transmission schemes (transmission lines & sub … · transmission schemes (transmission lines...

53
TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OF POWER FROM THE GENERATION PROJECTS 2017-18 28-February-2018 Associated Transmission Lines and Substations STG(C km)/Er ection State/Agen cy Executing Asociated Trans. TE(Nos)/ Recp.Ma teria Voltage Level (KV) TL(Nos)/ Land Acq. (%) STC(Nos )/Civil Work Revised Target Date Original Target Date Remark (Status of all statutory clearences particularly forest clearence and ROW problem, if any needs to be mentioned here.) Ckts (S/C) & (D/C) Construction progress Status Ckm/ MVA Month of Completio n 6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13. Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C) Commissioned. 7/12 ADHUNIK JUL-12 D/C 1 1 400 1 Adhunik - Jamshedupur (PG) (Padampur) JUL-12 Remark: Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,ST-I, 08/16 (C),ST-2,3/15(C) TSECL D/C 1 132 AGTP - Agartala line TSECL S/C 2 132 AGTP - Kumarghat line Remark: Agrartala Gas Turbine Combinedd Cycle Extension Plant Stg-1 (25.5MW) commissioned on 23.08.2015. Akaltara(Naiyara) TPP (6x600 MW), Chg, KSK, U1-8/13(c),U2-8/14(c),U3-12/17,U4-3/18,U5-9/18,U6-12/18 Commissioned 04/15. (Interim) 118 APR-15 2xD/C 1 118 118 71 400 71 LILO of both ckt, of Raigarh - Raipur at Akaltara TPP APR-15 Ready for Commissioning 06/15. 164 JUN-15 2xD/C 2 164 164 105 400 105 KSK Mahanadi (Warda Power) - Champa Pooling Station JUN-15 Remark: Alaknanda HEP (6x50 MW), PS, UK, Badrinath, Project dropped GMR D/C 1 220 Alaknanda HEP - Joshimath Remark: Generation project has been dropped. Amravati, TPS,(5x270+5x270), Phase-II-uncertain Commissioned 10/12. IBPL 22 OCT-12 D/C 1 22 22 14 400 14 LILO of Koradi -Akola at Amravati OCT-12 Commissioned 03/15. IBPL 279 MAR-15 D/C 2 279 279 207 400 207 Amravati - Akola (Bableshwar) - I MAR-15 Remark: Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C) Commissioned 3/12. UPPTCL 6 MAR-12 S/C 1 6 6 1 765 1 Shifting of Anpara B-Unnao termination point from Anpara B to Anpara C sw. yard. MAR-12 Work completed. 6/10. LEPP JUN-10 D/C 2 400 Extn. of Bus from Anpara B to Anpara C. JUN-10 Line charged at 400 kV Oct'11 UPPTCL 3 OCT-11 S/C 3 3 3 1 765 1 Shiffting of 765 kV Anpara- Unnao at Unnao OCT-11 Commissioned 3/12. UPPTCL 100 MAR-12 4 100 100 1000 765/400 100 Unnao MAR-12 Remark: Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-3/16 (C) Work in progress. UPPTCL 1176 JUN-18 S/C 1 JAN-12 1103 1225 416 765 347 Anpara D - Unnao Commissioned 06/14. UPPTCL 11 JUN-14 S/C 2 JAN-12 11 11 3 765 3 Anpara C - Anpara D JUN-14 Commissioned 03/16. UPPTCL 23 MAR-16 D/C 3 23 23 5 400 5 Anpara B-Anpara D (Ckt-I) MAR-16 Commissioned 06/14. UPPTCL 100 JUN-14 4 100 100 1000 765/400 100 Anpara D. S/S JUN-14 TL: Total Location 53 Page 1 of STG: Stringing Completed STC: Stubs Cast Legends TE: Towers Erected Report generated through 4.38.19 PM Wednesday 14 March 2018

Upload: others

Post on 31-Oct-2019

65 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB-STATIONS) FOR EVACUATION OFPOWER FROM THE GENERATION PROJECTS 2017-18

28-February-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Adhunik Power TPP (Mahadev Prasad TPP) (2x270 MW), PS,Jhk, APCL.U1-11/12(C),U2-3/13 (C)

Commissioned. 7/12ADHUNIK JUL-12D/C1 1400 1Adhunik - Jamshedupur (PG)(Padampur)

JUL-12

Remark:

Agartala (AGTP) (4x21 MW), PS NEEPCO, Tripura,ST-I, 08/16 (C),ST-2,3/15(C)

TSECL D/C1 132AGTP - Agartala line

TSECL S/C2 132AGTP - Kumarghat line

Remark: Agrartala Gas Turbine Combinedd Cycle Extension Plant Stg-1 (25.5MW) commissioned on 23.08.2015.

Akaltara(Naiyara) TPP (6x600 MW), Chg, KSK, U1-8/13(c),U2-8/14(c),U3-12/17,U4-3/18,U5-9/18,U6-12/18

Commissioned 04/15. (Interim)118 APR-152xD/C1 11811871400 71LILO of both ckt, of Raigarh -Raipur at Akaltara TPP

APR-15

Ready for Commissioning 06/15.164 JUN-152xD/C2 164164105400 105KSK Mahanadi (Warda Power) -Champa Pooling Station

JUN-15

Remark:

Alaknanda HEP (6x50 MW), PS, UK, Badrinath, Project dropped

GMR D/C1 220Alaknanda HEP - Joshimath

Remark: Generation project has been dropped.

Amravati, TPS,(5x270+5x270), Phase-II-uncertain

Commissioned 10/12.IBPL 22 OCT-12D/C1 222214400 14LILO of Koradi -Akola atAmravati

OCT-12

Commissioned 03/15.IBPL 279 MAR-15D/C2 279279207400 207Amravati - Akola (Bableshwar) -I

MAR-15

Remark:

Anpara C (2X600 MW),PS,UP,LANCO,U1&2-11/11(C)

Commissioned 3/12.UPPTCL 6 MAR-12S/C1 661765 1Shifting of Anpara B-Unnaotermination point from Anpara Bto Anpara C sw. yard.

MAR-12

Work completed. 6/10.LEPP JUN-10D/C2 400Extn. of Bus from Anpara B toAnpara C.

JUN-10

Line charged at 400 kV Oct'11UPPTCL 3 OCT-11S/C3 331765 1Shiffting of 765 kV Anpara-Unnao at Unnao

OCT-11

Commissioned 3/12.UPPTCL 100 MAR-124 1001001000765/400 100Unnao MAR-12

Remark:

Anpara-D TPP (2x500 MW),SS,UP,UPRVUNL, U6-6/15 (C),U7-3/16 (C)

Work in progress.UPPTCL 1176 JUN-18S/C1 JAN-1211031225416765 347Anpara D - Unnao

Commissioned 06/14.UPPTCL 11 JUN-14S/C2 JAN-1211113765 3Anpara C - Anpara D JUN-14

Commissioned 03/16.UPPTCL 23 MAR-16D/C3 23235400 5Anpara B-Anpara D (Ckt-I) MAR-16

Commissioned 06/14.UPPTCL 100 JUN-144 1001001000765/400 100Anpara D. S/S JUN-14

TL: Total Location 53Page 1 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 2: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Anuppur TPP Ph-I, (2x600 MW),PS,MP,Moser Baer Power MP, U1-4/15 (C),U2-2/15 (C)

Commissioned in Dec'13.PGCIL 45 DEC-13D/C1 454531400 31Jabalpur Pooling Station -Jabalpur (High Capacity) line

DEC-13

Commissioned 11/12.MPPTCL 18 NOV-12D/C2 181816220 16LILO of Amarkantak - Korba atAnooppur

NOV-12

Commissioned 08/14.PGCIL 600 AUG-14D/C3 600600492400 492Anuppur (Moser Baer) - JabalpurPooling Station

AUG-14

Remark:

Avantha Bhandar TPS, (2x600 MW), PS,Chhattisgarh,Korba West Power Comany Limited U1-3/14(C),

Commissioned 05/2016 (Late Reported)KWPCL 64 DEC-16D/C1 646437400 37Avantha Bhandar TPS (KorbaWest) - Raigarh (Kotra)

DEC-16

Interim arrangement.KWPCL 22 DEC-13D/C2 222210400 10LILO of on Ckt of Raigarh -Raipur at Avantha Bhandar(Korba west ) TPS

Remark:

Avantha (Jhabua Power) (2x600 MW), PS,Seoni,MP, BHEL, U1-03/14 (C)

Commissioned 05/15.JHAPL 207 MAY-15D/C1 207207131400 131Jhabua Power TPS - JabalpurPooling Station.

