  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    1/43

    We shape a safe, high quality, sustainable and friendly built environment.

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    2/43

    Firms

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    3/43

    Construction ManpowerDevelopment

    Regulate foreign workers demandEnhance quality of workforce

    CONSTRUCTION PRODUCTIVITY

    Tightening RegulatoryRequirements & Standards

    Incentives to Adopt Technology& Build Capability

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    4/43

    CONSTRUCTION PRODUCTIVITY & CAPABILITY FUND

    (CPCF)

    WORKFORCEWORKFORCEDEVELOPMENTDEVELOPMENT

    Workforce Training& Upgrading (WTU)

    TECHNOLOGY ADOPTION &TECHNOLOGY ADOPTION &CAPABILITY DEVELOPMENTCAPABILITY DEVELOPMENT

    Mechanisation Credit(MechC)

    We shape a safe, high quality, sustainable and friendly built environment.

    EnhancedBCA-Industry

    Built EnvironmentScholarship

    ProductivityImprovement Projects

    (PIP)

    Building InformationModelling (BIM) Fund

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    5/43

    MECH CMechanisation Credit

    Scheme

    What is it?

    Provide assistance for companies to reduce cost

    incurred in technology adoption such as purchase or

    780 applications received from260 companies.

    The equipment must achieve

    20% improvement in thespecific process

    We shape a safe, high quality, sustainable and friendly built environment.

    leasing of equipment.

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    6/43

    MECH C

    Equipment Cost Funding Cap*

    (whichever is lower)

    Purchase< $100,000 50% $20,000

    > $100,000 20% $100,000

    Mechanisation Credit

    Scheme

    Cap on funding of $250,000 per firm

    We shape a safe, high quality, sustainable and friendly built environment.

    Leasing< $30,000 50% $6,000

    > $30,000 20% $30,000

    * per application

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    7/43

    Skid Steer Loader

    Screed Leveler

    MECH C

    Automatic wheel washer

    Concrete Placing Boom

    Telescopic HandlerB

    oomL

    ift

    Scissor Lift

    Spider LiftPersonnel Lift

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    8/43

    PIPProductivity Improvement Project

    Scheme

    What is it?

    Encourage process improvement through- technologies adoption; or

    - simplification of work procedures

    We shape a safe, high quality, sustainable and friendly built environment.

    to achieve higher site productivity by at least 20%

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    9/43

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    10/43

    Productivity Improvement Project

    Scheme

    PIP

    a. Manpower-Related Costs Salary of project members Airfare (economy) & Cost ofLiving Allowance

    c. Professional Services Consultancy Subcontracting

    Supportable Costs include:

    We shape a safe, high quality, sustainable and friendly built environment.

    b. Equipment & Materials Equipment Materials/Consumables

    Software

    d. Intellectual Property Rights Licensing/Royalties Technology Acquisition

    * GST is not a supportable cost

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    11/43

    PIP

    Support level for key systems and materials

    Key System and Material Support levelSelected

    Equipment

    System formworkUp to 50%

    Climbing scaffold

    Productivity Improvement Project

    Scheme

    We shape a safe, high quality, sustainable and friendly built environment.

    SelectedMaterial

    concrete Up to 80%

    (for extra cost overconventional material)

    Prefab bathroom

    Drywall

    Only gypsum boards, cement boards and similar drywall systems used in residentialprojects are supportable.

    If the material is specified in tender documents, the grant to defray extra material costwill be given to the developer.

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    12/43

    Common WSH risks in

    construction sites

    1. Safety of demolition works

    2. Falling from height3. Injury due to carrying heavy items

    4. Working in confined space

    We shape a safe, high quality, sustainable and friendly built environment.

    5. Safety of excavation works

    6. Environmental health

    7. Fire and explosion

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    13/43

    1. Demolition works WSHRisks

    ROBOTICROBOTICDEMOLITIONDEMOLITION

    MACHINEMACHINE

    Operate the machine at a distance from thedemolition area

    Able to reach high work area without the need

    for worker access

    Conventional method

    We shape a safe, high quality, sustainable and friendly built environment.

    Hand-held concrete breakerProductivity 60% MECH C

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    14/43

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    15/43

    Sound proof panel

    Auto

    2. Falling from height WSHRisks

    External Net

    Climbing

    System

    SECTION 1

    (Planter Box area)

    SECTION 2

    (Bay window area)

    SECTION 3

    (Normal wall area)

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    16/43

    -Wide and clean

    2. Falling from height WSHRisks

    Examples (South Korea projects)

    external access-100% covered

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    17/43

    2. Falling from height WSHRisksMODULAR SCAFFOLDMODULAR SCAFFOLD

    SYSTEMSYSTEM able to take 6 tons per leg

    modular system reduces the need for additional

    bracing

    wider spacing than conventional scaffold frames=> more working space

    Productivity 22% PIPPIPPIPPIP

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    18/43

    Current Prevailing Technology / method used in the industry

    ConventionalScaffolding

    Elevator use Gondola

    Manual Operated

    Lifting Platform

    Rope Assist Platform

    Machine Assisted

    Lifting Platform

    Metal Frame Scaffolding

    2. Falling from height WSH

    Risks

    Chain Assist Platform Moving Platform

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    19/43

    Proposed Technology / methodMoving Platform Lift Installation Method using Temp System.

