TOOL KIT ON CONSTRUCTION & DEMOLITION WASTE MANAGEMENT RULES- 2016 September 2017 Capacity Building Programme on Implementation of Waste Management Rules, 2016 Central Pollution Control Board Ministry of Environment, Forests& Climate Change, Govt. of India Ministry of Housing & Urban Affairs National Productivity Council

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 1 of 54

TOOL KIT ON CONSTRUCTION &

DEMOLITION WASTE MANAGEMENT RULES-2016

September 2017

Capacity Building Programme on Implementation

of

Waste Management Rules, 2016

Central Pollution Control Board Ministry of Environment, Forests& Climate Change, Govt. of India

Ministry of Housing & Urban Affairs

National Productivity Council

Page 2: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 2 of 54

Table of Contents 1. Overview of C&D waste management .................................................................................... 5

1.1 Objectives and Scope of the Toolkit ....................................................................................... 5

1.2 Historical Background of Construction Waste Management: ................................................ 5

1.3 Indian Scenario of C&D Waste Processing .............................................................................. 6

1.4 Effects of C&D Waste .............................................................................................................. 7

1.5 Rationale for C&D rules: ......................................................................................................... 8

1.6 Chronology of evolution of C&D Waste Rules ........................................................................ 9

2. Features of C&D Waste Rules-2016 ...................................................................................... 11

2.1 Application (Rule – 2) ............................................................................................................ 11

2.2 Duties of waste Generators (Rule – 4) .................................................................................. 11

2.3 Duties of Service providers and Contractors (Rule –5) ......................................................... 12

2.4 Duties of State Government and Local Authorities (Rule –6 & 9) ........................................ 12

2.5 Duties of CPCB, SPCB or Pollution Control Committee (Rule –8 & 10) ................................. 13

2.6 Standards for products of construction and demolition waste (Rule –11) .......................... 13

2.7 Duties of Central Ministries (Rule –12) ................................................................................. 14

2.8 Facility for processing / recycling facility (Rule –7) ............................................................... 14

3. Implementation Guidance Framework ................................................................................. 15

3.1 Stakeholders involved in the implementation of C &D waste management: ...................... 15

3.2 Tools for effective implementation of C & D Rules 2016...................................................... 17

3.3 Time frames for C & D waste management implementation ............................................... 18

4. C&D Waste Definition, Characteristics, Generation & Quantification – Sources and

Constituents .................................................................................................................................. 19

4.1 Definition of C&D Waste ....................................................................................................... 19

4.2 C&D Wastes generated from different type of sources: ...................................................... 20

4.3 C&D Waste Components and Quantification: ...................................................................... 21

4.4 Physical Composition of Construction & Demolition Waste: ............................................... 22

4.5 Characteristics & Quantity Estimation of C&D Waste: ......................................................... 22

4.6 C&D Waste Processing and Recycling opportunities ............................................................ 24

4.7 Economic Benefits of Using C&D Waste Recycled Products: ................................................ 25

4.8 Environmental benefits of recycling C&D waste .................................................................. 25

4.9 Two Pillars of C&D Waste Stream Utilization: ...................................................................... 25

4.10 RECYCLING OF WASTE CONCRETE ........................................................................................ 25

4.10.1 Necessity of Concrete Recycling: .................................................................................. 26

Page 3: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 3 of 54

4.10.2 Advantages of Concrete Recycling: ............................................................................... 26

4.10.3 Other Benefits of Recycling of Concrete are: ................................................................ 26

4.10.4 Quality of recycled aggregate and its concrete: ........................................................... 27

4.11 Process of C&D waste Recycling ........................................................................................... 27

4.12 Machineries for Recycling ..................................................................................................... 29

4.13 C&D Waste Processing Flow Chart: ...................................................................................... 30

4.14 Products from C&D Waste Processing: ................................................................................. 31

4.15 C&D Waste Recycled Products& its Applications ................................................................. 32

4.16 Uses of C&D Waste Recycled Materials ................................................................................ 35

4.17 Potential uses for materials commonly found in concrete debris ........................................ 35

4.18 C&D Waste Cradle to Grave - Stakeholders: ......................................................................... 36

5. General Terms & Definitions as specified in the Rules (Rule – 3) ......................................... 37

6. ANNEXURES ........................................................................................................................... 38

6.1 Annexure– I: C&D Waste Materials Checklist ....................................................................... 39

6.2 ANNEXURES – II (Tipping Fee & Containers Specifications) .................................................. 41

6.3 ANNEXURES – III : Quantity Estimation of C&D Waste ......................................................... 43

6.4 ANNEXURE– IV : Case studies of Delhi, Ahmedabad and Mumbai ....................................... 44

6.5 ANNEXURE –V: FORM – I ...................................................................................................... 47

6.6 ANNEXURE-VI: Form-II .......................................................................................................... 51

6.7 ANNEXURE-VII: Form –III ...................................................................................................... 52

6.8 ANNEXURE-VIII: Form–IV ...................................................................................................... 55

6.9 ANNEXURE-IX: REFERENCES .................................................................................................. 56

List of Tables Table 2-1 – Schedules in C&D Waste Management Rules-2016 .......................................................... 14Table 4-1 – Components of C&D Waste ............................................................................................... 21Table 4-2 – Typical composition of Indian C&D waste ......................................................................... 23Table 4-3 – Different Products obtained from C&D Waste Processing ................................................ 32Table 4-4 – Potential Uses of Materials Segregated from C&D Waste Processing .............................. 35

List of Figures

Figure 1-1 – Dumping of C&D Waste in Public Places ............................................................................ 7Figure 4-1 – Demolition & Construction Waste .................................................................................... 19Figure 4-2 – Sources of C&D Waste ...................................................................................................... 20Figure 4-3 – Physical Composition of C&D Waste ................................................................................ 22

Page 4: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 4 of 54

Figure 4-4 –Characterization of Building-related C& D waste in USEPA, June, 1998 ........................... 23Figure 4-5 – Typical C&D Waste Composition in India ......................................................................... 24Figure 4-6 – Process of Waste Concrete Recycling ................................................................................ 27Figure 4-7 – Cycle of C&D Waste Processing ........................................................................................ 28Figure 4-8 – C&D Waste Processing Flow Chart: .................................................................................. 30Figure 4-9 – Cradle to Grave Stakeholders ........................................................................................... 36

Page 5: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 5 of 54

Overview of C&D waste management

1.1 Objectives and Scope of the Toolkit

The objective of this toolkit is

• To aid the trainer with background reading material in an easy to adapt and

customize training programs to different stakeholders.

• To aid the stakeholders to comprehend their roles in implementing these rules.

The scope of this training kit is to provide reading material for capacity builders and

stakeholders in the area of C&D Waste Management as per C&D Waste Management Rules

2016,

1.2 Historical Background of Construction Waste Management:

Recycling of demolition waste was first carried out after the Second World War in Germany

to tackle the problem of disposing large amount of demolition waste caused by the war and simultaneously generate raw material for reconstruction.Considerable research has been

carried out in U.S.A, Japan, U.K, France, Germany, Denmarkand in other developed

countries for recycling concrete, masonry, bricks, bituminous and other constituents of waste from Construction Industry.

In India Central Building Research Institute (CBRI), Roorkee, and Central Road Research Institute (CRRI), New Delhi have done studies to assess and demonstrated possibility of

using construction waste to substitute new materials of recycling.

According to Technology Information, Forecasting and Assessment Council (TIFAC), study,

70% of the construction industry is not aware of recycling techniques and concludes the

need for quality standards for recycled aggregate materials and recycled aggregate concrete

to help setting targets for quality products and assure the user of a minimum quality

requirement, thus encouraging him to use it.

The C&D rules takes into account the historical perspective of the problems of C&D waste

disposal and methods deployed to manage them, both locally and globally.

Page 6: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 6 of 54

1.3 Indian Scenario of C&D Waste Processing

In India, it is very common to see huge piles of C&D waste, stacked alongside of major roads

resulting in traffic jams, congestion and disruption & chocking of drains. Around 30% of the

total municipal solid waste generated in the country comprises of C&D waste.

TIFAC has conducted a techno-market survey on 'Utilization of Waste from Construction

Industry' targeting housing/building and road segment. The total quantum of waste from

construction industry is estimated to be 12 to 15 million tons per annum out of which 7-8

million tons are concrete and brick waste.