MAY-15

Remark:

Babandh - (Dhenkanal) TPS , (2x660 MW), PS Orissa, Lanco Infratech U1-7/18,U2-1/19

Work yet to start.LEPP 0 DEC-16D/C1 07248400 0Babandh TPP - Angul PoolingStation

Remark:

Baghliar-II HEP (3x150MW) SS,J&K, JKPDC, U1-9/15 (C),U2-9/15(C),U3- 10/15 (C)

Progress at 2 locations have been affecteddue to severe RoW issue and matter incourt for one location.

JKPDD 4 DEC-17D/C1 11712400 0LILO of one ckt of Kishanpur -New wanpoh at Baglihar HEP

Remark:

Bajoli Holi HEP(3x60=180 MW), HP, GMR-BHHPPL, U1,2-07/19

Forest proposal would be submittedshortly. Bid is to be opened on 28.08.17.HPPTCL is yet apply for connectivity fortermination at Chamera (PGCIL) substation.

HPPTCL 0 APR-19D/C1 OCT-180070400Lahal-Chamera

Forest proposal would be submittedshortly. Fund is being arranged from ADBand proposal has been submitted and afterits approval, the LOA would be issued.

HPPTCL 0 AUG-18D/C2 OCT-160036220Bajoli Holi HEP - Lahal GISS

HPPTCL 15 JUN-183 JAN-180100630400/220 0Lahal S/S

Remark:

Balco TPS PS,Chg,Sterlite,U1-6/15 (C),U2-3/16 (C),U3-2/14,(4x300 MW, 4x67.5 (CPP) ) 4x67.5 (C)

Commissioned 06/2016 (Late Reported).BALCO 72 DEC-16D/C1 707246400 46Balco - Dharamjaygar PoolingStation

DEC-16

commissioned 3/12 (Interim)BALCO JUN-12D/C2 35400 35LILO of one ckt of Korba -Birsinghpur at Balco

MAR-12

TL: Total Location 53Page 2 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 3: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Bandakhar TPP, (300 MW), PS,Chg, MCC&PL, U1-6/15 (C)

Commissioned 06/14.MCCPL 14 JUN-14D/C1 14146400 6LILO of ACBIL-Baraari (Bilaspur)PS at Bandakhar (Maruti CleanCoal)

JUN-14

Remark:

Banswara and Pratpgarh Wind Project

Commissioned 06/2017.RVPNL 421 JUL-17D/C1 421421181220 181Nimbahera - Pratapgarh (Part ofPratapgarh -Chittorgarh line)

JUN-17

Commissioned 06/2017.RVPNL 100 JUN-172 10010060220/132 100Pratapgarh (Upgradation)(160-100)

JUN-17

Remark:

Banswara Super Critical TPS (2x660 MW), SS,Raj, U1 & U2 -2016/2017

Commissioned 11/14.RVPNL 100 NOV-141 100100315400/220 100Chitorgarh S/S NOV-14

Earlier issued W.O. withdrawn. W.Oawarded to M/s Techno Pvt Ltd. Work underprogress.

RVPNL 602 50100630400/220 65Jodhpur (New) S/S

Remark:

Baradarha TPP (2x600 MW), PS,D.B.P.C.L, Dist.. Jangir Champa ,Chhattisgarh,U1-8/13, U2-2/14

Line completed. (Interim)DBPCL 44 MAY-13D/C1 444430400 30LILO of Raigarh - Raipur (3rdCkt) at Baradhara TPP ( Interimarrangement)

Commissioned 08/14.DBPCL 54 AUG-14D/C2 545436400 36DB Power (Baradarha) - Raigarh(Kotra) Pooling Station

AUG-14

Remark:

Bara TPP (3x660MW),PS,UP,PPGCL,U1-12/15(C),U2-9/16(C),U3-9/15 (C)

Commissioned 03/15.UPPTCL 2 MAR-15D/C1 221400 1LILO of Panki - Obra at RewaRoad

MAR-15

Karchana gantry not finalised. The projectis at stand still pending of a time extensionrequested to UPPTCL in June 2015

SEUPPTC 0 JUN-16D/C2 012480400 0Bara - Karchana

Ready for commissioning 12/2016SEUPPTC 899 DEC-16S/C3 899899377765 377Mainpuri - Bara Ckt-II DEC-16

The project is at stand still pending of atime extension requested to UPPTCL inJune 2015

SEUPPTC 613 JUN-17S/C4 346889375765 0Mainpuri - Bara Ckt-I

Ready for commissioning 12/2016SEUPPTC 135 DEC-172xD/C5 13513593400 93LILO of Orai - Mainpuri line atMainpuri

DEC-16

Ckt-I commissioned 12/2016 and Ckt-IIReady for commissioning 12/2016

SEUPPTC 219 DEC-16D/C6 219219186400 186Mainpuri - Aligarh DEC-16

Remark: Unit - II (660MW) commissioned on 06.09.2016.

Barauni TPS Extn (2x250, Bihar, BSPGCL,U8-12/17,U9-3/18

Due to severe ROW at 4 locations workprogress is slow

BSPTCL 399 JUN-18D/C1 JUN-16397403214220 198Barauni TPS Exte. - Hazipur

Commissioned 10/2017 (Late Reported).BSPTCL 9 DEC-17D/C2 994220 4LILO of Both ckt. of Biharsharif -Begusarai at BTPS Extn.

DEC-17

TL: Total Location 53Page 3 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 4: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work under process.BSPTCL 90 APR-183 90100300220/132 90Barauni (TPS ) (ICT)

Remark:

Barh STPP -Stage-I (3x660 MW), Stage-2 (2x660 MW), CS, Bihar, U4,5-11/13(C),U1-3/18,U2-09/18,U3-3/19

Commissioned 06/10.PGCIL 645 JUN-10D/C1 SEP-09645645488400 488Barh-Balia (Quad) JUN-10

Commissioned 05/15.PGCIL 944 MAY-15D/C2 AUG-14944944698400 698Barh-II - Gorakhpur MAY-15

Commissioned 6/12PGCIL 100 JUN-123 1001001250500 100Balia & Bhiwadi convertor Stn.(Pole-II)

JUN-12

Remark:

Barkhera TPP (2x45 MW), PS,UP, Bajaj,

26.05.14 Barkhera-pilibhit Section, Ickt.Energised on10.02.12. II ckt. On 14.2.12

UPPTCL 203D/C1 203203132 129Barkhera (Bajaj) - Dohna

UPPTCL D/C2 132Bayas - Pilibhit

UPPTCL D/C3 132Bayas - Dohna

Remark:

Bela TPP (1x270 MW),PS,Maha,IEPL,U1-3/13(C)

Completed (Interim)IEPL 2 NOV-12D/C1 220400 0LILO of Mouda - Wardha at Bela

Commissioned 12/15. (Only LILO Portion2x24.3 Ckm has been taken).

