Addressing traffic congestion on city streets is a priority for Elk Grove. This fact sheet is intended to summarize completed actions, ongoing activities, as well as proposed future solutions that City staff is actively working on to help alleviate traffic. For additional information or questions, please contact our Public Works Department at (916)478-2256. • Sheldon/Waterman Roundabout. Traffic Management Center (TMC) relocated to City Hall to allow staff to better monitor and address congestion in real time. Connected all 148 Traffic Signals to TMC so that signal timing can be remotely changed based on observations. Signal upgrades to controllers and additional traffic monitoring cameras though ITS IV. • Bradshaw/Sheldon Roundabout. Extended westbound left turn pocket at Laguna Boulevard and Franklin Boulevard. Extended westbound left turn pocket on Laguna Boulevard at Laguna Park Drive (east intersection). Bilby Road extension (Bruceville Road to Big Horn Boulevard extension). New traffic signal coordination plans are being developed for Laguna Boulevard, Bond Road and Elk Grove Boulevards to reduce congestion. Traffic signal timing is reviewed and adjusted on an ongoing basis Staff conducts travel time studies along Elk Grove Boulevard, Laguna Boulevard and Bond Road. Coordination plans are modified based on findings. Implement flashing yellow arrow (FYA) pilot program. TRAFFIC CONGESTION Completed Actions Ongoing Activities Proposed Mid Term Solutions (within next 5 years) Evaluate allowing permissive left turns on flashing yellow arrow. Grant Line Road Widening from Waterman Road to Bradshaw Road. Install traffic signal on Grant Line Road at Mosher Road. Install traffic Signal on Grant Line Road at Bradshaw Road. Install traffic signal on Bruceville Road at Quail Run Lane/Poppy Ridge Road. Install a traffic signal on Whitelock Parkway at Cape Verde Way. Big Horn Boulevard extension (Whitelock Parkway to Bilby Road Extension). I-5 HOV Lanes. Franklin Blvd Cycle Track. Proposed Long Term Solutions (beyond 5 years) Kammerer Road – Reconstruct existing roadway and extension of 2 lanes to Interstate 5. New Highway 99/Whitelock interchange Traffic Signal Communications fiber optic network. Hwy 99 Auxiliary Lanes. See Map on Back MAY 2019

Upload: others

Post on 22-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRAFFIC CONGESTION - City of Elk Grove...Addressing traffic congestion on city streets is a priority for Elk Grove. This fact sheet is intended to summarize completed actions, ongoing

Addressing traffic congestion on city streets is a priority for Elk Grove. This fact sheet is intended to summarize completed actions, ongoing activities, as well as proposed future solutions that City staff is actively working on to help alleviate traffic. For additional information or questions, please contact our Public Works Department at (916)478-2256.

• Sheldon/Waterman Roundabout. • Traffic Management Center (TMC) relocated to City Hall to allow staff to better monitor and address congestion in real time.• Connected all 148 Traffic Signals to TMC so that signal timing can be remotely changed based on observations.• Signal upgrades to controllers and additional traffic monitoring cameras though ITS IV.

• Bradshaw/Sheldon Roundabout.

• Extended westbound left turn pocket at Laguna Boulevard and Franklin Boulevard.

• Extended westbound left turn pocket on Laguna Boulevard at Laguna Park Drive (east intersection).

• Bilby Road extension (Bruceville Road to Big Horn Boulevard extension).

• New traffic signal coordination plans are being developed for Laguna Boulevard, Bond Road and Elk Grove Boulevards to reduce congestion. • Traffic signal timing is reviewed and adjusted on an ongoing basis • Staff conducts travel time studies along Elk Grove Boulevard, Laguna Boulevard and Bond Road. Coordination plans are modified based on findings.• Implement flashing yellow arrow (FYA) pilot program.

TRAFFIC CONGESTION

Completed Actions

Ongoing Activities

Proposed Mid Term Solutions (within next 5 years)• Evaluate allowing permissive left turns on flashing yellow arrow.• Grant Line Road Widening from Waterman Road to Bradshaw Road. • Install traffic signal on Grant Line Road at Mosher Road. • Install traffic Signal on Grant Line Road at Bradshaw Road. • Install traffic signal on Bruceville Road at Quail Run Lane/Poppy Ridge Road. • Install a traffic signal on Whitelock Parkway at Cape Verde Way. • Big Horn Boulevard extension (Whitelock Parkway to Bilby Road Extension). • I-5 HOV Lanes.• Franklin Blvd Cycle Track.

