torija xl the lowest cost and largest site on the … · 2019. 10. 4. · torija xl, the lowest...

8
TORIJA XL, THE LOWEST COST AND LARGEST SITE, ON THE MADRID A2 CORRIDOR

Upload: others

Post on 24-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • TORIJA XL, THE LOWEST COST AND LARGEST SITE,

    ON THE MADRID A2 CORRIDOR

  • 1 UNIQUE NEW XXL WAREHOUSE DEVELOPMENT OF UP TO 80,000 SQM STRATEGICALLY LOCATED IN THE HENARES CORRIDORn The Henares Corridor is the most important logistics Hub in the Madrid influence area due to its connection to Zaragoza, Barcelona and France. An important place of transit for good’s distribution between Europe and Africa, with the main logistics, distribution and e-commerce companies settled in it.

    n ELCP TORIJA XL is located within the national distribution logistics area of Madrid, a mere forty (40) minutes from the capital, with excellent connections through motorways A-2 and R-2, and its proximity to Adolfo Suarez Barajas International Airport.

    n It is a point chosen by the main logistics operators to make great logistics at a national level.

    2

    n Local distribution

    n Regional distribution

    n National distribution

    SPAIN

    EUROPE

    AFRICA

    FRANCE

    POR

    TUG

    AL MADRID

    BARCELONA

    ZARAGOZA A-2

    A-2

    R-2

    M-50

    M-40

    M-30

    MADRID

    TO SEVILLA

    A-2TO BARCELONA

    TORIJA

    A-4

  • THE LARGEST AND LOWEST RENT LOCATION CLOSE TO MADRID

    ON THE A-2 MOTORWAY THAT CAN BE DEVELOPED IN THE SHORT TERM

    n ELCP TORIJA XL site benefits from direct access to the A2 motorway (Madrid-Zaragoza-Barcelona) via Exit 73 in both directions, Madrid and Barcelona, which enables trucks driving to avoid going through or around the city.

    n The R2 is a toll highway that runs along 62 kilometres between the M40 and Guadalajara. It is the best alternative to enter and leave Madrid through the Henares Corridor to avoid traffic jam. Connection with R2 is located at km 61 of A2, 22 km from the site.

    2

    3

    A-2

    12.9 ha

    GU-190

    CM-2011

    TO MADRID

    A-2

    TO BARCELONA

    LEROY MERLIN

    LEROY MERLIN

    FM LOGISTICS

    BRIDGESTONE

    PRIMARK

    TORIJA

    ELCP TORIJA XL

    Access from West (Madrid)

    Access from East (Barcelona)

    Exit to West (Madrid)

    Exit to East (Barcelona)

  • DISTRIBUTION

    3BUILT AREAS REGULATION PROJECT m2 (sqm)

    Plot Area 129,000

    Warehouse 76,376

    Total 3,896

    Offices Ground Floor 640

    Pl. Primera 3,256

    Total Built Area 103,200 80,272

    0.8m2/m2 62.23

    Cover Ratio 90,300 79,950

    70% 61.98%

    Trucks Docks 80

    Parking nº Workers

    Cars 389

    Electric charge parking spaces 18

    Trucks 70

    Infrastructure 42,561

    Green Areas (5%) 6,450 7,589

    Max Height Ht = 15m Ht = 15m (1.15+13.85) (1.15+13.85)

