    I. DIRECT COST

    NO. No. UNIT

    P PREPARATION WORKS

    PREPARATION WORKS

    1 TRANSFER TOWER (TT-1) 1 Earth Work M3

    CIVIL WORKS

    STEEL WORKS 2 Lean Concrete M3

    2 TRANSFER TOWER (TT-3)

    CIVIL WORKS 3 Soil Filling M3

    STEEL WORKS3 TRANSFER TOWER (TT-4) 4 Grade Slab M3

    CIVIL WORKS

    STEEL WORKS 5 Concrete M3

    4 BELT CONVEYOR (BC-RH.01)

    CIVIL WORKS 6 Deform bar KG

    STEEL WORKS (dia. < 14 mm)

    5 BELT CONVEYOR (BC-RH.03) 7 Deform bar KG

    CIVIL WORKS (dia. 16-122mm)

    STEEL WORKS 8 Deform bar KG

    6 BELT CONVEYOR (BC-RH.03 & BC-03.04C) (dia. > 24 mm)

    CIVIL WORKS

    STEEL WORKS

    7 BELT CONVEYOR (BC-03.04A) 1 Besi INP KG

    CIVIL WORKS

    STEEL WORKS 2 Besi L KG

    8 BELT CONVEYOR (BC-03.04B)

    CIVIL WORKS 3 Besi UNP KG

    STEEL WORKS

    9 MAGENETIC SEPARATOR 4 Besi H KG

    CIVIL WORKS

    STEEL WORKS 5 Pipe KG

    10 CRUSHER HOUSE

    CIVIL WORKS 6 I Colums KG

    STEEL WORKS (Ex Germany)

    11 TUNNEL 7 U Box KG

    CIVIL WORKS (Ex Germany)

    12 STACKER RECLAIMER SHED - (PRESENT) 8 Besi 2L KG

    CIVIL WORKS (Ex Japanese)

    STEEL WORKS 9 Corrgtd. Steel KG

    13 STACKER RECLAIMER SHED - (FUTURE) A-750

    10 Corrgtd. Steel M2

    A. TOTAL DIRECT COST A-680

    II. INDIRECT COST

    NO TARGET PRICE TO BE ISSUED :

    1 PROJECT MANAGEMENT See attached

    2 INSURANCE (CONSTRUCTION ALL RISK)

    3 BIAYA BANK `

    A. JAMINAN PELAKSANAAN (5%) (1 TAHUN) NET MARGIN :

    B. JAMINAN PEMELIHARAAN (5%) (1 TAHUN)

    4 OVERHEAD HEAD OFFICE 2% direct cost

    5 CONTINGENCY (ESTIMATED 1%)

    6 TARGET NET MARGIN 10%

    7 PPH 3%

    B. TOTAL INDIRECT COSTTOTAL PROJECT COST (A+B)

    No ITEM UNIT No. ITEM UNIT

    1 Earth Work M3 1 Besi INP KG

    2 Lean Concrete M3 2 Besi L KG

    3 Soil Filling M3 3 Besi UNP KG

    4 Grade Slab M3 4 Besi H KG

    5 Concrete M3 5 Pipe KG

    6 Deform bar KG 6 Corr. Steel M2

    7 I Column M2

    6 Besi U Box M2

    6 Besi 2L M2

    530,184,237

    ITEM

    995,000,000

    995,000,000

    TOTAL VOL.

    CONCRETE

    STEEL STRUCTURE

    DESCRIPTION VALUE (Rp) REMAKRS

    SUB TOTAL (Rp) TOTAL I (Rp) TOTAL II (Rp)DESCRIPTION

    742,141,635

    112,228,512

    90,661,731

    629,913,123

    1,580,614,964

    297,471,466

    439,522,506

    298,067,275

    1,283,143,499

    227,671,130

    3,191,385,376

    349,197,917

    70,396,145

    4,434,579,658

    195,239,406

    2,842,187,460

    479,742,261

    437,188,737

    4,239,340,252

    42,553,524

    138,432,850

    1,433,778,565

    109,207,506

    35,948,672

    1,295,345,716

    73,258,834

    4,066,399,605

    2,854,849,765

    1,211,549,840

    449,536,565

    449,536,565

    22,869,122,706

    36,618,888,238

    11,429,921,828

    13,749,765,532

    167,000500,000

    250,000

    500,000

    800,000

    8,300

    267,200

    1,577

    1,780 3,115 890

    BASIC UNIT PRICE FOR STEEL STRUCTURE (Rp)

    MAT'L ERECTION

    115,500

    183,567

    7,309

    163,381

    425,111

    151,986

    9,000 1,780 3,120 890

    MAT'L

    #VALUE!

    11,217

    344

    4

    39

    23

    9,603

    16,390

    2,491,061

    2,580

    11,250 2,500 3,325 450

    85,000 25,500

    #VALUE!

    9,000 1,780 3,120 890

    2,635

    6,385

    8,750 1,780 3,108 890

    9,500 1,780 3,120 890

    8,750 1,780 3,108 890

    79,637,512,348

    BASIC UNIT PRICE FOR CONCRETE WORK (Rp)

    9,000 1,780 3,120 890

    FABR. ERECTION PAINT

    8,900

    6,635,944,771

    2,319,539,195

    0.20%

    0.10%

    0.10%

    13,278,064,636

    132,718,895

    99,539,172

    99,539,172

    1,327,188,954

    663,594,477

    SUMMARY RENCANA ANGGARAN PROYEK (RAP)

    TOTAL QUANTITY FOR MAIN MATERIAL

    79,000,000,000Rp

    9.07%

    Trass and Limestone Handling System PROJECT - CITEUREUP

    167,000

    66,359,447,712

    2,000,000,000

  • 8/22/2019 to vendor

    2/38

    Heidelberg Technology Center

    Jakarta - Indonesia

    Project :Trass and Limestone Handling System

    at Indocement, Citeureup - West Java

    Doc no. :

    Doc title :Bill of Item - Trass and Limestone Handling System Project

    BILL NO. PW PREPARATION WORKS

    UNIT RATE

    (RP)

    1.00 MOBILIZATION / DEMOBILIZATION

    1.01 Mobilization / demobilization ls 1.0 75,000,000

    2.00 TEMPORARY OFFICE AND STORAGE

    2.01 Contractor's site office and storage ls 1.0 180,000,000

    3.00 ELECTRIC POWER AND WATER SUPPLY

    3.01 Electric power for working & lighting ls 1.0 100,000,000

    3.02 Clean water supply for working ( connection fee only) ls 1.0 10,000,000

    4.00 AS BUILT DRAWINGS & FINAL REPORT

    4.01 Preparation of Printed as built drawings and files in Auto CAD for nos 3.0 10,000,000

    4.02 Preparation of final report set 3.0 10,000,000

    5.00 SETTING OUT

    5.01 Setting out during construction period ls 1.0 30,000,000

    6.00 INSURANCE

    6.01 Insurance to person ls 1.0 50,000,000

    7.00 SAFETY AND SECURITY

    7.01 Safety and security during construction period ls 1.0 70,000,000

    8.00 LIFTING EQUIPMENT FOR ERECTION PURPOSE

    8.01 Lifting equipment during construction period

    1) Crane for erection of steel structures ls 1.0 380,000,000

    9.00 TEMPORARY FENCE

    9.01 Temporary fencing during construction period, safety marking and ls 1.0 40,000,000

    NO DESCRIPTION UNIT QTY

  • 8/22/2019 to vendor

    3/38

  • 8/22/2019 to vendor

    4/38

    06-11-2012

    00

    AMOUNT SUB TOTAL

    (RP) (RP)

    75,000,000

    75,000,000

    180,000,000

    180,000,000

    110,000,000

    100,000,000

    10,000,000

    60,000,000

    30,000,000

    30,000,000

    30,000,000

    30,000,000

    50,000,000

    50,000,000

    70,000,000

    70,000,000

    380,000,000

    380,000,000

    40,000,000

    40,000,000

  • 8/22/2019 to vendor

    5/38

    995,000,000

    80,518,027,053

    995,000,000

  • 8/22/2019 to vendor

    6/38

    Doc no. :

    Doc titl : Bill of Item - Trass and Limestone Handling System Project -Concrete Works 1 1 1 1

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    1 CONCRETE WORKS 46

    1

    1). Earth work excavation under Pile cap m3 26 - 75,000 - 7,500 82,5002). Drilling of Piles m 120 - - - - -

    3). Piles - M25 m3 34 - - - - -

    4). Lean concrete m3 1 500,000 150,000 12,500 4,500 667,000

    5). Pile cap - M40 m3 13 800,000 240,000 20,000 7,200 1,067,200

    6). Plinth beams - M40 m3 2 800,000 240,000 20,000 7,200 1,067,200

    7). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    8). Soil filling under grade slab m3 10 250,000 65,000 - 6,500 250,000

    9). Grade slab - M12.5 m3 6 500,000 150,000 12,500 4,500 667,000

    10). VGTU - M40 m3 12 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS

    2

    1). TT-1

    8mm dia. kg 570 8,300 830 498 249 9,877

    10mm dia. kg 650 8,300 830 498 249 9,877

    16mm dia. kg 1,000 8,300 830 498 249 9,877

    19mm dia. kg 4,050 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3 10,000,000

