traffic survey and forecast of east intercahnge in ulanbaatar

14
CHAPTER 3 TRAFFIC SURVEY AND FORECAST 3-1 CHAPTER 3 TRAFFIC SURVEY AND FORECAST There are approximate traffic forecast, direct demand model and 4 step approach method in traffic forecast. The Consultant forecasted the future traffic with past trend extension method of approximate traffic forecast because the project area is small (only one intersection), project period is short and the survey data of OD (Origin-Destination) for each traffic zones was insufficient. The traffic forecast for each direction on the most concentrated traffic time of 2031 was forecasted with present condition. 3.1 Traffic Forecasting Method There are approximate traffic forecast, direct demand model and 4 step approach method in traffic forecast. Approximate traffic forecast is used for the small area or when the collect of data is difficult and it has past trend extension method and demand flexibility method. Direct demand model and 4 step approach method are used for accurate forecast in large scaled area. The project area is small (only one intersection) and the survey data of traffic pattern and OD (Origin-Destination) for each traffic zone was insufficient, so the Consultant applied future traffic with past trend extension method of approximate traffic forecast. Based on the colleting result of the traffic demand forecast case for UB city, 4 step approach method was used in “Detailed engineering design of road from Yarmag bridge to Bayanzurh in Ulaanbaatar city", so reviewed it first. 3.1.1 Review the demand in “Detailed engineering design of road from Yarmag bridge to Bayanzurh in Ulaanbaatar city"

Upload: spadezero

Post on 21-Nov-2015

8 views

Category:

Documents


1 download

DESCRIPTION

traffic survey and analysis report of East intersection in Ulaanbaatar, Mongol.

TRANSCRIPT

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-1

    CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    There are approximate traffic forecast, direct demand model and 4 step approach

    method in traffic forecast. The Consultant forecasted the future traffic with past

    trend extension method of approximate traffic forecast because the project area

    is small (only one intersection), project period is short and the survey data of OD

    (Origin-Destination) for each traffic zones was insufficient. The traffic forecast

    for each direction on the most concentrated traffic time of 2031 was forecasted

    with present condition.

    3.1 Traffic Forecasting Method

    There are approximate traffic forecast, direct demand model and 4 step approach

    method in traffic forecast. Approximate traffic forecast is used for the small area

    or when the collect of data is difficult and it has past trend extension method and

    demand flexibility method. Direct demand model and 4 step approach method

    are used for accurate forecast in large scaled area.

    The project area is small (only one intersection) and the survey data of traffic

    pattern and OD (Origin-Destination) for each traffic zone was insufficient, so the

    Consultant applied future traffic with past trend extension method of

    approximate traffic forecast.

    Based on the colleting result of the traffic demand forecast case for UB city, 4

    step approach method was used in Detailed engineering design of road from

    Yarmag bridge to Bayanzurh in Ulaanbaatar city", so reviewed it first.

    3.1.1 Review the demand in Detailed engineering design of road from Yarmag

    bridge to Bayanzurh in Ulaanbaatar city"

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-2

    4 step approach method dividing the forecasted OD (Origin-Destination) volume

    after organizing the road network under the reflection of the social-economic

    index forecast and related plans was applied.

    - Present O/D settlement: Settlement by the calibration process which repeatedly

    distributes the O/D which was forecasted based on the detailed regional

    population data on the present road network.

    - Network settlement: The feasible planned road network on present road

    network was reflected.

    - Future O/D settlement: Settlement by calibration after the multiply of the

    growth rate on the already settled present O/D traffic volume.

    4 step approach method

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-3

    Ulaanbaatar city is organized with six Districts such as Sukhbaatar, Khan-Uul,

    Bayangol, Bayanzurkh, Songino Khairkhan and Chingeltei. Each Dirstict is

    organized 14~25 Khoroo, and there are totally 120 Khorooes. East 4 road

    intersection which is the project area is included in the Bayanzurkh District.

    UB Districts in Study Area

    S. No. Name of District No. of Blocks (Khoroos)

    1 Bayangol 20

    2 Chingeltei 19

    3 Sukhbaatar 18

    4 Bayanzurkh 24

    5 Khan Uul 14

    6 Songino Khairkhan 25

    Total 120

    Source: Data from Ulaanbaatar city government

    Section map of traffic zone

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-4

    Based on the review in the allocated traffic volume of Detailed engineering design

    of road from Yarmag bridge to Bayanzurh in Ulaanbaatar city", there is big

    difference in the project route with the OD and allocated traffic volume to

    downtown because the project route is passing through the southern outer area

    of UB city. The traffic volume of south-north direction of East 4 Road

    Intersection in 2031 (Target year) was forecasted as below 1,000 vehicles per

    hour. So, the use of the 4 step approach method and traffic data of Detailed

    engineering design of road from Yarmag bridge to Bayanzurh in Ulaanbaatar

    city" is insufficient.