Proposed Long Term Solutions (beyond 5 years)• Kammerer Road – Reconstruct existing roadway and extension of 2 lanes to Interstate 5. • New Highway 99/Whitelock interchange • Traffic Signal Communications fiber optic network. • Hwy 99 Auxiliary Lanes.

See Map on Back

MAY 2019

Page 2: TRAFFIC CONGESTION - City of Elk Grove...Addressing traffic congestion on city streets is a priority for Elk Grove. This fact sheet is intended to summarize completed actions, ongoing

CITY

OF

SAC

RA

MEN

TOO

F EL

KCI

TYG

ROVE

Whi

telo

ck P

kwy

Shel

don

Rd

Elk Grove Florin Rd

Grant Line Rd

Lagu

na B

lvd

Bruceville Rd

Franklin Blvd

Elk

Grov

e Bl

vd

Bradshaw Rd

Wilto

n Rd

Calv

ine

Rd Bond

Rd

Waterman Rd

Excelsior Rd

Bilb

y Rd

Willa rd Pkwy

Hood

Fran

klin

Rd

Lotz

Pkwy

E Stockton Blvd

Kam

mer

er R

d

Mos

her R

d

Bader Rd

Elk

Grov

e Bl

vd

Harbo ur Point Dr

Shel

don

Rd

BigHorn BlvdPo w

erIn

n Rd

12

13

1

2

3

4

5

6

7

8

9

1011

15

16

14

Elk

Grov

e Ci

ty Li

mits

Cong

estio

n Lo

catio

ns a

nd P

lann

ed P

roje

cts

G:\

PR

OJE

CT

S\T

RA

FF

IC\T

RA

FF

IC_

VO

LU

ME

S\L

ayo

uts

\Co

ng

est

ion

_Lo

cati

on

s_P

lan

ned

_P

roje

cts.

mxd

5/2

/20

19

01

0.5

Mile

s

Map

Pro

duce

d by

Elk

Gro

ve G

IS, 2

019

May

.

Plan

ned

Proj

ects

Proj

ect N

umbe

r and

Des

crip

tion

1- L

eft T

urn

Pock

et E

xten

sion

EB L

agun

a Bl

vd a

t Fra

nklin

Blv

d(C

ompl

ete)

2- C

oord

inat

ion

Impr

ovem

ents

EG

Blvd

(Fra

nklin

Blv

d to

Hw

y 99

)3

- Coo

rdin

atio

n Im

prov

emen

ts La

guna

Blv

d/Bo

nd R

d (F

rank

lin B

lvd

to E

G Fl

orin

Rd)

4- B

ond

Rd M

edia

n Im

prov

emen

ts a

nd R

esur

facin

g5

- Old

Tow

n Ar

ea S

tree

tsca

pe P

hase

26

- Whi

telo

ck P

kwy/

Stat

e Ro

ute

99 In

terc

hang

e Pr

ojec

t7

- Kam

mer

er R

d Ex

tens

ion

and

Wid

enin

g8

- Bra

dsha

w R

d/Sh

eldo

n Rd

Rou

ndab

out

(Com

plet

e)9

- Gra

nt Li

ne R

d/Br

adsh

aw R

d In

ters

ectio

n, G

rant

Line

Rd/

Mos

her R

d In

ters

ectio

n,Gr

ant L

ine

Rd W

iden

ing

10- T

raffi

c Sig

nal,

Bruc

evill

e Rd

/Pop

py R

idge

Rd

(In C

onst

ruct

ion)

11- B

ig H

orn

Blvd

and

Bilb

y Rd

Ext

ensio

ns(C

ompl

ete)

12- I

nter

stat

e 5

HOV

Lane

s13

- Fra

nklin

Cyc

le T

rack

14- S

tate

Rou

te 9

9 Au

xilia

ry La

nes

15- L

agun

a Bl

vd/W

. Sto

ckto

n Bl

vd R

ight

Tur

n La

ne16

- She

ldon

Rd

Left

Turn

Lane

s

Cong

estio

n Th

resh

old

Appr

oach

es P

erfo

rman

ce T

arge

tDo

es N

ot M

eet P

erfo

rman

ce T

arge

t

CO

NG

ESTI

ON

LO

CA

TIO

NS

AN

D P

LAN

NED