    1) Type - I (400X400) nos 4 800,000 250,000 20,000 6,250 1,076,250

    2) Type - II (200X200) nos 8 200,000 250,000 5,000 6,250 461,250

    For Shear Key

    1) Type - I (250X250X250) nos 4 156,250 250,000 3,906 6,250 416,406

    Sub Total

    BILL NO. 2 - E12C058 - 650 - TRANSFER TOWER - 3

    1 CONCRETE WORKS

    1

    1). Earth work excavation under Pile cap m3 26 - - - - -

    2). Drilling of Piles m 120 - - - - -

    3). Piles - M25 m3 34 - - - - -

    4). Lean concrete m3 1 500,000 150,000 12,500 4,500 667,000

    5). Pile cap - M40 m3 13 800,000 240,000 20,000 7,200 1,067,200

    6). Plinth beams - M40 m3 3 800,000 240,000 20,000 7,200 1,067,200

    7). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    9). Grade slab - M12.5 m3 6 500,000 150,000 12,500 4,500 667,000

    10). VGTU - M40 m3 6 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS

    2

    1). TT-3

    8mm dia. kg 570 8,300 830 498 249 9,877

    10mm dia. kg 700 8,300 830 498 249 9,877

    16mm dia. kg 1,100 8,300 830 498 249 9,877

    19mm dia. kg 4,050 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (400X400) nos 4 800,000 250,000 20,000 6,250 1,076,250

    2) Type - II (200X200) nos 4 200,000 250,000 5,000 6,250 461,250

    For Shear Key

    1) Type - I (250X250X250) nos 4 156,250 250,000 3,906 6,250 416,406

    Sub Total

    BILL NO. 3 - E12C058 - 650 - TRANSFER TOWER - 4

    Total Unit P

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M12.5,M25, M40 acc. to PBI '71 'b

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M12.5,M25, M40 acc. to PBI '71 'b

    High tensile steel deform bar reinforcement to concrete

    DESCRIPTIONNO. UNIT Q'ty

    Unit Price

    033671.xls.ms_office 6 - 38

  • 8/22/2019 to vendor

    7/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    1 CONCRETE WORKS

    1

    1). Earth work excavation under Pile cap m3 67 - - - - -

    2). Drilling of Piles m 170 - - - - -

    3). Piles - M25 m3 59 - - - - -

    4). Lean concrete m3 2 500,000 150,000 12,500 4,500 667,0005). Pile cap - M40 m3 92 800,000 240,000 20,000 7,200 1,067,200

    6). Plinth beams - M40 m3 2 800,000 240,000 20,000 7,200 1,067,200

    7). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    8). Tie Beams - M40 m3 17 800,000 240,000 20,000 7,200 1,067,200

    9). Soil filling under grade slab m3 29 250,000 65,000 - 6,500 250,000

    10). Grade slab - M12.5 m3 11 500,000 150,000 12,500 4,500 667,000

    11). VGTU - M40 m3 10 - - - - -

    2 REINFORCING STEEL WORKS 15,020

    2

    1). TT-4

    8mm dia. kg 990 8,300 830 498 249 9,87710mm dia. kg 3,000 8,300 830 498 249 9,877

    13mm dia. kg 250 8,300 830 498 249 9,877

    16mm dia. kg 2,000 8,300 830 498 249 9,877

    19mm dia. kg 7,080 8,300 830 498 249 9,877

    22mm dia. kg 1,100 8,300 830 498 249 9,877

    25mm dia. kg 600 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (500X500) nos 4 375,000 250,000 5,000 6,250 636,250

    2) Type - II (400X400) nos 2 800,000 250,000 20,000 6,250 1,076,250

    3) Type - III (200X200) nos 8 200,000 250,000 5,000 6,250 461,250For Shear Key

    1) Type - I (250X250X250) nos 6 156,250 250,000 3,906 6,250 416,406

    Sub Total

    BILL NO. 4 - E12C058 - 650 - BELT CONVEYOR (BC-RH.01)

    1 CONCRETE WORKS

    1

    1). Earth work excavation under Pile cap m3 14 - - - - -

    2). Drilling of Piles m 80 - - - - -

    3). Piles - M25 m3 23 - - - - -4). Pile cap - M40 m3 6 800,000 240,000 20,000 7,200 1,067,200

    5). Plinth beams - M40 m3 0 800,000 240,000 20,000 7,200 1,067,200

    6). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS 5,680

    2

    1). BC-RH.01

    8mm dia. kg 570 8,300 830 498 249 9,877

    10mm dia. kg 160 8,300 830 498 249 9,877

    16mm dia. kg 900 8,300 830 498 249 9,877

    19mm dia. kg 4,050 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (400X400) nos 4 800,000 250,000 20,000 6,250 1,076,250

    For Shear Key

    1) Type - I (250X250X250) nos 4 156,250 250,000 3,906 6,250 416,406

    Sub Total

    BILL NO. 5 - E12C058 - 650 - BELT CONVEYOR (BC-RH.03)

    Structural concrete M25, M40 acc. to PBI '71 'bk = 250

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M12.5, M25, M40 acc. to PBI '71 'b

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    033671.xls.ms_office 7 - 38

  • 8/22/2019 to vendor

    8/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    1 CONCRETE WORKS 81

    1

    1). Earth work excavation under Pile cap m3 79 - 75,000 - 7,500 82,500

    2). Drilling of Piles m 440 - - - - -

    3). Piles - M25 m3 124 - - - - -

    4). Pile cap - M40 m3 71 800,000 240,000 20,000 7,200 1,067,200

    5). Plinth beams - M40 m3 5 800,000 240,000 20,000 7,200 1,067,200

    6). Pedestals - M40 m3 5 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS

    2

    1). BC-RH.03

    8mm dia. kg 2,080 8,300 830 498 249 9,877

    10mm dia. kg 1,200 8,300 830 498 249 9,877

    16mm dia. kg 4,550 8,300 830 498 249 9,877

    19mm dia. kg 14,900 8,300 830 498 249 9,877

    22mm dia. kg 580 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (500X500) nos 16 375,000 250,000 5,000 6,250 636,250

    1) Type - II (400X400) nos 6 800,000 250,000 20,000 6,250 1,076,250

    For Shear Key

    1) Type - I (250X250X250) nos 22 156,250 250,000 3,906 6,250 416,406

    Sub Total

    1 CONCRETE WORKS 27

    1

    1). Earth work excavation under Pile cap m3 43 - 75,000 - 7,500 82,500

    2). Drilling of Piles m 240 - - - - -

    3). Piles - M25 m3 68 - - - - -

    4). Pile cap - M40 m3 19 800,000 240,000 20,000 7,200 1,067,200

    5). Plinth beams - M40 m3 5 800,000 240,000 20,000 7,200 1,067,200

    6). Pedestals - M40 m3 3 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS

    2

    1). BC-RH.03 &BC-03.04C

    8mm dia. kg 1,130 8,300 830 498 249 9,877

    10mm dia. kg 1,600 8,300 830 498 249 9,877

    16mm dia. kg 3,000 8,300 830 498 249 9,877

    19mm dia. kg 8,380 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (500X500) nos 22 375,000 250,000 5,000 6,250 636,250

    For Shear Key

    1) Type - I (250X250X250) nos 22 156,250 250,000 3,906 6,250 416,406

    Sub Total

    BILL NO. 7 - E12C058 - 650 - BELT CONVEYOR (BC-03.04A)

    1 CONCRETE WORKS 8

    1

    1). Earth work excavation under Pile cap m3 14 - 75,000 - 7,500 82,500

    2). Drilling of Piles m 80 - - - - -

    3). Piles - M25 m3 23 - - - - -

    4). Pile cap - M40 m3 6 800,000 240,000 20,000 7,200 1,067,200

    5). Plinth beams - M40 m3 0 800,000 240,000 20,000 7,200 1,067,200

    Structural concrete M25, M40 acc. to PBI '71 'bk = 250

    High tensile steel deform bar reinforcement to concrete

    BILL NO. 6 - E12C058 - 650 - BELT CONVEYORS (BC-RH.03 &B

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M25, M40 acc. to PBI '71 'bk = 250

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M25, M40 acc. to PBI '71 'bk = 250

    033671.xls.ms_office 8 - 38

  • 8/22/2019 to vendor

    9/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    6). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS 2,340

    2

    8mm dia. kg 750 8,300 830 498 249 9,877

    10mm dia. kg 150 8,300 830 498 249 9,877

    16mm dia. kg 900 8,300 830 498 249 9,87719mm dia. kg 540 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (400X400) nos 8 800,000 240,000 20,000 6,250 1,066,250

    For Shear Key

    1) Type - I (250X250X250) nos 8 156,250 46,875 3,906 6,250 213,281

    Sub Total

    BILL NO. 8 - E12C058 - 650 - BELT CONVEYOR (BC-03 .04B)

    1 CONCRETE WORKS 20

    1

    1). Earth work excavation under Pile cap m3 36 - 75,000 - 7,500 82,500

    2). Drilling of Piles m 200 - - - - -

    3). Piles - M25 m3 57 - - - - -

    4). Pile cap - M40 m3 16 800,000 240,000 20,000 7,200 1,067,200

    5). Plinth beams - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    6). Pedestals - M40 m3 2 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS 10,730

    2

    1). BC-03.04B

    8mm dia. kg 940 8,300 830 498 249 9,877

    10mm dia. kg 950 8,300 830 498 249 9,877

    16mm dia. kg 1,800 8,300 830 498 249 9,877

    19mm dia. kg 6,740 8,300 830 498 249 9,877

    22mm dia. kg 300 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (500X500) nos 8 375,000 112,500 5,000 6,250 498,750