    3.1.2 Traffic forecast using past trend extension method

    Traffic volume increasing rate was established as 1.35% after review of the past

    traffic survey data of UB city and the bus terminal traffic data of The Study on

    UB city Master Plan and Urban Development Program (JICA, 2006) and the

    traffic data which the Consultant surveyed for the same area at 2008 was also

    reviewed.

    3.2 Present condition of traffic

    The present traffic conditions such as geometric structure, traffic volume,

    walkers volume, traffic sign time, etc were investigated and analyzed and were

    used as the basic data for alternative design establishment and selection.

    3.2.1 Traffic Survey

    Traffic surveys of traffic index such the number of lanes, lane operation, traffic

    sign operation, etc to check the accurate traffic conditions of East 4 road

    intersection have been implemented Oct. 2008.

    Traffic Survey Item

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-5

    Item Contents

    Geometry Number of Lanes, lane operation, Road width

    Traffic Volume The vehicle types were classified as five (motor car, micro bus, general bus, small truck and large truck) and the traffic volume

    by time and direction was investigated.

    Pedestrian Volume Traffic volume of one hour on each fifteen minute from each direction

    Signal Operation Traffic signal phase, and cycle length and location of traffic signal

    Survey Site

    3.2.2 Geometry

    The Consultant investigated the road alignment, number of lanes and width of

    each intersection approach, width of sidewalk and location of the bus stop to

    check the traffic features of East 4 roads intersection.

    Unsignalized Intersection of Westbound Approach

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-6

    Bus Stop and Pedestrian Cross at Eastbound Approach

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-7

    Geometry

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-8

    3.2.3 Traffic Volume

    1) Total volume on the intersection

    Based on the traffic survey on the East 4 roads intersection for 14 hours, it

    was found that the total volume on the intersection was increased quickly

    after 08:00 and continued until after 20:00. The most concentrated traffic jam

    time was from 09:00 to 10:00 and the traffic volume was 6,239 pcu/hr. The

    traffic rates by vehicle type were investigated to be motor car 77%, bus 16%

    and truck 7%.

    Intersection Hourly Volume

    0

    1,000

    2,000

    3,000

    4,000

    5,000

    6,000

    7,000

    6-7

    7-8

    8-9

    9-10

    10-11

    11-12

    12-13

    13-14

    14-15

    15-16

    16-17

    17-18

    18-19

    19-20

    Time

    Vehicles(pcu/hr)

    Volume Ratio by Vehicle Classification

    Auto77%

    MicroBUS13%

    GeneralBUS3%

    Truck7%

    Auto73%

    MicroBUS18%

    GeneralBUS4%

    Truck5%

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-9

    2) Traffic volume by direction

    The traffic volume by direction from 09:00 to 10:00 which was the most

    concentrated traffic jam time among 14 hours of survey is as below.

    Traffic volume by each direction

    14-hrs Volume Peak Hour Volume

    Peak Hour Traffic volume and vehicle type rate for each

    approach

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    Volume(veh/hr)

    SB WB NB EB

    Approach

    Truck

    GeneralBUS

    MicroBUS

    Auto

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-10

    3) Delay and LOS analysis

    The result of the calculation for the delay on the intersection by Synchro is

    116.8sec/veh, LOS F. The service level for all approach to the intersection is F and

    the delay from all approach was reported, and the delay especially occurred mainly

    on left turn traffic system.

    The delay will be relieved due to the signal time increase according to the

    installment of overpass on the left turn of east-west direction. The left turn lane

    increase is needed for the left turn of south-north direction.

