Client: Reference: Location: Dates: Town of Bennett Trish Stiles, Town Administrator 303.644.3249, [email protected] Bennett, CO 2019 The Town of Bennett is projected to triple their population in the next 10 years and thus needed a comprehensive, dynamic, and user-friendly asset management program and masterplan tool. Rather that create a written static report, AQUA Engineering created an interactive GIS-based asset inventory and master plan for all of the Town’s major infrastructure focus areas including water, wastewater, road, buildings and land, and stormwater systems. The wastewater focus area included a detailed survey, inventory and data compilation of the Town’s sanitary sewer system, lift stations, and wastewater treatment facility. First the basis of planning was established by conducting a growth and population projection along with defining design flows and loadings for residential, commercial, and institutional users based on a single family equivalent (SFE). Assets and infrastructure were then evaluated and scored based on three metrics: capacity, condition, and criticality. We worked with the Town to develop a 3, 5 and 10-year capital improvement project plan. For the collection system, we used Bentley SewerGems and performed a hydraulic modeling and capacity analysis of current conditions and future planning conditions to identify system deficiencies and needed capital projects. The Town’s lift stations and wastewater treatment facility were also assessed for these metrics. The Master Plan and Capital Projects Plan was delivered in a GIS platform with functionality to allow Town staff to update the plan annually. Capital Asset Inventory Assessment and Master Plan Town of Bennett

Upload: others

Post on 01-Jun-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Town of Bennett - AQUA Engineering

Client:Reference:

Location:Dates:

Town of BennettTrish Stiles, Town Administrator303.644.3249, [email protected], CO2019

The Town of Bennett is projected to triple their population in the next 10 years and thus needed a comprehensive, dynamic, and user-friendly asset management program and masterplan tool. Rather that create a written static report, AQUA Engineering created an interactive GIS-based asset inventory and master plan for all of the Town’s major infrastructure focus areas including water, wastewater, road, buildings and land, and stormwater systems. The wastewater focus area included a detailed survey, inventory and data compilation of the Town’s sanitary sewer system, lift stations, and wastewater treatment facility. First the basis of planning was established by conducting a growth and population projection along with defining design flows and loadings for residential, commercial, and institutional users based on a single family equivalent (SFE). Assets and infrastructure were then evaluated and scored based on three metrics: capacity, condition, and criticality.

We worked with the Town to develop a 3, 5 and 10-year capital improvement project plan. For the collection system, we used Bentley SewerGems and performed a hydraulic modeling and capacity analysis of current conditions and future planning conditions to identify system deficiencies and needed capital projects. The Town’s lift stations and wastewater treatment facility were also assessed for these metrics. The Master Plan and Capital Projects Plan was delivered in a GIS platform with functionality to allow Town staff to update the plan annually.

Capital Asset Inventory Assessment and Master PlanTown of Bennett

Page 2: Town of Bennett - AQUA Engineering

Capital Asset Inventory Assessment and Master PlanTown of Bennett

aquaeng.com

Colorado Office5325 S Valentia WayGreenwood Village, CO 80111720.667.1250

Utah Office533 W 2600 S Suite 275Bountiful, UT 84010801.299.1327

Features

• Planning and Design• Assessment / Evaluation• Recommendations / CIP• Project Vision• Project Approach• Guiding Principles• Projected Growth Summary• Zoning Projections• Existing Infrastructure

Summary• Asset Inventory• Plan Monitoring• Project Processing• Impact Fees• Financial Planning• Water / Wastewater