    Area by Modules

    Module 1 19,574

    Module 1 19,539

    Module 1 19,539

    Module 1 21,620

    TOTAL 80,272

    4

  • 5

    INFS

    BC

    VALLA TRANSFORMADOR

    VALLA TRANSFORMADOR

    BCGM-V

    CGM-L

    INFS

    BC

    VALLA TRANSFORMADOR

    INFS

    BC

    VALLA TRANSFORMADOR

    VALLA TRANSFORMADOR

    BCGM-V

    CGM-L

    INFS

    BC

    VALLA TRANSFORMADOR

    VALLA TRANSFORMADORVALLA TRANSFORMADOR

    B

    CGM-V

    CGM-L

    B

    CGM-V

    CGM-L

    35.0

    037

    .00

    31.0

    0

    6.00

    4.50

    4.50

    37.0

    0

    6.00

    107.80MODULE 3

    107.80MODULE 2

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    10 DOCKS

    TRUCKEXIT

    39 CAR PARKING

    TRUCKACCESS

    CONTROLACCESS

    EMERGENCYACCESS

    OFICCEACCESS

    PEOPLEACCESS

    79 CAR PARKING

    CARACCESS

    2 RMP 2 RMP 2 RMP 2 RMP

    94 CAR PARKING110 CAR PARKING

    54 CAR PARKING

    5 CARPARKING

    OFICCEACCESS

    PEOPLEACCESS

    20 DOCKS 4 DOCKS

    10 DOCKS 10 DOCKS 10 DOCKS 16 DOCKS

    WELCOMEDRIVERS

    WELCOMEDRIVERS

    8 TRUCK PARKING 4 TRUCKPARKING 8 TRUCK PARKING 8 TRUCK PARKING5 TRUCKPARKING

    4 TRUCKPARKING

    2 TRUCKPARKING

    9 TRUCK PARKING 9 TRUCK PARKING 9 TRUCK PARKING 3 TRUCKPARKING1 TRUCKPARKING

    cs CM

    25.00

    5.00

    25.00

    5.00

    25.00

    PUMPROOM

    PCITANK

    10.00

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    17.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.7525

    .50

    12.0

    012

    .00

    12.0

    012

    .00

    12.0

    012

    .00

    12.0

    012

    .00

    12.0

    012

    .00

    25.5

    0

    173.

    20 o

    ut.

    450.00 int.125.90

    MODULE 4107.90

    MODULE 1

    450.40 out.

    172.

    80 in

    t.

    ACCESS

    LEGENDTRUCKS PATH:

    ALTERNATIVE PATH

    RE-CIRCULATION

    ACCESS

    EXIT

    EXIT

    CARS PATH:

    REGULATION

    BUILT AREAS

    TORIJA PAU 9REGULATION PROJECTm²(sqm)

    PLOT AREA 129.000

    WAREHOUSE 76.376

    3.896

    OFFICES 640

    3.256

    TOTAL

    GROUND FLOOR

    PL. PRIMERA

    80.272TOTAL BUILT AREA

    62,23

    103.200

    0,8m²/m²

    79.950COVER RATIO

    61,98%

    90.300

    70%

    TRUCKS DOCKS 80

    PARKING 389

    Cars 389

    Trucks 70

    nº workers

    42.561INFRAESTRUCTURE

    7.589GREEN AREAS (5%) 6.450

    MAX HEIGHT

    AREA BY MODULES

    MÓDULE 1 18.600

    18.565

    18.565

    20.646

    MÓDULE 2

    MÓDULE 3

    MÓDULE 4

    Ht = 15m(1,15+13,85)

    Ht = 13,85m(1,20+12,65)

    Electric charge parking spaces 18

    76.376TOTAL

    Nº DOCKS: 80 ud.MAX STORAGE HEIGHT: 11,00 m.TOTAL RACKS LENGTH: 18.952,5 ml.TOTAL FULL PALLET: 99.016 pallets

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    ARCHITECTUREGENERAL PLAN 020 7,5 15 22,5 30 37,5 A1: 1/750 A3: 1/1500

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    cs CM

    983.35

    983.42

    983.42

    982.80

    983.00

    983.65

    983.75

    983.15

    983.00

    983.00

    983.42

    982.80

    983.00

    983.00

    984.15

    982.90

    982.50982.30

    982.25

    982.05

    982.05

    984.00

    983.00

    984.00

    983.42

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    BCGM-VCGM-L

    BCGM-VCGM-L

    L'

    6' 7' 18'19'

    B CGM-VCGM-L

    B CGM-VCGM-L

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2617.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.75

    13.7

    0U

    nder

    Dec

    k

    1.10

    ext 450.40

    ins 450.00

    11.0

    0

    13.8

    5<15

    m.

    L

    4.50Road

    1.00Sidewalk

    4.50Road

    1.00Sidewalk

    L

    11.0

    0

    13.8

    5<15

    m.