    2) Type - II (400X400) nos 2 800,000 240,000 20,000 6,250 1,066,250

    For Shear Key

    1) Type - I (250X250X250) nos 10 156,250 46,875 3,906 6,250 213,281

    Sub Total

    BILL NO. 9 - E12C058 - 700 - MAGNETIC SEPARATOR

    1 CONCRETE WORKS 16

    1

    1). Earth work excavation under Pile cap m3 38 - 75,000 - 7,500 82,500

    2). Raft - M40 m3 15 800,000 240,000 20,000 7,200 1,067,200

    3). Pedestals - M40 m3 1 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS 1,080

    2

    1). Magnetic Separator

    10mm dia. kg 130 8,300 830 498 249 9,877

    13mm dia. kg 850 8,300 830 498 249 9,877

    16mm dia. kg 100 8,300 830 498 249 9,877

    3 GROUTING WORKS

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    Grouting under main column base plate 30 mm thk. with

    Structural concrete M25, M40 acc. to PBI '71 'bk = 250

    High tensile steel deform bar reinforcement to concrete

    Structural concrete M40 acc. to PBI '71 'bk = 250 kg/c

    High tensile steel deform bar reinforcement to concrete

    033671.xls.ms_office 9 - 38

  • 8/22/2019 to vendor

    10/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    3

    1). Type - I (400X400) nos 4 800,000 240,000 20,000 6,250 1,066,250

    For Shear Key

    1) Type - I (250X250X250) nos 4 156,250 46,875 3,906 6,250 213,281

    Sub Total

    BILL NO. 10 - E12C058 - 300 - CRUSHER HOUSE

    1 CONCRETE WORKS 1,003

    1

    1). Piles m3 700 - - - - -

    2). Drilling of Piles m 1,030 - - - - -

    3). Base Slab m3 400 800,000 240,000 20,000 7,200 1,067,200

    4). Columns m3 13 800,000 240,000 20,000 7,200 1,067,200

    5). Walls Columns m3 590 960,000 288,000 24,000 8,640 1,280,640

    2 REINFORCING STEEL WORKS 166,250

    2

    1). Piles kg 56,000 8,300 830 498 249 9,877

    2). Base Slab kg 43,000 8,300 830 498 249 9,877

    3). Columns kg 3,250 8,300 830 498 249 9,877

    4). Walls kg 64,000 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3 9,450

    1) Type - I (600X420) nos 6 378,000 113,400 9,450 11,340 512,190

    2) Type - II (700X700) nos 7 735,000 220,500 18,375 22,050 995,925

    3) Type - III (440X440) nos 4 240,000 72,000 6,000 7,200 325,200

    4) Type - IV (600X420) nos 10 378,000 113,400 9,450 11,340 512,190

    For Pockets Grouting

    1) Type - I (300X300X800) nos 28 135,000 40,500 3,375 4,050 182,925

    2) Type - II (300X510X800) nos 28 229,500 68,850 5,738 6,885 310,973

    3) Type - III (200X400X700) nos 32 123,000 36,900 3,075 3,690 166,665

    Sub Total

    BILL NO. 11 - E12C058 - 300 - CRUSHER HOUSE (tunnel

    1 CONCRETE WORKS 117

    1

    1). Piles m3 166 - - - - -

    2). Drilling of Piles m 330 - - - - -

    3). Base Slab m3 58 800,000 240,000 20,000 7,200 1,067,200

    4). Walls m3 60 960,000 288,000 24,000 28,800 1,300,800

    2 REINFORCING STEEL WORKS 31,425

    2

    1). Piles kg 18,500 8,300 830 498 249 9,877

    2). Base Slab kg 6,325 8,300 830 498 249 9,8773). Walls kg 6,600 8,300 830 498 249 9,877

    Sub Total

    BILL NO. 12 - E12C058 -201- STACKER AND RECLAIMER

    1 CONCRETE WORKS 7,734

    1

    1). Piles m3 5,429 - - - - -

    2). Drilling of Piles m 10,830 - - - - -

    Structural concrete K-250, acc. to PBI '71 'bk = 250 kg

    Structural concrete K-250, acc. to PBI '71 'bk = 250 kg

    Grouting under main column base plate 30 mm thk. with

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 50 mm thk. with

    Structural concrete K-250, acc. to PBI '71 'bk = 250 kg

    High tensile steel deform bar reinforcement to concrete

    033671.xls.ms_office 10 - 38

  • 8/22/2019 to vendor

    11/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    3). Pile cap - M40 m3 4,403 800,000 240,000 20,000 7,200 1,067,200

    4). Columns m3 323 800,000 240,000 20,000 7,200 1,067,200

    5). Wall Columns m3 282 960,000 288,000 24,000 8,640 1,280,640

    6). Walls m3 1,176 960,000 288,000 24,000 8,640 1,280,640

    7). Beams m3 216 960,000 288,000 24,000 8,640 1,280,640

    8). Roof Slab m3 187 960,000 288,000 24,000 8,640 1,280,640

    9). Grade Slab m3 1,056 800,000 240,000 20,000 7,200 1,067,20010). Brackets m3 8 960,000 288,000 24,000 8,640 1,280,640

    11). Drains m3 85 500,000 150,000 12,500 4,500 667,000

    2 REINFORCING STEEL WORKS 1,439,266

    2

    1). Piles kg 609,573 8,300 830 498 249 9,877

    2). Pile Cap kg 449,855 8,300 830 498 249 9,877

    3). Columns kg 80,675 8,300 830 498 249 9,877

    4). Wall Columns kg 70,403 8,300 830 498 249 9,877

    5). Walls kg 129,307 8,300 830 498 249 9,877

    6). Beams kg 54,043 8,300 830 498 249 9,877

    7). Roof Slab kg 11,191 8,300 830 498 249 9,8778). Grade Slab kg 31,680 8,300 830 498 249 9,877

    9). Drains kg 2,540 8,300 830 498 249 9,877

    3 GROUTING WORKS

    3

    1) Type - I (700X500) nos 27 315,000 94,500 7,875 2,363 419,738

    2) Type - I (1100X500) nos 36 495,000 148,500 12,375 3,713 659,588

    Sub Total

    BILL NO. 13 - E12C058 -201- STACKER AND RECLAIMER

    1 CONCRETE WORKS 3,416

    1

    1). Piles m3 3,910 - - - - -

    2). Drilling of Piles m 7,780 - - - - -

    3). Pile cap - M40 m3 3,416 800,000 240,000 20,000 7,200 1,067,200

    2 REINFORCING STEEL WORKS 788,131

    2

    1). Piles kg 439,118 8,300 830 498 249 9,877

    2). Pile Cap kg 349,013 8,300 830 498 249 9,877

    Sub Total

    Total

    1 1 1 1 1

    BAHAN Painting Trans.

    Raw Fabrication Erection

    BILL NO. 1 -TRANSFER TOWER-1 STEEL WORKS

    Not

    1 SECTION-1&2 41,842

    1 Columns 8,900 1,780 2,670 890 445

    a. INP 280x119x10.1x15.2 / 48.3 kg/m kg 1,165 8,900 1,780 2,670 890 445

    b UNP 120x55x7/ 13.4 kg/m kg 192 8,750 1,780 2,670 890 438

    2 Beams 445

    a. INP 280x119x10.1x15.2 / 48.3 kg/m kg 1,092 8,900 1,780 2,670 890 445

    b. INP 220x98x8.1x12.2 / 31.01 kg/m kg 1,417 8,900 1,780 2,670 890 445

    3 Vertical bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 471 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 783 9,000 1,780 2,670 890 450

    High tensile steel deform bar reinforcement to concrete

    Grouting under main column base plate 30 mm thk. with

    High tensile steel deform bar reinforcement to concrete

    DESCRIPTION

    Structural concrete K-250, acc. to PBI '71 'bk = 250 kg

    All unit rates incl. supply, fabrication, derusting w/ s

    UNITNO. Q'tyHARGA SATUAN

    UPAH

    033671.xls.ms_office 11 - 38

  • 8/22/2019 to vendor

    12/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    SECTION-3&4

    1 Columns 445

    a. INP 280x119x10.1x15.2 / 48.3 kg/m kg 2,257 8,900 1,780 2,670 890 445

    b. INP 220x98x8.1x12.2 / 31.01 kg/m kg 743 8,900 1,780 2,670 890 445

    2 Beams 445

    a. INP 300x125x10.8x16.2x6.5 / 55.08 kg/m kg 857 8,900 1,780 2,670 890 445

    b INP 360x143x13x19.5 / 77.16 kg/m kg 8,070 8,900 1,780 2,670 890 445

    c. UNP 300x100x10x / 55.6kg/m kg 528 8,750 1,780 2,670 890 438

    d. UNP 140x60x7 / 16kg/m kg 36 8,750 1,780 2,670 890 438

    e. UNP 180x70x8 / 22.58kg/m kg 51 8,750 1,780 2,670 890 438

    3 Vertical bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 210 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 507 9,000 1,780 2,670 890 450

    a. L 90x90x7 / 9.59 kg/m kg 252 9,000 1,780 2,670 890 450

    2 PLATFORM

    Not

    2 BEAM LAYOUT AT EL + 31.050

    1 Beams

    a. INP 280x119x10.1x15.2 / 48.3 kg/m kg 2,257 8,900 1,780 2,670 890 445

    b. INP 220x98x8.1x12.2 / 31.01 kg/m kg 557 8,900 1,780 2,670 890 445

    c. INP 300x125x10.8x16.2x6.5 / 55.08 kg/m kg 1,930 8,900 1,780 2,670 890 445

    d. UNP 80x45x6/ 8.6 kg/m kg 101 8,750 1,780 2,670 890 438

    e. UNP 200x75x8.3/ 25.83 kg/m kg 57 8,750 1,780 2,670 890 438

    2 Horizontal bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 78 9,000 1,780 2,670 890 450

    2 BEAM LAYOUT AT EL + 28.650

    1 Beams

    a. INP 220x98x8.1x12.2 / 31.01 kg/m kg 1,454 8,900 1,780 2,670 890 445

    b. UNP 120x55x7/ 13.4 kg/m kg 715 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.3/ 25.83 kg/m kg 52 8,750 1,780 2,670 890 438

