tony kenny, it manager, beaumont hospital server consolidation at beaumont hospital based on ibm...

25
Tony Kenny, IT Manager, Beaumont Hospit SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

Upload: caleb-baird

Post on 26-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

Tony Kenny, IT Manager, Beaumont Hospital

SERVER CONSOLIDATION AT BEAUMONT HOSPITAL

BASED ON IBM HARDWARE AND VMWARE

Page 2: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

HISTORICAL BACKGROUND

LIST OF SERVERSLIST OF SERVERS

RED HAT ADVANCED SERVER 45WINDOWS SERVERS (NT/2000) 20NOVELLE 1SOLARIS 9 1HP-UX 1HP-3000 2

Page 3: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

SERVERS

Server Nam e MODEL O/S CPU SPEED RAM H-Drive Location Users Applications Age

NTTSVR4 HP LH4R CITRIX 2 550MHZ 3.9GB 18gb Computer Room 50 *

LINSVR4 HP LPR LINUX 1 500MHZ 500MB 18gb Computer Room 3000 Intranet *

LINSVR1 HP LH6000R LINUX 2 700MHZ 1.2GB 40GB Computer Room 1000 A/E,Accreditation,bpu,cardio,FOI, Respond, Endo,EEg, 2 Years

Flextime,Pharmacy,Health/safety,HIPE,Poisons,

LINORACLE HP LH6000R LINUX 1 700MHZ 3.3GB 130GB Computer Room 350 2 Years

NTSVR10 HP LH4R NT 2 500MHZ 2.3GB 66gb Computer Room Sql server 2 Years

NTSVR7 HP LH4R NT 2 500MHZ 2.3GB 67GB Computer Room 40 PDC, Fax Server *

NTTSVR5 HP LH4R CITRIX 2 500MHZ 1.3GB 18gb Computer Room 50 B.H.I.S, P.I.P.E.,A&E, N.D.S, McKeow ns, Intranet *

PSERVER HP LPR LINUX 1 400MHZ 640MB 18gb Computer Room N/A Print Server *

NTTSVR2 HP LH4R CITRIX 2 500MHZ 1.3GB 18gb Computer Room 50 B.H.I.S, P.I.P.E.,A&E, N.D.S, McKeow ns, Intranet *

Helpdesk Server DELL GX 260 NT 1 2.4Ghz 1GB 40GB Helpdesk/Niamh 5 Backup Helpdesk Server 1 Year

NTSVR2 HP LPR LINUX 1 500MHZ 640MB 38GB Computer Room 30 Development server *

LINTESTORACLE HP LH4R LINUX 1 500MHZ 3.3GB 60GB Computer Room N/A Oracle test databases. 3 Years

VERITAS1 HP LPR NT 1 500MHZ 256MB 9GB Computer Room 1 BackupExec / NetBackup, Webserver *

FS3 HP LPR NOVELL 1 500MHZ 256MB 18gb Computer Room 10 Blood Bank *

RENALAPPS COMPAQ ML370 NT 1 1.4GHZ 2.3GB 66gb Computer Room 40 Renalsystem 1 Year

NTSVR3 HP LXE PRO NT 2 200MHZ 196MB 15GB Computer Room 50 FTP Server, ORSOS, *

IPORTAL COMPAQ ML370 LINUX 2 1.4GHZ 2.3GB 2x 72GB Computer Room 1000 E-learning 1 Year

LINSTARSERVER1 SUN LX50 LINUX 2 1.4GHZ 2GB 1gb Computer Room 200 Staroff ice 1 Year

LINSTARSERVER2 SUN LX50 LINUX 2 1.4GHZ 2GB 1gb Computer Room 150 starof f ice 1 Year

DABLSERVER NT 1 1.8GHZ 500MB Comms room 15 DABL System 1 Year

SYBASE HP LC2000 LINUX 2 1.8GHZ 1GHZ Computer Room X-Ray, Imaging 1 Year

NTTSVR3 HP LH4R CITRIX 2 400MHZ 1.3GHZ 18gb Computer Room 50 B.H.I.S, P.I.P.E.,A&E, N.D.S, McKeow ns, Intranet *