    (Ground floor)±0.00

    (Ground floor)±0.00

    2% 2%2% 2%1.0

    0

    1.00

    1.00

    1.5%2% 2%

    1.10

    10.0

    0

    2%

    10.0

    0

    10.0

    0

    10.0

    0

    10.0

    013.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    M L K J I H G F E D C B A

    ext 171.90

    26.15 12.00 26.15

    1,5%1,5%1,5% 1,5%

    8.708.70

    1.20

    1.10

    13.8

    5<15

    m.

    25.00 L L

    1.10

    1.20

    13.8

    5<15

    m.

    12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    ins 173.20

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k(Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    4,2%

    (Ground floor)±0.00

    (Docks)-1.20

    1 2 3 4 5 6 717.75 18.00 18.00 18.00 18.00 18.00

    13.7

    0U

    nder

    Dec

    k

    1.10

    11.0

    0

    PLO

    T LI

    MIT

    4.50Road

    1.00Sidewalk

    4.50Road

    L

    13.8

    5<15

    m.

    (Ground floor)±0.00

    2% 1.0

    0

    10.0

    0

    2%

    24 25 2618.00 17.75

    13.8

    5<15

    m.

    PLO

    T LI

    MIT

    L

    4.50Road

    1.00Sidewalk

    11.0

    0

    (Ground floor)±0.00

    2%

    1.10

    10.0

    0

    M L K J

    Free volume min.Offices Free volume max.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    4.70

    0.40

    1.30

    26.15 12.00

    1,5% 1,5%

    8.70

    1.10

    25.00 L

    1.20

    13.8

    5<15

    m.

    12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    (Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    4,2%

    D C B A

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    26.15

    1,5%1,5%

    8.70

    1.20

    13.8

    5<15

    m.

    L

    1.10

    12.00 12.00

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k

    (Ground floor)±0.00

    (Docks)-1.20

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    Indicated

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200 SECTION B

    MÓDULO 1 MÓDULO 2 MÓDULO 3 MÓDULO 4SECTION A

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    scale = 1 : 3.000GENERAL PLANT

    MODULE 1 MODULE 2 MODULE 3 MODULE 4

    Detail 2Detail 1

    scale = 1 : 600SECTION A

    scale = 1 : 600SECTION B

    Detail 3 Detail 4

    scale = 1 : 300DETAIL 1

    scale = 1 : 300DETAIL 2

    scale = 1 : 300DETAIL 4

    scale = 1 : 300DETAIL 3

    ARCHITECTUREGENERAL SECTIONS 06

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    cs CM

    983.35

    983.42

    983.42

    982.80

    983.00

    983.65

    983.75

    983.15

    983.00

    983.00

    983.42

    982.80

    983.00

    983.00

    984.15

    982.90

    982.50982.30

    982.25

    982.05

    982.05

    984.00

    983.00

    984.00

    983.42

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    BCGM-VCGM-L

    BCGM-VCGM-L

    L'

    6' 7' 18'19'

    B CGM-VCGM-L

    B CGM-VCGM-L

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2617.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.75

    13.7

    0U

    nder

    Dec

    k

    1.10

    ext 450.40

    ins 450.00

    11.0

    0

    13.8

    5<15

    m.

    L

    4.50Road

    1.00Sidewalk

    4.50Road

    1.00Sidewalk

    L

    11.0

    0

    13.8

    5<15

    m.

    (Ground floor)±0.00

    (Ground floor)±0.00

    2% 2%2% 2%1.0

    0

    1.00

    1.00

    1.5%2% 2%

    1.10

    10.0

    0

    2%

    10.0

    0

    10.0

    0

    10.0

    0

    10.0

    013.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    M L K J I H G F E D C B A

    ext 171.90

    26.15 12.00 26.15

    1,5%1,5%1,5% 1,5%

    8.708.70

    1.20

    1.10

    13.8

    5<15

    m.

    25.00 L L

    1.10

    1.20

    13.8

    5<15

    m.