    d. UNP 140x60x7 / 16kg/m kg 16 8,750 1,780 2,670 890 438

    e. UNP 80x45x6/ 8.6 kg/m kg 12 8,750 1,780 2,670 890 438

    f. L 50 x 50 x 6 / 4.5 kg/m kg 95 9,000 1,780 2,670 890 450

    2 BEAM LAYOUT AT EL + 34.200

    1 Beams

    a. INP 220x98x8.1x12.2 / 31.01 kg/m kg 792 8,900 1,780 2,670 890 445

    b INP 360x143x13x19.5 / 77.16 kg/m kg 421 8,900 1,780 2,670 890 445

    c. INP 300x125x10.8x16.2x6.5 / 55.08 kg/m kg 859 8,900 1,780 2,670 890 445

    d. UNP 80x45x6/ 8.6 kg/m kg 75 8,750 1,780 2,670 890 438

    e. UNP 140x60x7 / 16kg/m kg 42 8,750 1,780 2,670 890 438

    f. UNP 200x75x8.3/ 25.83 kg/m kg 27 8,750 1,780 2,670 890 438

    2 Horizontal bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 63 9,000 1,780 2,670 890 450

    2 PLAN AT BOTTOM CHORD

    1 Beams

    a. INP 280x119x10.1x15.2 / 48.3 kg/m kg 408 8,900 1,780 2,670 890 445

    b INP 220x98x8.1x12.2 / 31.01 kg/m kg 895 8,900 1,780 2,670 890 445

    2 Horizontal bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 72 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 225 9,000 1,780 2,670 890 450

    2 PLAN AT PURLIN

    1 Beams

    a. UNP 140x60x7 / 16kg/m kg 838 8,750 1,780 2,670 890 438

    2 Sagrod dia. 12 / 0.89 kg/m kg 17 8,750 1,780 2,670 890 438

    2 DETAIL-E

    1 Columns

    a. INP 300x125x10.8x16.2x6.5 / 55.08 kg/m kg 525 8,900 1,780 2,670 890 445

    b. UNP 80x45x6/ 8.6 kg/m kg 48 8,750 1,780 2,670 890 438

    2 GABLE FRAME

    1 Horizontal bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 171 9,000 1,780 2,670 890 450

    2 Siding Girt

    Beams that belong to main structure are included i

    033671.xls.ms_office 12 - 38

  • 8/22/2019 to vendor

    13/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    1 a. UNP 140x60x7 / 16kg/m kg 4,759 8,750 1,780 2,670 890 438

    2 Sagrod dia. 12 / 0.89 kg/m kg 47 8,750 1,780 2,670 890 438

    3 STAIRCASE

    3 Staircase Type 1

    a. UNP 140x60x7 / 16kg/m kg 510 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 75 9,000 1,780 2,670 890 450

    c. 25 thk grating/28.3kg/m kg 927 35,000 15,000 3,750 450 350

    5 Railing m1 267 150,000 30,000 50,000 100 250

    a. Top and post rail dia. 1 1/4", medium steel pipe (painted)

    b. Mid rail dia. 3/4", medium steel pipe ( painted )

    c. Kickers plate

    3 Gusset plates, base plates and stiffener kg 3,811 8,750 1,780 2,670 890 438

    4 MISCELLANEOUS

    4 Bolt ASTM A-307 (Prov. Volume) 5,000 375 125 250

    1) Available Dia nos 16 5,000 - 375 125 250

    4 ASTM A325 Bolts

    1) For Available bolt dia kg 402 6,000 - 450 150 300

    4 m2 41 85,000 21,250 4,250

    4 m2 312 85,000 21,250 4,250

    BILL NO. 2 -TRANSFER TOWER-3 STEEL WORKS

    Not

    1 MAIN FRAMES 25,619

    1

    1) Columns

    a. INP 360x 143x 13 x 19.5 / 77.16 kg/m kg 2,653 8,900 1,780 2,670 890 445

    2) Beams

    a. INP 300x 125x 10.8 x 16.2 / 55.08 kg/m kg 301 8,900 1,780 2,670 890 445

    b. INP 140x 66x 5.7x 8.6/ 14.58 kg/m kg 109 8,900 1,780 2,670 890 445

    c. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 783 8,900 1,780 2,670 890 445

    d. INP 140x 66x 5.7x 8.6/ 14.58 kg/m kg 117 8,900 1,780 2,670 890 445

    e UNP 200x 75x 8.5/ 25.83 kg/m kg 155 8,750 1,780 2,670 890 438

    3) Vertical bracings

    a. 2L 75 x 75 x 6 / 6.8 kg/m kg 571 9,000 1,780 2,670 890 450

    b 2L 75 x 75 x 6 / 6.8 kg/m kg 283 9,000 1,780 2,670 890 450

    c 2L 75 x 75 x 6 / 6.8 kg/m kg 82 9,000 1,780 2,670 890 450

    d. 2L 90 x 90 x 7 / 9.6 kg/m kg 207 9,000 1,780 2,670 890 450

    e 2L 50 x 50 x 6 / 4.5 kg/m kg 134 9,000 1,780 2,670 890 450

    f 2L 50 x 50 x 6 / 4.5 kg/m kg 101 9,000 1,780 2,670 890 450

    g 2L 50 x 50 x 6 / 4.5 kg/m kg 9 9,000 1,780 2,670 890 450

    4) Gusset plates, base plates and stiffener kg -

    1

    1) Columns

    a. INP 360x 143x 13 x 19.5 / 77.16 kg/m kg 2,653 8,900 1,780 2,670 890 445

    2) Beams

    a. INP 450x 170x 16.2 x 24.3 / 116.66 kg/m kg 875 8,900 1,780 2,670 890 445

    b INP 360x 143x 13 x 19.5 / 77.16 kg/m kg 579 8,900 1,780 2,670 890 445

    c INP 300x 125x 10.8 x 16.2 / 55.08 kg/m kg 579 8,900 1,780 2,670 890 445

    d. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 1,929 8,900 1,780 2,670 890 445

    e INP 140x 66x 5.7x 8.6/ 14.58 kg/m kg 119 8,900 1,780 2,670 890 445

    f UNP 200x 75x 8.5/ 25.83 kg/m kg 54 8,750 1,780 2,670 890 438

    3) Vertical bracings

    a. 2L 75 x 75 x 6 / 6.8 kg/m kg 234 9,000 1,780 2,670 890 450

    b 2L 75 x 75 x 6 / 6.8 kg/m kg 41 9,000 1,780 2,670 890 450

    c 2L 75 x 75 x 6 / 6.8 kg/m kg 95 9,000 1,780 2,670 890 450

    d. 2L 90 x 90 x 7 / 9.6 kg/m kg 1,498 9,000 1,780 2,670 890 450

    e 2L 50 x 50 x 6 / 4.5 kg/m kg 144 9,000 1,780 2,670 890 450

    f 2L 50 x 50 x 6 / 4.5 kg/m kg 173 9,000 1,780 2,670 890 450

    g 2L 100 x 100 x 10 / 14.9 kg/m kg 725 9,000 1,780 2,670 890 450

    4) Gusset plates, base plates and stiffener kg -

    Corrugated steel sheet cladding type A 680, PERKASA

    SECTION 1&2

    SECTION 3&4

    Corrugated steel sheet roofing type A 750, PERKASAD

    All unit rates incl. supply, fabrication, derusting w/

    Sub Total

    033671.xls.ms_office 13 - 38

  • 8/22/2019 to vendor

    14/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    2 PLATFORM

    Not

    2

    1) Beams

    a. UNP 80x 45x 4.5/ 7.96 kg/m kg 67 8,750 1,780 2,670 890 438

    b. INP 140x 66x 5.7x 8.6/ 14.58 kg/m kg 245 8,900 1,780 2,670 890 445

    c. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 1,396 8,900 1,780 2,670 890 445

    d. INP 300x 125x 10.8 x 16.2 / 55.08 kg/m kg 921 8,900 1,780 2,670 890 445

    2) Horizontal bracings

    a. 2L 50 x 50 x 6 / 4.5 kg/m kg 38 9,000 1,780 2,670 890 450

    b 2L 50 x 50 x 6 / 4.5 kg/m kg 16 9,000 1,780 2,670 890 450

    c. 2L 50 x 50 x 6 / 4.5 kg/m kg 28 9,000 1,780 2,670 890 450

    3) kg -

    2

    1) Beams

    a. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 798 8,900 1,780 2,670 890 445

    b INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 218 8,900 1,780 2,670 890 445

    c. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 272 8,900 1,780 2,670 890 445

    d UNP 80x 45x 4.5/ 7.96 kg/m kg 30 8,750 1,780 2,670 890 438

    f UNP 80x 45x 4.5/ 7.96 kg/m kg 32 8,750 1,780 2,670 890 438

    g UNP 80x 45x 4.5/ 7.96 kg/m kg 25 8,750 1,780 2,670 890 438

    h INP 360x 143x 13 x 19.5 / 77.16 kg/m kg 603 8,900 1,780 2,670 890 445

    2) Horizontal bracings

    a. 2L 50 x 50 x 6 / 4.5 kg/m kg 15 9,000 1,780 2,670 890 450

    b 2L 50 x 50 x 6 / 4.5 kg/m kg 129 9,000 1,780 2,670 890 450

    2

    1) Beams

    a. INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 381 8,900 1,780 2,670 890 445

