track lay-by
TRANSCRIPT
0
METRES (1:500)
10 20 30 40 50
7ESS
Lay-
by
9
LODGE CLOSE
Path (um)
Barrow School(primary)
Food Processing Plant
Trac
k
Path (um)
6
Loom Loft Furniture& Interiors
CO-OP
McD
onald
's
A59
RetainedVegetation
2
1
A59
A59
2
1
Site Analysis Plan
JBStage 3 - Spatial Coordination
01-123-0005
02.06.2021 1:500@A1
Barrow Brook Business Park Barrow Brook Business Park,Clitheroe
CD.AC.BBBP.SAP.O1
Client: Project Name:
Drawn By:
A T
M
E W
The
Gra
nary
, Sut
ton
Lodg
e F
arm
,55
Che
ster
Roa
d, S
utto
n W
eave
r,R
unco
rn, W
A7
3EA
0160
6 65
4983
0788
4401
777
C.B
rear
ley@
Arc
hi-S
cape
.net
ww
w.A
rchi
-Sca
pe.n
et
Project Address:
Project Status:
Project Number:
Drawing Title:
Date:
Drawing Number:
Scale: Rev:
Barrow Brook Business ParkConsortium
LEGEND
Denotes potential location forSUDS pond.
Denotes existing public right ofway. Footpath 3-47-FP1.
Denotes existing trees to beretained as far as possible.
Denotes A59 Carriageway.
Denotes proposed vehicular siteaccess location.
Denotes close range views, fromapproved future residentialdevelopment, to be considered.
Denotes existing business park.
Denotes approved residentialdevelopment.
NOTESProvision for lorry parking required.
Denotes pedestrian link to futureresidential developement.
Denotes potential location forgreen buffer between proposedcommercial/employment proposal &future residential development.
Revisions:
Rev Description By Date
S3A Updated in accordance with additional reports and information received. CB 16.7.21
S3A
S3A