand and five hundred only).

(By Order of Chairman - cum - Managing Director)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *Hydro - Generation Circle Erode - Cleaning, Sweeping and Maintenance of watersupply and sanitation arrangements in the Lower Mettur Barrage Power House 3 andCamp area at Kuthiraikkalmedu and Lower Mettur Barrage Power House 4 andCamp area at Urachikottai for a period of one Year from the date of utilisation forthe year 2018-2019 - Administrative Approval - Accorded.

(Technical Branch)

(Rt.) CMD TANGEDCO Proceedings No.23, Dated the 26th April 2018.Chithirai 13, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CE/Hydro’s note approved by the CMD/TANGEDCOdated 21.04.2018.

-----PROCEEDINGS:

Administrative Approval is accorded for the following works including EmployeesProvident Fund & Miscellaneous Provision (EPF & MP) @ 13.36%, Employees StateInsurance (ESI) @ 4.75% on the labour portion and Goods Service Tax @ 18%based on the PWD Schedule of rates for the year 2017-2018.

(i) Erode Generation Circle - Maintenance of routine civil works including watersupply and sanitary arrangements in the camp and Power House premises ofLower Mettur Barrage Power House-III/Kuthiraikalmedu for the period of oneyear from the date of utillisation at an estimated cost of Rs.15,55,200/-(Gross & Nett) (Rupees Fifteen lakhs Fifty five thousand and two hundredonly).

(ii) Erode Generation Circle - Maintenance of routine civil works including watersupply and sanitary arrangements in the camp and Power House premises ofLower Mettur Barrage Power House-IV/Urachikottai for the period of oneyear from the date of utillisation at an estimated cost of Rs.11,05,500/-(Gross & Nett) (Rupees Eleven lakhs Five thousand and five hundred only).

(By Order of Chairman - cum - Managing Director)K.Subash Chandra Bose,

Chief Engineer/Hydro.

* * *Lr.No.SE/RE&I(D)/EE/RE/A2/F.TAHDCO/D.424/2018, (Techl.Br.) Dt.26-04-2018.

Sub : Electricity - Effecting of agricultural service connectionsunder Fast Track Supply scheme to Scheduled Tribe farmers- List of 45 beneficiaries based on G.O. 251 dated09.10.2017 for the year 2017-2018 - Communicated-Regarding.

Page 45: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

45

Ref : 1) G.O.No.251 AD & TWD (TW 1 (2) DepartmentDated 09.10.2017.

2) Lr.No.SE/RE&I(D)/EE/RE/A2/F.TAHDCO/D.209/2018,Dated 02.03.2018.

3) TAHDCO Lr.No.G2/6217/2017 dated 12.04.2018.-----

In continuation to the letter 2nd cited, the Managing Director, TAHDCO hasrequested to effect agricultural service connections to 45 Scheduled Tribe farmersunder Fast Track Supply Scheme and remitted an amount of Rs.4.50 lakhs (Initialamount of Rs.10,000/- per service connection) vide Cheque No.934722 dated10.04.2018 to Headuarters Account.

The list of 45 beneficiaries based on G.O.251 dated 09.10.2017 for the year2017-2018 are enclosed.

The following instructions based may be followed for effecting service connection.

1. 90 days notice shall be issued to the 45 applications before 15.05.2018 andconfirmation for serving 90 days notice may be sent to this office. Nametransfer, SF change are not permitted. If there is any deviation in the detailsmentioned in the list, notice need not be issued and the concerned DistrictManager/TAHDCO, may be addressed for clarification. Only after gettingclearance from District Manager/TAHDCO, the notice has to be issued.

2. Readiness entered details shll be informed to Head Quarters as on 20th ofevery month (Report has to be sent before 25th of every month), as balanceRs.65,000/- per service has to be paid by TAHDCO Head office to TANGEDCOHead office. Work has to be taken up after receipt of balance amount fromTAHDCO.

3. It is informed that maximum of 180 days as accepted by TAHDCO is onlypermitted for entering readiness under this scheme and time extension afterexpiry of 90 days notice period has to be got approved from the ChiefEngineers/Distribution concerned by the Superintending Engineer/EDC. It shallbe specifically noted that 5 years and 90 days period is not applicable to thisTAHDCO Fast Track scheme. After expiry of 180 days, the applications haveto be transferred to normal category.

