Date: 10.11.2016 To, The Director, Infrastructure and Miscellaneous Projects & CRZ Indira Paryavaran Bhavan Jor Bagh Road, New Delhi ‐ 110 003 Sub: Application for Amendment and Expansion in EC for Residential Project on sub plot ‘D’, bearing C. S. No. 7/1895 of Byculla division off Keshavrao Khadye Marg, Mahalaxmi, Mumbai, Maharashtra. Ref: EC received vide letter No. SEAC‐2015/CR‐229/TC‐1 dt. 31.12.2015 Dear Sir, We have obtained prior Environmental Clearance vide letter No. SEAC‐2015/CR‐229/TC‐ 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’, bearing C. S. No. 7/1895 of Byculla Division, off Keshavrao Khadye Marg, Mahalaxmi, Mumbai, Maharashtra. The EC was obtained for plot area of 14,301.11 m 2 , FSI Area (including Fungible) of 24,683.38 m 2 and Total Construction area of 57,500 m 2 . The construction work is yet to start on site. Now, we would like to amend the Environmental Clearance due to change in planning. Due to this amendment, total construction area is increased by 6800 m 2 . Therefore total construction area shall be 64,300 m 2 from earlier granted EC is 57,500 m 2 .

Upload: others

Post on 24-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,

Date:10.11.2016

To,TheDirector,InfrastructureandMiscellaneousProjects&CRZIndiraParyavaranBhavanJorBaghRoad,NewDelhi‐110003

Sub: ApplicationforAmendmentandExpansioninECforResidentialProjectonsub

plot ‘D’,bearingC.S.No.7/1895ofByculladivisionoffKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.

Ref: ECreceivedvideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015DearSir,WehaveobtainedpriorEnvironmentalClearancevideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015, forourResidentialprojectonSub‐plot ‘D’,bearingC.S.No.7/1895ofBycullaDivision,offKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.

TheECwasobtainedforplotareaof14,301.11m2,FSIArea(includingFungible)of24,683.38m2andTotalConstructionareaof57,500m2.

Theconstructionworkisyettostartonsite.

Now,wewouldliketoamendtheEnvironmentalClearanceduetochangein

planning.

Duetothisamendment,totalconstructionareaisincreasedby6800m2.Therefore

totalconstructionareashallbe64,300m2fromearliergrantedECis57,500m2.

Page 2: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,

ComparativeStatementisasbelow:Sr.No. ProjectDetails EarlierEC ProposedAmendment

1 PlotArea 14,301.11m2 14,301.11m2

2 Permissible FSI includingfungible

Notmentioned 24,918.54m2

3 FSIAreaProposed(includingFungible)

24,683.38m2 24,650.92m2

4 NONFSIArea 32,816.62m2 39,649.08m2

5 TotalConstructionArea 57,500m2 64,300m2

6 Buildingconfiguration Part Basement forservices+ Gr (P1) +7Podium (P2 – P8) + 38Upper floors (including2Fire check /3 servicefloors)

Part Basement for services+Gr(P1)+7Podium(P2–P8)+Stilt (AmenityLevel–1)+AmenityLevel–2+40Upperfloors(33habitablefloors+3MEP Floors + 2 Fire CheckFloors + 2 StructuraloutriggerFloor)

7 Tenement 61Nos. 61Nos.

8 Waterrequirement 43KLD 43KLD

9 Sewagegeneration 40KLD 40KLD

10 STPCapacity 50KLD 50KLD

11 SolidWastegeneration 159kg/day 159kg/day

12 Parking 191Nos 191Nos.

It canbeseen fromthecomparativestatement that there isnochange inplotareaandthereismarginalincreaseinconstructionarea.

WeareenclosingherewithamendedplanoftheprojectandForm1&1A.“AsSEACII(MMR)&SEIAAMaharashtratenureisoverandthereisnocommitteeforappraisalofprojects”we request you sir to appraiseourproject andgrantus theEnvironmentalClearance.Thankingyou,Yoursfaithfully,ForTheModernIndiaLtd.

ProjectProponentEncl: 1.Form1&1A 2.EarlierEC

Page 3: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 4: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 5: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 6: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 7: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 8: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 9: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 10: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 11: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 12: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 13: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,
Page 14: To, The Director, and Miscellaneous Projects CRZ Indira ...environmentclearance.nic.in/writereaddata/online/... · 1 dt. 31.12.2015, for our Residential project on Sub‐plot ‘D’,