MSETCL 75 DEC-15D/C2 757549400 49LILO of Koradi II- Wardh(PG) atBela TPP

DEC-15

Remark:

Bellary TPP (3X500 MW),SS,KAR,KPCL,U1-12/07(C),U2-6/14,U3-3/16 (C)

Commissioned 6/08KPTCL 3 JUN-08D/C1 332400 2LILO of RTPS - Guttur at BTPS. JUN-08

Commissioned 3/12KPTCL 440 MAR-12D/C2 DEC-08440440313400 313BTPS- Hiriyur MAR-12

Remark:

Bhadradri TPP (Manuguru) (4x270 MW),TSGENCO, U1-12/17,U2-2/18,U3-5/18,U4-8/18

Commissioned 12/2017(Late Reported)TSTRANS 306 OCT-17D/C1 MAR-17306306219400 219Julurupadu (QM) - Suryapet S/s JAN-18

Work Under ProgressTSTRANS 313 OCT-17D/C2 MAR-17310313222400 220Julurupadu SS - Manuguru TPP

TSTRANS3 0400400kV Suryapet Bay Extensions

bus I and Bus II charged on 23.12.2017TSTRANS 100 OCT-174 100100630400/220 100Julurupadu S/S

Remark:

Bhasmey HEP (2x25.5 MW),PS,Sikkim,Gati Infra,U1,2&3-3/19

Work yet to be awarded.GISL MAY-182xS/C1 10220LILO of one circuit of Chujachen- Rangpo line at Bhasmay

Remark: Generation Projects stopped since Dec-16

Bhavanagar Padva (2x250MW),SS,Guj,BHEL,U1-6/16,U2-9/16

Commissioned 03/14.GETCO 139 MAR-14D/C1 13913983220 83BECL (Padva)- Sagapara line MAR-14

Commissioned 06/13.GETCO 97 JUN-13D/C2 979756220 56LILO of Savarkundla - Vartej atBECL (Padva)

JUN-13

W I P / Severe RoW problemsGETCO 182 MAR-18D/C3 142292188220 34BECL (Padva) - Botad line

Remark:

TL: Total Location 53Page 4 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 5: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Bhavanapaddu TPP, (2x660MW),PS, AP,East cost Energy, U1-12/17,U2-05/18

XYZ D/C1 44400Bhavanapaddu TPP - Srikakulam(PS)

Remark:

Bhawani Barrage HEP -II & III (4x15 MW), SS,TN, TANGEDCO, BB-II (U1-8/13 (C ),U2-9/13(C), BB-III (U1-12/12 (C),U2-9/13(C)

Energised on 23.08.12.TANTRAN 30 AUG-12D/C1 303015110 15BKB-II - Common Point line AUG-12

Commissioned 09/13.TANTRAN 12 SEP-13D/C2 12124110 4LILO of Mettupalayam -Irumborai line at BKB-II

SEP-12

Energised 6/12TANTRAN 69 JUN-12S/C3 696922110 22BKB-III Common point - BKB-IIline

JUN-12

Energised on 23.08.12.TANTRAN 7 AUG-12S/C4 772110 2BKB-II Common point -Pallipalayam line

AUG-12

Energised on 23.08.12.TANTRAN 40 AUG-12S/C5 40409110 9BKB-II Common point -Thirucengode line

AUG-12

Energised on 06/11TANTRAN 10 JUN-11D/C6 10105110 5LILO of BKB-I - SP Budur at BKB-II line

JUN-11

Energised on 13.08.12.TANTRAN 36 AUG-12S/C7 363610110 10BKB-III Common point - Nallurline

AUG-12

Energised on 13.08.12.TANTRAN 13 AUG-12D/C8 13136110 6BKB-III - Common point line. AUG-12

Remark:

Bhognipur TPP Ph-I (2x660 MW),Ph- II(2x660 MW) ,PS,UP,Lanco Infratech,Northen Region

UPPTCL S/C1 765Bhognipur - Gatampur

UPPTCL 2xS/C2 765Bhognipur - Orai (PG)

UPPTCL S/C3 765Bhognipur - Moradabad/Rampur

UPPTCL S/C4 765Bhognipur - Jawarharpur

Remark:

Bhusaval TPS (2x500 MW),SS,MAHA,MSPGCL,U4-3/12 (C),U5-3/12 (C)

Commissioned 4/10.MSETCL 26 APR-10D/C1 DEC-09262615400 15Bhusaval - II - existing Khadka APR-10

Commissioned 12/11.MSTRANS 283 DEC-11D/C2 283283185400 185Bhusaval - II - Aurangabad DEC-11

Commissioed 11/11MSETCL 331 NOV-11D/C3 331331197220 197Bhusaval - II - Amalner NOV-11

Commissioned 9/11.MSETCL 100 SEP-114 100100500400/220 100Bhusaval (ICT -II) S/S SEP-11

Commissioned 8/11.MSETCL 100 AUG-115 100100500400/220 100Bhusaval (ICT-I) S/S AUG-11

Remark:

Bijora Ghanmukh TPP (2x300MW), Maharashtra ,JPGPL, Uncertain

MSETCL D/C1 0400JPGPL TPS Switchyard - WaroraPS (JPGPL-TBCB)

Remark:

Bilhaur (2x660 MW),PS,UP, NTPC,

UPPTCL S/C1 765Bilhaur - Sandila

UPPTCL D/C2 765LILO of Bhognipur - Mbd atBilhaur

UPPTCL D/C3 400Bilhaur - Kanpur (PG)

TL: Total Location 53Page 5 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 6: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

UPPTCL D/C4 765LILO of Unnao - Mainpur atBilhaur

Remark:

Bina TPS (2x250 MW),PS,MP,Bina power,U1-8/12(C),U2-3/13(c )

Commissioned.JV(PG&JP JAN-15D/C1 400Termination of Ckt of above atBina (PG) & otuer ckt at Bina(MPTCL)

JAN-15

Commissioned 01/15.JV(PG&JP JAN-15D/C2 40400 40Bina TPS - Suitable location(along Bina (PG) - Bina(MPPTCL)

JAN-15

Remark:

Binjkote TPP (4x300 MW),PS,Chg,SKS Power, U1-4/17(c),U2-12/17,U3,4-unknown

Commissioned 05/15.SKS 93 MAY-15D/C1 939355400 55Binjkote - Raigarh (Kotra)Pooling Station

MAY-15

Interim arrangement removed.SKS D/C2 400LILO of one ckt of Raigarh -Raipur at Binjkote TPP

Remark:

Bokaro TPS

Commissioned 12/14.PGCIL 276 DEC-14D/C1 AUG-12276276200400 200Bokaro TPS Extn.- Koderma TPS DEC-14

Remark:

Bongaigaon TPS (3x250 MW),CS, Assam, NTPC, U1-6/15 (C),U2-3/17(C),U3-12/17

Commissioned 12/12.PGCIL 11 DEC-12D/C1 11116400 6Bongaigaon TPS - Bongaigaon DEC-12

1 . All normal Foundations have beencompleted, 2. Out of total 10 nos., 6 nos. ofPile foundations completed, work of 2nos.Are being in progress and rest 2 nos. of PileFoundation work are held up due toErosion. 3. 128.024 ckm of line are idlecharged.

AEGCL 513 MAR-18D/C2 JAN-13511517326220 223Bongaigaon TPS - Rangia(Salakati)

commissioned 9/14AEGCL 195 SEP-14S/C3 19519565220 65BTPS-Agia-Sarusajai (2ndCircuit, Balance portion)

SEP-14

Line charged on 30.06.2016AEGCL 39 JAN-16S/C onD/C

4 DEC-13393910132 10BTPS - Kokrajhar line

Kokrajhar to Bilashipara charged on24.06.16 and Bilashipara to Gauripurcharged on 14.06.2016

AEGCL 203 JUN-16S/C onD/C

5 SEP-1320320363132 63Kokrajhar - Bilashipara -Gauripur

Remark:

Budhil HEP (2x35 MW), PS, H.P., LANCO Green, U1-5/12(C),U2-5/12.(C)

Commissioned 3/12LEPP 62 MAR-12S/C onD/C

1 626240220 40Budhil -Chamera III MAR-12

Remark:

Butibori (2x300 MW) TPS Phase -II,PS,Maha,RPL,U1-8/12(C),U2-11/12

Commissioned 12/11.MSETCL DEC-11D/C1 1220 1Buttibori TPS -Buttibori-III DEC-11

Commissioned on 26.03.2013MSETCL 90 MAR-132 100100100220/132 90butibori III MAR-13