As per the Central Public Health & Environmental Engineering Organization (CPHEEO), the

Indian Real Estate Industry alone is facing a shortage of aggregates to the extent of 55,000

million cum. In addition, 750 million cum of aggregates would be required to achieve the

targets of road construction sector, which will lead to tremendous pressure on natural resources.

The C&D Waste generated in each city would reflect different characteristics based on each city’s growth pattern and lifestyle. While retrievable items such as bricks, wood, metal, titles

are recycled, the concrete and masonry waste, accounting for more than 50% of the waste

from construction and demolition activities, are not being currently recycled in India.

Page 7: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 7 of 54

Figure 1-1 – Dumping of C&D Waste in Public Places

The traditional practice in India is to dispose of this waste in landfills or illegally dump in

rivers and water bodies. Faced with growing environmental concerns and lack of landfill

space, most cities like Ahmedabad, Delhi, Mumbai and Pune are opting for recycling and

recovery of materials from C &D waste.

1.4 Effects of C&D Waste

Construction activities occur to build/rebuild new structures or old structures. Demolition

activities are growing due to old structures needing restructuring or replacement with time to make way for vertical structures or flats in line with growing needs of the society. All such

activities generate C&D waste.

Disposal of such debris in a safe environment is a big challenge for the builders, developers, and owners. When on one hand the disposal of debris is a challenge, then, on the other

hand, there is an acute shortage of naturally available aggregates for the construction of

buildings. Reduction of this demand is possible only with the reusing or recycling of waste

generated from the construction activities.

Construction, renovation, and demolition projects create environmental and economic

problems in addition to waste. These include depletion of already diminishing natural

resources, air and water pollution from waste that is improperly disposed of, and, for many

state and local governments, pressure on premium landfill space and taxpayer money. As

virgin materials become scarcer and more costly, some increased recycling of construction,

renovation, and demolition waste has occurred, but most of these materials continue to be discarded. Moreover, many types of construction materials and demolition waste contain

persistent, bio-accumulative toxins (PBTs) and other hazardous substances.

Typically, demolition activity is undertaken by specialized demolition contractors who bring their own equipment and personnel and transport the residual waste. The property owners

Page 8: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 8 of 54

pay fee to the demolition contractors, which is decided based on the recoverable value of

recycled materials – steel, wood, glass, pipes etc. by demolition contractors.

The environmental impacts of unmanaged C&D waste are evident. Waste to resource

approach towards recycling C&D waste brings great benefit.

Environment and Social Impacts of Unmanaged C&D Waste include:

Impose strain on landfill needs;

Hazardous portion of waste, such as asbestos, could lead to potential harm to the

environment and public health issues;

Illegal dumping affecting the bio-habitat of dump area and creates potential public

health issues such as mosquito breeding;

Potential high value of recycled material not tapped and gets buried in landfills or

illegal dumps leading to economic loss;

Increasing quantity of C&D Waste leads to un-sustainable situation;

Reliance on mines and natural sources for building material leads to escalating price,

un- sustainable supply and high transportation costs;

To address the problems of resource depletion, increasing demand for building materials,

societal awareness on pollution effects (dust, pollution due to traffic congestion owing to roadside disposal) of C&D these rules were framed.

1.5 Rationale for C&D rules:

India’s population living in cities and urban areas increased from 14% at the time of independence to 27.8% during 2001, again it has increased from 27.8 percent in 2001 to

31.16 percent in 2011. The increased urbanization and scarce land created opportunity and

demand for multistoried housing flats in place of independent houses. The demolition of old structures generates C& D waste besides new construction requiring building materials

creating the need to manage demolition waste through 3R’s principles and planned

disposal.

The rules are framed to address

• The current common practice to pile C&D waste in the road or illegally dump in less populated areas causing traffic congestion.

• C&D waste from individual households finding its way into nearby municipal bins

Page 9: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 9 of 54

• To avoid missing of this waste with municipal waste making it heavy, and degrading

its quality in MSW processing such as composting or energy recovery etc.

• To prevent clogging of surface drains blocking free flow of water runoff and

obstructing them.

• To create a framework for organized storage, collection, reuse or disposal waste

generated.

• To meet the demand for aggregates in the housing and road sectors through

recovery of materials from C& D waste to reduce significant gap in demand and

supply.

• To reduce resource depletion due to sand mining which is becoming a major source

of problem. Recycling of aggregate material from construction and demolition waste

will reduce the demand-supply gap in both these sectors.

1.6 Chronology of evolution of C&D Waste Rules

C&D waste is one of the major components of MSW and is a major hindrance in waste processing when mixed with MSW and delivered at the processing facility. C&D waste finds

a brief mention in Schedule III of the Municipal Solid Waste (Management and Handling)

Rules, 2000 and the ‘‘Manual on Municipal Solid Waste Management’’ of the MoUD, 2000 has a chapter on C&D waste which lays down basic guideline on its handling.

Municipal CorporationofGreaterMumbaihasnotified Construction&Demolition and Desilting Waste (Management & Disposal) Rules 2006.

The Delhi government has decided to mandate recycled products from C&D waste in

prospective contracts for building works and road works. Following the verdict, all Delhi

government authorities are required to incorporate a clause in their tenders: It mandates

use of a minimum of two percent recycled products in all future contracts for building works

and ten percent recycled products for road works. Five percent use of such products is

expected for non-structural applications during examining and approving building plans.

To address the growing problem of C&D waste, and have uniformity in approach to address the issue which is being randomly and separately being addressed by each state, C&D Waste

Management Rules 2016 were enacted by MOEF&CC vid Gazette notificationG.S.R. 317(E)

Part-II, Section-3, Sub-section (ii).

Key highlights of the recent developments:

• Mandatory for large cities to setup recycling plant within 18 months and smaller

cities within 2-3 years.

Page 10: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 10 of 54

• Generators of waste are required to pay notified collection and processing fees.

• Imposition of heavy penalties on illegal dumping of C&D Waste.

• Use of Construction & Demolition waste 20% to 100% is allowed in construction. IS-

383 standard code revised.

• Introduction of Centralized Helpline number including Mobile App in Delhi.

Page 11: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 11 of 54

Features of C&D Waste Rules-2016

The Government has notified Construction & Demolition Waste Management Rules, 2016

for the first time. These rules shall be called the “Construction and Demolition Waste

Management Rules, 2016” (Rule – 1).The guiding principle of these Rules is to recover,

recycle and reuse (3R’s) the waste generated through construction and demolition.

Segregating construction and demolition waste and depositing it to the collection centers

for processing will now be the responsibility of every waste generator.

Cities with a population of more than one million will commission processing and disposal

facility within 18 months from the date of final notification of these rules, while cities with a

population of 0.5 to 1 million and those with a population of less than 0.5 million will have

to provide these facilities within two years and three years respectively. (Rule – 13)

Monitoring shall be made by State Pollution Control Boards (SPCBs) 3 times a year i.e.once

in 4 months for cities having population more than one million. Cities with population of

0.5-1 million and less than 0.5 million shall be Monitored by SPCBs 2 times a year i.e.once in 6 months. (Rule – 13)

“Permission for construction will be given only when the complete construction and demolition waste management plan is presented”, large generators of waste will have to

pay relevant charges for collection, transportation, processing and disposal, as notified by

the concerned authorities.

The following are the important features of the Construction & Demolition Waste

Management Rules, 2016.

1.7 Application (Rule – 2)

- Applies to everyone who generates construction and demolition waste.

1.8 Duties of waste Generators (Rule – 4)

- Every waste generator shall segregate construction and demolition waste and deposit

at collection center or handover it to the authorized processing facilities.

- Shall ensure that there is no littering or deposition so as to prevent obstruction to the

traffic or the public or drains.

Page 12: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 12 of 54

- Large generators (who generate more than 20 tons or more in one day or 300 tons

per project in a month) shall submit waste management plan and get appropriate

approvals from the local authority before starting construction or demolition or

remodeling work,

- Large generators shall have environment management plan to address the likely

environmental issues from construction, demolition, storage, transportation process

and disposal / reuse of C & D Waste.

