trailer auxiliary power system (taps)™€¦ · 1. interpret this drawing in accordance with asme...
TRANSCRIPT
![Page 1: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/1.jpg)
INSTALLATION GUIDE
300-22 Doc 1.02
Trailer Auxiliary Power System (Taps)™
![Page 2: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/2.jpg)
![Page 3: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/3.jpg)
1P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
CONTENTSGeneral Information ..........................................................................................2System Diagram for Dual Pole Application ....................................................3System Diagram for Straight Truck Application ............................................4Dual Pole Configuration....................................................................................5Straight Truck Configuration ............................................................................5Mounting the TAPS Enclosure .........................................................................6120 VAC Harness Installation ...........................................................................7Input Cable Routing for Dual Pole Application ...........................................11Input Cable Routing for Straight Truck Application ...................................13LED Indication and Operation .......................................................................15Limited Commercial Warranty Policy ...........................................................16
![Page 4: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/4.jpg)
2
The Trailer Auxiliary Power System (TAPS)™ is designed to provide auxiliary AC power at 120 volts in a trailer so that AC devices can be powered while on the trailer. In this application, the AC power allows a device such as an electric pallet jack to be charged while the truck is driving between stops. It keeps the pallet jack at a high state of charge so it stays functional during the hours of operation.
This trailer-based system receives DC power from the tractor via the dual pole power cord. If mounted on a straight truck, it receives DC power from the tractor batteries. TAPS converts DC power to 120 volt AC power and is managed by a smart inverter that will not turn on until it sees a DC input of 12.8 volts.
Once the inverter turns on, it will stay on until the voltage drops below 12.4 volts for 30 seconds, or until the voltage drops below 10.5 volts. Once the inverter turns off, it will not turn back on until the voltage again reaches at least 12.8 volts.
GENERAL INFORMATION
![Page 5: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/5.jpg)
3P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
SYSTEM DIAGRAM FORDUAL POLE APPLICATION
Dual pole nosebox
20' Dual pole negative cable
Dual pole positive cable
1500 Watt pure sine inverter
Liquid tight 110 VAC harness
Reinforced nylon receptacle box
110 VAC receptacle with LED indication
x
INTERPRET THIS DRAWING IN ACCORDANCE WITH ASME 1.Y14.100-2004SEE SEPARATE PARTS LIST FOR PARTS2.REMOVE ALL BURRS3.BREAK SHARP CORNERS4.WEIGHT: -5.MATERIAL: 6.MATERIAL FINISH: 7.MATERIAL COLOR: 8.
TOLERANCES UNLESS OTHERWISE SPECIFIED:IF ENGLISH AND METRIC SPECIFIED - ENGLISH [METRIC]
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF PURKEYS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF PURKEYS IS PROHIBITED.
ENGLISH.X .030.XX .010.XXX .005
METRIC.X .25.XX .13.XXX .013
LOWELL, ARKANSAS 72745
DRAFT
3RD ANGLE
Peer Review Checklist:Decal(s) (Buy Sticker)•
Decal(s) included•No overlap•Correct tolerancing•
Label(s) (Make Sticker)•Label(s)iIncluded•No overlap•Correct tolerancing•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Appropriate tolerances on each sheet•
Correct units are selected•Tolerances are appropriate•
Weight•Weight includes everything in drawing•Units are shown•
Important features•Complete title block (Based on PDM data card)•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By shows correct name and date•
Appropriate notes are included•First page shows entire part•BOM page(s) are complete and reflect •manufacturing processLast page shows complete revision history•
TECHNICAL DRAWINGTechnical Drawing Checklists - 2018/12/11
10111 - TAPS PURE SINEPROJECTPART #
CAGE:
DRAWN BY
REVIEWED BY
ENG APPR.
Q.A. APPR.