    b INP 240x 106x 8.7x 13.1/ 36.25 kg/m kg 384 8,900 1,780 2,670 890 445

    2) Horizontal bracings

    a. 2L 75 x 75 x 6 / 6.8 kg/m kg 453 9,000 1,780 2,670 890 450

    RAILS

    a. 40 MS PIPE kg 224 11,250 2,500 2,763 450 563

    b. 25 MS PIPE kg 77 11,250 2,500 2,763 450 563

    2

    a. UNP 125x 65x 6/ 36.25 kg/m kg 1,740 8,750 1,780 2,670 890 438

    2 Gusset plates, base plates and stiffener kg 2,329 8,900 1,780 2,670 890 445

    3

    3 Bolt ASTM A-307 (Prov. Volume)

    1) Available Dia nos 16 5,000 - 250

    3 ASTM A325 Bolts

    1) For Available bolt dia kg 329 6,000 600 300

    3 m2 50 85,000 21,250 4,250

    3 m2 492 85,000 21,250 4,250

    BILL NO. 3 -TRANSFER TOWER-4 STEEL WORKS

    Not

    1 MAIN FRAMES 78,160

    Not

    1

    1) Beams

    a. UNP 200x75x8.5/ 25.83 kg/m kg 517 8,750 1,780 2,670 890 438

    b. UNP 200x75x8.5/ 25.83 kg/m kg 504 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.5/ 25.83 kg/m kg 70 8,750 1,780 2,670 890 438

    1

    1) Beams

    a. UNP 200x75x8.5/ 25.83 kg/m kg 517 8,750 1,780 2,670 890 438

    b. UNP 200x75x8.5/ 25.83 kg/m kg 504 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.5/ 25.83 kg/m kg 70 8,750 1,780 2,670 890 438

    1

    BEAM LAYOUT AT EL + 22.200

    All unit rates incl. supply, fabrication, derusting w/ s

    MISCELLANEOUS

    Corrugated steel sheet roofing type A 750, PERKASAD

    Beams that belong to main structure are included i

    Beams that belong to main structure are included i

    BEAM LAYOUT AT EL + 27.112

    BEAM LAYOUT AT EL + 31.106

    Gusset plates

    BEAM LAYOUT AT EL + 26.100

    MONORAIL PLAN

    ROOF PURLIN

    BEAM LAYOUT AT EL + 35.100

    Sub Total

    Corrugated steel sheet cladding type A 680, PERKASA

    033671.xls.ms_office 14 - 38

  • 8/22/2019 to vendor

    15/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    1) Beams

    a. UNP 200x75x8.5/ 25.83 kg/m kg 517 8,750 1,780 2,670 890 438

    b. UNP 200x75x8.5/ 25.83 kg/m kg 1,007 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.5/ 25.83 kg/m kg 70 8,750 1,780 2,670 890 438

    d. UNP 200x75x8.5/ 25.83 kg/m kg 108 8,750 1,780 2,670 890 438

    e UNP 200x75x8.5/ 25.83 kg/m kg 83 8,750 1,780 2,670 890 438

    1

    1) Beams

    a. UNP 200x75x8.5/ 25.83 kg/m kg 517 8,750 1,780 2,670 890 438

    b. UNP 200x75x8.5/ 25.83 kg/m kg 1,007 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.5/ 25.83 kg/m kg 70 8,750 1,780 2,670 890 438

    d. UNP 200x75x8.5/ 25.83 kg/m kg 108 8,750 1,780 2,670 890 438

    e UNP 200x75x8.5/ 25.83 kg/m kg 83 8,750 1,780 2,670 890 438

    1

    1) Beams

    a. UNP 200x75x8.5/ 25.83 kg/m kg 517 8,750 1,780 2,670 890 438

    b. UNP 200x75x8.5/ 25.83 kg/m kg 1,007 8,750 1,780 2,670 890 438

    c. UNP 200x75x8.5/ 25.83 kg/m kg 70 8,750 1,780 2,670 890 438

    d. UNP 200x75x8.5/ 25.83 kg/m kg 108 8,750 1,780 2,670 890 438

    e UNP 200x75x8.5/ 25.83 kg/m kg 83 8,750 1,780 2,670 890 438

    1

    1) Beams

    a. INP 600x210x12/ 170.7 kg/m kg 3,414 8,900 1,780 2,670 890 445

    b. INP 600x210x12/ 170.7 kg/m kg 1,110 8,900 1,780 2,670 890 445

    c. INP 400x155x14.4x21.6x/ 94.71 kg/m kg 1,231 8,900 1,780 2,670 890 445

    d. INP 200x90x7.5x11.3x/ 26.25 kg/m kg 53 8,900 1,780 2,670 890 445

    e UNP 400x110x14/ 71.83 kg/m kg 2,816 8,750 1,780 2,670 890 438

    2) Horizontal bracings

    a. L 50 x 50 x 6 / 4.5 kg/m kg 21 9,000 1,780 2,670 890 450

    b L 50 x 50 x 6 / 4.5 kg/m kg 24 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 8 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 14 9,000 1,780 2,670 890 450

    e L 50 x 50 x 6 / 4.5 kg/m kg 31 9,000 1,780 2,670 890 450

    f L 50 x 50 x 6 / 4.5 kg/m kg 26 9,000 1,780 2,670 890 450

    g L 50 x 50 x 6 / 4.5 kg/m kg 15 9,000 1,780 2,670 890 450

    3) kg -

    1

    1) Beams

    a. INP 600x210x12/ 170.7 kg/m kg 3,414 8,900 1,780 2,670 890 445

    b. INP 600x210x12/ 170.7 kg/m kg 2,219 8,900 1,780 2,670 890 445

    c. INP 400x155x14.4x21.6x/ 94.71 kg/m kg 1,231 8,900 1,780 2,670 890 445

    d. INP 200x90x7.5x11.3x/ 26.25 kg/m kg 171 8,900 1,780 2,670 890 445

    e INP 200x90x7.5x11.3x/ 26.25 kg/m kg 26 8,900 1,780 2,670 890 445

    f UNP 400x110x14/ 71.83 kg/m kg 1,401 8,750 1,780 2,670 890 438

    g UNP 300x100x10/ 46.33 kg/m kg 422

    h UNP 300x100x10/ 46.33 kg/m kg 477 8,750 1,780 2,670 890 438

    2) Horizontal bracings

    a. L 90 x 90 x 10 / 13.4 kg/m kg 89 9,000 1,780 2,670 890 450

    b L 90 x 90 x 10 / 13.4 kg/m kg 113 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 10 / 13.4 kg/m kg 186 9,000 1,780 2,670 890 450

    3) kg - - - - - -

    1

    1) Beams

    a. INP 200x90x7.5x11.3x/ 26.25 kg/m kg 525 8,900 1,780 2,670 890 445

    2) Horizontal bracings

    a. L 120 x 120 x 11 / 19.9 kg/m kg 259 9,000 1,780 2,670 890 450

    b L 75 x 75 x 6 / 6.8 kg/m kg 237 9,000 1,780 2,670 890 450

    c. L 75 x 75 x 6 / 6.8 kg/m kg 218 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 177 9,000 1,780 2,670 890 450

    1) PURLIN

    a. UNP 140x60x7/ 16 kg/m kg 1,280 8,750 1,780 2,670 890 438

    3) kg -

    1

    1) Beams

    a. H 300x300x10/ 94 kg/m kg 11,217 8,750 1,780 2,671 890 438

    B INP 450x 170x 16.2 x 24.3 / 116.66 kg/m kg 4,433 8,900 1,780 2,670 890 445

    c. INP 600x210x12/ 170.7 kg/m kg 3,312 8,900 1,780 2,670 890 445

    d. INP 200x90x7.5x11.3x/ 26.25 kg/m kg 632 8,900 1,780 2,670 890 445

    BEAM LAYOUT AT EL + 39.094

    BEAM LAYOUT AT EL + 59.119

    BEAM LAYOUT AT EL + 50.479

    Gusset plates

    BEAM LAYOUT AT EL + 43.094

    BEAM LAYOUT AT EL + 47.094

    Gusset plates

    Gusset plates

    TR-1 TO TR-4

    033671.xls.ms_office 15 - 38

  • 8/22/2019 to vendor

    16/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    e INP 200x90x7.5x11.3x/ 26.25 kg/m kg 6,571 8,900 1,780 2,670 890 445

    f UNP 140x60x7/ 16 kg/m kg 404 8,750 1,780 2,670 890 438

    2) Horizontal bracings

    a. L 120 x 120 x 11 / 19.9 kg/m kg 7,216 9,000 1,780 2,670 890 450

    b L 100 x 100 x 10 / 28.4 kg/m kg 6,644 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 10 / 13.4 kg/m kg 995 9,000 1,780 2,670 890 450

    d L 75 x 75 x 6 / 6.8 kg/m kg 686 9,000 1,780 2,670 890 450

    e L 50 x 50 x 6 / 4.5 kg/m kg 203 9,000 1,780 2,670 890 450

    1 Gusset plates, base plates and stiffener kg 7,105 9,000 1,780 2,670 890 450

    2

    2 Bolt ASTM A-307 (Prov. Volume)

    1) dia. 32 mm nos 16 5,000 - 375 - 250

    2 ASTM A325 Bolts

    1) For Available bolt dia kg 1,326 6,000 - 450 - 300

    2 m2 74 85,000 21,250 4,250

    2 m2 1,083 85,000 21,250 4,250

    BILL NO. 4-BC RH.01, CONVEYOR - STEEL WORKS

    Not

    1 BC.RH. MAIN FRAMES 13,782

    GALLERY_GR1

    1) ELEVATION

    a. UNP 100x50x6/ 10.6 kg/m kg 473 8,750 1,780 2,670 890 438

    b. UNP 80x45x6/ 8.6 kg/m kg 375 8,750 1,780 2,670 890 438

    c. L 80 x 80 x 7.5 / 9.6 kg/m kg 143 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 141 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 204 9,000 1,780 2,670 890 450

    f. L 80 x 80 x 7.5 / 9.6 kg/m kg 150 9,000 1,780 2,670 890 450

    2) BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 84 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 261 9,000 1,780 2,670 890 450

    c. UNP 180x70x8/ 22.5 kg/m kg 256 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 401 8,750 1,780 2,670 890 438

    e. UNP 120x55x7/ 13.4 kg/m kg 74 8,750 1,780 2,670 890 438

    f. UNP 120x55x7/ 13.4 kg/m kg 241 8,750 1,780 2,670 890 438

    g. UNP 100x50x6/ 10.6 kg/m kg 29 8,750 1,780 2,670 890 438

    3) TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 78 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 261 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 102 9,000 1,780 2,670 890 450

