(Select Tower)

MARCH 2016

Tower A | Tower B | Tower C | Tower D | Tower E | Tower F | Tower G

Tower H | Tower I | Tower J | Tower K | Tower L | Tower M | Tower N

TOWER A Level 12 roof completed

TOWER B Level 4 flooring work in Progress

TOWER C Terrace and internal Plastering work in progress

TOWER D • Level 12 flooring work in progress • Level 7 dado work in progress

TOWER E • Level 4 base molding work in progress

• Level 8 flooring work in progress

TOWER F• Common flooring works of level 10 and 4 are in progress

• Level 11 flooring work in progress • Terrace work in progress

TOWER G Terrace work in progress

TOWER H Level 1 work in progress

TOWER J Level 1 roof completed

TOWER K Level 20 roof completed

TOWER L • Upper basement floor completed• Level 1 column work in progress

TOWER M Level 1 roof completed

TOWER NUpper basement roof reinforcement work in progress

PODIUM:

1. Tower L, M & N podium area.

2. Tower H & J podium area slab shuttering

reinforcement in progress

3. Tower G podium area

4. Podium K podium area

1 2

3 4