DATENAME
DESCRIPTION:
SIZE
BDWG. NO. REV
SCALE: 1:12
4/9/2019
SHEET 3 OF 3
PD009868
PART DESCRIPTION FILLS FROM DATA CARD
A A
B B
C C
D D
E E
F F
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Q.A. Approval Checklist:Overall dimensions•Wire lengths•Complete title block•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By, Reviewed By, and Eng. Appr show •correct names and datesTolerance units is selected on each sheet•
First page shows entire part•BOM complete•Last page shows complete revision history•Watermark has been removed•
Engineering Approval Checklist:Correct Decal(s) and Label(s)•
Correct graphic•All labels needed are shown•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Weight•
Weight includes everything in drawing•Units are shown•
Important engineering/manufacturing/customer •featuresAppropriate notes are included•First page shows entire part•Last page shows complete revision history•Reviewed By shows correct name and date•BOM pages reflect correct manufacturing steps•
NOTES:
### Be sure to press F7 to complete a spell check before you submit for Peer Review. ###
Components:• Dual pole nosebox• Dual pole positive (+)• Dual pole negative (-)• Inverter
• Liquid tight conduit with 110 VAC harness
• 110 V receptacle with power indication
15.20"
16.00"
22.50"
R.17" .25" 2.00"
4.44"
x
INTERPRET THIS DRAWING IN ACCORDANCE WITH ASME 1.Y14.100-2004SEE SEPARATE PARTS LIST FOR PARTS2.REMOVE ALL BURRS3.BREAK SHARP CORNERS4.WEIGHT: -5.MATERIAL: 6.MATERIAL FINISH: 7.MATERIAL COLOR: 8.
TOLERANCES UNLESS OTHERWISE SPECIFIED:IF ENGLISH AND METRIC SPECIFIED - ENGLISH [METRIC]
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF PURKEYS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF PURKEYS IS PROHIBITED.
ENGLISH.X .030.XX .010.XXX .005
METRIC.X .25.XX .13.XXX .013
LOWELL, ARKANSAS 72745
DRAFT
3RD ANGLE
Peer Review Checklist:Decal(s) (Buy Sticker)•
Decal(s) included•No overlap•Correct tolerancing•
Label(s) (Make Sticker)•Label(s)iIncluded•No overlap•Correct tolerancing•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Appropriate tolerances on each sheet•
Correct units are selected•Tolerances are appropriate•
Weight•Weight includes everything in drawing•Units are shown•
Important features•Complete title block (Based on PDM data card)•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By shows correct name and date•
Appropriate notes are included•First page shows entire part•BOM page(s) are complete and reflect •manufacturing processLast page shows complete revision history•
TECHNICAL DRAWINGTechnical Drawing Checklists - 2018/12/11
10111 - TAPS PURE SINEPROJECTPART #
CAGE:
DRAWN BY
REVIEWED BY
ENG APPR.
Q.A. APPR.
DATENAME
DESCRIPTION:
SIZE
BDWG. NO. REV
SCALE: 1:8
4/9/2019
SHEET 2 OF 3
PD009868
PART DESCRIPTION FILLS FROM DATA CARD
A A
B B
C C
D D
E E
F F
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Q.A. Approval Checklist:Overall dimensions•Wire lengths•Complete title block•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By, Reviewed By, and Eng. Appr show •correct names and datesTolerance units is selected on each sheet•
First page shows entire part•BOM complete•Last page shows complete revision history•Watermark has been removed•
Engineering Approval Checklist:Correct Decal(s) and Label(s)•
Correct graphic•All labels needed are shown•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Weight•
Weight includes everything in drawing•Units are shown•
Important engineering/manufacturing/customer •featuresAppropriate notes are included•First page shows entire part•Last page shows complete revision history•Reviewed By shows correct name and date•BOM pages reflect correct manufacturing steps•
NOTES:
### Be sure to press F7 to complete a spell check before you submit for Peer Review. ###
AC connections at the 4-terminal junction strip
![Page 6: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/6.jpg)
4
SYSTEM DIAGRAM FORSTRAIGHT TRUCK APPLICATION
Components:• 150 amp fuse cube and
bracket• Dual pole positive (+)• Dual pole negative (-)• Inverter
• Liquid tight conduit with 110 VAC harness
• 110 V receptacle with power indication
AC connections at the 4-terminal junction strip
VAC receptacle
63' Liquid tight 110 VAC harness
1500 Watt pure sine inverter
20' Dual pole positive cable
20' Dual pole negative cable
Nylon receptacle protector
Fuse
150 amp Fuse Cube
and Bracket
15.20"
16.00"
22.50"
R.17" .25" 2.00"
4.44"
x
INTERPRET THIS DRAWING IN ACCORDANCE WITH ASME 1.Y14.100-2004SEE SEPARATE PARTS LIST FOR PARTS2.REMOVE ALL BURRS3.BREAK SHARP CORNERS4.WEIGHT: -5.MATERIAL: 6.MATERIAL FINISH: 7.MATERIAL COLOR: 8.