    4) RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 128 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 738 8,750 1,780 2,670 890 438

    c. L 80 x 80 x 7.5 / 9.6 kg/m kg 242 9,000 1,780 2,670 890 450

    5) PORTAL FRME-1

    a. INP 220x98x8.1x12.2 x 4.9 / 31.08 kg/m kg 329 8,900 1,780 2,670 890 445

    b. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6) PORTAL FRME-2

    a. INP 220x98x8.1x12.2 x 4.9 / 31.08 kg/m kg 322 8,900 1,780 2,670 890 445

    b. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7) SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 257 8,750 1,780 2,670 890 438

    b. UNP 100x50x6/ 10.6 kg/m kg 253 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 248 8,750 1,780 2,670 890 438

    d. L 50 x 50 x 6 / 4.5 kg/m kg 7 9,000 1,780 2,670 890 450

    e. 25 NB PIPE / 2.46 kg/m kg 57 11,250 2,500 2,763 450 563

    f. 32 NB PIPE / 3.61 kg/m kg 84 11,250 2,500 2,763 450 563

    GALLERY_GR2

    1) ELEVATION

    a. UNP 100x50x6/ 10.6 kg/m kg 464 8,750 1,780 2,670 890 438

    b. UNP 80x45x6/ 8.6 kg/m kg 329 8,750 1,780 2,670 890 438

    c. L 80 x 80 x 7.5 / 9.6 kg/m kg 254 9,000 1,780 2,670 890 450

    Sub Total

    All unit rates incl. supply, fabrication, derusting w/

    MISCELLANEOUS

    Corrugated steel sheet roofing type A 750, PERKASAD

    Corrugated steel sheet cladding type A 680, PERKASA

    033671.xls.ms_office 16 - 38

  • 8/22/2019 to vendor

    17/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    d. L 50 x 50 x 6 / 4.5 kg/m kg 141 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 204 9,000 1,780 2,670 890 450

    2) BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 157 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 174 9,000 1,780 2,670 890 450

    c. UNP 180x70x8/ 22.5 kg/m kg 256 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 353 9,000 1,780 2,670 890 450

    e. UNP 120x55x7/ 13.4 kg/m kg 74 8,750 1,780 2,670 890 438

    f. UNP 120x55x7/ 13.4 kg/m kg 161 8,750 1,780 2,670 890 438

    g. UNP 100x50x6/ 10.6 kg/m kg 29 8,750 1,780 2,670 890 438

    3) TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 157 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 174 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 102 9,000 1,780 2,670 890 450

    4) RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 128 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 724 8,750 1,780 2,670 890 438

    c. L 80 x 80 x 7.5 / 9.6 kg/m kg 242 9,000 1,780 2,670 890 450

    5) PORTAL FRME-1

    a. INP 220x98x8.1x12.2 x 4.9 / 31.08 kg/m kg 329 8,900 1,780 2,670 890 445

    b. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6) PORTAL FRME-2

    a. INP 220x98x8.1x12.2 x 4.9 / 31.08 kg/m kg 347 8,900 1,780 2,670 890 445

    b. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7) SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 230 8,750 1,780 2,670 890 438

    b. UNP 100x50x6/ 10.6 kg/m kg 235 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 240 8,750 1,780 2,670 890 438

    d. L 50 x 50 x 6 / 4.5 kg/m kg 7 9,000 1,780 2,670 890 450

    e. 25 NB PIPE / 2.46 kg/m kg 53 11,250 2,500 2,763 450 563

    f. 32 NB PIPE / 3.61 kg/m kg 78 11,250 2,500 2,763 450 563

    TRESTLES_TR-1&2

    a. INP 300x125x10.8x16.2x6.5 / 55.08 kg/m kg 527 8,900 1,780 2,670 890 445

    b INP 200x90x7.5x11.3x4.5 / 26.25 kg/m kg 199 8,900 1,780 2,670 890 445

    d. L 75 x 75 x 6 / 6.8 kg/m kg 185 9,000 1,780 2,670 890 450

    Gusset plates, base plates and stiffener kg 1,253 9,000 1,780 2,670 890 450

    2 MISCELLANEOUS 150

    2 Bolt ASTM A-307 (Prov. Volume)

    1) Available dia Nos. 16 5,000 - 375 - 250

    ASTM A325 Bolts

    2) For Available bolt dia kg 150 6,000 - 450 - 300

    2 m2 92 85,000 21,250 4,250

    2 m2 124 85,000 21,250 4,250

    BILL NO. 5-BC-RH.03 CONVEYOR - STEEL WORKS

    Not

    1 BC.RH.03 181,923

    GALLERY_GR3

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 174 9,000 1,780 2,670 890 450

    b. L 100 x 100 x 10 / 14.9 kg/m kg 172 9,000 1,780 2,670 890 450

    c. L 75 x 75 x 6 / 6.8 kg/m kg 744 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 544 9,000 1,780 2,670 890 450

    e. UNP 160x65x7.5 / 19.25 kg/m kg 1,807 8,750 1,780 2,670 890 438

    f. UNP 120x55x7/ 13.4 kg/m kg 1,274 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 66 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    c L 50 x 50 x 6 / 4.5 kg/m kg 565 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 794 9,000 1,780 2,670 890 450

    Total

    Corrugated steel sheet roofing type A 750, PERKASAD

    All unit rates incl. supply, fabrication, derusting w/

    Corrugated steel sheet cladding type A 680, PERKASA

    033671.xls.ms_office 17 - 38

  • 8/22/2019 to vendor

    18/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    e. UNP 180x70x8/ 22.5 kg/m kg 753 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 56 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 781 8,750 1,780 2,670 890 438

    h. UNP 150x75x 6.5 / 18.6 kg/m kg 54 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 565 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 240 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 424 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 1,540 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,540 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 19 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 175 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 119 11,250 2,500 2,763 450 563

    GALLERY_GR4

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 179 9,000 1,780 2,670 890 450

    b. L 100 x 100 x 10 / 14.9 kg/m kg 174 9,000 1,780 2,670 890 450

    c. L 100 x 100 x 10 / 14.9 kg/m kg 197 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 637 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 544 9,000 1,780 2,670 890 450

    f. UNP 160x65x7.5 / 19.25 kg/m kg 1,790 8,750 1,780 2,670 890 438

    g. UNP 120x55x7/ 13.4 kg/m kg 1,261 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 67 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 78 9,000 1,780 2,670 890 450

    c L 50 x 50 x 6 / 4.5 kg/m kg 66 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 484 9,000 1,780 2,670 890 450

    e. L 90 x 90 x 7 / 8.2 kg/m kg 799 9,000 1,780 2,670 890 450

    f. UNP 180x70x8/ 22.5 kg/m kg 753 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 62 8,750 1,780 2,670 890 438

    h. UNP 150x75x 6.5 / 18.6 kg/m kg 781 8,750 1,780 2,670 890 438

    i. UNP 150x75x 6.5 / 18.6 kg/m kg 56 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 67 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 71 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 484 9,000 1,780 2,670 890 450

    e. L 50 x 50 x 6 / 4.5 kg/m kg 240 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 424 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 1,550 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,549 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 19 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 176 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 120 11,250 2,500 2,763 450 563

    GALLERY_GR5

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 186 9,000 1,780 2,670 890 450

    b. L 100 x 100 x 10 / 14.9 kg/m kg 177 9,000 1,780 2,670 890 450

    c. L 75 x 75 x 6 / 6.8 kg/m kg 744 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 544 9,000 1,780 2,670 890 450

    e. UNP 160x65x7.5 / 19.25 kg/m kg 1,892 8,750 1,780 2,670 890 438

    f. UNP 120x55x7/ 13.4 kg/m kg 1,294 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 69 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    c L 50 x 50 x 6 / 4.5 kg/m kg 565 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 799 9,000 1,780 2,670 890 450

    e. UNP 180x70x8/ 22.5 kg/m kg 753 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 70 8,750 1,780 2,670 890 438

    033671.xls.ms_office 18 - 38

  • 8/22/2019 to vendor

    19/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 781 8,750 1,780 2,670 890 438

    h. UNP 150x75x 6.5 / 18.6 kg/m kg 50 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 69 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 65 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 565 9,000 1,780 2,670 890 450

    d. L 50 x 50 x 6 / 4.5 kg/m kg 240 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 424 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 1,549 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,549 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 19 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 177 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 119 11,250 2,500 2,763 450 563