4. Sanction of estimate for taking up works has to be done after getting intimationfrom CE/Plg&RC regarding receipt of balance Rs.65,000/- per beneficiary.

5. Supply shall be effected to the above 45 beneficiaries in separate priority andthe same shall be accounted under normal category based on the seniority ofthe readiness reported by the applicants. G.O.Ms.No.251 dated 09.10.2017,List of 45 Nos ST beneficiaries shall be mentioned in all correspondances.

The details of services effected may be intimated to the Chief Engineer/Planning& RC and the concerned District Managers, TAHDCO. If any beneficiaries are notcoming under your Region/Circle, the above details may be transferred to concernedRegion with a copy to this office.

The progress of effecting serives shall be reported every month to SE/RE&I(D).

R.S. Usha,Chief Engineer/Planning & RC

* * *

Page 46: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

46

TANGEDCO - IT Wing - Provision of New Desktop Computers for the existing Thinclient users and replacement of laptop for CMD office and computers for IT wing -Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.175, Dated the 26th April 2018.Chithirai 13, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

CMD Note approval dated 21.04.2018.-----

PROCEEDINGS:TANGEDCO after careful consideration of the proposal of the Chief Engineer/IT

hereby approves the following:1. To replace 1 No. Crore i3 Laptop for the official use of CMD office.2. To replace 2 Nos. of Core i7 PCs and 2Nos. of Core i3 PCs 1 No. Colour laser

printer for the official use of IT Wing.3. To provide 20 Nos. of Core i3 PCs for the official use of the existing Thin client

users.Sl. Description Quantity Price/Unit(all Amount in Rs.No. inclusive)

in Rs.1. Core i3 laptop 1 No. 50,000.00 50,000.002. Core i7 Desktop PCs 2 Nos. 80,000.00 80,000.003. Core i3 Desktop PCs 22 Nos. 45,000.00 9,90,000.004. Colour Laser printer 1 No. 80,000.00 80,000.00

Total 12,80,000.00

(By Order of the CMD)S.Devikarani,

Chief Engineer/IT (i/c).* * *

Vehicle - Cancelling the existing hiring orders of the vehicle sanctioned for the utillsationof Assistant Executive Engineer/Special Maintenance/Udumalpet and Procurement of1 No. New, Diesel driven, Force tempo traveller, T1, BSIV, 3700 WB 17D, PS, Non ACVehicle - Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.176, Dated the 27th April 2018.Chithirai 14, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Extract of the minutes of the 281st BLTC meeting of TANGEDCOheld on 23.04.2018 vide Item No.4483 of CE/MM.

-----PROCEEDINGS:

“Administrative approval is hereby accorded for Cancelling the existing hiring

Page 47: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

47

orders of the vehicle sanctioned for the utilisation of Assistant Executive Engineer/Special Maintenance/Udumalpet and provision of vehicle to Assistant ExecutiveEngineer/Special Maintenance/Udumalpet by procurement of 1 No. New, Diesel driven,Force tempo traveller, T1, BSIV, 3700 WB 17D, PS, Non AC Vehicle at a cost ofRs.10.00 Lakhs (approximate) at GeM rates through GeM/GeM rates outside GeMwith waiver of EMD., SD and LD clauses or equivalent vehicle whichever is beneficialto TANGEDCO at GeM rates within the overall financial limit of Rs.10 lakhs.”

(By Order of the BLTC of TANGEDCO)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *Vehicle - Cancelling the existing hiring orders of the vehicle sanctioned for the utillsationof Assistant Executive Engineer/Special Maintenance/Mettur and Procurement of 1No. New, Diesel driven, Force tempo traveller, T1, BSIV, 3700 WB 17D, PS, Non ACVehicle - Approval Accorded.

(Technical Branch)

(Per) CMD TANGEDCO Proceedings No.177, Dated the 27th April 2018.Chithirai 14, Vilambi Varudam,Thiruvalluvar Aandu, 2049.