TOLERANCES UNLESS OTHERWISE SPECIFIED:IF ENGLISH AND METRIC SPECIFIED - ENGLISH [METRIC]
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF PURKEYS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF PURKEYS IS PROHIBITED.
ENGLISH.X .030.XX .010.XXX .005
METRIC.X .25.XX .13.XXX .013
LOWELL, ARKANSAS 72745
DRAFT
3RD ANGLE
Peer Review Checklist:Decal(s) (Buy Sticker)•
Decal(s) included•No overlap•Correct tolerancing•
Label(s) (Make Sticker)•Label(s)iIncluded•No overlap•Correct tolerancing•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Appropriate tolerances on each sheet•
Correct units are selected•Tolerances are appropriate•
Weight•Weight includes everything in drawing•Units are shown•
Important features•Complete title block (Based on PDM data card)•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By shows correct name and date•
Appropriate notes are included•First page shows entire part•BOM page(s) are complete and reflect •manufacturing processLast page shows complete revision history•
TECHNICAL DRAWINGTechnical Drawing Checklists - 2018/12/11
10111 - TAPS PURE SINEPROJECTPART #
CAGE:
DRAWN BY
REVIEWED BY
ENG APPR.
Q.A. APPR.
DATENAME
DESCRIPTION:
SIZE
BDWG. NO. REV
SCALE: 1:8
4/9/2019
SHEET 2 OF 3
PD009868
PART DESCRIPTION FILLS FROM DATA CARD
A A
B B
C C
D D
E E
F F
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Q.A. Approval Checklist:Overall dimensions•Wire lengths•Complete title block•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By, Reviewed By, and Eng. Appr show •correct names and datesTolerance units is selected on each sheet•
First page shows entire part•BOM complete•Last page shows complete revision history•Watermark has been removed•
Engineering Approval Checklist:Correct Decal(s) and Label(s)•
Correct graphic•All labels needed are shown•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Weight•
Weight includes everything in drawing•Units are shown•
Important engineering/manufacturing/customer •featuresAppropriate notes are included•First page shows entire part•Last page shows complete revision history•Reviewed By shows correct name and date•BOM pages reflect correct manufacturing steps•
NOTES:
### Be sure to press F7 to complete a spell check before you submit for Peer Review. ###
![Page 7: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/7.jpg)
5P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
DUAL POLE CONFIGURATION
STRAIGHT TRUCK CONFIGURATION
![Page 8: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/8.jpg)
6
MOUNTING THE TAPS ENCLOSURE
Step 1: Mount the TAPS enclosure in a suitable location, either inside or outside of the trailer, using the universal mounting brackets.
TAPS enclosure mounting complete.
15.20"
16.00"
22.50"
R.17" .25" 2.00"
4.44"
x
INTERPRET THIS DRAWING IN ACCORDANCE WITH ASME 1.Y14.100-2004SEE SEPARATE PARTS LIST FOR PARTS2.REMOVE ALL BURRS3.BREAK SHARP CORNERS4.WEIGHT: -5.MATERIAL: 6.MATERIAL FINISH: 7.MATERIAL COLOR: 8.
TOLERANCES UNLESS OTHERWISE SPECIFIED:IF ENGLISH AND METRIC SPECIFIED - ENGLISH [METRIC]
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF PURKEYS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF PURKEYS IS PROHIBITED.
ENGLISH.X .030.XX .010.XXX .005
METRIC.X .25.XX .13.XXX .013
LOWELL, ARKANSAS 72745
DRAFT
3RD ANGLE
Peer Review Checklist:Decal(s) (Buy Sticker)•
Decal(s) included•No overlap•Correct tolerancing•
Label(s) (Make Sticker)•Label(s)iIncluded•No overlap•Correct tolerancing•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Appropriate tolerances on each sheet•
Correct units are selected•Tolerances are appropriate•
Weight•Weight includes everything in drawing•Units are shown•
Important features•Complete title block (Based on PDM data card)•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By shows correct name and date•
Appropriate notes are included•First page shows entire part•BOM page(s) are complete and reflect •manufacturing processLast page shows complete revision history•
TECHNICAL DRAWINGTechnical Drawing Checklists - 2018/12/11
10111 - TAPS PURE SINEPROJECTPART #
CAGE:
DRAWN BY
REVIEWED BY
ENG APPR.
Q.A. APPR.