    Analysis result of intersection traffic movement

    Approach Movement Volume

    (pcu/hr)

    Movement

    Delay

    (sec/veh)

    Approach

    Delay

    (sec/veh),

    LOS

    Intersection

    Delay

    (sec/veh),

    LOS

    East Bound

    Left Turn 265 246.4

    102.8

    (F)

    116.8

    (F)

    Through 865 89.9

    Right Turn 288 9.2

    West Bound

    Left Turn 495 212.0

    136.7

    (F) Through 997 149.6

    Right Turn 415 15.8

    North Bound

    Left Turn 393 152.4

    85.8

    (F) Through 765 71.9

    Right Turn 237 20.2

    South Bound

    Left Turn 428 192.4

    133.5

    (F) Through 907 129.2

    Right Turn 184 17.5

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-11

    3.2.4 Pedestrian Volume

    The Consultant surveyed the volume of pedestrians crossing the intersection and

    the volume of pedestrians on the sidewalk of Peace Avenue. LOS of Pedestrian

    Crossing is C (moderate condition) and LOS of Sidewalk is A (good

    condition).

    Survey points for pedestrian volume

    Pedestrian volume and LOS

    Location Pedestrian Volume

    (person/15min)

    Effective Green Time for Pedestrian (sec)

    Pedestrian Delay

    (sec/person) LOS

    Pedestrian Crossing

    1 148 34 26.3 C

    2 19 31 28.3 C

    3 25 34 26.3 C

    4 25 31 28.3 C

    Location Pedestrian Volume

    (person/15min) Effective Length of Sidewalk(m)

    Flow Rate (person/min/m)

    LOS

    Sidewalk

    5 179 2.0 6.0 A

    6 23 2.0 0.8 A

    7 157 2.0 5.2 A

    8 27 2.0 0.9 A

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-12

    3.2.5 Traffic Signal Operation

    The signal for east 4 road intersection is operating as pre-timed signal on 110

    second cycle length. The design review of signal time connected with ITS will

    be needed because there is the ITS plan to change the signal controller unit for

    the intersection which is under examination of the design proposal.

    Traffic signal location

    4

    22

    2

    4

    2

    34

    2

    2

    2

    42

    44

    2

    4

    2

    32

    2

    2

    2

    4

    2

    3

    2

    Signal Operation

    Phase and Signal Time Signal Operation

    15

    1

    (3)

    2 3

    31(3) 24(3)

    Cycle

    110

    (sec)

    4

    28(3)

    Phase Scheme : Dual Ring

    Phase Sequence : Leading Left Turn

    Cycle Length : 110 sec

    Number of Phases : 4

    Overlap Phase : No

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-13

    3.3 Traffic forecast of the intersection in 2031

    Daily volume of the East 4 road intersection of UB city is forecasted as 101,168

    pcu/14hrs in 2031 which is the target year. The forecasted Peak

    Hour(09:00~10:00) volume is converted as directional volume based on the

    traffic rate of survey of Oct. 2008.

    Forecasted hourly traffic volume in 2031

    Time 2008 Hourly Volume

    (pcu/hr) Volume Ratio

    2031 Hourly Volume (pcu/hr)

    06:00~07:00 714 0.0096 972

    07:00~08:00 2,939 0.0396 4,001

    08:00~09:00 5,767 0.0776 7,851

    09:00~10:00 6,239 0.0840 8,494

    10:00~11:00 6,136 0.0826 8,354

    11:00~12:00 6,118 0.0823 8,329

    12:00~13:00 6,172 0.0831 8,403

    13:00~14:00 5,995 0.0807 8,162

    14:00~15:00 5,860 0.0789 7,978

    15:00~16:00 5,865 0.0789 7,985

    16:00~17:00 5,811 0.0782 7,911

    17:00~18:00 5,685 0.0765 7,740

    18:00~19:00 5,439 0.0732 7,405

    19:00~20:00 5,570 0.0750 7,583

    Total 74,310 1.0000 101,168

  • CHAPTER 3 TRAFFIC SURVEY AND FORECAST

    3-14

    The allocated traffic volume is calculated for each movement of approach to the

    intersection by traffic forecast. The present traffic rate is applied for the traffic

    rate of the movement. The peak hour is settled as 09:00~10:00 for A.M. based

    on present traffic volume.

    Intersection Volume in 2031

    Movement AM Peak Hour(09:00~10:00)

    Volume

    (pcu/hr) Ratio

    SB

    RT 251 0.0296

    TH 1,235 0.1454

    LT 583 0.0686

    WB

    RT 565 0.0665

    TH 1,356 0.1596

    LT 674 0.0794

    NB

    RT 323 0.0380

    TH 1,041 0.1226

    LT 535 0.0630

    EB

    RT 392 0.0462

    TH 1,178 0.1387

    LT 361 0.0425

    Total 8,494 1.0000

    NB : North Bound, SB : South Bound, EB : East Bound, WB : West Bound LT : Left Turn, TH : Through, RT : Right Turn