Remark:

TL: Total Location 53Page 6 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 7: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Chamera-II HEP,CS,HP,

Commissioned 3/11.PGCIL 3 MAR-11S/C1 APR-10331400 1Chamera-II HEP (Part-I)-Chamera Pooling Station

MAR-11

Remark:

Chamera-III HEP (3x77 MW), CS,H.P.,NHPC, U1-6/12,( C) U2-6/12(C), U3-6/12 (C )

Commissioned 8/11PGCIL 46 AUG-11D/C1 464630220 30Chamera-III - Pooling StationNear Chamera-II HEP

AUG-11

Commissioned 03/13.PGCIL 444 MAR-13D/C2 444444324400 324Chamera-II HEP - Jullandur line MAR-13

Commisiioned 8/11.PGCIL 100 AUG-113 100100630400/220 100GIS Pooling Station nearChamera-II HEP

AUG-11

Remark:

Chandrapur TPS, (2x500 MW), SS, Maha, MSPGCL, U1 to 7 (C) U8-3/15 (C), U9-3/16 (C)

Commissioned 4/13.MSETCL 11 SEP-13D/C1 11113400 3LILO of Chandrapur - Parli atChandrapur II

APR-13

Commissioned 01/13.MSETCL 223 JAN-13S/C2 22322376400 76Warora-Wardha(2nd Ckt) JAN-13

Commissioned 06/13.MSETCL 138 JUN-13D/C3 13713891400 91Chandrapur-II - Warora JUN-13

Commissioned 03/14.MSETCL 11 MAR-14S/C4 11114400 4Chandrapur switching Stn. -Chandrapur II S/S

MAR-14

Priority Bay 410, 426, 408 (Tie Bay) and409 ,411, 412, 428, 429, 404, 405commissioned from 30.12.2013 to13.3.2014. In 400KV Switchyard- erectionof ICT1 done, Testing and commissioning inprogress for ICT-I and balance for ICT-2.

MSETCL 97 AUG-175 961001000400/220 85Chandrapur-II

Remark:

Chango Yangthang (140 MW), PS, Spiti,HP, MPCL, Project dropped

MPCL D/C1 400Ka Dogri - Jangi Pooling Station

MPCL D/C2 220Chango Yangthang - Ka DogriPooling Station

Remark: Project has been dropped from generation program.

Chanju-I HEP (3x12 MW) on Ravi river, SS HPPTCL, IA Energy, U1,2-2/17(C), U3-9/17

commissioned.HPPTCL 29 MAY-16D/C1 273012132 10Chanju - Nakrot line

Completed.HPPTCL 1D/C2 111132 1LILO of one ckt Kurthala - Bathriat Nakrot Pooling Station

MAR-17

Remark:

Chhabra TPP Extn. (2x250 MW) SS,Raj, RRVUNL, U3-9/13(C),U4-6/14 (C)

Commissioned 8/11.RVPNL 329 AUG-11S/C1 329329101220 101Chhabra TPS - Jhalawar AUG-11

Commissioned 4/10RVPNL 803 APR-10S/C2 803803342400 342Chhabra TPS -Hindaun APR-10

Remark:

Chhabra TPS-II(2x660),SS,RRVUNL,Rajasthan, U5-4/17(c),U6-12/18

Commissioned 01/15.RVPNL 244 JAN-15D/C1 244244179400 179Chhabra TPS - Anta (Baran) JAN-15

Remark:

TL: Total Location 53Page 7 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 8: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Chitrangi TPP Ph-I (6x660 MW), Ph-II (3x660 MW),SS,MP,Ph-I,U1-9/13,U2-12/13,U3-3/14,U4-6/14,U5-9/14,U6-12/14, Ph-II,U1-3/15,U2-6/15,U3-9/19

XYZ D/C1 765Chitrangi TPS - VindhyachalPooling Station

Remark:

Chujachen HEP (2x49.5 MW)PS,Sikkim,GIL,U1-4/13(C),U2-4/13 (C).

Line commissioned.GISL D/C1 132Chujachen HEP - Rangpo PS MAR-17

Commissioned 04/13. (Interimarrangement)

GISL 91 APR-13D/C2 919147132 47LILO of Melli - Gantok atChuzachen (LILO point atnamthang)

MAR-17

Remark:

Chutak-HEP (4x11 MW), CS, J&K, NHPC, U1-11/12( C), U2- 11/12( C), U3- 11/12(C), U4-1/13(C)

Commissioned.JKPDD 29 SEP-12S/C1 2929566 5Chutak HEP-Gramthong -II MAR-17

Commissioned.JKPDD 55 OCT-12S/C2 55551066 10Chutak HEP-Kargil-I MAR-17

Commissioned.JKPDD 154 SEP-14S/C3 1541542766 27Gramthong -II - Sankoo MAR-17

CommissionedJKPDD 117 SEP-14S/C4 1171172366 23Khangral - Mulbek -II MAR-17

Commissioned.JKPDD 124 SEP-14S/C5 1241242866 28Mulbek-II - Kargil -I MAR-17

Commissioned.JKPDD 100 SEP-146 1001006066/11 100Sankoo S/S

Commissioned.JKPDD 100 SEP-127 1001006066/11 100Gramthong S/S

Commissioned.JKPDD 100 SEP-128 1001006066/11 100Kargil S/S

Commissioned.JKPDD 100 SEP-149 1001006066/11 100Khangral (Bodhkharbu)

Commissioned.JKPDD 100 SEP-1510 1001006066/11 100Mulbeck

Remark:

Common System Associated with Costal Energen Private Ltd and Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part - B..

Severe ROW in Karnataka. Obstruction arebeing removed progressively with the helpof Police protection.

PGCIL 644 JUN-18S/C1 SEP-14641644245765 204Salem Pooling Station -Madhugiri Pooling Station line

Ready for commissioning 08/15.PGCIL 165 AUG-15D/C2 SEP-14165165120400 120Salem Pooling Station - Salem AUG-15

Commissioned 11/2016.PGCIL 1000 NOV-16D/C3 SEP-1410001000731765 731Tuticorin Pooling Station -Salem Pooling Station

NOV-16

Remark:

Cosmos Sponge TPS, (1x350 MW), PS,Chh,CSPL,U1-6/13

XYZ D/C1 400CSPL TPS - Raigarh PoolingStation (Near Kotra)

Remark:

Cuddalore TPP (2x600 MW), PVT, IL&FS, SS, Tamil Nadu, U1-9/15 (C) U2-05/16

Commissioned 01/15. (Late reported.)ITPCL 138 JAN-15D/C1 13813895400 95Cuddalore - Naggapattinam AUG-16

Remark:

Dada Dhuni wale TPP, Khandwa (2x800 MW) SS,MP, U1-7/15,1U2-12/16

MPPTCL D/C1 80400Dada Dhuniwale TPP - MoondiPooling Point

MPPTCL 02 00630400/220 0Handia S/S

TL: Total Location 53Page 8 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 9: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work under progress.MPPTCL 233 21100630400/220 0Badnawar (2x315)

Remark:

Dahanu Solar (40 MW), PS,Tehsil Pokaran, Distt, Jaisalmer,Raj,M/s Dahanu Solar Power Pvt. Ltd.