WEBSWEEP99 COMPAQ EVO NT 1 2GHZ 256MB 8GB Comms room 200 Internet Web Sw eeper [For Decommissioning Q4 2003]3 Years

OPENVIEW DTCMGR VECTRA VE WIN95 1 200MHZ 64MB 500MB Comms room 1 Controls DTC's *

MASTERPIECE VECTRA VE NT 1 1GHZ 128MB 10GB Comms room 40 Web server for GL *

MEDLINE VECTRA VL400 LINUX 1 730GHZ 256MB 10GB Comms room 50 Medline Server [For Decomissioning Q4 2003] *

NTTPROFILES VECTRA VL420 LINUX 1 1.6GHZ 500MB 10GB Computer Room 250 Samba Print Server 2 Years

NTTSVR6 VECTRA VL400 CITRIX 1 1.9GHZ 512MB 40GB Computer Room 50 B.H.I.S, P.I.P.E.,A&E, N.D.S, McKeow ns, Intranet *

LINSVR3 HP LD PRO LINUX 1 200MHZ 450MB 40GB Computer Room 250 Holds Thin Client user data *

SYSADMIN VECTRA VL420 LINUX 1 1.9GHZ 256MB 10GB Comms room 1 Nagios Server 1 Year

HELPDESK HP LD PRO NT 2 200MHZ 654MB 10GB Comms room 10 RoyalBlue Helpdesk [Standby ] *

BLACKHOLE Svr DELL GX 260 NT 1 2.4Ghz 1GB 40GB Computer Room 3000 Black Hole 1 Year

FLEXIWEB VECTRA VL420 NT 1 1.6GHZ 512MB 10GB Comms room 1000 Web Server for Flexitime System. 3 Years

Helpdesk Server DELL GX 260 NT 1 2.4Ghz 1GB 40GB Computer Room Primary Helpdesk Server 1 Year

ANTIVIRUS VECTRA VL400 NT 1 863MHZ 512MB 10GB Comms room 1000 AntiVirus Softw are Distributer *

NTPDC HP KAYAK NT 1 350MHZ 128MB 15GB Computer Room 1000 primary domain controller *

MAILSWEEP VECTRA VL420 NT 1 1.6GHZ 512MB 10GB Comms room 800 MailSw eeper Softw are. *

New LINSVR2/3 RH9.0 2 2x3.06Ghz 3GB 216GB Computer Room 3000 Thin Client Prof iles, User Data, 1 Year

SCHEDULEDJOBS VECTRA VE NT 1 500MHZ 640MB 10GB Comms room 10 Automates scheduled tasks. *

POLLING PC VECTRA VL420 NT 1 1.6GHZ 128MB 10GB Comms room 1000 Updates Flexitime system from clocks. 3 Years

WEBSWEEP38 VECTRA VL400 NT 1 550MHZ 128MB 10GB Comms room 1000 Websw eeper *

API VECTRA VL400 NT 1 1GHZ 128MB 10GB Comms room 50 Casualty API 1 Year

HP3000 992/300 MPE 3 250MHZ 1.6GB 50GB D/R Room 3 *

HP3000 979/300 MPE 3 400MHZ 3GB 120GB Computer Room 1000 *

HP9000 L2000 HPUX 11.11 2 440mhz 3GB 120GB Computer Room 50 McKeow ns and GL Server *

HP VISUALISE B2000 HPUX 11.00 1 500MHZ 256MB 10GB Computer Room 1 OpenView 3 Years

SUN V880 Solaris5.9 2 600MHZ 1GB 550GB Computer Room 5 Radiology Images. 2 Years

SUSE Compaq Proliant SuseLinux 2 2x1.4Ghz 2.3 GB 2.72 GB Computer Room 3000 Email 1 Year

Proxy Server SUNFIRE V100 SUNSolaris 1 550MHZ 512MB 2X40GB Computer Room 1500 Squid 1 Year

Proxy Server SUNFIRE V100 SUNSolaris 1 550MHZ 512MB 2X40GB Computer Room 1500 Squid 1 Year

Doc Mgt System RH9.0 2 2x2.8Ghz 3GB 2x36GB Computer Room 3000 Jboss, Rostering System, TomCat, LDAP,CVS 1 Year

* = Totally Obsolete

B.H.I.S, P.I.P.E.,A&E, N.D.S, McKeow ns, Intranet

Social Work,toxbase,tissue typing

Oracle Database for P.I.P.E. A&E, N.D.S.