    12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    ins 173.20

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k(Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    4,2%

    (Ground floor)±0.00

    (Docks)-1.20

    1 2 3 4 5 6 717.75 18.00 18.00 18.00 18.00 18.00

    13.7

    0U

    nder

    Dec

    k

    1.10

    11.0

    0

    PLO

    T LI

    MIT

    4.50Road

    1.00Sidewalk

    4.50Road

    L

    13.8

    5<15

    m.

    (Ground floor)±0.00

    2% 1.0

    0

    10.0

    0

    2%

    24 25 2618.00 17.75

    13.8

    5<15

    m.

    PLO

    T LI

    MIT

    L

    4.50Road

    1.00Sidewalk

    11.0

    0

    (Ground floor)±0.00

    2%

    1.10

    10.0

    0

    M L K J

    Free volume min.Offices Free volume max.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    4.70

    0.40

    1.30

    26.15 12.00

    1,5% 1,5%

    8.70

    1.10

    25.00 L

    1.20

    13.8

    5<15

    m.

    12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    (Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    4,2%

    D C B A

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    26.15

    1,5%1,5%

    8.70

    1.20

    13.8

    5<15

    m.

    L

    1.10

    12.00 12.00

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k

    (Ground floor)±0.00

    (Docks)-1.20

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    Indicated

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200 SECTION B

    MÓDULO 1 MÓDULO 2 MÓDULO 3 MÓDULO 4SECTION A

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    scale = 1 : 3.000GENERAL PLANT

    MODULE 1 MODULE 2 MODULE 3 MODULE 4

    Detail 2Detail 1

    scale = 1 : 600SECTION A

    scale = 1 : 600SECTION B

    Detail 3 Detail 4

    scale = 1 : 300DETAIL 1

    scale = 1 : 300DETAIL 2

    scale = 1 : 300DETAIL 4

    scale = 1 : 300DETAIL 3

    ARCHITECTUREGENERAL SECTIONS 06

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    cs CM

    983.35

    983.42

    983.42

    982.80

    983.00

    983.65

    983.75

    983.15

    983.00

    983.00

    983.42

    982.80

    983.00

    983.00

    984.15

    982.90

    982.50982.30

    982.25

    982.05

    982.05

    984.00

    983.00

    984.00

    983.42

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    BCGM-VCGM-L

    BCGM-VCGM-L

    L'

    6' 7' 18'19'

    B CGM-VCGM-L

    B CGM-VCGM-L

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2617.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.75

    13.7

    0U

    nder

    Dec

    k

    1.10

    ext 450.40

    ins 450.00

    11.0

    0

    13.8

    5<15

    m.

    L

    4.50Road

    1.00Sidewalk

    4.50Road

    1.00Sidewalk

    L

    11.0

    0

    13.8

    5<15

    m.

    (Ground floor)±0.00

    (Ground floor)±0.00

    2% 2%2% 2%1.0

    0

    1.00

    1.00

    1.5%2% 2%

    1.10

    10.0

    0

    2%

    10.0

    0

    10.0

    0

    10.0

    0

    10.0

    013.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    M L K J I H G F E D C B A

    ext 171.90

    26.15 12.00 26.15

    1,5%1,5%1,5% 1,5%

    8.708.70

    1.20

    1.10

    13.8

    5<15

    m.

    25.00 L L

    1.10

    1.20

    13.8

    5<15

    m.

    12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    ins 173.20

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k(Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    4,2%

    (Ground floor)±0.00

    (Docks)-1.20

    1 2 3 4 5 6 717.75 18.00 18.00 18.00 18.00 18.00

    13.7

    0U

    nder

    Dec

    k

    1.10

    11.0

    0

    PLO

    T LI

    MIT

    4.50Road

    1.00Sidewalk

    4.50Road

    L

    13.8

    5<15

    m.

    (Ground floor)±0.00

    2% 1.0

    0

    10.0

    0

    2%

    24 25 2618.00 17.75

    13.8

    5<15

    m.

    PLO

    T LI

    MIT

    L

    4.50Road

    1.00Sidewalk

    11.0

    0

    (Ground floor)±0.00

    2%

    1.10

    10.0

    0

    M L K J

    Free volume min.Offices Free volume max.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    4.70

    0.40

    1.30

    26.15 12.00

    1,5% 1,5%

    8.70

    1.10

    25.00 L

    1.20

    13.8

    5<15

    m.