- Large generators shall segregate the waste into four streams such as concrete, soil,

steel, wood and plastics, bricks and mortar,

- Large generators shall pay relevant charges for collection, transportation, processing

and disposal as notified by the concerned authorities;

1.9 Duties of Service providers and Contractors (Rule –5)

- The service providers shall prepare a comprehensive waste management plan for

waste generated within their jurisdiction, within six months from the date of

notification of these rules,

- Shall remove all construction and demolition waste in consultation with the

concerned local authority on their own or through any agency.

- Accidents if any during the process shall be Reported to Local authority on time (FORM-V)(Rule – 14)

1.10 Duties of State Government and Local Authorities (Rule –6 & 9)

- The Secretary, Urban Development Department in the State Government shall

prepare state’s policy with respect to management of construction and demolition of

waste within one year from date of final notification of these rules.

- The concerned department in the State Government dealing with land shall provide

suitable sites for setting up of the storage, processing and recycling facilities for

construction and demolition waste with one-and-a-half years from date of final

notification of these rules.

- The Town and Country planning Department shall incorporate the site in the

approved land use plan so that there is no disturbance to the processing facility on a

long term basis.

- Shall procure and utilize 10-20% materials made from construction and demolition

waste in municipal and Government contracts.

Page 13: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 13 of 54

- Local Authority shall place appropriate containers for collection of waste, removal at

regular intervals, transportation to appropriate sites for processing and disposal.

- LA shall seek detailed plan or undertaking from large generator of construction and

demolition waste and sanction the waste management plan;

- Seek assistance from concerned authorities for safe disposal of construction and

demolition waste contaminated with industrial hazardous or toxic material or nuclear

waste if any;

- LA shall give appropriate incentives to generator for salvaging, processing and or

recycling preferably in-situ;

- LA shall establish a data base and update once in a year,

- Million plus cities (based on 2011 census of India), shall commission the processing

and disposal facility within one-and-a-half years from date of final notification of these rules

- 0.5 to 1 million cities, shall commission the processing and disposal facility within two

years from date of final notification of these rules

- For other cities (< 0.5 million populations), shall commission the processing and

disposal facility within three years from date of final notification of these rules

- Shall review and issue instructions to the in- charge of the facility if any accidents reported by in charge of the processing facility (Rule – 14). Checklist of safety

concerns are included in annexure-1 for reference.

1.11 Duties of CPCB, SPCB or Pollution Control Committee (Rule –8 & 10)

- The Central Pollution Control Board shall prepare operational guidelines related to

environmental management of construction and demolition waste.

- SPCB shall grant authorization to construction and demolition waste processing

facility (Form-III)

- Monitor the implementation of these rules by the concerned local bodies

- Submit annual report to the Central Pollution Control Board and the State

Government. (Form IV)

1.12 Standards for products of construction and demolition waste (Rule –11)

- The Bureau of Indian Standards need to prepare code of practices and standards for

products of construction and demolition waste

Page 14: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 14 of 54

- Indian Roads Congress need to prepare standards and practices pertaining to

products of construction and demolition waste in roads construction.

1.13 Duties of Central Ministries (Rule –12)

- The Ministry of Urban Development, and the Ministry of Rural Development, Ministry

of Panchayat Raj, shall facilitate local bodies in compliance of these rules;

- The Ministry of Environment, Forest and Climate Change shall review implementation

of these rules as and when required.

1.14 Facility for processing / recycling facility (Rule –7)

- The operator of the facility shall obtain authorization from State Pollution Control

Board or Pollution Control Committee.(Form-I)

- The processing / recycling site shall be away from habitation clusters, forest areas,

water bodies, monuments, National Parks, Wetlands and places of important cultural, historical or religious interest.(Schedule-I)

- The processing/recycling facility exceeding five Tones per day capacity, shall maintain

a buffer zone of no development around the facility.

- The operator of the facility shall submit the annual report to the State Pollution

Control Board (Form II).

Table 2-1 – Schedules in C&D Waste Management Rules-2016

Schedule I : Criteria for Site Selection for Storage and Processing or Recycling Facilities

for construction and demolition Waste [See Rule 7(1)]

Schedule II : Application of materials made from construction and demolition waste and

its products [See Rule 7(3)]

Schedule III : Timeframe for Planning and Implementation [See Rule 13]

Page 15: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 15 of 54

Implementation Guidance Framework

This chapter is designed to provide a framework for implementing C & D rules 2016 with respect to activities of government, public & private agencies and other stakeholders within the timelines targeted under the rules. Implementation C & D waste management rules can be visualized as four parallel work elements in three time frames based on cities population. The four parallel work elements are visualized to be executed by:

• Central Governmental ministries and government agencies having the macro role of overseeing overall implementation, providing guidance, assessing and reviewing the relevance of policy through agencies as given in figure below.

• State/Regional local level governmental agencies playing the regional and local role of formulating local policy, action plan and modalities of implementing action plan.

• Infrastructure development and operational agencies assessing, establishing and operating collection, processing facilities besides marketing processed products.

• Opinion makers, community leaders, NGOs and other awareness generation and go-between actors among generators and government agencies to ensure generators follow the rules and processors process in safe and environmentally compliant manner.

1.15 Stakeholders involved in the implementation of C &D waste management:

This can be understood from the chart below.

The implementation of the rules requires understanding of activities to be performed by each of these stakeholders and comprehension of interdependency on each other. The chart below provides the activities to be undertaken by key stakeholders. The activity progress information flow from one stakeholder to the other is indicated by color coding of text and directional arrows. It may be noted Facility Planner, Developer and operator are indicated separately for ease of understanding but all three roles may be performed by single contractor or government agency.

GENERATORS

•Large scale(>20T/d or >300T /Project/Month)

• Small scale

FACILITY DEVELOPERS/OPER

ATORS

•Public

•Private

•Public-Private Partnership

STATE LEVEL/LOCAL AUTHORITY

• Secretary In-charge, Urban Development

• SPCB• Municipal

Corporation• Town & Country

Planning Department

CENTRAL AGENCIES

•MoEFCC•CPCB•MoUD•MoRD•MoPR•BIS• IRC

Page 16: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 16 of 54

ACTIVITY CHART FOR IMPLEMENTING C & D WASTE RULES 2016

State/Municipal Authority implementation Tasks

• Formulate and promulgate regional policy and local city wise action plans. • Identify and notify land for processing and collection centers. • Notify land use change plan by town planning departments. • Designate centers for collection and processing along with quantum of waste likely from

each center. • Define responsibilities of

o local government officials o small and large generator

• Assess severity of C&D waste effects and need for more stringent rules. • Develop local language awareness material and campaign programs for deposition and

handling of wastes. • Assess and notify waste disposal Fee. • Decide facility operation mode: Public/private/ public-private mode. • If Private of PPP mode is chosen develop terms of reference and tender/bid documents • Design and notify incentive schemes for

o Recycling and salvaging of materials. o Use of materials made of C&D waste.

• Penalties to be charged o For violations by generators o For violation of TOR by Facility developer and operator.

• Compile annual reports submitted by operator to SPCB/ Secretary who in turn will submit to CPCB.

C&D Waste Operator

Demonstrate follow of standard operational procedures ( Eg: ISO 9000 certification) Follow regulations prescribed by SPCB and other agencies. Report :

Accidents Pollution status (air quality, noise, water pollution, solid and HW generation) Annual report of quantum of waste collected and processed

Maintain records of • Water and energy use • Inspection reports by SPCB • Accidents • Community complaints

GENERATOR: • All generators: Collect within the premises and handover to facility for

processing. Small scale generatorspay storage + collection + transportation fee

Large scale generators: • Segregate concrete, soil, steel, wood & plastics, bricks & mortar • Submit waste management plan • Approval from local authority • Pay relevant fee (storage+ collection+ transportation + processing &

Disposal)

Central Government/CPCB/MOEF: Implementation Tasks

• .

C&D Waste Facility Planner: • Prepare and seek approval for DPR from regulatory agencies

and for utilities like electricity and water. • Identify fund sources (Bonds, loans from multilateral agencies,

banks, grants from central government) • Project financial closure.

C& D Waste Processing Facility Developer. • Land Development. • EPC of facility

• Review policy changes needed. • Disseminate best practices and learnings

from different states by CPCB. • Formulate Standards for recycled

materials and road construction by BIS and IRC

• Monitoring implementation of o Regional policy and action

plan o Progress of implementation

Assess issues being faced and provide direction in implementation

Page 17: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 17 of 54

Agencies,planning collection centers needs to undertake a forecast study about the likely C&D waste generation in each area and accordingly design the facility. A new residential area may not need the facility for next 15-20 years and an old or upcoming area may require the facility and hence this aspect needs to be addressed keeping local conditions in mind.