RVPNL D/C1 132Dahanu - Degchu GSS

Remark:

Damaracherla TPP (2*600+4*800), TSGenco, Telangana

TSTRANS D/C1 SEP-18310400Damaracherla TPP - Jangaon

TSTRANS D/C2 SEP-18280400Damacherla TPP - Dindi

TSTRANS D/C3 SEP-18300400Damacherla TPP - Choutuppal

TSTRANS D/C4 SEP-18310400Damaracherla TPP -Maheswaram (TS)

Remark:

Damodaram Sanjeevaiah(Krishnapatnam) TPP, (2x800MW) SS,AP, APPDCL, U1-9/14 (C), U2-3/15 (C)

Commissioned 11/12.APTRANS 112 NOV-12D/C1 11211272400 72Krishnapatnam TPS - Nellore. NOV-12

Commissioned 02/15.APTRANS 281 FEB-15D/C2 281281196400 196Bonapally - Chittoor (Quad) FEB-15

Commissioned 07/15.APTRANS JUL-15D/C3 180400 180Krishnapatnam TPS- Chittoor(Balance)

JUL-15

Remark:

Darlipalli TPS(2x800), Odissa, NTPC, U1-02/18, U2-08/18

Ready for Commissioning 04/2017PGCIL 61 APR-17D/C1 616141765 41Darlipalli TPS - Jharsuguda(Sundergarh) PS line

APR-17

Remark:

Derang TPP (2x600MW) PS, Orissa, JIPL, U1-5/14 (C), U2-1/15 (C)

Commissioned 08/14.JPL 231 AUG-14MC+D/C

1 231231154400 154Derang - Angul Pooling Station AUG-14

Remark:

DGEN TPS (3x400MW), Torrent Power Ltd, Gujarat

TOR. D/C1 400DGEN TPS - Bharuch/DahejPooling Station

Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.

TOR. D/C2 400DGEN - Vadodara (DGEN TL -TBCB)

Work awarded to M/s Instalaciones.Inabemsa. Spian on May 2014. Routechanged after survey observations.

TOR. D/C3 220Navseri - Bhasten (DGEN TL -TBCB)

TOR. 04 001500765/400 0Bharuch/Dahej

Remark:

Dhariwal TPS (2x300 MW), PS, Maharashtra, DIPL, U1-11/13(C),U2-5/14 (C)

Commissioned 09/13.DIPL 29 SEP-13S/C1 292910400 10Dhariwal TPS -Channdrapur II(1st Ckt)

SEP-13

Commissioned 08/14.DIPL 51 AUG-14D/C2 515131400 31LILO of one ckt of Bhadravati(PG) - Parli at Dhariwal

AUG-14

TL: Total Location 53Page 9 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 10: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Dharmpura TPP (4x300 MW), Jain Energy, P.S,

JAIN ETL MAR-17D/C1 400Jain Energy TPS -Dharamjaygarh Korba Poolingstation

Remark:

Dhuvaran CCPP-III,360 MW,SS ,GSECL

Work in Progress.GETCO 143 DEC-16D/C1 9415260220 18LILO of Karmsad -Vartej atDhuvaran

Remark:

Dikchu HEP (2x48MW)PS,Sikkim,SKPPL,U1,U2-4/17(C)

PGCONSU MAR-19D/C1 DEC-189642132(Sikkim) Dikchu Pool - Parbingline

PGCONSU JUN-19D/C2 DEC-1846220(Sikkim) Dikchu Pool - Singhik

PGCONSU SEP-18D/C3 DEC-1850220(Sikkim) Dikchu Pool - Rangpo(Samardong) (twin)

Completed.SIKKIM 2 FEB-17D/C4 1221400 1LILO of Teesta III - Rangpo 400kv line at Dikchu (Interimconnectivity)

Yet to awardSIKKIM 0D/C5 00132Dikchu HEP - Dikchu Pool

PGCONSU 0 MAY-196 DEC-180100132/33/11 0(Sikkim) Dikchu pool (new) S/S

Remark:

Dopaha TPP (3x660 MW), SS, UP, U1,U2,U3

UPPTCL D/C1 765Dopaha - Ghazipur

UPPTCL D/C2 765Dopaha - Varanasi / Jaunpur

UPPTCL D/C3 765Dopaha - Anpara

UPPTCL D/C4 765Meja - Bargarh

Remark:

Durgapur (DPL) Extn. (250 MW), SS,WB, U8-3/14 (C)

Existing line.DPL D/C1 400DPL - Bidhan nagar MAR-12

Remark:

Durgapur TPS (2x500 MW),CS,WB,DVC,U1-7/11(C),U2-3/1 (C)

Commissioned 3/11.DVC 14 MAR-11D/C1 MAY-0914147400 7LILO of Durgapur-Jamshedpur(PG) at Durgapur STPS

JAN-11

Commissioned 4/12.PGCIL 469 APR-12D/C2 451519276400 276Durgapur-Jamshedpur (PartLine)

APR-12

Commissioned 07/13.DVC 208 JUL-13D/C3 MAY-10208208138400 138Durgapur STPS - Raghunathpur JUL-13

Remark:

Dwarkesh Energy Ltd TPP (2x660 MW) PS, Khandwa, MP,

XYZ D/C1 765Dwarkesh Energy TPP - Indore

Remark:

TL: Total Location 53Page 10 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 11: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.EMCO Warora TPP (2x300 MW), PS,Maha,GMR, U1-2/13 (C),U2-8/13(C)

Commissioned 01/13.GMR 96 JAN-13D/C1 969680400 80EMCO - Bhadrawathi (PG) JAN-13

Remark:

Ennore TPP, Ennore Exp, N Chennai-III(2X660, 660, 800),TG,TANGENDCO,U1-3/20,U2-4/19;U1-9/21;U1-9/18

Tender opened on 07.06.17. Price bidopened and evaluation is under process.

TANTRAN 0D/C1 SEP-180024400ETPS exp. - North ChennaiPooling Station

Tender opened on 07.06.17. Price bidopened and evaluation is under process.

TANTRAN 0D/C2 SEP-180024400Ennore SEZ - North ChennaiPooling Station

Tender opened on 07.06.17. Price bidopened and evaluation is under process.

TANTRAN 0D/C3 APR-190024400ETPS exp.- Ennore SEZ

Tender under finalisaion.TANTRAN 0 MAR-194 SEP-18003000765/400 0North Chennai PS (GIS)

Remark:

Gadarwara STPS-I (2x800 MW), NTPC, U1-1/18,U2-07/18

commissioned 11/2016 (Late Reported)PGCIL 43 JAN-17D/C1 434316765 16LILO of existing Seoni-Bina atGadarwara STPP

JAN-17

Work was stalled due to law & orderproblem. Work restarted.

PGCIL 269 MAR-182xD/C2 NOV-17269269196400 195LILO of Wardha - Parli at WaroraPS (PWTL-TBCB)

Severe ROW being faced in Maharastra.Work was stalled at waivre due to Law &order problem created. Work restared,progress slow.

PGCIL 820 MAR-18D/C3 NOV-17797837628765 477Gadarwara - Warora PS (PWTL-TBCB)

Commissioned 05/17.PGCIL 271 MAY-17D/C4 NOV-17271271187765 187Gadarwara - Jabalpor Pool line(Balance Portion from LILO ofSeoni - Bina to Jabalpur) (PWTL-TBCB)

MAY-17

Work under progress. Work affected due tointerference from local political sinceOct'17.

PGCIL 99 MAR-185 NOV-17991003000765/400 97Warora PS (PWTL-TBCB)

Remark: SPV/BPC - Powergrid Warora Transmission Ltd / REC

Gadarwara STPS-II (2x800 MW), NTPC (Part-B) (TBCB)

Ready for Commissioning 2/11.PGCIL 15 FEB-11D/C1 JUL-10151510400 10Parli (MSETCL) - Parli (PG) FEB-11

Work under progress. Severe ROW problemin Maharastra.

