    JAYPEE UNIVERSITY OF

    ENGINEERING & TECHNOLOGY

    GUNA, M.P.

    USE OF WASTE MATERIAL IN MODIFIED BITUMEN FOR ROADCONSTRUCTION

    BY:HIMANSHU SHEKHAR (101526)PRATEEK KR. SINGH (101546)

    BRIJENDRA RAGHUWANSHI(101568)

    PROJECT GUIDE:

    MR. SHIV SHANKAR

    LECTURER CE DEPT.

  • 7/27/2019 TRAINING CIVIL.pptx

    2/28

    INTRODUCTION As the world population grows, so do the amount and type of

    waste being generated. Many of the wastes produced today

    will remain in the environment for hundreds, perhaps

    thousands, of years. The creation of non-decaying wastematerials, combined with a growing consumer population, has

    resulted in a waste disposal crisis. One solution to this crisislies in recycling waste into useful products

  • 7/27/2019 TRAINING CIVIL.pptx

    3/28

    Four issues are fundamental in the determination of the appropriate useof recycled waste materials in highway construction:

    Cost effectiveness

    Performance Availability Prevailing political climate Total amount of waste generated in India Per Day by Per Person

    NOWSolid waste per person per day

    0.34 kg

    2025

    Solid waste per person per day 0.7 kg

  • 7/27/2019 TRAINING CIVIL.pptx

    4/28

    PROBLEMS OF CONVENTIONAL

    BITUMEN

  • 7/27/2019 TRAINING CIVIL.pptx

    5/28

    BLEEDINGFATIGUE CRACK

  • 7/27/2019 TRAINING CIVIL.pptx

    6/28

    POT HOLES RUTTING

  • 7/27/2019 TRAINING CIVIL.pptx

    7/28

    BITUMEN:

    Higher Resistance to Deformation at High TemperatureEnhanced Deformation Resistance to Low Temperature CrackingImproved Temperature Susceptibility

    Improved Aging ResistanceImproved Adhesion between Aggregate and BinderHigher Fatigue Life of MixesDelay in Thermal / Reflective CrackingOver all Extended Pavement Surface LifeSavings in Total Road Life Costing.Improved Binder Film ThicknessImproved CohesionImproved WorkabilityImproved Fuel ResistanceImproved Water ResistanceNot detrimental to basic properties of Bitumen and Enhances them.

  • 7/27/2019 TRAINING CIVIL.pptx

    8/28

    Fig 1

    Severe rutting on a road built with Unmodified Bitumen, after just two years since

    completion.

    Fig 2

    Roads built with Modified Bitumen can have a lifespan of over 6 years.

    ADVANTAGES OF USING MODIFIED BITUMEN

  • 7/27/2019 TRAINING CIVIL.pptx

    9/28

    BINDER USED FOR ROAD SURFACE UNMODIFIED BITUMEN

    MODIFIED BITUMEN USED FOR THINNER ROAD SURFACE

  • 7/27/2019 TRAINING CIVIL.pptx

    10/28

    OBJECTIVE OF PROJECT

    To study current scenario of utility of recyclable portion

    of the solid waste.

    To analyse the performance of Crumb Rubber ModifiedBitumen (CRMB) and polymer modified bitumen propose

    with recycled waste by Dry Process.

    Determine the optimum replacement of waste.

  • 7/27/2019 TRAINING CIVIL.pptx

    11/28

    MATERAILS USED

    WASTE PLASTIC

    CRUMB RUBBER

  • 7/27/2019 TRAINING CIVIL.pptx

    12/28

    (REFERENCE : Journal of Engineering Research andStudies)

  • 7/27/2019 TRAINING CIVIL.pptx

    13/28

  • 7/27/2019 TRAINING CIVIL.pptx

    14/28

  • 7/27/2019 TRAINING CIVIL.pptx

    15/28

    Advantages of Plastic Tar RoadA well constructed Plastic Tar Road will result in the following advantages. Strength of the road increased (Increased Marshall Stability Value) Better resistance to water and water stagnation No stripping and have no potholes.

    Increased binding and better bonding of the mix. Increased load withstanding property(Withstanding increased load

    transport) Overall consumption of bitumen decreases. Reduction in pores in aggregate and hence less rutting and raveling. Better soundness property. Maintenance cost of the road is almost nil.

    The Road life period is substantially increased. No leaching of plastics. No effect of radiation like UV.

  • 7/27/2019 TRAINING CIVIL.pptx

    16/28

  • 7/27/2019 TRAINING CIVIL.pptx

    17/28

    CRMB Advantage Over Normal Bitumen :

    Higher resistance to deformation at increased road temperature enhancessmooth drive comforts,

    Improved adhesion and bonding with aggregates, Higher softening point, Highflow resistance and Higher impact resistance, takes heavy vehicular traffic.