As per the rules the C&D waste needs to be stored within their premises and either deposited at collection center on their own or through facility arranged by local public/private agency for a fee. Since the criteria is waste needs to be stored within one’s premises how it will be stored is left to the generator with a mandate that the waste does not cause littering, blockage of drains and not obstruct traffic. Also, the amount of waste for minor or moderate repairs in existing buildings to complete destruction varies no standardized bin sizes can be advocated.

1.16 Tools for effective implementation of C & D Rules 2016

For effectively implementing the activities outlined in the chart above

• Operators can use form-I to seek approval of local authority and authorities can issue permission in Form –II. For aggregating information at local to state level Form-III and then from state to central level Form-IV can be used to enable policy makers to review progress and make amendments to policy or give directions.

• Checklists can be used to monitor progress of work for each hierarchical level. Templates outlining key monitoring elements are developed as checklists and presented below which can be further refined based on local conditions.

CHECKLIST FOR CENTRAL LEVEL AGENCIES Activities to monitor Yes No Regional policy has been framed List of city wise action plans outlining areas identified and notified by town and country planning department.

Copy of letter stating chosen method for developing process ( public/ private/ public-private)

Terms of reference, bidding method and process developed Copy of letter of award of contract to developer and operator DPR approval letter by SPCB and other agencies submitted by developer Land allotment for Collection & processing done List of NGOs, community leaders identified Public awareness and campaigns in regional level promoted Fee charges for collection fixed Subsidy framework and quantum fixed for use of processed material done List of officials designated with responsibility for each city

Page 18: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 18 of 54

CHECKLIST FOR STATE LEVEL AGENCIES Activities to monitor Yes No List of approved designated centres by Responsibilities of local authorities fixed Stringency of existing rules sufficient Location specific bye-laws required for -------- city Awareness and campaign plans of each city and budget allocated Fee of disposal fixed Subsidy quantum and mode of disbursal framed Collection & treatment through Public/ private/ public-private agency Penalties for violation of contract fixed

CHECK LIST FOR LOCAL CITY/ MUNICIPAL CORPORATION AUTHORITY /SPCB Activities to monitor Yes No Quantity of waste generation estimated in ------ locality Tender has been floated DPR prepared/reviewed DPR approved Responsibilities of generator fixed Find raising formalities carried out Land allotted for the facility Land development completed EPC started Construction and commissioning completed Inspection by SPCB

1.17 Time frames for C & D waste management implementation

These checklists needs to be looked in conjunction with desired time frame for implementing the rules as given in table below to appreciate interdependencies among various stakeholders and the need to work in coordinated manner to ensure timely, qualitative and quantitative completion of development of collection and processing facilities.. Compliance criteria Cities with

population of 01 million and above

Cities with population of 0.5-0.1 million

Cities with population of less than 0.5 million

Formulation of policy by state Government

12 months 12 months 12 months

Identification of sites for collection & processing facility

18 months 18 months 18 months

Commissioning & implementation of the facility

18 months 24 months 36 months

Monitoring by SPCBs 3 times a year-once in 4 months

2 times a year-once in 6 months

2 times a year-once in 6 months

Page 19: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 19 of 54

C&D Waste Definition, Characteristics, Generation & Quantification –

Sources and Constituents

1.18 Definition of C&D Waste

Construction and Demolition (C&D) waste is generated whenever any construction or demolition

takes place. These wastes consist of mostly inert and non-biodegradable material like concrete,

tiles, brick aggregates, plaster, wood, plastics, gypsum, glass, metals, solvents, asphalt, asbestos,

excavated soil & rock particles etc, many of which can be recycled. These wastes are heavy, bulky

and occupy considerable amount of space when dumped without processing. Conventionally these wastes excluding metal and wood are regarded as a material with limited economic potential, but

actually these wastes provide an ideal solution to minimize the problems of virgin material

exhaustion ( Eg: Sand, aggregates etc).

During construction activity, excessive cement mix or concrete left after work is over due to

rejection/ demolition caused by change in design or wrong workmanship etc. Construction wastes

are mainly leftovers from new construction materials like Excavated material such as rock and soil, Waste asphalt, broken bricks, concrete, plasterboard, timber and vegetation during construction

and all other wastes includes from construction activities on a typical construction site.

Figure 4-1 – Demolition & Construction Waste

As per Rule 3 (c) "construction and demolition waste" means the waste comprising of building materials, debris and rubble resulting from construction, re-modeling, repair and demolition of any civil structure;

Page 20: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 20 of 54

1.19 C&D Wastes generated from different type of sources:

Figure 4-2 – Sources of C&D Waste

C&D Waste

Construction &Other Wastes

Excavation Soil

Roadwork Waste

Demolition Waste

Excavation Activity Road

Railroad Airport Runway Construction Renovation Demolition

Activity

Building Demolition Activities; Such as Residential Educational Health care Industrial

building

Construction Excavation Renovation Refurbishment Demolition Roadwork and Other

Construction Related Activities

Type

of W

aste

So

urce

s Co

mpo

nent

s Plantsoil Soil Sand Gravel Rock Clay

Concrete Broken

asphalt Paving

Stone Sand Pebble Railway

Traverse d

Concrete with Iron

Concrete without iron

Roofing Construction and Roofing Cover (wood, tile, isolation material)

Wall Materials (brick, briquet, stone)

Stucco

Concrete, Wall

materials (brick, briquet, stone)

Stucco Sand Pebble Wood Plastics Ceramics Metals Paper and

Carton

Page 21: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 21 of 54

1.20 C&D Waste Components and Quantification:

C&D waste can be classified into two components;

Table 4-1 – Components of C&D Waste

1. Major components includes, 2. Minor components includes,

• Cement concrete

• Bricks

• Cement plaster

• Steel from RCC

• Doors & windows

• Roofing support systems

• Rubble

• Stones & Clay (Soil from excavation)

• Timber etc.

• Conduits,

• GI pipes/Iron pipes/Plastic pipes

• Electrical fixtures,

• Panels,

• Asbestos and contaminated soil,

• Glass.

• Plastic carry bags, sachets of

tobacco and other plastics,

Clothes, Cement bags, gunny bags, Thermocol, etc.

Demolition waste are mainly the collection of all construction materials from a building after

removal of salvageable components like doors and windows. Demolition wastes are much larger in volume than the construction wastes. According to Danish Environmental Protection Agency

(DEPA), 2003, 30% of the total waste generated was C&D waste. Of this 70-75% waste generated

was from demolition activity, 20-25% from renovation and remaining 5-10% from new building developments

In India the following amount of C&D Wastes generated during different activities.

Demolition of Pucca and Semi-Pucca buildings on an average generates 500 and 300 kg. Per

Sq.m. Respectively.

Estimated waste generation during construction is 40 to 60 Kg. per Sq.m.

Waste generation during renovation/ repair work is estimated to be 40 to 50 kg. Per Sq.m.

The disposal of C&D waste contributes to environmental concerns including wasted materials and

embodied energy, greenhouse gas generation and other environmental impacts associated with

producing new materials instead of using existing materials. Concurrently, the number of C&D

landfills is declining, which means fewer disposal options, greater hauling distances, and increased

fuel consumption and vehicle emissions.

Page 22: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 22 of 54

1.21 Physical Composition of Construction & Demolition Waste:

Figure 4-3 – Physical Composition of C&D Waste

1.22 Characteristics&Quantity Estimation of C&D Waste:

It is commonly understood that C&D waste can be considered a resource and can be reused on-site

or elsewhere, or recycled. Central Pollution Control Board has estimated current quantum of solid

waste generation in India to the tune of 48 million tons per annum out of which, waste from

construction industry only accounts for more than 25%. Management of such high quantum of

waste puts enormous pressure on solid waste management system.