    12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    (Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    4,2%

    D C B A

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    26.15

    1,5%1,5%

    8.70

    1.20

    13.8

    5<15

    m.

    L

    1.10

    12.00 12.00

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k

    (Ground floor)±0.00

    (Docks)-1.20

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    Indicated

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200 SECTION B

    MÓDULO 1 MÓDULO 2 MÓDULO 3 MÓDULO 4SECTION A

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    scale = 1 : 3.000GENERAL PLANT

    MODULE 1 MODULE 2 MODULE 3 MODULE 4

    Detail 2Detail 1

    scale = 1 : 600SECTION A

    scale = 1 : 600SECTION B

    Detail 3 Detail 4

    scale = 1 : 300DETAIL 1

    scale = 1 : 300DETAIL 2

    scale = 1 : 300DETAIL 4

    scale = 1 : 300DETAIL 3

    ARCHITECTUREGENERAL SECTIONS 06

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    cs CM

    983.35

    983.42

    983.42

    982.80

    983.00

    983.65

    983.75

    983.15

    983.00

    983.00

    983.42

    982.80

    983.00

    983.00

    984.15

    982.90

    982.50982.30

    982.25

    982.05

    982.05

    984.00

    983.00

    984.00

    983.42

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    BCGM-VCGM-L

    BCGM-VCGM-L

    L'

    6' 7' 18'19'B CGM-VCGM-L

    B CGM-VCGM-L

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2617.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.75

    13.7

    0U

    nder

    Dec

    k

    1.10

    ext 450.40

    ins 450.00

    11.0

    0

    13.8

    5<15

    m.

    L

    4.50Road

    1.00Sidewalk

    4.50Road

    1.00Sidewalk

    L

    11.0

    0

    13.8

    5<15

    m.

    (Ground floor)±0.00

    (Ground floor)±0.00

    2% 2%2% 2%1.0

    0

    1.00

    1.00

    1.5%2% 2%

    1.10

    10.0

    0

    2%

    10.0

    0

    10.0

    0

    10.0

    0

    10.0

    013.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    M L K J I H G F E D C B A

    ext 171.90

    26.15 12.00 26.15

    1,5%1,5%1,5% 1,5%

    8.708.70

    1.20

    1.10

    13.8

    5<15

    m.

    25.00 L L

    1.10

    1.20

    13.8

    5<15

    m.

    12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    ins 173.20

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k(Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    4,2%

    (Ground floor)±0.00

    (Docks)-1.20

    1 2 3 4 5 6 717.75 18.00 18.00 18.00 18.00 18.00

    13.7

    0U

    nder

    Dec

    k

    1.10

    11.0

    0

    PLO

    T LI

    MIT

    4.50Road

    1.00Sidewalk

    4.50Road

    L

    13.8

    5<15

    m.

    (Ground floor)±0.00

    2% 1.0

    0

    10.0

    0

    2%

    24 25 2618.00 17.75

    13.8

    5<15

    m.

    PLO

    T LI

    MIT

    L

    4.50Road

    1.00Sidewalk

    11.0

    0

    (Ground floor)±0.00

    2%

    1.10

    10.0

    0

    M L K J

    Free volume min.Offices Free volume max.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    4.70

    0.40

    1.30

    26.15 12.00

    1,5% 1,5%

    8.70

    1.10

    25.00 L

    1.20

    13.8

    5<15

    m.

    12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    (Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    4,2%

    D C B A

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    26.15

    1,5%1,5%

    8.70

    1.20

    13.8

    5<15

    m.