DATENAME
DESCRIPTION:
SIZE
BDWG. NO. REV
SCALE: 1:8
4/9/2019
SHEET 2 OF 3
PD009868
PART DESCRIPTION FILLS FROM DATA CARD
A A
B B
C C
D D
E E
F F
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Q.A. Approval Checklist:Overall dimensions•Wire lengths•Complete title block•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By, Reviewed By, and Eng. Appr show •correct names and datesTolerance units is selected on each sheet•
First page shows entire part•BOM complete•Last page shows complete revision history•Watermark has been removed•
Engineering Approval Checklist:Correct Decal(s) and Label(s)•
Correct graphic•All labels needed are shown•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Weight•
Weight includes everything in drawing•Units are shown•
Important engineering/manufacturing/customer •featuresAppropriate notes are included•First page shows entire part•Last page shows complete revision history•Reviewed By shows correct name and date•BOM pages reflect correct manufacturing steps•
NOTES:
### Be sure to press F7 to complete a spell check before you submit for Peer Review. ###
![Page 9: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/9.jpg)
7P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
120 VAC HARNESS INSTALLATION
Step 1: Route the end of the 120 VAC harness that contains the three wires with the #10 eyelets through the hole at the top of the TAPS enclosure. Secure the harness to the enclosure using the supplied liquid-tight fitting.
Step 2: Attach the white wire to the top post, the green wire to the 2nd post, and the black wire to the 3rd post. Tighten each connection.
Important! To reduce the risk of electrical shock, make sure the inverter does not have power before making the following connections.
Step 3: Once the connections are complete, close the lid, then install all 8 lid screws (included). Torque to 5 lb-in. DO NOT exceed 7 lb-in or screws can be damaged.
15.20"
16.00"
22.50"
R.17" .25" 2.00"
4.44"
x
INTERPRET THIS DRAWING IN ACCORDANCE WITH ASME 1.Y14.100-2004SEE SEPARATE PARTS LIST FOR PARTS2.REMOVE ALL BURRS3.BREAK SHARP CORNERS4.WEIGHT: -5.MATERIAL: 6.MATERIAL FINISH: 7.MATERIAL COLOR: 8.
TOLERANCES UNLESS OTHERWISE SPECIFIED:IF ENGLISH AND METRIC SPECIFIED - ENGLISH [METRIC]
PROPRIETARY AND CONFIDENTIALTHE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE
PROPERTY OF PURKEYS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF PURKEYS IS PROHIBITED.
ENGLISH.X .030.XX .010.XXX .005
METRIC.X .25.XX .13.XXX .013
LOWELL, ARKANSAS 72745
DRAFT
3RD ANGLE
Peer Review Checklist:Decal(s) (Buy Sticker)•
Decal(s) included•No overlap•Correct tolerancing•
Label(s) (Make Sticker)•Label(s)iIncluded•No overlap•Correct tolerancing•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Appropriate tolerances on each sheet•
Correct units are selected•Tolerances are appropriate•
Weight•Weight includes everything in drawing•Units are shown•
Important features•Complete title block (Based on PDM data card)•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By shows correct name and date•
Appropriate notes are included•First page shows entire part•BOM page(s) are complete and reflect •manufacturing processLast page shows complete revision history•
TECHNICAL DRAWINGTechnical Drawing Checklists - 2018/12/11
10111 - TAPS PURE SINEPROJECTPART #
CAGE:
DRAWN BY
REVIEWED BY
ENG APPR.
Q.A. APPR.
DATENAME
DESCRIPTION:
SIZE
BDWG. NO. REV
SCALE: 1:8
4/9/2019
SHEET 2 OF 3
PD009868
PART DESCRIPTION FILLS FROM DATA CARD
A A
B B
C C
D D
E E
F F
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Q.A. Approval Checklist:Overall dimensions•Wire lengths•Complete title block•
Description is accurate•Part number is correct•Project name is correct•Drawing number is correct•Revision is correct•Drawn By, Reviewed By, and Eng. Appr show •correct names and datesTolerance units is selected on each sheet•
First page shows entire part•BOM complete•Last page shows complete revision history•Watermark has been removed•
Engineering Approval Checklist:Correct Decal(s) and Label(s)•
Correct graphic•All labels needed are shown•
Serial # (if needed)•Appropriate location•Correct tolerancing•Correct sticker type•
Work Order Barcode•Appropriate location•Correct tolerancing•Correct sticker type•
Overall dimensions•Critical dimensions•Wire lengths•Weight•
Weight includes everything in drawing•Units are shown•
Important engineering/manufacturing/customer •featuresAppropriate notes are included•First page shows entire part•Last page shows complete revision history•Reviewed By shows correct name and date•BOM pages reflect correct manufacturing steps•
NOTES:
### Be sure to press F7 to complete a spell check before you submit for Peer Review. ###
![Page 10: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/10.jpg)
8
Step 5: Mount the sealed AC receptacle box in a suitable location on the side wall at the back of the trailer.