PGCIL 912 MAR-18D/C2 JAN-18883919698765 555Warora PS - Parli (PPTL-TBCB)

ROW being faced.PGCIL 311 MAR-18D/C3 JAN-18306311236765 203Parli - Solapur (PPTL - TBCB)

Work under progress.PGCIL 98 MAR-184 JAN-18951003000765/400 70Parli (New) S/s (PPTL -TBCB)

Remark: SPV/BPC - Powergrid Parli Transmission Ltd / REC

GAMA CCPP (225 MW), M/s GAMA Infraprojects Ltd., UK, Module-1:4/16(C)

XYZ D/C1 3220LILO of Mahuakheraganj-Kashipur line at GAMA CCPP

Remark:

GEPL Ph -1 (2x60 MW ), U1-60 MW,9/12 (C) & Ph-2 (2x270 MW) TPS,PS,Maha,GEPL,U2-4/12(C)

GEPL D/C1 400LILO of one ckt of Bhadrawati -Parli at GEPL TPS

Commissioned 9/14GEPL SEP-14D/C2 20220 20GEPL -MIDC S/S SEP-14

TL: Total Location 53Page 11 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 12: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Ghatampur TPP (3x660 MW), CS, UP, JVN,UPRVUNL, 2020-21

UPPTCL 2xS/C1 765Ghatampur - Moradabad /Rampur

UPPTCL D/C2 60400Ghatampur TPS - Kanpur (PG)

Remark:

Ghazipur (2x660 MW), PS, UP, BEL Spun,

UPPTCL D/C1 400Varanasi/Jaunpur - Azamgarh

UPPTCL D/C2 400Varanasi/Jaunpur - Aurai

Commissioned 09/14.UPPTCL 186 SEP-14S/C3 FEB-1118618659220 59Ghazipur - Rasra SEP-14

UPPTCL S/C4 400Ghazipur - Varanasi / Jaunpur

UPPTCL D/C5 765Varanasi/Jaunpur - Meja

UPPTCL D/C6 400LILO of Anpara - Mau atGhazipur

UPPTCL D/C7 400LILO of Sarnath - Azamgarh atVaranasi / Jaunpur

UPPTCL D/C8 400Varanasi / Jaunpur - Gorakhpur

Remark:

Goindwal Sahib (2x270MW), PS,Punjab,GVK, U1-2/16(C),U2-3/16 (C)

Work in progress. Forest case approvalreceived. Railway approved

PSTCL 203 MAR-18D/C1 202203129220 111Goindwal Sahib - Bottianwala

Commissioned 8/12PSTCL 60 AUG-12D/C2 606038220 38Goindwal Sahib - SultanpurLodhi

AUG-12

Ready for Commissioning 12/15.PSTCL 92 DEC-15D/C3 929255220 55Goindwal Sahib - Chola Sahib DEC-15

Remark:

Gongri HEP (2x72 MW), PS, Arp, Dirang Energy, U1&U2-03/20

DEPL D/C1 220Gongri - Dinchang PoolingStation

Remark:

Gorgi TPP (2x660MW), MP, DB Power Ltd. , Uncertain

MPPTCL D/C1 0400DBTPS - Vindhyachal PS (Quad)line

Remark:

Haldia TPP (2x300 MW) SS, WB, IPC(H)L. U1 - 07/16, U2 - 11/16

Commissioned 03/17 (Late Reported).IPCHL 15 MAY-17D/C1 15155220 5Haldia TPP (IPCL) - New Haldia(WBSETCL)

MAY-17

Under planning stage by WBSETCL.ISPAT D/C2 180220Haldia TPP - Egra

Remark:

Harduaganj TPS (2x250 MW),SS,UP,UPRVUNL,U8-9/11(C),U9-5/12(C)

Commissioned 11/14.UPPTCL 151 NOV-14D/C1 AUG-0915115199220 99Harduaganj - Jahangirabad NOV-14

Remark:

TL: Total Location 53Page 12 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 13: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Harduaganj TPS Exp-II (1x660MW), UP, UPRVUNL , U-6/19

UPPTCL MAR-19D/C1 50400LILO of one Ckt Aligarh-Sikandrabad at Harduaganj TPSLine

UPPTCL2 630400/220ICT at Harduaganj Extn

Remark:

Hazaira CCPP (351 MW),SS,GUJ,GSECL,,GT+ST-2/12(c )

A/T given on 22.11.2017GETCO 110 JAN-19D/C1 95182111220 27Hazaira (GSEC) - Mota

Commissioned 9/11.GETCO 211 SEP-11D/C2 APR-11211211125220 125Hazaira (GSEC)-Kosamba SEP-11

Remark:

Hindustan Electricity GCL TPP (1x350+3x379 MW), PS, Maha, U1-3/14, U2, & U3

XYZ D/C1 400LILO of Lonikhand - Kalwa atHEGCL TPP

XYZ D/C2 110400HEGCL TPP - Pune (AIS) (PG)

Remark:

Ind Barath TPP (Utkal)(2x350MW),PS,Orissa,Barath, U1-2/16(C), U2-11/17

Commissioned 06/2017 (Late Reported).IBPIL 125 OCT-17D/C1 125125124400 124Ind - Barath (Power Plant(Shahjbahal) - Jharsuguda(Sundargarh)line

OCT-17

IBPIL 72 JUN-15D/C2 727247400 47LILO of Rouekila - Raigarh at IndBarath

Remark:

Jal Churk (4x60 MW), PS,UP, M/S Jal ,

Commissioned 01/14.UPPTCL JAN-14D/C1 13220 13Churk - Robertsganj JAN-14

Remark:

Jallipa-Kapurdi TPP(8x135MW),PS,RAJ, RW Power, U1 to U8: Comm from 10/09(c) to 2/13(c)

Commissioned 8/10RVPNL 10 AUG-08D/C1 10105220 5LILO of Giral - Barmer Ckt 1 atRaj West LTPS.

AUG-08

1 ckt Commissioned 5/10RVPNL 44 MAY-10D/C2 APR-10444430400 30Rajwest- Barmer MAY-10

Commisisoned 3/12RVPNL 283 MAR-12S/C3 28328383220 83Raj West-Dhorimana MAR-12

Commissioned 5/10RVPNL 560 MAY-10D/C4 APR-09560560417400 417Rajwest- Jodhpur MAY-10

Remark:

Jawaharpur TPP, (3x660 MW), Uttar Pradesh, JVUNL, 2020-21

UPPTCL S/C1 15220LILO of Mainpuri- Sikandrarao atJawarharpur TPS

UPPTCL MAR-18D/C2 20400LILO Agra(South)-Fahtehabad(Agra) at Firozabad

JAWAHAR D/C3 400Jawaharpur TPP - yet to bedecided

UPPTCL S/C4 30765LILO of Mainpuri - G Noida atJawaharpur TPS

UPPTCL MAR-18D/C5 80400Jawahapur TPS-Firozabad Line

TL: Total Location 53Page 13 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 14: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Jegurupadu extesion project (Phase II) GVK Group) 220 MW U (C)

Commissioned in FY 2008-09.GVKP&IL MAR-09D/C1 14400 14Jegurupadu - Vemagiri line MAR-09

Remark:

Jhajjar Mahatama Gandhi (CLP) (2x660 MW), PS, U1-1/12(C),U2-4/12(C)

Commissoned 2/12.HVPNL FEB-12D/C1 133400Kabulpur-Deepalpur FEB-12

commissioned 2/12.HVPNL 3 FEB-12D/C2 332400 2LILO of abdullapur-Bawana atdeepalpur

FEB-12

Commissioned 10/11.HVPNL 23 OCT-11D/C3 232310400 10LILO of Jhajjar (APCPL) -Daultabad line at MG Jhajjar(CLP)

OCT-11

Commissioned 11/13.HVPNL 94 NOV-13D/C4 949447220 47LLIO of Bahadurgarh- Rohtak atKabulpur

NOV-13

Commissioned 09/13HVPNL 97 SEP-13D/C5 979746220 46Kabalpur - Badhan SEP-13

Ready for commissioning 02/2016 (LateReported)

HVPNL 101 DEC-16M/C6 MAY-1310110141220 41Deepalpur-Sonepat HSIIDC Rai (terminated at Rajiv Gandhi s/s)

DEC-16

Commissioned 2/12.HVPNL 64 FEB-12D/C7 646440400 64Jhajjar -Dhanonda FEB-12

Commissioned 2/12.HVPNL 95 FEB-12D/C8 959570400 95Jhajjar - Kabulpur FEB-12

Commissioned 05/13.HVPNL 95 MAY-13D/C9 959525220 25Deepalpur-Barhi MAY-13

Commissioned 2/12.HVPNL 100 FEB-1210 100100200220/132 100Deepalpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1211 100100630400/220 0Deepalpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1212 100100200220/132 100Kabulpur S/S FEB-12

Commissioned 2/12.HVPNL 100 FEB-1213 100100630400/220 100Kabulpur S/S FEB-12

Remark:

Jhajjar TPS (Indira Gandhi ) TPS (3x500 MW),CS,HR,ACPCL,U1- (C),U2-(C),U3-12/12

1st cket commissioned 9/10 & 2nd ckt in11/10.