    Moving Platformwith the use ofTemp Access

    Frame

    2. Falling from height WSH

    Risks

    19

    Lift Installation usingMoving Platform Method

    Lift Installation by Moving Platform Methodwith the use of Temp System

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    20/43

    MethodologyMoving Platform Lift Installation Method using Temp Cantilever System.

    Machine Room1. Set up Temp System

    2. Set up template and plumb lift shaft

    3. Install motor room & pit equipment

    4.Install 1st & 2nd set of guide rail & brackets

    Governor Machine

    Traction Machine

    Machine Beam

    Counterweight & Frame

    Controller

    2. Falling from height WSH

    Risks

    20

    Lift Shaft

    5. Install Car Platform & Frame, Counterweight,Temp Access Frame & Rope

    Buffers

    TeMP Access

    Frame

    PermanentCab Frame

    Components

    a n re

    Ropes

    Work Platform with ToeGuard to be provided

    Guide Rail

    6. Move the moving platform & removethe Temp System

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    21/43

    Area ofImprovement

    Projected Outcomes

    Moving Platformwith Temp

    System

    ScaffoldingMethod

    GondolaMethod

    ImprovementExpected (%) on

    using MovingPlatform with TempS stem over other

    Productivity Impacts

    2. Falling from height WSH

    Risks

    PIPPIPPIPPIP

    21

    methods

    Manpower (numberof workers)

    2 workers/lift 4 workers/lift 3 workers/lift

    100% savings overscaffold

    50% savings overgondola

    Productivity (manhours) 903 man hours/lift

    2512 manhours/lift

    1374 manhours/lift

    64% savings overscaffold

    35% savings overgondola

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    22/43

    3. Injury due to carrying heavy items WSHRisks

    LADDER HOISTLADDER HOIST

    Conventional methodHoisting LadderHoisting Ladder

    Productivity 65% MECH C

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    23/43

    MINI CRANESMINI CRANES

    3. Injury due to carrying heavy items WSHRisks

    Small enough to be transported in elevator L:2000W:590H:1300mmProductivity 60%

    MECH C

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    24/43

    3. Injury due to carrying heavy items WSHRisks

    Brickwall

    Drywall

    Drywall much lighter and faster to install

    Productivity 150% PIPPIPPIPPIP

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    25/43

    3. Injury due to carrying heavy items WSHRisks

    CUSTOMISED FORKLIFT ATTACHMENT TO INSTALLCUSTOMISED FORKLIFT ATTACHMENT TO INSTALLCONCRETE PANELS AT HEIGHTCONCRETE PANELS AT HEIGHT

    Productivity 80% PIPPIPPIPPIP

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    26/43

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    27/43

    Project Objectives- To study the project level productivity on MRT

    projects- To track manpower movement in confined space

    -

    4. Working in confined space WSHRisks

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    28/43

    Present Situation

    Manual registration

    Manual tagging on tally board

    Access Control Point (Top view)

    4. Working in confined space WSHRisks

    Confined

    Space

    Registration Point Tally Board

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    29/43

    Ultra High Frequency RFID system

    4. Working in confined space WSHRisks

    UHF RFIDTag

    GantryReaders Processor

    DisplayTerminal

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    30/43

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    31/43

    5. Safety of excavation works WSHRisks

    Strut-free excavation provides more space forconstruction equipments and workers

    Avoid accidental hitting of steel struts by excavators

    PIPPIPPIPPIP

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    32/43

    6. Environmental health WSHRisks

    Traditional Timber Formwork

    System Formwork

    Easy to install, less noise,tidier working environment

    Productivity 50% PIPPIPPIPPIP

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    33/43

    7. Fire and explosion WSHRisks

    Flexible Piping with

    Compression Sleeve Joint

    1. Expand

    3. Compress

    2. Insert

    Inexpensive and easy to store Bends easily in the most confined space

    No hot works needed

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    34/43

    7. Fire and explosion WSHRisks

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    35/43

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    36/43

    Other incentives schemes

    We shape a safe, high quality, sustainable and friendly built environment.

    Construction Industry

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    37/43

    INVESTMENT ALLOWANCE SCHEME (IAS)

    Tax incentive for equipment purchases

    Approved equipment would be supported with aninvestment allowance of 50% of the capital

    expenditure, to be off-set against taxable income

    Equipment must

    be new and owned by the applicant

    be purchased only after date of application and within1st year of qualifying period

    be at least $10,000 for construction equipment and$2,000 for IT related equipment

    We shape a safe, high quality, sustainable and friendly built environment.