Furniture and Furnishings:Office furniture

Partition systemsMedical/lab equipment

Reception/casual furnitureLockers/athletic

equipment

Architectural salvage:Doors and door

framesWindows and frames

MillworkNon-Ferrous Metals:

Wiring/conduitPlumbing

(pipes, fixtures)HVAC

(ductwork, motors)

Aggregate:Concrete (with &

without rebar)Brick

Concrete blockLand clearing

residuals:Trees, stumps, brush

SoilFerrous Metals:Structural steelSteel framing

membersPorcelain fixtures

Wood:Dimensional lumber

Panels (plywood, OSB, MDF

)Engineered beams

(Glu-lam, etc.)Carpeting:BroadloomCarpet tiles

Roofing:Shingles

Commercial membrane

Wood, metal, slateAsphalt

Ceiling tilesGypsum Wallboard

Page 23: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 23 of 54

C&D waste can be characterized based on the source of generation or the components of the waste

as shown in following figures.

Figure 4-4 –Characterization of Building-related C& D waste in USEPA, June, 1998

Estimate of C&D waste:

TIFAC calculated waste from the construction industry accounting for 25 percent of solid waste or

12 to 14 million tons per annum. Methodology for C& D waste estimation is given in annexure-2.

Though it is very difficult to predict the characteristics of C&D Waste, it can broadly be categorized

as mixture of following materials: Table 4-2 – Typical composition of Indian C&D waste

Material Composition

Soil, Sand & Gravel 36% Brick &Masonary 31%

Concrete 23% Metals 5%

Bitumen 2% Wood 2%

Others 1% Source: Technology Information, Forecasting and Assessment Council, Department of Science

and Technology, Government of India, 2001

33%

23%21%

15%5%3%

Characterization of Building-related C&D waste in USEPA, June, 1998

Non Residential Demolition Residentional Renovation

Non Residentional Renovation Residential Demolition

Residential New Construction Non Residential New Construction

Page 24: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 24 of 54

i

Figure 4-5 – Typical C&D Waste Composition in India

1.23 C&D Waste Processing and Recycling opportunities

Reuse and recycling of C&D waste is one component of a larger holistic practice called sustainability

or green building construction being practiced in most developed countries. Re-utilization or recycling is an important strategy for management of such waste.

Construction and demolition waste can be used in the following manner:

• Reuse (at site) of bricks, stone slabs, timber, conduits, piping railings etc. to the extent possible

and depending upon their condition.

• Sale / auction of material which cannot be used at the site due to design constraint or change in

design.

• Plastics, broken glass, scrap metal etc. can be used by recycling industries.

• Rubble, brick bats, broken plaster/concrete pieces etc. can be used for building activity, such as, leveling, under coat of lanes where the traffic does not constitute of heavy moving loads.

• Larger unusable pieces can be sent for filling up low-lying areas.

• Fine material, such as, sand, dust etc. can be used as cover material over sanitary landfill.

• Use as a granular sub-base (the layer above compacted earthen sub-grade) in road construction.Sub-base is generally constructed using non-plastic moorum. Processed C&D waste

(after sizing and sieving) can be used in road pavement for sub-base construction.

Soil, Sand & Gravel

36%

Bricks & Masonry31%

Concrete23%

Metals5%

Bitumen2%

Wood2%

Others1%

Page 25: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 25 of 54

C&D waste being a free draining material, its proper particle gradation can be used in place of

moorum.

1.24 Economic Benefits of Using C&D Waste Recycled Products:

1. Use of recycled aggregate up to 30% does not affect the functional requirements of the

structure as per the findings of the test results.

2. Various tests conducted on recycled aggregates and results compared with natural

aggregates are satisfactory as per IS 386.

1.25 Environmental benefits of recycling C&D waste

The environmental benefits of recycling C&D waste are considerable. By assessing carbon di oxide

and energy use at a large scale recycling plant, researchers have shown that, over its 60 year life

span, the carbon di oxide emissions prevented will be ten times as much as those produced, and

eight times as much energy will be saved, than is used .

It eases the production and emission of greenhouse gas and other pollutants by reducing the need

to extract raw materials and transporting the materials long distances. It reduces the need for new

landfills and the costs involved in it. Recycling saves energy and also reduces the environmental impact. It creates employment opportunities in recycling industries. A lot of money can be saved by

reducing the project disposal costs, transportation costs and the cost of new construction materials

by recycling old materials onsite.

1.26 Two Pillars of C&D Waste Stream Utilization:

1. Reusing of C& D Waste: It does not require any further processing to convert into a useful

product. The items which are usable directly are screened out from the debris and put into the possible use without further processing.

2. Recycling of C&D Waste: Once the waste generated from construction and demolition

activities has been segregated and reusable items are taken out, the leftover is available for

further processing i.e. recycling into next useful stage.

1.27 RECYCLING OF WASTE CONCRETE

Recycling of waste concrete is done to reuse the concrete rubble as aggregates in concrete. The

recycled aggregates have less crushing strength, impact resistance and specific gravity and has

more absorption value as compared to fresh aggregates.

Page 26: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 26 of 54

1.27.1 Necessity of Concrete Recycling:

Millions of tonnes of waste concrete is generated every year around the world due to following

reasons:

• Demolition of old structure,

• Destruction of buildings and structures during earthquakes and wars,

• Removal of useless concrete from structures, buildings, road pavements etc.

• Waste concrete generated due to concrete cube and cylinder testing, destructive methods

of testing of existing structures etc.

1.27.2 Advantages of Concrete Recycling:

Usually demolished concrete were shipped to landfills for disposal, but due to greater

environmental awareness, the concrete is being recycled for reuse in concrete works. There are a

variety of benefits in recycling concrete rather than dumping it or burying it in a landfill. Keeping

concrete debris out of landfills saves space there.

1.27.3 Other Benefits of Recycling of Concrete are:

• Local Product – Local Sources

• Reduces Truck Traffic

• Alternative to a Non-Renewable Resource

• Cost Savings

• No Disposal Fees

• Better Trucking Utilization (Reduced Costs)

Using recycled material as gravel reduces the need for gravel mining. There are also economic

benefits. Recycled concrete is a construction material that the community does not need to pay for; those who generated the concrete waste pay a fee to have it recycled.

Page 27: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 27 of 54

Figure 4-6 – ProcessofWasteConcreteRecycling

1.27.4 Quality of recycled aggregate and its concrete:

The strength of recycled aggregate concrete is about 10 to 15 per cent less as compared to

concrete with fresh aggregate. However suitable mix designs may be made and reliable results obtained. The mix requires slightly higher quantity of cement or using admixtures to reduce water

requirement.

Recycled aggregate concrete can be safely used as plain concrete. With proper corrections in mix

design, it can be used for R.C.C. works also.

1.28 Process of C&D waste Recycling

Crushing and screening systems start with primary jaws, cones and/or large impactors taking rubble

from 30 inches to 4 feet. A secondary cone or impactor may or may not need to be run, and then

primary and secondary screens may or may not be used, depending upon the project, the

equipment used and the final product desired.

A scalping screen will remove dirt and foreign particles. A fine harp deck screen will remove fine

material from coarse aggregate. Further cleaning is necessary to ensure the recycled concrete

product is free of dirt, clay, wood, plastic and organic materials. This is done by water floatation,

hand picking, air separators, and electromagnetic separators.

Page 28: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 28 of 54

Occasionally asphalt overlay or patch is found. A mixture of asphalt and concrete is not

recommended but small patches are not detrimental. The more care that is put into the quality, the

better product you will receive.

With sound quality control and screening you can produce material without having to wash it as

with virgin aggregate which may be ladened with clay and silt.

Figure 4-7 – Cycle of C&D Waste Processing

Usually demolished concrete were shipped to landfills for disposal, but due to greater

environmental awareness, the concrete is being recycled for reuse in concrete works. There are a

variety of benefits in recycling concrete rather than dumping it or burying it in a landfill. Keeping concrete debris out of landfills saves space there. Other benefits of recycling of concrete are (a)

Local product local sources. (b)Reduces truck traffic. (c) Alternative to a non-renewable resource.

(d) Cost savings. (e) No disposal fees. (f) Better trucking utilization (reduced costs).

Using recycled material as gravel reduces the need for gravel mining. There are also economic

benefits. Recycled concrete is a construction material that the community does not need to pay for; those who generated the concrete waste pay a fee to have it recycled.

The strength of recycled aggregate is same as compared concrete with fresh aggregate. However

suitable mix designs may be made and reliable results obtained. The mix requires slightly higher

quantity of cement or using admixtures to reduce water requirement. Recycled aggregate concrete

can be safely used as plain concrete. With proper corrections in mix de-sign, it can be used for

R.C.C. works also.