APCPL 186 NOV-10D/C1 MAR-10186186132400 132Jhajjar - Mundka NOV-10

Commissioned 2/12.HVPNL 175 FEB-12D/C2 175175136400 136Jhajjar - Daultabad FEB-12

Commissioned 9/12.DTL 100 SEP-123 100100160220/66 100Mundka (2nd ICT) SEP-12

Commissioned 12/10HVPNL 0 DEC-104 00945400/220Daultabad S/S DEC-10

Commissioned 3/11.DTL 100 MAR-115 100100160220/66Mundka (1st ICT) MAR-11

1st Trans. Commissioned 9/10. 2nd trf3/11.

DTL 0 MAR-116 00630400/220Mundka (2x315) S/S MAR-11

Remark:

Jharsuguda (Sterlite TPP),PS, Ori,Sterlite, U1-12/10(C), U2-10/10(C),U3-8/11(C),U4-6/12 (c)

Commissioned 2/11. (Interimarrangement).

SEL 85 FEB-11D/C1 858549400 49LILO of Rourkela - Raigarh atSterlite TPP (Existing line)

FEB-10

Commissioned 10/2017SEL 64 OCT-17D/C2 NOV-16646441400 47Sterlite TPP (Vedanta)-Jharsuguda (Sundergarh)(Balance portion from LILO-Ipoint to Jharsuguda)

OCT-17

TL: Total Location 53Page 14 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 15: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Ist ckt commissioned, 2nd cktcommissioned 8/10.

SEL AUG-102xD/C3 9220 9Sterlite TPP - Sterlite captiveplant D/C

AUG-10

Transmission work not started yet. SEL willapproach CEA for approval of continuingthe LILO-II.

SEL 0D/C4 NOV-160040400Sterlite TPP - Jharsuguda (LILO-IIto Jharsuguda)

Commissioned 03/14. (Interimarrangement).

SEL 92 MAR-14D/C5 929260400 60LILO of Rourkela - Raigarh atSterlite TPP ( 2nd LILO)

MAR-14

Remark:

Jorethang Loop HEP (2x48MW)PS,Sikkim,DANS,U1-9/15 (C), U2-9/15 (C).

Commissioned 11/2016.(Interim connectionremoved- LILO on one ckt of New Melli -Rangpo D/C tr. Line at Jorethang ).

DEPL 35 NOV-16D/C1 353520220 20Jorethang HEP - New Melli NOV-16

Remark:

JSW Ratnagiri TPP (4x300 MW) ,PS,MAHA,JSW Energy ,U1-8/10(C),U2-12/10(C),U3-5/11(C),U4-10/11(C)

Commissioned 10/11.JSWEL 300 OCT-11D/C1 300300219400 218Jaigad - karad. SEP-11

Ckt 1 commissioned 7/10 & ckt 2commissioned 8/10.

JSWEL 160 AUG-10D/C2 MAY-10160160110400 110Jaigad - New Koyna AUG-10

Remark:

Kaiga APP (220 MW),CS,KAR,NPCIL,U4-11/10(C)

Commissioned 03/08PGCIL 422 MAR-08D/C1 422422310400 310Narendra - Davangere MAR-08

Ready for Commissioning 09/15.PGCIL 614 SEP-15D/C2 DEC-07614614420400 420Mysore - Kozhikode SEP-15

Commissioned 03/08PGCIL 100 MAR-083 100100315400/220 100Hirriyur (Extn.) S/S MAR-08

Commissioned 10/15.PGCIL 100 OCT-154 DEC-07100100630400/220 100Kozhikode S/Stn. (2x315) OCT-15

Remark:

Kakatiya TPP Extn (2x600 MW) SS,TCTL, APGENCO, U1-5/10 (C),U2-12/15 (C)

Commissioned 09/13.APTRANS 363 SEP-13D/C1 363363262400 262Bhoopalapally (Kakatiya) -Gajwel

SEP-13

Remark:

Kalisindh TPS (2x600 MW), SS,Raj,RRVUNL, U1-5/14 (C),U2-6/15 (C)

Commissioned 03/14.RVPNL 220 MAR-14D/C1 220220159400 159Kalisndh TPS - Anta (Baran)Pooling Station (Quad)

MAR-14

Commissioned 4/12.RVPNL 35 APR-12D/C2 353519220 19Kalisindh-Jhalawar line APR-12

W.O awarded to M/s Varsana Ispat.(W.O.withdrawn from M/s. GET) . Line workcompleted. Bay work at 400 KV GSS Ajmerpending.

RVPNL 284 MAR-18D/C3 SEP-12284284210400 213Phagi(Jaipur south-765 kV)-Ajmer line

Commissioned 03/14.RVPNL 586 MAR-14S/C4 586586212765 212Anta - Phagi (Jaipur South Ckt-1) MAR-14

Charged at 400 kV 01/14.RVPNL 570 JAN-14S/C5 570570214765 214Anta - Phagi (Jaipur South Ckt-2)(Charged at 400 kV)

JAN-14

Commissioned 11/2016 (Reported Late)RVPNL 126 DEC-16D/C6 SEP-12126126104400 104Phagi GSS (Jaipur) - Heerpuraline

DEC-16

Commissioned 01/16.RVPNL 100 JAN-167 100100315400/220 100Ajmer S/S JAN-16

Commissioned 02/15.RVPNL 100 FEB-158 1001003000765/400 100Phagi (jaipur South ) (2x1500 )S/S

FEB-15

TL: Total Location 53Page 15 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 16: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 02/15.RVPNL 100 FEB-159 1001003000765/400 100Anta (Distt. Banra) PoolingStation

FEB-15

Remark:

Kalpakkam PBR (500 MW)

Line commissioned in Nov'11PGCIL 140 NOV-11D/C1 14014072230 72Kalpakkam PFBR-Sirucheri NOV-11

Commissioned 3/12.PGCIL MAR-12D/C2 213230 213Kalpakkam - Arni MAR-12

Commissioned 8/12.PGCIL 306 AUG-12D/C3 306306160230 160Kalpakkam PFBR-Kanchepurram AUG-12

Remark:

Kamalanga TPP (3x350MW),PS,GMR, Orissa, U1-3/13(C),U2-9/13(C),U3-9/13

Commissioned 12/14.GMR 103 DEC-14D/C1 10310360400 60Kamalanga (GMR) - Angulpooling station

DEC-14

For start up power,work completed 5/12.GMR 3 MAY-12D/C2 331400 1LILO of Talchar -Meramundli atKamalanga TPP

Remark:

Kameng HEP,(4x150 MW) SS,ArP, NEEPCO,U-03/18

Completion matching with Generation(Kameng HEP, ant. by Mar'18). 01 loc.under ROW affecting balance Towererection & Stgg. Critical.

PGCIL 151 MAR-18D/C1 AUG-13150151114400 109Kameng - Balipara line

Remark:

Karcham Wangtoo HEP ( 4x250 MW)PS, HP, JKHCL, U1-5/11(C), U2-6/11( C), U3-9/11 (C), U4,9/11 (C).