READ:

Extract of the minutes of the 281st BLTC meetingof TANGEDCO held on 23.04.2018 vide Item No.4487 ofCE/MM

-----PROCEEDINGS:

“Administrative approval is hereby accorded for Cancelling the existing hiringorders of the vehicle sanctioned for the utilisation of Assistant Executive Engineer/Special Maintenance/Mettur under control of Superintending Engineer/MEDC/Metturand provision of vehicle by procurement of 1 No. New, Diesel driven, Force tempotraveller, T1, BSIV, 3700 WB 17D, PS, Non AC Vehicle at a cost of Rs.10.00 Lakhs(approximate) at GeM rates through GeM/GeM rates outside GeM with waiver ofEMD., SD and LD clauses or equivalent vehicle whichever is beneficial to TANGEDCOat GeM rates within the overall financial limit of Rs.10 lakhs.”

(By Order of the BLTC of TANGEDCO)V.Gopalakrishnan,

Chief Engineer/Materials Management.

* * *

Page 48: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

Page No.

News & Notes (Part-I) 2

General Administration and Services (Part-II)1) Memo.No.021842/61/G.56/G.562/2018, (Adm.Br.) dated : 02.04.2018. 9

TANGEDCO - Part-Time conservancy Workers - Pay Band revised from Rs.1300-3000+Rs.300/- (Grade Pay) to Rs.4100-12500 with notional effect from01.12.2015 (Fixation on 01.01.2016) and monetary effect from 01.10.2017 -Pay Matrix - Orders issued.

2) Memo.(Per.) No.13475/A23/A231/2018-1, (BOSB) dated : 12.04.2018. 10Establishment – TANGEDCO - Creation of 27 posts for the year 2018-2019 for2x660 MW Udangudi Supercritical Thermal Power Project Stage-I for co-ordination, supervision and monitoring of power project and Captive Coal Jettyworks - Orders Issued - Amendment - Issued.

3) (Per.) (F.B.) TANGEDCO Proceedings No.10 (Adm.Br.) Dt.13.04.2018. 11Tamil Nadu Generation and Distribution Corporation Ltd - Settlement undersection 12 (3) of the Industrial Disputes Act, 1947 - Merger of Mazdoor postswith Field Assistant posts – Orders – Issued.

4) Memo.(Per.) No.14307/A18/A183/2018-1, (BOSB) dated : 13.04.2018. 12Revision of Pension/Family Pension relating to the employees who retired/diedwhile in service before 01.12.2015 Amendment - Issued.

5) (Per.) CMD TANGEDCO Proceedings No.74 (BOSB) Dt.17.04.2018. 14PENSION - Dearness Allowance to Pensioners and Family Pensioners Revisedrates of Dearness Allowance from 1st January, 2018 – Orders – Issued.

6) (Per.) CMD TANGEDCO Proceedings No.76 (BOSB) Dt.19.04.2018. 15Pension - Sanction of revised rates of Dearness Allowance to the Exgratiabeneficiaries of TANGEDCO – Orders – Issued.

7) Memo. No.17047/A3/A31/2018-1, (BOSB) dated : 20.04.2018. 16TANGEDCO - Deduction of donation to Trade Union - Contribution from membersof Central Organization of Tamil Nadu Electricity Employees towards deductionof donation from the revised pay payable in June 2018 – Orders Issued.

8) (Per.) FB TANGEDCO Proceedings No.14 (BOSB) Dt.23.04.2018. 16Establishment - TANGEDCO - Delegation of Powers - Sanction of estimate andexecution of supply, laying and maintenance works of LAN Cable for ComputerNetworks and Optical Fibre Cable (OFC) in Headquarters - Delegation of monetarypowers to Chief Engineer/Information Technology/Chennai Enhancement – Orders– Issued.

9) Memo. No.14980/A3/A31/2018-1, (BOSB) dated : 26.04.2018. 18TANGEDCO - Deduction of donation to Trade Union - Contribution from membersof Tamil Nadu Electricity Board Engineers’ Union towards deduction of specialdonation (in lieu of Wage Revision) from the revised pay payable in July 2018 –Orders issued.