Step 6: Route the three AC wires into the AC receptacle box and secure the harness to the box using the supplied liquid-tight connector.
Note: It may be necessary to recess the receptacle into the trailer wall to prevent it from getting damaged. Consult with your trailer manufacturer first.
Step 4: Route the AC harness. (If the TAPS is inside the trailer, route the harnesss to the corner where the side wall and the ceiling meet. Route along this edge all the way to the back of the trailer. Use the supplied cable clamps to secure the harness to the trailer wall.)
Note: To prevent the AC harness from sagging, place the cable clamps approximately every 18 inches.
![Page 11: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/11.jpg)
9P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
Step 7: Ensure the AC wires will reach the location on the AC receptacle where they will be secured and cut off the excess wire.
Step 8: Strip ¼ inch of insulation off the ends of all three AC wires and crimp on the supplied #10 spade terminals. Apply heat to shrink the heat shrink on the spade terminals.
Step 9: Connect the white wire to the silver screw, the green wire to the green screw, and the black wire to the gold screw on the AC receptacle.
Step 10: Place the supplied foam gasket and plastic face plate over the AC receptacle. Insert the AC receptacle into the AC receptacle box and tighten the mounting screws.
![Page 12: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/12.jpg)
10
Step 11: Install the AC receptacle cover.
110 VAC harness installation complete.
![Page 13: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/13.jpg)
11P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
INPUT CABLE ROUTING FOR DUAL POLEAPPLICATION (ROUTING INSIDE TRAILER)
Step 1: Route the 1/0 red and black input cables down the trailer wall. Secure the cables separately to the trailer wall using the supplied plastic clamps.
Important: Ensure that the positive and negative cables are routed so they cannot touch. Due to normal vibrations, the cables could potentially rub through the insulation and cause a short if they are touching.
Step 2: Route the 1/0 red and black input cables through the trailer wall and out to the dual pole nosebox and mount the nosebox on the front of the trailer.
Step 3: Once the cables are through the trailer wall, crimp the supplied 3/8 inch cable lug onto the 1/0 red positive cable. Apply heat to the heat shrink to seal the connection.
Note: Cut the cables to length once a the dual pole nosebox has been determined.
![Page 14: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/14.jpg)
12
Step 4: Crimp the supplied ¼ inch cable lug onto the 1/0 black negative cable. Apply heat to the heat shrink to seal the connection.
Step 5: Remove the cover on the side of the nosebox.
Step 6: Install the 1/0 cables, attaching the black cable to the negative cable stud and the red cable to the positive cable stud. Replace the side cover.
Input cable routing for dual pole application complete.
![Page 15: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/15.jpg)
13P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
Step 2: Route the 1/0 red and black input cables through the trailer wall or floor toward the vehicle battery box. It may be necessary to use the supplied cable pass-through plate as shown in this picture. Using a 3 ½ inch hole saw, cut a hole in the wall or floor to mount the cable pass-through plate.
Step 3: Once the cables are through the trailer wall or floor, ensure they will reach the positive and negative posts on the vehicle batteries. Plan for a little slack in the cables and cut off any excess cable.
INPUT CABLE ROUTING FORSTRAIGHT TRUCK APPLICATION(ROUTING INSIDE TRAILER)
Step 1: Route the 1/0 red and black input cables down the trailer wall. Secure the cables separately to the trailer wall using the supplied plastic clamps.
Important! Ensure that the positive and negative cables are routed so they cannot touch. Due to normal vibrations, the cables could potentially rub through the insulation and cause a short if they are touching.
![Page 16: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/16.jpg)
14
Step 4: Crimp the supplied 3/8 inch cable lugs onto the 1/0 black negative cable and the 1/0 red positive cable. Apply heat shrink to seal the connection.
Step 5: Attach the supplied fuse cube and bracket assembly to the 1/0 red positive cable. Tighten the fuse cube nut.