    Productivity and InnovationProductivity and Innovation Credit (PIC)Credit (PIC)

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    38/43

    Productivity and InnovationProductivity and Innovation Credit (PIC)Credit (PIC)

    We shape a safe, high quality, sustainable and friendly built environment.

    Pls refer to www.iras.gov.sgfor more information

    $100 $400 $68Example:

    Expenditure Tax Deduction

    400% deduction on $100 = $400 CreditTax savings = 17% x $400 = $68

    Tax Savings

    Supportable automation equipment/Supportable automation equipment/

    system:system:

    a.a. Concreting pumpConcreting pump

    b.b. RideRide--on concrete trowelon concrete trowel

    c.c. AutoAuto--climb scaffold systemclimb scaffold system

    d.d. CNC machineryCNC machinery

    e.e. ComputerComputer--aided design/ drafting softwareaided design/ drafting software

    Increase SME Productivity with Infocomm

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    39/43

    Increase SME Productivity with Infocomm

    Adoption and Transformation (iSPRINT)Types of Project Grant Cap Qualifying Costs

    Packaged solutions, pre-qualifiedby IDA, for basic business

    functions:

    Finance/ AccountingPayrollPoint-of-SalesSoftware-as-a-Service

    Up to 50% of qualifying costs

    For Finance & Accounting, Payrolland Point-of-Sales, capped atS$1,500 per packaged solution For Software-as-a-Servicemax.12 months subscription,ca ed S 10 000

    Software/ subscription cost Consultancy services

    Training cost

    We shape a safe, high quality, sustainable and friendly built environment.

    Customised solutions(eg. customer relationshipmanagement, enterprise resourceplanning)

    Up to 50% of qualifying costs,capped at S$10,000 per SME

    Consultancy servicesTraining cost

    Customised solutions that requireextensive development efforts and

    business re-engineering(eg. supply chain management)

    Up to 50% of qualifying costs

    (Grant amount is determined on acase-by-case basis)

    Manpower-related costs Consultancy services

    Hardware/ software costs(amortised) Training cost

    Definition of SME: At least 30% of your shareholding is local ANDYour company's group annual sales turnover is less than S$100 million ORYour company's group employment size not more than 200 workers

    For more info, visithttp://www.ida.gov.sg/Sector%20Development/20060929142757.aspx

    Productivity Management Programme (PMP)

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    40/43

    Productivity Management Programme (PMP)

    What: Get recommendations on relevant Government schemes that you can tapon for productivity improvements.

    Attend productivity clinics to perform a diagnosis of your organisations

    productivity using the Integrated Management of Productivity Activities (IMPACT)Assessment tool. The diagnosis can be used to identify areas to focus on anddevelop your productivity

    Get referrals to certified consultants for your productivity projects

    We shape a safe, high quality, sustainable and friendly built environment.

    When and where: Available at 5 Enterprise Development Centres (EDCs) - Chinese, Indian andMalay business chambers, the Association of Small and Medium Enterprises(ASME) and the Singapore Manufacturers' Federation (SMa).

    Until Nov 2013

    For more info:http://productivity.business.gov.sg/en/performance_management_programme.aspx

    Inclusive Growth Programme (IGP)

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    41/43

    Inclusive Growth Programme (IGP)

    What:

    $40 million, 2 year programme administered by NTUC/e2i (Employment andEmployability Institute)

    50% funding for projects that improve work processes

    Company has to share productivity gains through raising the wages of local

    We shape a safe, high quality, sustainable and friendly built environment.

    low-wage workers

    When: The IGP was launched in August last year and will run until Aug 2012

    More info: http://www.e2i.com.sg/services/employers/inclusive-growth-programme

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    42/43

    Workforce Training & Upgrading (WTU) SchemeMs Sharon Tan DID: 6325 2096 Email: [email protected]

    Ms Cherlyn Lee DID: 6325 5034 Email: [email protected]

    Building Information Model (BIM) FundMs Cindy Liew DID: 6325 1107 E-mail: [email protected]

    Mechanisation Credit (MechC)SchemeMs Ezrin Raof DID: 6325 5093 E-mail: [email protected]

    Productivity Improvement Project (PIP)SchemeMs Phang Li Bin DID: 6325 5071 E-mail: [email protected]

    Mr Martin Ho DID: 6325 5101 E-mail: [email protected]

    For more info, visit: http://www.bca.gov.sg/CPCF/cpcf.html

    For any enquires, pleases call the CPCF Hotline: 18001800--325 5050325 5050

  • 7/28/2019 Track 2 - 1_Productive Technologies Enhancing Construction Safety

    43/43

    Thank you

    We shape a safe, high quality, sustainable and friendly built environment.