DELLPOWERDGE 2450

DELLPOWERDGE 2650

B.H.I.S. Test System

B.H.I.S.

DELLPOWERDGE 2650

Page 4: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

HISTORICAL BACKGROUND

• GROWING DEMANDS• LEGACY INHERITANCE• ONE BOX / ONE APPLICATION• MAZE OF BOXES• DIFFERENT O/S VERSIONS

WINDOWS• NT• 2000• 2003

LINUX• REDHAT 8• REDHAT 9• REDHAT A/S• RED HAT E/S

Page 5: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

HISTORICAL BACKGROUND

AGE PROFILE OF SERVERSAGE PROFILE OF SERVERS< 7 yrs 85 - 7 yrs 103 - 5 yrs 371 - 2 yrs 110 - 1 yr 4

70

• RELIABILITY• SUPPORT CONTRACTS• MANAGABILITY• DIY ENGINEERING CULTURE

Page 6: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

HISTORICAL BACKGROUND

MANAGEMENTMANAGEMENT• HIGHLY COMPLEX ENVIRONMENTHIGHLY COMPLEX ENVIRONMENT• HIGHLY VOLATILEHIGHLY VOLATILE• HIGHLY CONFUSINGHIGHLY CONFUSING• GENIUS SYNDROMEGENIUS SYNDROME• DYNAMIC SOFTWARE ENVIRONMENTDYNAMIC SOFTWARE ENVIRONMENT

WINDOWSWINDOWS LINUXLINUX MANY NEW PRODUCTSMANY NEW PRODUCTS

Page 7: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

SO WHAT DID WE DO

X445 ESS(6TB)

PRODUCTIONPRODUCTION

DS 4100(9 TB)

DISASTERDISASTERRECOVERYRECOVERY

THEN

Applications

Oracle Database

Applications

TestEnvironment

Page 8: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

NDSNDS EpilepsyEpilepsy

PIPEPIPE

ClinicalClinicalNotesNotes

TheatreTheatre

BHISBHIS

RADRADLABLAB

HRHRBillingBilling

FinanceFinance

IT ALIGNMENT

Page 9: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

CONSOLIDATION OPTIONS

NEW X86 SERVERSNEW X86 SERVERS• BLADES• MULTI-CPU

NUMA SERVERSNUMA SERVERS• SOPHISTICATED

•MEMORY •SHARING

• REDUNDANCY

LITTLE ENOUGH APPARENT DIFFERENCE…. BUT….