• Ready-Mix Concrete Plant

• Cast Products Plants

• Aggregate Washing & Size Separation

• Screening & Crushing Equipment

1.Screening &

Crushing

2.Dry & Wet

Processing

3.RMC4.Casting

Page 29: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 29 of 54

1.29 Machineries for Recycling

Once the structure is demolished as per the plan in an Engineering manner, use of appropriate

equipment and machinery is essential in the recycling process. Such equipment may be jaw

crushers, magnetic separators, vibratory screens, washing equipment.

The new recycling plant consists of the following technologies:

1. Feed hopper

2. Pre Screening

3. Washing & Aggregate cleaning

4. Trash Screen for removal of light weights

5. Sizing Screen for washed Aggregate

6. Hydro cyclone system for Sand washing

7. Water Management system for recycling of process water

Among the major & minor components of C&D Waste, the most unpredictable and difficult

materials are Clay (Soil) and all types of floating materials like plastic carry bags, sachets, thermocol etc. Recycling Technology has provided the solutions to tackle these difficult materials and make

C&D Waste an acceptable quality product for re-use.

Page 30: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 30 of 54

1.30 C&D Waste Processing Flow Chart:

Figure 4-8 – C&D Waste Processing Flow Chart:

In view of significant role of recycled construction material and technology in the development of

urban infrastructure,

The following products can be recovered from recycling:

1. Recovery of washed sand for construction

2. Recovery of 2-3 sizes of mixed Aggregates

3. RMC made with recovered material

4. Value-added products like Kerb Stones, Pavement Blocks and Concrete Bricks etc.

These products made from recycled material were tested in various laboratories and found to be

suitable for specified purposes. Today, these products are actually being sold in the market bringing

extremely high return to the investor.

Processing of C&D Waste [Hammering, Crushing,

Washing, size Separation & Physicochemical Processes]

MSW Recycling/Processing &

disposal facility

Removal of Iron, Al, Wood, Plastics, etc.

Receiving of C&D waste

Collection and transportation of C& D Waste

Recycled products Recovery

Process Waste Can be used as Landscaping Soil

Page 31: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 31 of 54

1.31 Products from C&D Waste Processing:

Recycled Sand Recycled Aggregate

Trash such as Plastic, Wood and Chips etc. removed

Page 32: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 32 of 54

1.32 C&D Waste Recycled Products& its Applications

Table 4-3 – Different Products obtained from C&D Waste Processing

S.

No. Product Name Image specimen Uses

1.

Ready Mix Concrete.

• Most versatile

construction material.

• Used in all kind of

construction activities.

2.

Hollow Bricks

• Used in construction of

buildings and houses, especially compound

walls.

• Provides heat insulation.

3.

Pavement blocks

• Parking Pavements.

• Pedestrian Pathways

• Passageway

4. Tiles

(i) Chequered Tile

Page 33: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 33 of 54

(ii) Brick Tile

• Pedestrian subways

• Special effects in drive

ways

• Creative items like

artifacts

(iii) Dumble Tile

(iv) Wall Tile

(v) Interlocking Tile

(vi) Tech Tile

5.

Kerbstones

Page 34: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 34 of 54

6.

Granular Sub Base

(GSB)

• Used for the load

bearing layer

immediately below

the pavement layer.

• Provide strength and

support to the

overlying pavement.

7.

Manufactured Sand

• Used for construction

and landfilling

purpose.

8. Aggregates

(i) 5mm to 10 mm

• Sold as per customer

requirements.

(ii) 10mm to 20

mm

• Sold as per customer

requirements.

9.

Loose soil/Excavated

Soil

• Can be sold for land

filling purpose.

• Also, further reuse options are being

explored for the same.

Page 35: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 35 of 54

1.33 Uses of C&D Waste Recycled Materials

Rapid infrastructural development such as highways, airports etc. and growing demand for housing

has led to scarcity & rise in cost of construction materials. Most of waste materials produced by

demolished structures are disposed off by dumping them as land fill. Dumping of wastes on land is

causing shortage of dumping places in urban areas. Therefore, it is necessary to start recycling and

re-use of demolition and concrete waste to save environment, cost, and energy.

1.34 Potential uses for materials commonly found in concrete debris

Table 4-4 – Potential Uses of Materials Segregated from C&D Waste Processing

Material Potential use

Asphalt Road sub-base fill

Concrete Crushed and mixed to make new asphalt cement blocks, crushed and screened

aggregate can be used in asphalt concrete

Dirt Landscaping landfill cover

Metal Scrap metal dealers

Wood Timber/wood pulp shredded for fuel, animal, bedding, landscaping,

manufactured building products and compost

Brick Masonry crushed for ornamental store

Glass Fiberglass insulation sandblast, aggregate in asphalt reflective beads

Gypsum Soil amendment, gypsum board, absorbent media

Plastic ABS, plastic lumber, PVC, Highway barriers

Polystyrene Insulation

Porcelain Crushed for aggregate

Corrugated

Cardboards

Paper mills, Fuel pellets

Carpet Landfill cover

Roofing

Shingles

Asphalt paving

Page 36: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 36 of 54

1.35 C&D Waste Cradle to Grave - Stakeholders:

Figure 4-9 – Cradle to Grave Stakeholders

C&D Waste

Processing

C&D Waste generation

Collection & Transportation

Role of Regulatory authorities

Role of Operator

of the Facility

Role of State Government

Role of Central Government

Role of BIS & IRC

Designated Collection

Points

Recycled Products

Role of C&D Waste generator

Page 37: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 37 of 54

General Terms & Definitions as specified in the Rules (Rule – 3) The following are the general terms & definitions given in C&D Waste Management Rules-2016

(a) “ACT’ means the Environment ( Protection) Act, 1986 (29 of 1986);

(b) "construction" means the process of erecting of building or built facility or other structure,

or building of infrastructure including alteration in these entities,;

(c) "construction and demolition waste" means the waste comprising of building materials,

debris and rubble resulting from construction, re-modeling, repair and demolition of any

civil structure;

(d) “de-construction” means a planned selective demolition in which salvage, re-use and

recycling of the demolished structure is maximized;

(e) “Demolition” means breaking down or tearing down buildings and other structures either

manually or using mechanical force (by various equipment) or by implosion using explosives.

(f) “form” means a Form annexed to these rules;

(g) “local authority” means an urban local authority with different nomenclature such as municipal corporation, municipality, nagarpalika, nagarnigam, nagarpanchayat, municipal

council including notified area committee and not limited to or any other local authority

constituted under the relevant statutes such as gram panchayat, where the management of construction and demolition waste is entrusted to such agency;

(h) “ schedule” means a schedule annexed to these rules;

(i) “service provider’ means authorities who provide services like water, sewerage, electricity,

telephone, roads, drainage etc. often generate construction and demolition waste during

their activities, which includes excavation, demolition and civil work;

(j) “waste generator” means any person or association of persons or institution, residential

and commercial establishments including Indian Railways, Airport, Port and Harbour and

Defence establishments who undertakes construction of or demolition of any civil structure

which generate construction and demolition waste.