    GALLERY_GR10

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 373 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 769 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 511 9,000 1,780 2,670 890 450

    d. UNP 160x65x7.5 / 19.25 kg/m kg 1,676 8,750 1,780 2,670 890 438

    e. UNP 100x50x6/ 10.6 kg/m kg 923 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 178 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 624 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 7 / 8.2 kg/m kg 728 9,000 1,780 2,670 890 450

    e. UNP 200 x 75 x 8.5/ 25.8 kg/m kg 774 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 140 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 670 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 178 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 271 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 484 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 371 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 1,413 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,413 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 160 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 109 11,250 2,500 2,763 450 563

    GALLERY_GR8

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 328 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 512 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 365 9,000 1,780 2,670 890 450

    d. UNP 160x65x7.5 / 19.25 kg/m kg 1,101 8,750 1,780 2,670 890 438

    e. UNP 100x50x6/ 10.6 kg/m kg 606 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 164 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 416 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 7 / 8.2 kg/m kg 483 9,000 1,780 2,670 890 450

    e. UNP 200 x 75 x 8.5/ 25.8 kg/m kg 602 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 86 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 446 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 164 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 193 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 323 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 265 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 937 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    033671.xls.ms_office 19 - 38

  • 8/22/2019 to vendor

    20/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 937 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 12 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 106 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 73 11,250 2,500 2,763 450 563

    GALLERY_GR9

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 328 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 512 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 365 9,000 1,780 2,670 890 450

    d. UNP 160x65x7.5 / 19.25 kg/m kg 1,101 8,750 1,780 2,670 890 438

    e. UNP 100x50x6/ 10.6 kg/m kg 606 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 164 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 416 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 7 / 8.2 kg/m kg 483 9,000 1,780 2,670 890 450

    e. UNP 200 x 75 x 8.5/ 25.8 kg/m kg 602 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 86 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 446 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 164 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 193 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 323 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 265 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 937 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 937 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 12 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 106 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 73 11,250 2,500 2,763 450 563

    GALLERY_GR6A

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 426 9,000 1,780 2,670 890 450

    b. UNP 160x65x7.5 / 19.25 kg/m kg 196 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 108 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 98 9,000 1,780 2,670 890 450

    c. UNP 200 x 75 x 8.5 / 25.8 kg/m kg 172 8,750 1,780 2,670 890 438

    d. UNP 150x75x 6.5 / 18.6 kg/m kg 95 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 22 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 15 11,250 2,500 2,763 450 563

    GALLERY_GR7A

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 426 9,000 1,780 2,670 890 450

    b. UNP 160x65x7.5 / 19.25 kg/m kg 196 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 108 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 98 9,000 1,780 2,670 890 450

    c. UNP 200 x 75 x 8.5 / 25.8 kg/m kg 172 8,750 1,780 2,670 890 438

    d. UNP 150x75x 6.5 / 18.6 kg/m kg 95 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    033671.xls.ms_office 20 - 38

  • 8/22/2019 to vendor

    21/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 22 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 15 11,250 2,500 2,763 450 563

    GALLERY_GR8A

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 426 9,000 1,780 2,670 890 450

    b. UNP 160x65x7.5 / 19.25 kg/m kg 196 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 108 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 98 9,000 1,780 2,670 890 450

    c. UNP 200 x 75 x 8.5 / 25.8 kg/m kg 172 8,750 1,780 2,670 890 438

    d. UNP 150x75x 6.5 / 18.6 kg/m kg 95 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 22 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 15 11,250 2,500 2,763 450 563

    GALLERY_GR9A

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 426 9,000 1,780 2,670 890 450

    b. UNP 160x65x7.5 / 19.25 kg/m kg 196 8,750 1,780 2,670 890 438

    c. UNP 100x50x6/ 10.6 kg/m kg 108 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 98 9,000 1,780 2,670 890 450

    c. UNP 200 x 75 x 8.5 / 25.8 kg/m kg 172 8,750 1,780 2,670 890 438

    d. UNP 150x75x 6.5 / 18.6 kg/m kg 95 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 195 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 22 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 15 11,250 2,500 2,763 450 563

    GALLERY_GR6

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 168 9,000 1,780 2,670 890 450

    b. L 100 x 100 x 10 / 14.9 kg/m kg 171 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 7 / 8.2 kg/m kg 640 9,000 1,780 2,670 890 450

    d. L 80 x 80 x 6 / 7.3 kg/m kg 438 9,000 1,780 2,670 890 450

    e. UNP 160x65x7.5 / 19.25 kg/m kg 1,346 8,750 1,780 2,670 890 438

    f. UNP 100x50x6/ 10.6 kg/m kg 735 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 83 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 84 9,000 1,780 2,670 890 450

    c. L 65 x 65 x 6 / 5.8 kg/m kg 95 9,000 1,780 2,670 890 450

    d. L 65 x 65 x 6 / 5.8 kg/m kg 416 9,000 1,780 2,670 890 450

    e. L 90 x 90 x 7 / 8.2 kg/m kg 583 9,000 1,780 2,670 890 450

    f. UNP 200 x 75 x 8.5/ 25.8 kg/m kg 774 8,750 1,780 2,670 890 438

    g. UNP 150x75x 6.5 / 18.6 kg/m kg 49 8,750 1,780 2,670 890 438

    h. UNP 150x75x 6.5 / 18.6 kg/m kg 52 8,750 1,780 2,670 890 438

    i. UNP 150x75x 6.5 / 18.6 kg/m kg 97 8,750 1,780 2,670 890 438

    j. UNP 150x75x 6.5 / 18.6 kg/m kg 446 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 65 x 65 x 6 / 5.8 kg/m kg 83 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 96 9,000 1,780 2,670 890 450

    a. L 65 x 65 x 6 / 5.8 kg/m kg 84 9,000 1,780 2,670 890 450

    b. L 65 x 65 x 6 / 5.8 kg/m kg 309 9,000 1,780 2,670 890 450

    c. L 50 x 50 x 6 / 4.5 kg/m kg 283 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 248 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 318 9,000 1,780 2,670 890 450

    033671.xls.ms_office 21 - 38

  • 8/22/2019 to vendor

    22/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    c. UNP 100x50x6/ 10.6 kg/m kg 1,130 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 320x131x11.3x17.3 X 6.9 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,130 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 19 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 128 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 87 11,250 2,500 2,763 450 563

    GALLERY_GR7

    1 ELEVATION

    a. L 100 x 100 x 10 / 14.9 kg/m kg 365 9,000 1,780 2,670 890 450

    b. L 100 x 100 x 10 / 14.9 kg/m kg 465 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 1,140 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 1,066 9,000 1,780 2,670 890 450

    e. UNP 320 x 320 x 100 / 59.5 kg/m kg 9,413 8,750 1,780 2,670 890 438

    e. UNP 240 x 85 x 9.5 / 34.16 kg/m kg 5,404 8,750 1,780 2,670 890 438

    2 BOTTOM CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 136 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 969 9,000 1,780 2,670 890 450

    c. L 90 x 90 x 7 / 8.2 kg/m kg 1,327 9,000 1,780 2,670 890 450

    d. UNP 180 x 70 x 8 / 22.58 kg/m kg 1,130 8,750 1,780 2,670 890 438

    e. UNP 150x75x 6.5 / 18.6 kg/m kg 132 8,750 1,780 2,670 890 438

    f. UNP 150x75x 6.5 / 18.6 kg/m kg 1,339 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 50 x 50 x 6 / 4.5 kg/m kg 136 9,000 1,780 2,670 890 450

    b. L 50 x 50 x 6 / 4.5 kg/m kg 969 9,000 1,780 2,670 890 450

    c. L 65 x 65 x 6 / 5.8 kg/m kg 503 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 497 9,000 1,780 2,670 890 450

    d. L 75 x 75 x 6 / 6.8 kg/m kg 690 9,000 1,780 2,670 890 450

    c. UNP 100x50x6/ 10.6 kg/m kg 2,573 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 360x143x13 x 19.5 X 7.8 / 62.5 kg/m kg 1,398 8,900 1,780 2,670 890 445

    6 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 2,573 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 19 9,000 1,780 2,670 890 450

    c. 32 NB PIPE / 3.61 kg/m kg 292 11,250 2,500 2,763 450 563

    d. 25 NB PIPE / 2.46 kg/m kg 199 11,250 2,500 2,763 450 563

    TRESTLES_TR3 TO TR-9

    a. INP 340x137x12.2 x 18.3 X 7.3 / 69.41 kg/m kg 4,257 8,900 1,780 2,670 890 445

    b. INP 300x125x10.8 x 16.2 X 6.5 / 55.08 kg/m kg 13,797 8,900 1,780 2,670 890 445

    d. INP 240 x 123 x 4 x 7 / 36.25 kg/m kg 1,378 8,900 1,780 2,670 890 445

    e. INP 200 x 100 x 3.2 x 4.5 / 36.25 kg/m kg 26 8,900 1,780 2,670 890 445

    f. L 80 x 80 x 6 / 7.3 kg/m kg 2,502 9,000 1,780 2,670 890 450

    g. L 75 x 75 x 6 / 6.8 kg/m kg 2,751 9,000 1,780 2,670 890 450

    h. L 65 x 65 x 6 / 5.8 kg/m kg 7,274 9,000 1,780 2,670 890 450

    Gusset plates, base plates and stiffener kg 16,540 9,000 1,780 2,670 890 450

    2 MISCELLANEOUS

    2 Bolt ASTM A-307 (Prov. Volume)

    1) Available dia Nos. 88 5,000 375 250

    ASTM A325 Bolts

    2) For Available bolt dia kg 979 6,000 450 300

    2 m2 385 85,000 21,250 4,250

    2 m2 1,070 85,000 21,250 4,250

    BILL NO. 6-BC-RH.03&BC-0.3.04C, CONVEYOR - STEEL WORKS

    Not

    1 BC-RH.03&BC-03.04C 267,162

    GALLERY_GR11

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 3,161 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 1,483 8,750 1,780 2,670 890 438