• MAINFRAME FOCUS• RELIABILITY• DISCIPLINE• MANAGEMENT

Page 10: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

DISASTER RECOVERY

• STORAGE BASED

• PPRCESS 1 ESS 2

• COMPLEX SET UP

• INVISIBLE TO OPS TEAM

• STILL IN SETUP/TEST MODE

Page 11: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

DISASTER RECOVERY

Network Star

Topology CISCO 2900

CISCO 2900CISCO 2900

Redundancy in networkCICSO Infrastructure

2900 - edge6509 - core

DVE - June 2006

Page 12: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

DISASTER RECOVERY

• FAILOVER SCRIPTING

• STRESS TESTING

• IP ADDRESS SWITCHOVER

• STILL IN DEVELOPMENT

• TARGET Q3 2006

BH MATER

AMNCH SJH SVH

Page 13: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE

CONFIGURATION SET UPCONFIGURATION SET UP

• 3 X445 / 8 CPU / 50GB RAM

• 30 VIRTUAL SERVERS

• DYNAMIC RESOURCE ALLOCATION

• MIXED O/S ENVIRONMENT

• BALANCED NETWORK CONNECTIONS

• DUAL HBA SAN LINKS

Page 14: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE SET UP

NEW CONCEPT FOR US

EAGER TO GET TO GRIPS

•SELF TEACHING

•FORMAL TRAINING

•SOME REWORK REQUIRED

RELATIVELY STRAIGHT FORWARD TO SET UP

Page 15: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE SET UP

GOOD SUPPORT CENTRE (24X7)

VERSION UPGRADES DONE (2.1 -> 2.5)

LITTLE USE MADE OF ADVANCED FEATURES

• VMOTION ?

• VSAN ?

Page 16: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE ISSUES

SOME APPLICATION VENDOR PUSH BACK

RESOURCE POOLING OVER DIFFERENT MACHINES

NEED FOR ADDITIONAL SKILLS TO IMPROVE

SYSTEM MANAGEMENT

DIFFICULT TO DIRECTLY MEASURE PERFORMANCE/

RESOURCE LODING

Page 17: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE ISSUES

DISASTER RECOVERYDISASTER RECOVERY

ONE BIG DRAWBACK - MACHINE FAILURE (31/12)

NO SHARED CONFIGURATION

12 HOURS DOWNTIME

CAUGHT NAPPING

Page 18: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE ISSUES

• SYSTEM MANAGEMENT - BIG CHANGE

• CONFIGURATION CONTROL

• CHANGE CONTROL PROCESS

• DYNAMIC RESOURCE ALLOCATION

• DISTINCT TEST ENVIRONMENT

Page 19: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE ISSUES

• DR NOW IN PLACE

• MULTI BOX MANAGEMENT

• ADDITIONAL TUNING / PERFORMANCE TRAINING

• INTEGRATE WITH VSAN MANAGEMENT

Page 20: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

VM WARE ISSUES

• SERVER ROOM SPACE

• SERVER ARCHEOLOGY

• CONVOLUTED PATCH UP PATHS

• DISPARATE O/S RELEASES

• LACK OF SOP

• REBOOT “CURE ALL”

Page 21: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

WHAT WE GOT

UPGRADED HOSPITALNETWORK

FAST ….SEGMENTED ….SECURE ….

Page 22: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

STRATEGIC INTENT

LIFELIFESUPPORTSUPPORT

CARECAREDELIVERYDELIVERY

CLINICAL CLINICAL SUPPORTSUPPORT

ADMINISTRATIVEADMINISTRATIVE Need

for

reliab

ilit

y

Resp

on

se t

imeCURRENTCURRENT

STATUSSTATUS

HP3000

Page 23: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

STRATEGIC INTENT

• VIRTUALISE VIRTUALISE

• MODULARISE MODULARISE

• POWER MANAGE xPOWER MANAGE x

• SYSTEMATISE SYSTEMATISE

SERVER INFRASTRUCTURESERVER INFRASTRUCTURE

Page 24: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

WHAT I WANT

• DATA CENTRE MANAGEMENT

• RESOURCE BALANCING

• SKILL SET TRANSFER

• CREDIBLE ROLL OUT SCHEDULE

• RELIABILITY- SERVICE DELIVERY- SUPPORT- COMMNICATION

• LITE PROJECT MANAGEMENT

Page 25: Tony Kenny, IT Manager, Beaumont Hospital SERVER CONSOLIDATION AT BEAUMONT HOSPITAL BASED ON IBM HARDWARE AND VMWARE

PAYBACK

Once OffOnce Off Recurring PARecurring PA

Investment Premium 50,000

Training Cost 39,000

Server Maintenance (48,000)Saving

Staff Redeployment (1) (39,000)

Additional Storage 50,000 _______

139,000 87,000

Payback 19 months

BUTBUTROI of Infrastructure• SLA (?)• Uptime (?)• Load balancing (?)• Future Expansion (?)