To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout the presentation to see a definition. Click to view reference figures. For further exploration, links to selected Web sites are included. Click under this banner throughout the presentation. Toolkit 3 Home Page – Welcome!

Upload: keanu-harwin

Post on 15-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys.

Move your mouse over the key terms throughout the presentation to see a definition.

Click to view reference figures.

For further exploration, links to selected Web sites are included. Click under this banner throughout the presentation.

Toolkit 3 Home Page – Welcome!

Page 2: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

2

Toolkit Objectives

Define economic feasibility Classify costs and benefits into various

categories, including tangible or intangible, direct or indirect, fixed or variable, and developmental or operational

Understand chargeback methods and how they are used

Page 3: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

3

Toolkit Objectives

Use payback analysis to calculate the length of time that it takes for a project to pay for itself

Use return on investment analysis to measure a project’s profitability

Use present value analysis to determine the value of a future project measured in current dollars

Page 4: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

4

Introduction

You need to know how to calculate costs and benefits when you conduct preliminary investigations, evaluate IT projects, and make recommendations to management

Financial analysis tools are important throughout the systems development life cycle

Page 5: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

5

Describing Costs and Benefits

You must review a project’s costs and benefits at the end of each SDLC phase so management can decide whether or not to continue the project

Economic feasibility Total cost of ownership (TCO)

Figure TK 3-2

Figure TK 3-3

Figure TK 3-4

Page 6: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

6

Describing Costs and Benefits

Cost Classifications– Tangible costs– Intangible costs– Direct costs– Indirect costs or overhead expenses

Page 7: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

7

Describing Costs and Benefits

Cost Classifications– Fixed costs– Variable costs– Developmental costs– Operational costs

Page 8: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

8

Describing Costs and Benefits

Managing Information Systems Costs and Changes

– Chargeback method

1. No charge method• Cost center

2. Fixed charge method• Profit center

Page 9: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

9

Describing Costs and Benefits

Managing Information Systems Costs and Changes

3. Variable charge method based on resource usage• Resource allocation

• Connect time

• Server processing time

4. Variable charge method based on volume

Page 10: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

10

Describing Costs and Benefits

Benefit Classification

– You must classify the benefits that the company expects from a project

– Like costs, benefits can be classified as tangible or intangible, fixed or variable, and direct or indirect

– Positive benefits

– Cost-avoidance benefits

Page 11: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

11

Cost-Benefit Analysis

Cost-benefit analysis Many cost-benefit analysis techniques exist Three most common methods: payback

analysis, return on investment analysis, and present value analysis

The objective is the same: to provide reliable information for making decisions

Page 12: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

12

Cost-Benefit Analysis

Payback Analysis

– Payback period

– Carry out the following steps1. Determine the initial development cost of the

system

2. Estimate annual benefits

3. Determine annual operating costs

4. Find the payback period

For more information aboutPayback Analysis, visit scsite.com/sad7e/more, locate Toolkit Part 3 and then the Payback Analysis link.

Page 13: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

13

Cost-Benefit Analysis

Payback Analysis

– Economically useful life

– You calculate the time it takes for the accumulated benefits of an information system to equal the accumulated costs of developing and operating the system

Figure TK 3-5

Figure TK 3-6

Page 14: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

14

Cost-Benefit Analysis

Payback Analysis

– Some managers are critical of it because it places all the emphasis on early costs and benefits and ignores the benefits received after the payback period

– Even with its drawbacks, payback analysis is a widely used tool

Figure TK 3-7

Page 15: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

15

Cost-Benefit Analysis

Using a Spreadsheet to Compute Payback Analysis

– First step is to design the worksheet and label the rows and columns

– After entering the cost and benefit data for each year, you enter the formulas

– You will need a formula to display cumulative totals, year by year

Figure TK 3-8 Figure TK 3-9

Page 16: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

16

Cost-Benefit Analysis

Return on Investment Analysis

ROI = (total benefits – total costs)/ total costs

– Projects must meet or exceed a minimum ROI

– You can also use ROI for ranking projects

– Measures the overall rate of return for the total period, and annual return rates can vary considerably

– Ignores the timing of costs and benefits

Figure TK 3-10

For more information aboutReturn on Investment Analysis, visit scsite.com/sad7e/more, locate Toolkit Part 3 and then the Return on Investment Analysis link.

Page 17: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

17

Cost-Benefit Analysis

Using a Spreadsheet to Compute ROI

– Use cumulative columns but you also will need two overall totals (one for costs and one for benefits)

– The last step is to add a formula to calculate the ROI percentage rate

– If your data changes, you can modify your worksheet and calculate a new result instantly

Figure TK 3-11

Page 18: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

18

Cost-Benefit Analysis

Present Value Analysis

– Time value of money

– Present value analysis

– Present value

– Present value tables

– Net present value (NPV)

Figure TK 3-12

Figure TK 3-13

For more information aboutPresent Value Analysis, visit scsite.com/sad7e/more, locate Toolkit Part 3 and then the Present Value Analysis link.

Page 19: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

19

Cost-Benefit Analysis

Present Value Analysis

– In theory, any project with a positive NPV is economically feasible

– Can also be used to compare and rank projects

– Provides solutions to the shortcomings of payback analysis and return on investment analysis

Figure TK 3-14

For more information aboutTime Value, visit scsite.com/sad7e/more, locate Toolkit Part 3 and then the Time Value link.

Page 20: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

20

Cost-Benefit Analysis

Using a Spreadsheet to Calculate Present Value

– There is one more way to use a worksheet in present value analysis

– Most spreadsheet programs include a built-in present value function that calculates present value and other time-adjusted variable factors

Figure TK 3-15

Page 21: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

21

Toolkit Summary

Must be concerned with economic feasibility throughout the SDLC

Must classify project costs as tangible or intangible, direct or indirect, fixed or variable, and developmental or operational

Every company must decide how to charge or allocate information systems costs and the chargeback method

Page 22: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

22

Toolkit Summary

You must also classify system benefits Present value analysis adjusts the value of

future costs and benefits to account for the time value of money

Many companies use present value analysis to evaluate and rank projects

Page 23: To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout

Systems Analysis & Design

7th Edition

End Toolkit 3