    All unit rates incl. supply, fabrication, derusting w/

    Total

    Corrugated steel sheet roofing type A 750, PERKASAD

    Corrugated steel sheet cladding type A 680, PERKASA

    033671.xls.ms_office 22 - 38

  • 8/22/2019 to vendor

    23/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    c. L 100 x 100 x 10 / 14.6 kg/m kg 308 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 574 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 637 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 347 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,071 9,000 1,780 2,670 890 450

    c. UNP 300x100x10 / 46.3 kg/m kg 1,820 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 775 9,000 1,780 2,670 890 450

    e. UNP 150x75x6.5 / 18.6 kg/m kg 385 8,750 1,780 2,670 890 438

    f. UNP 150x75x6.5 / 18.6 kg/m kg 1,339 8,750 1,780 2,670 890 438

    g. UNP 100x50x6/ 10.6 kg/m kg 67 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 347 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,071 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 621 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 301 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 1,502 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.9 kg/m kg 1,350 9,000 1,780 2,670 890 450

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,502 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 117 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 171 11,250 2,500 2,763 450 563

    GALLERY_GR11A

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 348 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 163 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 426 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 95 9,000 1,780 2,670 890 450

    c. UNP 150x75x6.5 / 18.6 kg/m kg 190 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 162 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 184 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 14 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 21 11,250 2,500 2,763 450 563

    GALLERY_GR12

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 3,212 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 1,507 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 445 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 574 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 637 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 351 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,071 9,000 1,780 2,670 890 450

    c. UNP 300x100x10 / 46.3 kg/m kg 1,891 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 787 9,000 1,780 2,670 890 450

    e. UNP 150x75x6.5 / 18.6 kg/m kg 413 8,750 1,780 2,670 890 438

    f. UNP 150x75x6.5 / 18.6 kg/m kg 1,339 8,750 1,780 2,670 890 438

    033671.xls.ms_office 23 - 38

  • 8/22/2019 to vendor

    24/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    g. UNP 100x50x6/ 10.6 kg/m kg 67 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 351 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,071 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 621 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 301 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 1,526 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.9 kg/m kg 1,350 9,000 1,780 2,670 890 450

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,502 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 118 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 173 11,250 2,500 2,763 450 563

    GALLERY_GR12A

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 348 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 163 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 426 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 95 9,000 1,780 2,670 890 450

    c. UNP 150x75x6.5 / 18.6 kg/m kg 190 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 162 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 184 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 14 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 21 11,250 2,500 2,763 450 563

    GALLERY_GR13

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 3,330 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 1,574 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 465 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 574 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 637 9,000 1,780 2,670 890 450

    f. L 100 x 100 x 10 / 14.6 kg/m kg 420 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,249 9,000 1,780 2,670 890 450

    c. UNP 300x100x10 / 46.3 kg/m kg 1,891 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 787 9,000 1,780 2,670 890 450

    e. UNP 150x75x6.5 / 18.6 kg/m kg 413 8,750 1,780 2,670 890 438

    f. UNP 150x75x6.5 / 18.6 kg/m kg 1,339 8,750 1,780 2,670 890 438

    g. UNP 100x50x6/ 10.6 kg/m kg 67 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 172 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,249 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 621 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 301 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 1,526 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.9 kg/m kg 1,350 9,000 1,780 2,670 890 450

    033671.xls.ms_office 24 - 38

  • 8/22/2019 to vendor

    25/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,526 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 118 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 173 11,250 2,500 2,763 450 563

    GALLERY_GR13A

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 348 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 163 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 426 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 98 9,000 1,780 2,670 890 450

    c. UNP 150x75x6.5 / 18.6 kg/m kg 190 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 190 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 14 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 22 11,250 2,500 2,763 450 563

    GALLERY_GR14

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 3,196 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 1,507 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 173 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 574 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 637 9,000 1,780 2,670 890 450

    f. L 100 x 100 x 10 / 14.6 kg/m kg 231 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 179 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,249 9,000 1,780 2,670 890 450

    c. UNP 300x100x10 / 46.3 kg/m kg 1,891 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 787 9,000 1,780 2,670 890 450

    e. UNP 150x75x6.5 / 18.6 kg/m kg 190 8,750 1,780 2,670 890 438

    f. UNP 150x75x6.5 / 18.6 kg/m kg 1,562 8,750 1,780 2,670 890 438

    g. UNP 100x50x6/ 10.6 kg/m kg 67 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 172 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 1,249 9,000 1,780 2,670 890 450

    c. L 80 x 80 x 6 / 7.3 kg/m kg 621 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 301 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 1,526 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.9 kg/m kg 1,350 9,000 1,780 2,670 890 450

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    033671.xls.ms_office 25 - 38

  • 8/22/2019 to vendor

    26/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    a. UNP 100x50x6/ 10.6 kg/m kg 1,526 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 17 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 118 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 173 11,250 2,500 2,763 450 563

    GALLERY_GR14A

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 350 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 164 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 427 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 99 9,000 1,780 2,670 890 450

    c. UNP 150x75x6.5 / 18.6 kg/m kg 191 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 173 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. UNP 100x50x6/ 10.6 kg/m kg 191 8,750 1,780 2,670 890 438

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 191 8,750 1,780 2,670 890 438

    b. 25 NB PIPE / 2.46 kg/m kg 15 11,250 2,500 2,763 450 563

    c. 32 NB PIPE / 3.61 kg/m kg 22 11,250 2,500 2,763 450 563

    GALLERY_GR15

    1 ELEVATION

    a. UNP 240x85x9.5 / 34.1 kg/m kg 2,391 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 1,130 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 155 9,000 1,780 2,670 890 450

    d. L 90 x 90 x 7 / 8.2 kg/m kg 410 9,000 1,780 2,670 890 450

    e. L 75 x 75 x 6 / 6.8 kg/m kg 425 9,000 1,780 2,670 890 450

    f. L 100 x 100 x 10 / 14.6 kg/m kg 222 9,000 1,780 2,670 890 450

    2 BOTTOM CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 177 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 714 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 176 9,000 1,780 2,670 890 450

    c. UNP 300x100x10 / 46.3 kg/m kg 1,351 8,750 1,780 2,670 890 438

    d. L 90 x 90 x 7 / 8.2 kg/m kg 593 9,000 1,780 2,670 890 450

    e. UNP 150x75x6.5 / 18.6 kg/m kg 212 8,750 1,780 2,670 890 438

    f. UNP 150x75x6.5 / 18.6 kg/m kg 893 8,750 1,780 2,670 890 438

    g. UNP 150x75x6.5 / 18.6 kg/m kg 205 8,750 1,780 2,670 890 438

    h. UNP 100x50x6/ 10.6 kg/m kg 48 8,750 1,780 2,670 890 438

    3 TOP CHORD

    a. L 75 x 75 x 6 / 6.8 kg/m kg 177 9,000 1,780 2,670 890 450

    b. L 75 x 75 x 6 / 6.8 kg/m kg 714 9,000 1,780 2,670 890 450

    c. L 75 x 75 x 6 / 6.8 kg/m kg 176 9,000 1,780 2,670 890 450

    d. L 80 x 80 x 6 / 7.3 kg/m kg 444 9,000 1,780 2,670 890 450

    4 RAFTER&PURLIN

    a. L 50 x 50 x 6 / 4.5 kg/m kg 301 9,000 1,780 2,670 890 450

    b. UNP 100x50x6/ 10.6 kg/m kg 1,151 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.9 kg/m kg 964 9,000 1,780 2,670 890 450

    5 PORTAL FRME-1

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    6 PORTAL FRME-2

    a. INP 340x137x12.2x18.3 x7.3 / 69.41 kg/m kg 889 8,900 1,780 2,670 890 445

    b. INP 300x125x10.1x16.2 x6.5 / 46.3 kg/m kg 270 8,900 1,780 2,670 890 445

    c. UNP 100x50x6/ 10.6 kg/m kg 10 8,750 1,780 2,670 890 438

    7 SIDE RUNNERS&ROOFTRUSS

    a. UNP 100x50x6/ 10.6 kg/m kg 1,151 8,750 1,780 2,670 890 438

    b. L 50 x 50 x 6 / 4.5 kg/m kg 12 9,000 1,780 2,670 890 450

    c. 25 NB PIPE / 2.46 kg/m kg 89 11,250 2,500 2,763 450 563

    d. 32 NB PIPE / 3.61 kg/m kg 131 11,250 2,500 2,763 450 563

    GALLERY_GR15A

    1 ELEVATION

    033671.xls.ms_office 26 - 38

  • 8/22/2019 to vendor

    27/38

    Material Labor Small Tool Transport.

    (2) (5) (8) (9) (10) = (2~9)

    BILL NO. 1 - E12C058 - 650 - TRANSFER TOWER - 1

    DESCRIPTIONNO. UNIT Q'ty

    a. UNP 240x85x9.5 / 34.1 kg/m kg 352 8,750 1,780 2,670 890 438

    b. UNP 140x60x7/ 16 kg/m kg 165 8,750 1,780 2,670 890 438

    c. L 100 x 100 x 10 / 14.6 kg/m kg 428