Step 6: Attach the fused 1/0 red positive cable to the vehicle positive battery post and the 1/0 black negative cable to the vehicle negative battery post.
Note: The fuse cube nut is tapered to ensure that the nut is tightened all the way so there is no air gap between the cable lug and the fuse cube nut.
Important: Make sure that the AC harness installation is complete before making connections at the vehicle batteries.
Input cable routing for straight truck application complete.
![Page 17: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/17.jpg)
15P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
LED INDICATION AND OPERATION
LED STATUS
AC Power LED
Green Solid TAPS unit is functioning.
Orange Solid TAPS unit is off.
Fault LED
Orange Solid Undervoltage.
Orange Blink Overvoltage.
Yellow Solid Over power.
Yellow Blink Over temperature.
System FaultContact Purkeys at
1-800-219-1269for assistance.
![Page 18: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/18.jpg)
16
LIMITED COMMERCIAL WARRANTY POLICY
Purkeys Fleet Electric, Inc. (hereafter “Purkeys”), warrants each product to be free of defects in material or workmanship under normal use and service. This warranty is for the benefit of Original Equipment Manufacturers, Dealers, Warehouse Distributors, Fleets, or other End Users (hereafter “Customers”) and covers products manufactured by Purkeys and sold new to Customers either directly by Purkeys or by its authorized dealers, distributors, or agents. The length of the Warranty Period is 36 months.
The warranty period commences on the in-service or install date and is not transferable. Failure to provide the in-service or install date on the warranty claim form will cause the warranty period to begin on the date the part was manufactured or date of sale recorded on the original sales invoice, whichever is earlier.
A completed warranty claim form should accompany all parts submitted to Purkeys for consideration for repair or replacement under warranty. The submitted claim form should contain all of the information required. Lack of a properly or fully completed claim form will result in delay or denial of warranty claim. Claims must be submitted no later than 30 days after part is removed.
This warranty does not apply if, in sole judgement of Purkeys, the product has been damaged or subjected to accident, faulty repair, improper adjustment, improper installation or wiring, neglect, misuse, or alteration or if the product failure is caused by defects in peripheral vehicle components or components attached to the Product or failure of a part not manufactured by Purkeys.
This warranty shall not apply if any Purkeys product is used for a purpose for which it is not designed or is in any way altered without the specific prior written consent of Purkeys. ANY Product alleged by a Customer to be defective must be inspected by Purkeys as a part of the warranty claims process in order to confirm that the part has failed as a result of a defect in material or workmanship.
Transportation for products and parts submitted to Purkeys for warranty consideration must be prepaid by Customer. Repaired or replaced products and or components will be returned to Customer pre-paid by Customer or “freight collect” to the address provided by Customer in the warranty claim form. No charge will be made for labor or material in effecting such repairs.
The Warranty provided by Purkeys hereunder is specifically limited to repair or replacement of the Product as Purkeys deems most appropriate in its sole discretion. Purkeys neither assumes nor authorizes any other person to assume on its behalf any other warranty or liabilities in connection with Purkeys products. The Warranty does not apply to fuses or other “consumable” or maintenance items which are or may be a part of any Purkeys product.
THIS WARRANTY DOES NOT APPLY TO LOSS OF VEHICLE OR EQUIPMENT, LOSS OF TIME, INCONVENIENCE, OR OTHER INCIDENTAL OR CONSEQUENTIAL DAMAGES. PURKEYS SPECIFICALLY DISCLAIMS AND SHALL NOT BE LIABLE FOR INCIDENTAL OR CONSEQUENTIAL DAMAGES arising out of or from the use of Purkeys products by the Customer.
THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, INCLUDING COMMON LAW WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY, AND ANY OTHER EXPRESS OR IMPLIED WARRANTIES. ALL OTHER SUCH WARRANTIES ARE SPECIFICALLY DISCLAIMED.
This Limited Commercial Warranty supersedes all previous Warranty Policies issued by Purkeys and any of its suppliers.
![Page 19: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/19.jpg)
17P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net
TAPS INSTALLATION GUIDE
![Page 20: Trailer Auxiliary Power System (Taps)™€¦ · 1. interpret this drawing in accordance with asme y14.100-2004 2.see separate parts list for parts 3.remove all burrs 4.break sharp](https://reader030.vdocument.in/reader030/viewer/2022040606/5eb5703f3aca503fcd28f7c0/html5/thumbnails/20.jpg)