    Higher skid resistance, Better road grip and smother vehicle break application,which reduces accident chances

    Higher elongation and tensile strength, increases Elasticity. Reduced thermalsensitivity, which avoids all types of cracks under stress

    Reduced degree of rutting, improves driving comforts even on higher axle loads Anti- stripping properties. High resistance to moisture / water absorption

    hence no damage to roads during rains even under improper drainage. Higher aging resistance due to passivity to oxidation (resists degradation on

    high application temperature as well as during summer. Longer road pavementlife and lesser maintenance.

    No change in pavement laying practice, application and machinery and overallcost reduction.

  • 7/27/2019 TRAINING CIVIL.pptx

    18/28

    EXPERIMENTAL METHODOLOGY1. Bitumen Test

    Flash and Fire Point Test

    Softening Point Test

    Marshall Stability Test

    Ductility Test

    2. Elastic Recovery Test

  • 7/27/2019 TRAINING CIVIL.pptx

    19/28

  • 7/27/2019 TRAINING CIVIL.pptx

    20/28

    MANUFACTURNG PROCESS:1. FOR PLASTIC:

    DRY PROCESS

    Dry process is recommended for isolated works.It is recommended that the percentage of shreddedwaste plastic will be 8% by CRRI, while the same isspecified as 10% by Dr. Vasudevan. However we canadopt 8% as the optimum plastic content for

    blending the bitumen in the construction of plasticroads. The details of the process are given below.Bitumen of grades 60/70 or 80/100 can be used asbinder as in case of conventional method.

  • 7/27/2019 TRAINING CIVIL.pptx

    21/28

    MINI HOT MIX PLANT:

    The stone aggregate mix (as per specification) istransferred to the mix cylinder where it is heated to1650c (as per the IRC specification) and then it istransferred to the mixing paddler (Temperature can bemonitored using IR thermometer), while transferringthe hot aggregate into the paddler, calculated quantityof shredded plastics is sprayed over the hot aggregatewithin 30seconds. The sprayed plastic films melts andgets coated over the aggregate, thus forming an oilycoating.

  • 7/27/2019 TRAINING CIVIL.pptx

    22/28

    FOR RUBBER:

    In the wet mix process, rubber and bitumen are digestedtogether at high temperature to produce a crumb rubberbinder. The crumb rubber binder is added to aggregate ina mixing plant in the same way as any other binder. In thedry process, however, dry rubber particles are added to

    aggregate and bitumen in a pug mill at the asphalt mixingplant. The rubber is usually mixed with the aggregateprior to bitumen addition but is still considered part of thebinder. The wet process has the advantage that the binder

    properties are better controlled, while the dry process isoften easier for an asphalt manufacturer to use. To date,the dry process has been mainly used and has producedmixes which have performed successfully in service.

    U IS L N AC ION

  • 7/27/2019 TRAINING CIVIL.pptx

    23/28

    RUBBERISED BLENDER REACTION

    PROCESS

  • 7/27/2019 TRAINING CIVIL.pptx

    24/28

    Recommendations

    A dry mix composition has given excellent performance

    over cracked pavements in road trials. The same mix had

    good rutting resistance. The mix could be specified as

    follows:

    The 14 mm asphalt mix shall contain 8.0% of bitumen and 2.5% of crumb rubber

    expressed as a percentage of the total mass of the mix. The crumb rubber shall

    have a maximum particle size of 440 mm and a maximum bulk density of 300

    kg/m3.

    Dry mix asphalt shall be stored for a minimum of half an hour, to allow digestion

    of the rubber to proceed, before being placed.

  • 7/27/2019 TRAINING CIVIL.pptx

    25/28

    CONCLUSION The High Cost of Polymers is still a cause for concern. Bitumen prices are on the rise. Natural Disasters like flooding which erode roads is another factor

    taken into consideration.

    CRMB AND PMB Should be more actively specified. Advance Economies are still the major users of PMB. Local Road

    Authorities in Developing Countries should be better informed of thebenefits of using Modified Bitumen over standard grades.

    Increased traffic conditions will and are reducing the life span of roads.Modified bitumen is a means of prevention, and ultimately will be the

    cure. It will save millions of dollars in the future and reduce theamount of the resources used for construction. Using recycled Polymers and Rubber to make Modified Bitumen

    helps to Save the Earth and benefit the Environment.

  • 7/27/2019 TRAINING CIVIL.pptx

    26/28

    WORK PLAN

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Category 1

    Series 3

    Series 2

    Series 1

    SERIES 1:JULY- SEPT :LITERATURE REVIEW

    SERIES 2:SEPT- OCT :MATERIAL PROCURMENT

    SERIES 3:OCT - DEC :EXPERIMENT WITH PLASTIC(DRY PROCESS)

  • 7/27/2019 TRAINING CIVIL.pptx

    27/28

    REFERENCE1. IRC CODE: SP- 53

    2. journal homepage:

    www.elsevier.com/locate/conbuildmat

    National Rural Roads Development Agency Ministry of

    Rural Development.

    SCIENCE DIRECT.COM

    http://www.elsevier.com/locate/conbuildmathttp://www.elsevier.com/locate/conbuildmat
  • 7/27/2019 TRAINING CIVIL.pptx

    28/28

    THANK YOU