Page 38: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 38 of 54

ANNEXURES

Page 39: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 39 of 54

1.36 Annexure– I: C&D Waste Materials Checklist

The following checklist template will be useful when planning to salvage, reuse and recycle demolition materials

Demolition Materials Comments and Concerns Air conditioning equipment CFC Air conditioning: Computer room packages CFC Air conditioning: Mini central systems CFC Air conditioning: Window units CFC Aluminum: Handrails, other Appliances, white goods Asbestos Containing Materials: Insulation, floor and ceiling tile, floor and wall coverings, roofing felt and shingles, wall board, siding, ductwork, adhesives,

Asbestos: Various possible materials Testing, removal Asphalt Asphalt: Paving Asphalt: Shingles Batteries Brass Brick Bronze Cabinets Cable: Various Cardboard Carpet, padding and backing Cast iron: Radiators, pipes, other Clay tile blocks Compressors CFC Computer equipment Computers, monitors Concrete Concrete masonry units Decking: Wood Door frames: Wood, metal Doors: Heavy vault Doors: Thin panel and various Non-rated Doors: Wood, Metal Ductwork Earth Electric switchgear, feeder cables, conduit Electrical equipment PCB Electrical: Cable Elevator cabs, machinery, shaft equipment, rails Fabric Fiberglass Fire suppression equipment Fixtures & fittings: Plumbing Fixtures:Electrical Flooring:Carpet Flooring:Wood Fuelstoragetanks Furniture:Metal Furniture:Reusable Furniture:System Canberemanufactured

Page 40: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 40 of 54

Furniture:Wood Glass:Interiorandexterior Glass:Plate Glass: Wired,laminated Glazingcompound: Asbestos,leadpossible Testing Guttersandflashing Gypsumblocks Gypsumboard Hardwood Hazardousmaterials Heavytimbers Insulation ACBM Interiorairhandlersandcontrols Kraftpaper Lamps:Fluorescent Mercuryretrieval Lead:Paint Testing,removal Lead:Roofing Lead:Flashing Lead:Piping Lightbulbs Lightfixtures:Decorative Lightfixtures:Fluorescentandutilityfixtures Lightfixtures:Vintagefluorescent, incandescent PCBBallasts Marble: Toiletpartitions Marble:Walls Metal:Brass Metal:Bronze Metal:Cable Metal:Castiron Metal:Conduit Metal:Copper Metal:GalvanizedSteel Metal:Miscellaneous Metal:Steel Mirrors Paper Partitions,demountablepanels Partitions:Aluminumtracks,miscframing PBX/telephoneequipment, conduit,cables Petroleumproducts

Page 41: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 41 of 54

1.37 ANNEXURES – II (Tipping Fee & Containers Specifications)

TIPPING FEES TO BE PAID BY AUTHORIZED AGENCY FOR DISPOSAL OF WASTE AT DESIGNATED DISPOSAL SITES:

C&D WASTE VOLUME ILLUSTRATIVE RATES, (Rs/Container)

Container (<3 m3 ) 90 Container (6 m3 ) 180 Container (9 m3 ) 270

Container (>12 m3 ) 360

SPECIFICATIONS OF TYPICAL CONTAINERS TO BE USED FOR STORING C&D WASTE

Model Container Specification Hook Loader Dumper Placer

Container Type Closed Closed Volume (m3)# 9 12-16 1.5*, 2.5-3.5**, 4.5-

5*** Material Of Construction Commercial Mild Steel of Appropriate IS specification

(Not less than 3mm for walls/sides and not less than 4mm for floor/bottom)

Recommended Chasis 16-25 T GVW 7*, 9**, 12*** T GVW

Lifting Arrangement Rear lifting Rear lifting

# Dimensions of the containers to adhere to the RTO norms. Total loading not to exceed GVW. The containers shall have integral securement system to ensure that the rear end of the container is well secured with the vehicle chassis.

Illustrative Pictures of Different Containers & Vehicles:

TypicalContainers

Page 42: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 42 of 54

TypicalHookLifts

TypicalDumperPlacers

Page 43: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 43 of 54

1.38 ANNEXURES – III :Quantity Estimation of C&D Waste

Quantity Estimation of C&D Waste:

The following formulae can be used to estimate the quantity of C&D Waste

Formula: A x Gave x 0.0005 = Q

Where,

A=Project Square Footage

Gave=Weighted Average Generation Rate (Refer below Table)

Qp = Total Project C&D Waste

0.0005 = Conversion Factor from lbs to tons

WeightedAverageC&DWasteGenerationRates

S.No Type Residential (lbs/sq.ft) Non-Residential (lbs/sq.ft)

1. New Construction 4.38 3.89

2. Renovation Varies 17.67

3. Demolition 115.00 155.00

(Source: Franklin Associates, “Characterization of Building-Related Construction and Demolition

Debris in the United States,” U.S. Environmental Protection Agency, Jun. 98, p. 2-2, 2-3, 2-6, 2-7, 2-8, 2-9, 2-10, and A-5.)

Page 44: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 44 of 54

1.39 ANNEXURE–IV :Case studies of Delhi, Ahmedabad and Mumbai

Delhi: Delhi produces about 4,000 to 4,600 tons of C&D waste per day. The inert but bulky waste is either disposed in city landfills or dumped in open spaces, water bodies and flood plains. Typical construction waste in Delhi consists of Concrete (23%), Soil and sand (36%) and bricks and masonry (31%)ii.The Municipal Corporation of Delhi, working in cooperation with the private sector, established a C&D recycling plant with the aims of diverting waste from landfill and developing the market for C&D waste. The plant, a public private partnership in operation since the end of 2009, had an original design capacity of 500 tonnes per day that was expanded in 2014 to 2000 tonnes per dayiii. Incoming material is inspected and weighed. Plastics, metals, wood and certain other materials are separated out by both manual and mechanical means. The remaining waste is again separated, this time sorted into whole bricks for internal use and sale, large pieces of concrete and mixed C&D waste that is managed using dry processing to crush and grade the concrete and C&D waste and also wet processing for mineral processing and washing. The plant recovers products such as sand, stone and ready-mix concrete and uses these to manufacture other value-added products such as paving blocks and tiles, kerbstones and bricks. By early 2015, the plant had sold well over a million tonnes of recycledproducts.

Figure 1.3 - C&D Waste recycling plant in Delhiiv

The second 500 TPD capacity of C&D Waste recycling plant in Delhi (presently under commissioning process) will experience a quantum jump in technological advancement in C&D Waste recycling as compared to the first plant due to space constraints.

Hopper

Wastewater

Manageme

Crushe

Washer/Aggregate

Conveyo

Page 45: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 45 of 54

Mumbai: Mumbai generates about 2300 metric tons of construction waste every day. In September 2005, the Municipal Corporation of Greater Mumbai issued the Demolition and Desilting Waste (Management and Disposal) Guidelines. The Youth for Unity and Voluntary Action (YUVA) and City Industrial Development Corporation (CIDCO then came up with a decentralized solution for recycling debris into construction material such as bricks and interlocking pavers. An electric-powered machine basically used in pharmaceutical and chemical industries has been modified for the purpose. Cement and water are other inputs. The debris is sourced from construction sites and is broken down into particles, 30-40 millimeters (mm) in diameter. The particles are then powdered down by a pulverizingmachinev.

Special screens enable the machine to ground the particles to desired levels of fineness. Coarse aggregates around 10 mm in diameter, for example, require screens with large gaps. The dust controller sections of the machine filter out unwanted light materials like wood particles and sundry other organic items. Cement and water is then added to the pulverized material to mould it to a brick-like shape. Moulded bricks are then cured (hardened by repeated wetting and drying) for 14 days and then sun-dried. Laboratory tests show compressive strength of blocks at 59 kg per square centimeters which is quite high compared to burnt clay bricks and water absorption ration at 9.8% well below the allowed limit of 10%. Transverse strength is higher than natural aggregates products.

YUVA gets its debris free and people who supply the waste are given discounts on the products. Two community centers in Rapar, Gujarat, one such centre in Mumbai, and a few otherbuildings in the country’s financial capital have already used the recycled debris.

Pune: Pune Municipal Corporation has recently decided to reserve 18 acres of open land in the Yeolewadi village, around 20 km from the city, to set up a modern construction and demolition (C&D) waste processing plant, with a 100 tonnes per day (TPD) capacity. According to Pune Municipal Corporation (PMC) statistics, with rapid urbanization and constantly increasing C&D, the city generates an average of 125 tonnes of such waste every day, which has been contributed to heavily by the recent demolitions drives. This plant will reprocess C&D debris and re-use it in brick production. Cement, bricks, tar, etc. will be segregated and processed with modern machinery. The plant is expected to be set up in co-ordination with a privateentity.

Page 46: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 46 of 54

Gurgaon: According to the members of a citizens’ group in Gurgaon named MalbaHatao, the municipal commissioner of the city has promised to earmark a site wherein a construction waste recycling plant can be set up soon along with allotment of multiple transit dumping sites across the city in coordination with other civic agencies such as the Haryana Urban Development Authority (HUDA) and the Department of Town and Country Planning(DTCP).

Ahemadabad: Ahemadabad Municipal Corporation (AMC) has awarded the work to Private agency to operate 300 TPD C&D waste processing plant 5 acres of land on PPP mode for 30 years. It is operational from October, 2013, involved in collection & transportation of such waste from 24 designatedlocations.