10) Memo. No.21625/A22/A221/2018-1, (BOSB) dated : 30.04.2018. 18TANGEDCO - Implementation of a proper informant system - Payment of cashReward to the informants who give information about power theft etc. - Sanctionof amount – Orders issued.

Page 49: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

49

Finance (Part - III) (Cont.) Page No.11) (Per) CH TANTRANSCO Proceedings No.07 (Accts.Br.) Dt.03.04.2018. 20

TANTRANSCO - Financial assistance of REC for RTL of Additional loan ofRs.51776.22 lakhs - Transmission scheme under P:SI (Trans) category sanctionedby Rural Electrification Corporation Ltd., (REC Ltd.,) New Delhi - acceptance ofLoan - Approved by the Borrowing Committee - Orders - Issued.

12) (Per) CH TANTRANSCO Proceedings No.08 (Accts.Br.) Dt.20.04.2018. 22TANTRANSCO - Financial assistance of REC for RTL of Rs.5784.88 lakhs for 01no. - Transmission scheme under P:SI (Trans) category sanctioned by RuralElectrification Corporation Ltd., (REC Ltd.,) New Delhi - Acceptance of Loan -Approved by the Borrowing Committee - Orders - Issued.

Technical (Part - IV)13) (Per.) FB TANGEDCO Proceedings No.34, (Techl.Br.) Dt.03.04.2018. 25

TANGEDCO - MM I - Specification No. M 25/2017-2018 - Procurement of 7/3.15mm AAA Rabbit conductor for DDUGJY & agriculture - Schemes and regularworks - Placing of Orders - Approved.

14) Per. (FB) TANGEDCO Proceedings No.35, (Techl.Br.) Dt.03.04.2018. 25Procurement of 600 Kms of 11KV, 3x300 sq.mm UG XLPE Aluminium PowerCables - For conversion of existing HT lines in to UG cable in the extended areaof Chennai City with financial assistance from M/s. PFC (Ltd) and balance IPDSscheme works - placing of Orders - Approved.

15) (Per.) F.B. TANGEDCO Proceedings No.37, (Techl.Br.) Dt.03.04.2018. 26Gas Turbine Schemes - Valuthur Gas Turbine Power Station - Supply, installation& commissioning of Bently Nevada 3500 Temperature and Vibration Monitoringsystem for upgrading the existing 3300 system in Gas Booster Compressor #1,in Valuthur Gas Turbine Power Station/Phase-I by M/s. GE Oil & Gas India Pvt.Ltd., Pune, under single tender proprietory basis - Approved - Regarding.

16) Per. FB TANGEDCO Proceedings No.33, (Techl.Br.) Dt.03.04.2018. 27Mettur Thermal Power Station I - Unit IV - R&M of ESP inclusive of refurbishmentof the existing ESP and augmentation of additional ESP to achieve the desiredSPM level as per the revised Environmental norms - Under single Tender system/Proprietary basis- Proposal to place order on M/s. Bharat Heavy ElectricalsLtd., Chennai - Approval Accorded - Orders Issued - Regarding.

17) (Per.) F.B TANGEDCO Proceedings No.38, (Techl.Br.) Dt.04.04.2018. 27MM-II -e-Tender Specification No.M-06/2017-2018-Procurement of1050 Nos. of 63 KVA/22KV/433V Distribution Transformers Energy EfficientLevel-2 under Two Part Open Tender Rate Contract System - Award of PurchaseOrders - Approval -Accorded.

18) (Per.) F.B TANGEDCO Proceedings No.39, (Techl.Br.) Dt.04.04.2018. 28MM-II -e-Tender Specification No.M-19/2017-2018-Two Part Open TenderSystem - Procurement of 4500 Nos. of 100 KVA/22KV/433V Energy EfficientLevel-2 Distribution Transformers - Award of Purchase Orders - Approval -Accorded.

19) Rt. CMD TANGEDCO Proceedings No.15, (Techl.Br.) Dt.10.04.2018. 30TANGEDCO - Erode Region - Salem EDC - Theft of Transformer Oil - Write offproposal - Approved - Regarding.