    L

    1.10

    12.00 12.00

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k

    (Ground floor)±0.00

    (Docks)-1.20

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    Indicated

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200 SECTION B

    MÓDULO 1 MÓDULO 2 MÓDULO 3 MÓDULO 4SECTION A

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    scale = 1 : 3.000GENERAL PLANT

    MODULE 1 MODULE 2 MODULE 3 MODULE 4

    Detail 2Detail 1

    scale = 1 : 600SECTION A

    scale = 1 : 600SECTION B

    Detail 3 Detail 4

    scale = 1 : 300DETAIL 1

    scale = 1 : 300DETAIL 2

    scale = 1 : 300DETAIL 4

    scale = 1 : 300DETAIL 3

    ARCHITECTUREGENERAL SECTIONS 06

    1 10 20 30 1 10 20 30 50 60 7040 80

    40

    150

    1 2 3 4 1 2 3 4

    95 100 110 120 130 140

    85 90 100

    150

    50 60 70 80 90

    160 170 180 190 200 203

    110 120 130 140

    160 170 178

    cs CM

    983.35

    983.42

    983.42

    982.80

    983.00

    983.65

    983.75

    983.15

    983.00

    983.00

    983.42

    982.80

    983.00

    983.00

    984.15

    982.90

    982.50982.30

    982.25

    982.05

    982.05

    984.00

    983.00

    984.00

    983.42

    5

    B

    J

    11

    F

    7

    G

    K

    19

    H

    1 64 12

    M

    E

    C

    A

    D

    2 2283 1814

    I

    13 241715 20

    L

    10 23 269 2116 25

    BCGM-VCGM-L

    BCGM-VCGM-L

    L'

    6' 7' 18'19'

    B CGM-VCGM-L

    B CGM-VCGM-L

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2617.75 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 17.75

    13.7

    0U

    nder

    Dec

    k

    1.10

    ext 450.40

    ins 450.00

    11.0

    0

    13.8

    5<15

    m.

    L

    4.50Road

    1.00Sidewalk

    4.50Road

    1.00Sidewalk

    L

    11.0

    0

    13.8

    5<15

    m.

    (Ground floor)±0.00

    (Ground floor)±0.00

    2% 2%2% 2%1.0

    0

    1.00

    1.00

    1.5%2% 2%

    1.10

    10.0

    0

    2%

    10.0

    0

    10.0

    0

    10.0

    0

    10.0

    013.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    M L K J I H G F E D C B A

    ext 171.90

    26.15 12.00 26.15

    1,5%1,5%1,5% 1,5%

    8.708.70

    1.20

    1.10

    13.8

    5<15

    m.

    25.00 L L

    1.10

    1.20

    13.8

    5<15

    m.

    12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    ins 173.20

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k(Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    13.7

    0U

    nder

    Dec

    k

    4,2%

    (Ground floor)±0.00

    (Docks)-1.20

    1 2 3 4 5 6 717.75 18.00 18.00 18.00 18.00 18.00

    13.7

    0U

    nder

    Dec

    k

    1.10

    11.0

    0

    PLO

    T LI

    MIT

    4.50Road

    1.00Sidewalk

    4.50Road

    L

    13.8

    5<15

    m.

    (Ground floor)±0.00

    2% 1.0

    0

    10.0

    0

    2%

    24 25 2618.00 17.75

    13.8

    5<15

    m.

    PLO

    T LI

    MIT

    L

    4.50Road

    1.00Sidewalk

    11.0

    0

    (Ground floor)±0.00

    2%

    1.10

    10.0

    0

    M L K J

    Free volume min.Offices Free volume max.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    4.70

    0.40

    1.30

    26.15 12.00

    1,5% 1,5%

    8.70

    1.10

    25.00 L

    1.20

    13.8

    5<15

    m.

    12.00

    PLO

    T LI

    MIT

    NO

    RM

    ATI

    VE

    25m

    (Offices)+6.40

    (Ground floor)±0.00

    6.42

    5.10

    1.30

    (Docks)-1.20

    13.7

    0U

    nder

    Dec

    k

    4,2%

    D C B A

    11.0

    0Fr

    ee v

    olum

    e m

    in.

    12.1

    0Fr

    ee v

    olum

    e m

    ax.

    26.15

    1,5%1,5%

    8.70

    1.20

    13.8

    5<15

    m.