Figure 1.4 – C&D Waste Processing plant & Recycled Products in Ahmadabad

The Clean India campaign of Govt. of India further reinforces the need of similar facilities across all major

cities, to get rid of illegal dumping of C&D Waste either in lands or in rivers or blocking large stretches of land resources. The ever growing needs of construction land and construction material close to the heart of city

are going to be in high demand. Establishment of multiple numbers of small to medium capacity C&D Waste

Page 47: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 47 of 54

recycling facility within close proximity ofdemolition and construction site, may provide a viable solution for City Municipalities as well as to businesses interested in investing for a profitable venture from Waste

recycling.

To, The MemberSecretary

1.40 ANNEXURE –V: FORM – I

See [Rule 7(2)] Application for obtainingauthorisation

Name of the local authority or Name of theagency : appointed by the municipalauthority

Correspondenceaddress TelephoneNo. Fax No.

Nodal Officer and designation (Officerauthorized by the competent authority or agency responsiblefor operation of processing or recycling or disposalfacility)

Authorization applied for (Please tickmark) Setting up of processing orrecycling facility of construction and demolitionwaste

Page 48: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Capacity Building Programme on waste management rules Page 48 of 54

Detailed proposal of construction and demolitionwaste processing or recycling facility to include thefollowing

Location of site approved and allotted bythe CompetentAuthority.

Average quantity (in tons per day) andcomposition of construction and demolition waste to be handled at the specific site

Details of construction and demolition waste processing or recycling technology to be used. Quantity of construction and demolition waste to be processed per day. Site clearance from Prescribed Authority. Salient points of agreement between competent authority or local authority and operating agency (attach relevant document). Plan for utilization of recycled product.

Expected amount of process rejects and plan for its disposal (e.g., sanitary landfill for solid waste). Measures to be taken for prevention and control of environmental pollution. Investment on project and expected returns. Measures to be taken for safety of workers working in the processing or recycling plant.

Any preventive plan for accident during the collection, transportation and treatment including processing and recycling should be informed to the Competent Authority (Local Authority) or Prescribed Authority

Date: Signature of Nodal Officer

Page 49: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

1.41 ANNEXURE-VI: Form-II

See ( Rule (7) (3) )

Format for Issue of Authorization to the Operator

To,

Ref : Your application number Dt. …………

The -------------------State Pollution Control Board or Pollution Control Committee after examining the proposal hereby authorizes ------------- having theiradministrative office at--------------------- to set up and operate construction and demolition waste processing facility at --------------------on the terms and conditions (including the standards to comply) attached to this authorization letter.

1. The validity of this authorizationis till-------------. After expiry of the validity period, renewal of authorization is to be sought.

2. The------------------------- State Pollution Control Board or Pollution Control Committee may, at any time, for justifiable reason, revoke any of the conditions applicable under the authorization and shall communicate the same in writing.

3. Any violation of the provision of the construction and demolition Waste Management Rules, 2016 shall attract the penal provision of the Environment (Protection) Act, 1986 (29 of 1986).

Date: Place:

(MemberSecretary)

State Pollution Control Board/

Pollution Control Committee

Page 50: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

1.42 ANNEXURE-VII: Form –III

See ( Rule 8(2) )

Format of Annual Report to be submitted by Local Authority to the State Pollution ControlBoard

(i) Name of the City orTown……………………. (ii) Population………………… (iii) Name and address of local authority or competentauthority

Telephone No:……………………………… Fax:…………………………………………. Email ID:……………………………………. Website:……………………………………..

(iv) Name of In-charge or Nodal Officer dealing with construction and demolitionwastes management with designation………………………………………………

1. Quantity and composition of construction and demolition waste includingany deconstructionwaste

(a) Total quantity of construction and demolition waste generated during the whole yearin metricton

Any figures for lean period and peak period generation per day………………………. Average generation of construction and demolition waste(TPD) Total quantity of construction and demolition waste collected perday Any Processing / Recycling Facility set up in the city…………………………………………………..Status of thefacility

(b) Total quantity of construction and demolition waste processed / recycled (in metricton)

Non-structural concrete aggregate :

Manufactured sand :

Ready-mix concrete (RMC) :

Paving blocks :

GSB :

Others, if any, please specify :

(c) Total quantity of Construction & Demolition waste disposed by land fillingwithout processing (last option) or filling low lyingareas

No of landfill sitesused :

Page 51: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Areaused : Whether weigh-bridge: Yes No

Facility used for quantityestimation?

(d) Whether construction and demolition waste used in sanitary landfill (for solid waste) asper ScheduleIII: Yes No

2. Storagefacilities

(a) Area orlocation or plot or societies covered for collection of Construction and Demolitionwaste

(b) No. of large Projects (including roadways project)covered

(c) Whether Area or location or plot or societies collection is Practiced (if yes, whether done by Competent Authority or Local Authority or through Private Agency or Non- Governmental Organization)

(d) StorageBins:-- Specifications (Shape & Size Number)

Existing Number

Proposed for future

(i) Containers or receptacle(Capacity) : (ii) Others, pleasespecify :

(e) Whether all storage bins/collection spots are attendedfor daily lifting : Yes No

(f) Whether lifting of Construction &Demolition Waste from Storage bins is manual ormechanical (Please tick mark)pleasespecifymode : Manual MechanicalOthers, and equipmentused (specifyequipment)

3.Transportation -------------------------------------------------

Existing Actually Required/Proposednumber -------------------------------------------------

Truck : Truck-Hydraulic : Tractor-Trailer : Dumper-placers : Tricycle :

Refuse-collector :

Page 52: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

Others (Pleasespecify) :

4. Whether any proposal has been made to improve Construction and Demolition waste management practices

5. Have any efforts been made to involve PPP for processing of Construction & Demolition waste: If yes, what is (are) the technologies being used, suchas:

----------------------------------------------------------------------------------------------------------

Processing /recycling Stepstaken Technology (Quantity to beprocessed)

--------------------------------------------------------------------------------------------------------------------

DryProcess : WetProcess : Others, ifany,

Pleasespecify :

6. Whatprovisions are available to check unauthorized operations of:

Encroachment on river bank or wet bodies:

Unauthorized filling of low line areas :

Mixing with solid waste :

Encroachment in Parks, Footpaths etc. :

7. How many slums are provided with construction and demolition waste receptacles facilities:

8. Are municipal magistrates appointedfor taking penal action for non-compliance with these rules: Yes No

[If yes, how many cases registered & settled during last three years (give year wisedetails)] Dated:

Signature of MunicipalCommissioner

Page 53: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

1.43 ANNEXURE-VIII: Form–IV

See (Rule (8)(3) )

Format of Annual Report to be submitted by the State Pollution Control Board / Committees tothe Central Pollution ControlBoard

To, TheChairman, Central Pollution ControlBoard, PariveshBhawan, East ArjunNagar, Delhi-110032

1. Name of the State/Unionterritory:

2. Name & address of the State Pollution Control Board/PollutionControl Committee:

3. Number of municipal authorities responsible for management ofmunicipal solid wastes in the State/Unionterritoryunder theserules :

4. A Summary Statement on progressmade by municipal authorities in respectof Implementation of ScheduleIII] : Please attach asAnnexure-I

5. A Summary Statement on progress made by municipal authorities in respect of

Implementation of Schedule IV : Please attach as Annexure-II

Date:

Chairman or the Member Secretary

State Pollution ControlBoard/

Place: PollutionControlCommittee

Page 54: Tool kit on CONSTRUCTION & DEMOLITION WASTE Management …upecp.in/assets/waste_management/CD-Waste-Management... · 2019-06-27 · TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016 Capacity

TOOLKIT FOR C&D WASTE MANAGEMENT RULES-2016

1.44 ANNEXURE-IX: REFERENCES

1) :C&D Waste Management Rules-2016 by MoEF&CC, GOI

2) CPHEEO- 2016 : Municipal Solid Waste Management Manual Part- II, Chapter- 3, Section

3.7

3) Construction & Demolition and De-silting Waste (Management and Disposal) Guidelines

by MUNICIPAL CORPORATION OF GREATER MUMBAI -2006

4) TIFAC – “Utilization of Waste from Construction Industry” 2001 Publication - India

5) IL&FS Environmental Infrastructure & Services Limited- Products Catalogue

6) CDE Asia Limited catalogue

7) Construction and Demolition Waste Management Guide by U.S Air force

8) Construction and Demolition Waste Management Pocket Guide by U.S Air Force