20) Rt. CMD TANGEDCO Proceedings No.17, (Techl.Br.) Dt.19.04.2018. 31Coimbatore Region - Estimate for provision of one no. Compact Thermal ImageCamera for MRT Lab in Coimbatore Metro Electricity Distribution Circle -Administrative Approval - Orders - Issued.

Page 50: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

50

Technical (Contd...) Page No.

21) (Per.) CMD TANGEDCO Proceedings No.148, (Techl.Br.) Dt.19.04.2018. 31Vehicle - Procurement of 1 No. New, Diesel driven, mahindra Bolero plus, 9seater non AC BS IV, Power Steering vehicle for the use of Executive Engineer/MRT/Vellore towards replacement of Condemned Departmental Van bearingRegistration No.TN 23-D-4530 attached to AEE/MRT/Vellore under the controlof Superintending Engineer/Vellore Electricity Distribution Circle/Vellore-ApprovalAccorded.

22) (Per) CMD TANGEDCO Proceedings No.149, (Techl.Br.) Dt.19.04.2018. 32Vehicle - Procurement of 1 No. New, Diesel driven, Mahindra Bolero LX Power +2WD 7 Seater non AC BS IV with Power steering towards replacement of thecondemned Jeep bearing Regn.No.TN-41-H-9258 for the use of ExecutiveEngineer/O&M/Negamam and attached to AEE/O&M/Negamam under the controlof Superintending Engineer/Coimbatore (South) EDC/Coimbatore - ApprovalAccorded.

23) Per TANGEDCO Proceedings (CMD) No.150, (Techl.Br.) Dt.19.04.2018. 32MTPS-II (1x600MW) - ES circle - C&I Division - Inspection and Servicing ofDEH, MED & HP/LP Bypss system MOOG make servo valve during AOH 2018 -under single tender/proprietary/private sector - Administrative Approval -Accorded - Regarding.

24) Per TANGEDCO Proceedings (CMD) No.152, (Techl.Br.) Dt.19.04.2018. 33TTPS - ECHP I Division - Proposal for carrying out dismantling and devolutionof 6 Nos. Travelling Hoppers and Conveyor - 13 and its structures situated onthe existing Coal Jetty-I of TTPS due to upgradation of Coal Jetty-I by M/s.VOC Port Trust/Tuticorin - under open e-tender system - Administrative ApprovalAccorded.

25) Per TANGEDCO Proceedings (CMD) No.153, (Techl.Br.) Dt.19.04.2018. 33TTPS - Procurement of One No. new bull dozer as replacement for the CoalHandling System of Tuticorin Thermal Power Station under open e-tender system- Administrative Approval - Accorded.

26) Per TANGEDCO Proceedings (CMD) No.154, (Techl.Br.) Dt.19.04.2018. 34TTPS - Electrical System - MRT-I Division - Replacement of existingelectromechanical type bus bar differential relays with latest version fullynumerical based high impedance differential relays for bus bar protection atSwitchyard I & II of TTPS - under open e-tender system - AdministrativeApproval Accorded.

27) (Per) TANGEDCO Proceedings (CMD) No.155, (Techl.Br.) Dt.19.04.2018. 34MTPS-I 210 MW LMW Design Turbine - Capital overhaul of Unit III - Turbineand Generator - Administrative Approval Accorded.

28) (Rt.) CMD TANGEDCO Proceedings No.18, (Techl.Br.) Dt.20.04.2018. 35Hydro - Tirunelveli Generation Circle - Maintenance of Water Supplyarrangements including cleaning of water tank and operation of Pump at filterhouse at Papanasam Lower Camp and maintenance of Sanitationarrangements including cleaning of toilet, collection chambers, sewage line atServalar Camp for a period of one year from the date of utilisation -Administrative Approval and Technical Sanction Accorded - Inclusion ofEmployees Provident Fund and miscellaneous Provisions (EPF & MP) andEmployees State Insurance (ESI) as per the directions of the AdministrativeBranch - Revision in the Estimate cost - Revised Administrative Approval -Accorded.

