Toyota Kata Direct Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019 www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 1 Toyota Kata Direct Establish the (Next) Target Condition 1 Step 3 Establish the first Target Condition (and the next) 2

Upload: others

Post on 28-Apr-2020

28 views

Category:

Documents


1 download

TRANSCRIPT

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 1

Toyota Kata Direct

Establish the (Next) Target Condition

1

Step 3 Establish the first Target Condition (and the next)

2

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 2

The Linear View

Thanks to Mike Rother

WE ARE HERE!

Professional science:The current research question –what part of the whole are the facts suggestingwe need to better understand next? 

A Target condition = The research question

• In the ImprovementKata, Establishing the Target Condition is the equivalent in professional science to the current research question – what part ofthe whole are the factssuggesting we need to better understand next? 

4

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 3

It’s a Target Condition

• Markers along the way

• A translation of whatthe japanese call a ”Target”

5

Conduct Experimentsto get thereGrasp the

CurrentCondition

Establish your Next

TargetCondition

Get the Direction orChallenge

1

2

3

4

It’s a Target Condition

• Key word is condition

6

Conduct Experimentsto get thereGrasp the

CurrentCondition

Establish your Next

TargetCondition

Get the Direction orChallenge

1

2

3

4

rulle

ställtiden

STANSNING SVETS & MONT. LEVERANS200 TON

dagligaorder

6 veckorsprognos

dagliga order

dagligaorder

1 xdag

Packning

S/T = 1 timmeC/T = 1 sek

C/T = 55 sekTakt = 60 sek

1,5 dagarledtid i produktion = 5 dagar

värde-höjning = 166 sek

1 sekund1,5 dagar

165 sekunder2 dagar

Swesteel AB

11

omställningi svetsen

up-time isvetsningen

Totalt<168 sek.

PRODUKTIONSPLANERING

MPS

60

1,5 dagar

20

rulle

rullar

OXOX 2020

20

43

21

2 dagar

90/60/30 darsprognoser

18.400 st/mån-12.000 ”V”-6.400 ”H”

2 skift

Låda = 20 st

Scavos ABMontering

920 st/dag

TAKT =460 min460 st

= 60 sek

SATS = 60 sek x 20 st =20 min

HVVHVVHVV

46 lådor

Källa: M. Rother & J. Shook (2005)

Slingbildagligen

25

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 4

A “state” beyond our current “knowhow”

• A Target Condition is a “state” beyond ourcurrent “knowhow” and thus will require us to iterate our way through the “grey zone”, a zone of uncertainty. 

7

Brings out actual NEEDS

• A Target Condition ensures peoples efforts arefocused on ACTUAL NEEDS rather than ideaswhich are often guesses arising from whatCAN be done.” 

• A Target Condition helps teamwork because it is forward looking and begs the question“What do we all NEED to focus on now?” 

8

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 5

You don’t do an actionplan!

• You don’t “plan yourwhole way” to a Target Condition – No plan willcover everything, and that is OK. 

9

Obstacles surface

• A Target Condition directs you to the obstaclesNEEDED to be worked on. 

10

Conduct Experimentsto get there

Grasp the Current

Condition

Establish your Next

TargetCondition

1

2

3

4

Obstacles are the real problems you NEED to work on to move forward! 

Get the Direction orChallenge

Obstacles

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 6

Case study, Current condition

11

Target Condition: ”One side at a time”

12

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 7

Obstacles came up!

13

Layoutissues Toolsissues Fixtures

The destination…..

14

Toyota Kata Direct

Lean Frontiers, Inc. TWI Institute KataCon & TWI Summit Feb. 18-22, 2019www.leanfrontiers.com www.twi-institute.org www.leanfrontiers.com/skillsweek 8

15

Thank you for listening!