    L

    1.10

    12.00 12.00

    PLO

    T LI

    MIT

    4,2%

    13.7

    0U

    nder

    Dec

    k

    (Ground floor)±0.00

    (Docks)-1.20

    situation

    Sector SI-9Torija, Guadalajara, EspañaELCP TORIJA XL

    drawingscale nº drawingNFebruary2019

    Indicated

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200

    0 6 12 18 24 30 A1: 1/600 A3: 1/1200 SECTION B

    MÓDULO 1 MÓDULO 2 MÓDULO 3 MÓDULO 4SECTION A

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    0 3 6 9 12 15 A1: 1/300 A3: 1/600

    scale = 1 : 3.000GENERAL PLANT

    MODULE 1 MODULE 2 MODULE 3 MODULE 4

    Detail 2Detail 1

    scale = 1 : 600SECTION A

    scale = 1 : 600SECTION B

    Detail 3 Detail 4

    scale = 1 : 300DETAIL 1

    scale = 1 : 300DETAIL 2

    scale = 1 : 300DETAIL 4

    scale = 1 : 300DETAIL 3

    ARCHITECTUREGENERAL SECTIONS 06

  • FEATURES

    4

    6

    WAREHOUSE

    • 80,272 sqm total building surface

    • Maximum height up to 15 m (with option to go higher- 18m- for an automated warehouse)

    • Site coverage ratio – 60%

    • Capacity for 99,000 full pallets (5 levels estimated)

    • 80 truck docks in both sides of the building (with possibility to be increased)

    • Flexibility to accommodate 1 to 4 tenants in modules of ca. 19,000 sqm each.

    • 4 MW power supply

    • ESFR sprinkler system

    • Fire alarm and evacuation alarm, inclusive a fire alarm panel, fire hoses, emergency lighting as per regulations

    • LED lighting, skylights and windows for natural light

    • Column grid: 18.0 x 12.0 m, 26.15 x 12.0 next to load façades

    • Floor load capacity: 5T/sqm

    SITE

    • Secured site

    • Multiple entrances possible: separate for trucks and personnel and/or for dedicated users

    • Emergency access for trucks

    • Ca. 400 car parking spaces

    • Ca. 70 truck parking spaces

    • 35 m truck yard

  • 7

    OFFICES

    • Flexible ca. 4,000 sqm (possibility to expand)• Offices on mezzanine level• High-end VRF-system for cooling and heating• Lighting: high efficiency LED• High-end finishing• BMS (Building Management System) for offices and warehouse

    SUSTAINABILITY

    • Solar or photovoltaic panels on roof/ car parking• Led lighting• Electric vehicles chargers in car parking• BREEAM ‘Very Good’ certification

    USE CASES

    n E-COMMERCE FULFILLMENT CENTRE• Access to main logistics corridor in Spain, A2 motorway• Strategic location for southern Europe distribution• Labour potential• Flexible layout and building height

    n EUROPEAN IMPORT & DISTRIBUTION HUB• Proximity to the most important Ports in Spain and Southern Europe (Algeciras,

    Valencia and Barcelona) connected each via direct highway connections• Distribution to Southern Europe• Scale

    n 3PL LOGISTICS CAMPUS• Economies of scale achieved by combining multiple contracts in one large

    and flexible campus locations• Flexible layout• Space for truck parking• Attractive labour market

    n DATA CENTRE· Proximity to power substation (200 m)

  • 30 Newman StreetFitzrovia, London W1T 1PTUnited KingdomT. +44 (0) 203 821 9813

    C/ Fernando El Santo, 15 planta 228010 MadridSpainT. +34 (0) 91 599 44 72

    Kristof Verstraeten

    James Markby

    Ion Saralegui

    Flor Fernández-Pacheco Olmedo

    [email protected]

    C/ José Ortega y Gasset, 29 planta 628006 MadridSpainT. +34 (0) 91 781 00 10

    Passeig de Gràcia, 56 planta 708007 BarcelonaSpainT. +34 (0) 93 488 18 81

    Guillermo Garcí[email protected]

    Luis Moreno Cebriá[email protected]

    Carlos [email protected]

    Pº de la Castellana, 79 planta 428046 MadridSpainT. +34 (0) 91 789 11 00

    Passeig de Gràcia, 11 planta 4 esc. A08007 BarcelonaSpainT. +34 (0) 93 318 53 53

    Pere [email protected]

    Gonzalo Gutiérrez [email protected]

    Rocío [email protected]