Page 51: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

51

Technical (Contd...) Page No.29) (Rt.) CMD TANGEDCO Proceedings No.19, (Techl.Br.) Dt.20.04.2018. 36

Hydro - Tirunelveli Generation Circle - Maintenance of Periodical sweeping andcleaning the open drains excluding water supply and sanitation arrangementsat Papanasam Lower Camp, Maintenance of Sanitation arrangements includingcleaning of toilet, collection chambers, sewage line at Papanasam LowerCamp, and Maintenance of periodical Sweeping and Cleaning the Open Drainsexcluding water supply and sanitation works at Servalar Camp for a period ofone year from the date of utilisation - Administrative Approval and TechnicalSanction - Accorded - Inclusion of Employees Provident Fund and MiscellaneousProvisions (EPF & MP) and Employees State Insurance (ESI) as per the directionsof the Administrative Branch - Revision in the Estimate cost - RevisedAdministrative Approval - Accorded.

30) Per (CMD) TANGEDCO Proceedings No.161, (Techl.Br.) Dt.20.04.2018. 37TANGEDCO - World bank funded Dam Rehabilitation and Improvement project(DRIP) - Providing Technical Assistance service to assist the AEEs/Civil inexecution of works, supervision, monitoring of the progress of works, takinglevel and measurements etc., for DRIP works with Graduate Engineers (BE/Civilpassed), for the civil sub-divisions of Papanasam and Kundah under the controlof Superintending Engineer/Civil/DRIP/Madurai - In Principle Approval Accorded- Regarding.

31) Per TANGEDCO Proceedings (CMD) No.164, (Techl.Br.) Dt.24.04.2018. 37TTPS - ICHP Division - Proposal for carrying out condemnation and dismantlingof unused & Idle Conveyor 29B and its structures at TTPS - under open e-tender system - Administrative Approval Accorded.

32) (Per) CMD TANGEDCO Proceedings No.165, (Techl.Br.) Dt.24.04.2018. 38Vehicle - Procurement of 1 No. New, Diesel driven, Force tempo traveller, T1,BSIV, 3700 WB 17D, PS, Non AC Vehicle for the use of AEE/Special Maintenance/South/Coimbatore towards replacement of Condemned Departmental lorry(TATABENZ) bearing Registration No: TDE 4273 under the control ofSuperintending Engineer/CEDC/South/Coimbatore - Approval Accorded.

33) (Per) CMD TANGEDCO Proceedings No.169, (Techl.Br.) Dt.24.04.2018. 38TANGEDCO - IT Wing - Provision of Broadband internet connection to the ChiefEngineer/Civil ETPS Exp. Proj. & NCTPS Stage - III for the official use at NCTPSstage-III site office building - Approval Accorded.

34) (Per) CMD TANGEDCO Proceedings No.170, (Techl.Br.) Dt.24.04.2018. 39TANGEDCO - Provision of non-OYT Landline connection for 25 Nos. of ExecutiveEngineer and provision of Broadband internet connection to all 36 Nos. ofExecutive Engineer offices in General Construction Circle under the control ofCE/Transmission Projects - I & II those who are involved in e-tender/e-procurement process exclusively - Approval Accorded.

35) (Per) FB TANGEDCO Proceedings No.40, (Techl.Br.) Dt.25.04.2018. 40TANGEDCO - NCES - Establishment of Co-generation plants in 12 Nos.Co-operative and public sector sugar mills in Tamil Nadu - Releasing of 10%retention amount for completed and operational Sugar mill Modernisation projectsat 7 sugar mills in a phased manner - Waiver of liquidated damages (L.D)clause as a special case till completion of all Co-generation Projects along withSugar Mill Modernisation in order to speed up the Co-generation Projects alongwith sugar mill modernisation at Arignar Anna, Tanjore and Perambalur - ApprovalAccorded.

36) (Rt.) CMD TANGEDCO Proceedings No.20, (Techl.Br.) Dt.26.04.2018. 41Hydro - Tirunelveli Generation Circle - Improvement works to the 6G quarters(6 Tenements) at Thekkadi Camp by replacing the existing damaged GI Sheet

Page 52: TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN APRIL - 2018tneb.tnebnet.org/test1/Gazette/YearWisePDF/2018/Apr 18.pdf · Power blance under SWAP 72.000 V TOTAL (TNEB Own Gen+Purchase +

52

roofing by galvanium colour coding sheet and allied Civil works - Administrativeapproval and Technical Sanction accorded - Inclusion of employees ProvidentFund and Miscellaneous Provisions (EPF & MP) and Employees State Insurance(ESI) as per the directions of the Administrative Branch - Revision in theExtimate cost - Revision Administrative Approval - Accorded.

