TR 10 943 Red Rock Subtation 8P22 8P25 8P28 8P21 8P24 8P27 8P20 8P23 K5 345kV Bus 1 345kV Bus 2 PT PT 115kV 10/31/2005, At Red Rock Substation, the switching procedure (TWR 814013) called for the isolation of the Red Rock 345kV bus #2 so that a C-phase lightning arrestor could be installed. The arrestor had failed during an earlier event on 10/4/2005. During this switching procedure, something caused high voltages on Bus 2 and the A & B phase pot transformers vented significant amounts of oil.

Upload: emma-harvey

Post on 31-Dec-2015

18 views

Category:

Documents


1 download

DESCRIPTION

8P22. 8P21. 8P20. 8P25. 8P24. 8P23. 345kV Bus 2. 345kV Bus 1. 8P28. 8P27. PT. PT. Red Rock Subtation. TR 10. K5. 943. 115kV. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

10/31/2005, At Red Rock Substation, the switching procedure (TWR 814013) called for the isolation of the Red Rock 345kV bus #2 so that a C-phase lightning arrestor could be installed. The arrestor had failed during an earlier event on 10/4/2005.

During this switching procedure, something caused high voltages on Bus 2 and the A & B phase pot transformers vented significant amounts of oil.

Page 2: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

The relay potentials have been placed on the Bus 1 position and the pot paralleling switch has been turned off. The dispatcher has opened two 115kV breakers and two 345kV breakers. Everything appears normal at this point. The next step is to de-energize the 345kV Bus #2 by opening 8P22.

Page 3: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

8P22 opened to de-energize the 345kV bus 2.

Va goes to 68%

Vb stays at nominal

Vc goes to 48%

No harmonics present.

What is keeping the Bus 2 B-phase PT at nominal voltage?

Sequence of Events:

07:15:14 8P22 opened

Page 4: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

8P22 Opened (shown on prev. slide.)

TR10 MOD opened.

Va jumps to 131%

Vb stays at nominal

Vc rises to 55%

No harmonics present.

Slow speed record only.

Page 5: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

07:16:18 8P22 A MOD opened

8P22 A MOD opened.

Va dips to 127%

Vb jumps to 128%

Vc drops to 44%

Va & Vb have significant harmonics now.

Slow speed record shown here, next slide shows high speed record of this same switching.

A

Page 6: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

07:16:18 8P22 A MOD opened

8P22 A MOD opened.

Va drops to 127%

Vb jumps to 128%

Vc drops to 44%

Va & Vb have significant harmonics now.

High speed record shows harmonics.

A

Page 7: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

07:16:18 8P22 A MOD opened

07:34:16 Va drops to 50%

What caused Va to drop to 50% of nominal 18 minutes after the last switching occurred? No operator actions are known to have occurred around this time.

Vb is still at 127% with harmonic distortion.

A

Page 8: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

07:16:18 8P22 A MOD opened

07:34:16 Va drops to 50%

07:42:08 Vb drops to 41%

What caused Vb to drop to 41% of nominal 26 minutes after last switching. No switching was recorded at this time.

All three voltages are at approximately 40%. Smooth waveforms are present.

At the start of this record, Va and Vc contain harmonics.

A

Page 9: TR 10

TR 10

943

Red Rock Subtation

8P22

8P25

8P28

8P21

8P24

8P27

8P20

8P23

K5

345kV Bus 1

345kV Bus 2

PT PT

115kV

Sequence of Events:

07:15:14 8P22 opened

07:15:40 TR 10 MOD opened

07:16:18 8P22 A MOD opened

07:34:16 Va drops to 50%

07:42:08 Vb drops to 41%

Next steps? We need to understand what happed here. In talking with the maintenance department, it seems like the two theories that could explain the bus energization are the grading capacitors on the ABB HPL 362A2 breakers or some problem with the pot paralleling scheme is allowing backfeed. More testing, investigation, and possibly ATP study work is needed!!!!

A

Page 10: TR 10

RRK 345kV HPL breakers with external grading capacitors.

Page 11: TR 10

RRK 345kV Wire wound potential transformers on Bus 2. A & B phase units blew oil out of their tops.