37) (Rt.) CMD TANGEDCO Proceedings No.21, (Techl.Br.) Dt.26.04.2018. 42Hydro - Generation Circle Tirunelveli - Maintenance of Sanitation arrangementsincluding cleaning of Toilets, Sewage Line, Collection chambers and Open drainsincluding periodical sweeping, cleaning of drinking water collection tank andWater diversion bund at Suruliar Lower Camp & Periyar Lower Camp andMaintenance of sanitation arrangements including cleaning of toilet, sewageline, collection chambers and Open drains including periodical sweeping, cleaningof drinking water colllection tank and Water diversion bund, maintenance ofHighwavys, Manalar and Eravangalar Dam by cleaning of Gallery, Sweeping atthe top of the Dam and taking dam water levels daily at Eravangalar Dam isSuruliar Upper Camp for a period of one year from the date of utilisation forthe year 2018-2019 - Administrative Approval - Accorded.

38) (Rt.) CMD TANGEDCO Proceedings No.22, (Techl.Br.) Dt.26.04.2018. 43Hydro - Tirunelveli Generation Circle - Maintenance of Kodayar Lower Campand Kodayar Upper Camp by periodical cleaning of collection chambers, branchsewer line, open drains, doors and windows repair works, toilet cleaning,maintenance of water supply arrangements, Inspection Bungalow premises,etc., for a period of one year from the date of utilisation for the year 2018-2019 - Administrative Approval - Accorded.

39) (Rt.) CMD TANGEDCO Proceedings No.23, (Techl.Br.) Dt.26.04.2018. 44Hydro - Generation Circle Erode - Cleaning, Sweeping and Maintenance ofwater supply and sanitation arrangements in the Lower Mettur Barrage PowerHouse 3 and Camp area at Kuthiraikkalmedu and Lower Mettur BarragePower House 4 and Camp area at Urachikottai for a period of one Year fromthe date of utilisation for the year 2018-2019 - Administrative Approval -Accorded.

40) Lr.No.SE/RE&I(D)/EE/RE/A2/F.TAHDCO/D.424/2018, (Techl.Br.)Dt.26.04.2018. 44

Electricity - Effecting of agricultural service connections under Fast TrackSupply scheme to Scheduled Tribe farmers - List of 45 beneficiaries based onG.O. 251 dated 09.10.2017 for the year 2017-2018 - Communicated- Regarding.

41) (Per) CMD TANGEDCO Proceedings No.175, (Techl.Br.) Dt.26.04.2018. 46TANGEDCO - IT Wing - Provision of New Desktop Computers for the existingThin client users and replacement of laptop for CMD office and computers forIT wing - Approval Accorded.

42) (Per) CMD TANGEDCO Proceedings No.176, (Techl.Br.) Dt.27.04.2018. 46Vehicle - Cancelling the existing hiring orders of the vehicle sanctioned for theutillsation of Assistant Executive Engineer/Special Maintenance/Udumalpet andProcurement of 1 No. New, Diesel driven, Force tempo traveller, T1, BSIV, 3700WB 17D, PS, Non AC Vehicle - Approval Accorded.

43) (Per) CMD TANGEDCO Proceedings No.177, (Techl.Br.) Dt.27.04.2018. 47Vehicle - Cancelling the existing hiring orders of the vehicle sanctioned for theutillsation of Assistant Executive Engineer/Special Maintenance/Mettur andProcurement of 1 No. New, Diesel driven, Force tempo traveller, T1, BSIV, 3700WB 17D, PS, Non AC Vehicle - Approval Accorded.

* * *

Technical (Contd...) Page No.

TANGEDCO Press, I.C.F. Colony, Chennai-38. Copies 6466, 12/2018.