Commissioned 3/11.PGCIL 395 MAR-11D/C1 SEP-11385403291400 230Abdullapur - Sonepat MAR-11

Commissioned. 7/12JV(PG&JP 518 JUL-12D/C2 518518432400 432Karcham Wangtoo-Abdullapur JUL-12

Remark:

Kasaipalli TPP (2x135 MW),PS,Cha,ACB,U1- 12/11(C),U2-6/12(C)

Commissioned. 7/12ACB 181 JUL-12D/C1 181181112400 112Kasaipalli TPP -Bharai (Sipat)Pooling station

JUL-12

Commissioned 11/11.ACB NOV-11D/C2 6400 6LILO of Korba - Bhatapara atKasaipalli

NOV-11

Remark:

Kashang-I,II & III HEP (1x65+2x65MW) on Satluj river,SS,HP,U1 -10/16 (C),U2-8/16 (C),U1-01/17 (C)

Commissioned 04/16.HPPTCL 100 APR-16D/C1 OCT-1510010039220 39Kashang - Bhaba (2nd Ckt) APR-16

power of kashang and other generatingprojects in vicinity was planned to bepooled at Jangi pooling station, since othergenerating projects have withdrawn LTAtherefore the construction of Jangi poolingstation has been dropped for the timebeing.

HPPTCL 0D/C2 00220Kashang - Jangi Pooling Station

Remark:

Kashipur CCPP (225+225 MW) (Gas),SEPL, UK, Mod-1:11/16(C)

PTCUL SEP-14D/C1 34220Kashipur - Mahuakheraganj JUL-14

Remark:

TL: Total Location 53Page 16 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 17: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Kawai Super Critical TPS (2x660 MW),Raj, PS,Adani , Unit 1-5/13 (C),U2-12/13 (C)

Commissioned 01/14.RVPNL 136 JAN-14D/C1 136136101400 101Kawai - Anta (Baran) JAN-14

Commissioned 12/12.RVPNL 46 DEC-12S/C2 464616400 16Chhabra TPS-Kawai SCTPS DEC-12

Commissioned 09/2016 (Late Reported)RVPNL 100 APR-173 1001001500765/400 100Anta GSS (ICT-3) APR-17

Remark:

Khaperkheda (500 MW),SS,MAHA,MSPGCL,U1-8/11(C)

Commissioned 11/9MSETCL 8 NOV-09D/C1 883400 3LILO of Koradi - Chandrapur atKhaperkheda TPS.

NOV-09

Commissioned 3/12.MSETCL 19 MAR-122xD/C2 191912220 12Khaperkheda TPS -Khaperkheda (Existing)

MAR-12

Commissioned 12/11.MSETCL 100 DEC-113 1001001000400/220 100Khaperkheda S/S (2x500) DEC-11

Remark:

Khargone Super Critical TPP(2x660 MW),CS,MP,NTPC,U1-3/19,U2-9/19 (TBCB)

Commissioned 02/2018.SGL 21 FEB-18D/C1 FEB-18212114400 14LILO of one ckt. of Khandwa -Rajgarh at Khargone TPP (KTL -TBCB)

FEB-18

Change in Law-Ministry of Finance, Dept.of Revenue with Notification No. 9/2017-Central Tax vide Gazette of India dated28th June 2017 by sub section (3) ofsection 1 of Central Goods and ServicesTax Act, 2017 & Notification No. 3/2017-Integrated Tax dated 28th June 2017 of subsection (3) of Section 1 of the IntegratedGoods and Service Tax Act, 2017 hasintroduced GST instead of Service Tax andit has been increased from 15% (ServiceTax) to 18% (GST) w.e.f. 01st July 2017,same has been intimated to all LTTCs

SGL 0 JUL-19D/C2 JUL-1907049400 0Khargone TPP - Khandwa Pool(Q) (KTL - TBCB)

Change in Law-Ministry of Finance, Dept.of Revenue with Notification No. 9/2017-Central Tax vide Gazette of India dated28th June 2017 by sub section (3) ofsection 1 of Central Goods and ServicesTax Act, 2017 & Notification No. 3/2017-Integrated Tax dated 28th June 2017 of subsection (3) of Section 1 of the IntegratedGoods and Service Tax Act, 2017 hasintroduced GST instead of Service Tax andit has been increased from 15% (ServiceTax) to 18% (GST) w.e.f. 01st July 2017,same has been intimated to all LTTCs

SGL 180 JUL-18D/C3 JUL-19127246179765 12Khandwa Pool - Indore (KTL -TBCB)

TL: Total Location 53Page 17 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 18: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Change in Law- a) As per Notification ofGovt. of Maharashtra vide Govt rule No. Policy-2016/Pra.kra./urja-4 dated 31st May2017 has increased the land compensationfor area under EHV Transmission tower andfor area under conductors, same has beenintimated to all LTTCs. B) Ministry ofFinance, Dept. of Revenue with NotificationNo. 9/2017-Central Tax vide Gazette ofIndia dated 28th June 2017 has introducedGST instead of Service Tax and it has beenincreased from 15% (Service Tax) to 18%(GST) w.e.f. 01st July 2017, same has beenintimated to all LTTCs

SGL 324 JUL-18D/C4 JUL-19214485378765 46Khandwa Pool - Dhule (KTL -TBCB)

a) Land Acquisition is in progress. b)Change in Law- Introduction of GST in placeof Service Tax and it has been increasedfrom 15% (Service Tax) to 18% (GST) w.e.f.01st July 2017, same has been intimated toall LTTCs

SGL 0 JUL-195 JUL-190803000765/400 0Khandwa PS (KTL - TBCB)

Remark: Khargone Transmission Limited (SGL)

Khurja (2x660 MW), PS, UP, THDC,

UPPTCL D/C1 765LILO of Mainpuri - Gr Noida atKhurja

UPPTCL D/C2 100400LILO of Agra - Muradnagar atKurja

UPPTCL S/C3 765Khurja - Hapur

Remark:

Kishanganga HEP (3x110MW) CS, J&K, NHPC, U1,2 & 3-02/18

''Work affected due to disturbance inKashmir since Jul'16 & slow process toresolve compensation issue. State/MoPhelp required. Critical All efforts are beingmade to complete earlier.

PGCIL 214 JUL-18D/C1 MAR-18124252228220 93Kishanganga - Wagoora

Commissioned 02/2018.PGCIL 150 FEB-18D/C2 JUL-1715015085220 85Kishanganga - Amargarh line FEB-18

Remark:

Koderma TPS 2x500 MW,CS,JHA,DVC,U1-7/11 (C),U2-2/13 (C)

Commissioned 8/10DVC 66 AUG-10D/C1 666632132 32LILO of Barhi-Koderma atKoderma S/S

AUG-10

Commissioned 5/11.PGCIL 294 MAY-11D/C2 APR-10294294222400 222Koderma-Biharshariff (Quad) MAY-11

Remark:

Koldam HEP (4x200 MW),CS,HP,NTPC, U3-4/15 (C), U4-6/15 (C)

Commissioned 03/10.PGCIL 127 MAR-10D/C1 12712793400 93Koldam - Nalagarh MAR-10

Commissioned 09/14.PKTCL 423 SEP-14D/C2 SEP-08423423301400 301Koldam - Ludhinana (JV Portion) SEP-14

Remark:

Koradi TPP Expn. (3x660 MW), SS,Maha, MSPGCL, U8-3/15 (C) ,U9-3/16 (C),U10-6/16

TL: Total Location 53Page 18 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 19: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 12/2016MSETCL 111 DEC-16D/C1 11111138400 38Koradi-II - Koradi-III (Ckt-I) DEC-16

Commissioned 03/16.MSETCL 72 MAR-16D/C2 DEC-13727228220 28Koradi TPS-New Khaparhkeda MAR-16

Commissioned 01/16.. (97 Ckm hadalready been taken as commissioned inMay 2015.)

MSETCL 336 JAN-16D/C3 APR-11336336144400 144Koradi TPS - Wardha JAN-16

Remark:

Korba (E) (2x250 MW), SS, Chg, U2-7/12 (C)

Commissioned 08/14.CSPTCL 505 AUG-14S/C1 MAR-12505505153220 153Korba -Vishrampur AUG-14

Remark:

Korba (W) (1x500 MW),SS,Cha,CSEB,U5-3/13(C)

Commissioned 12/12.CSPTCL 640 DEC-12D/C1 640640447400 447Korba (W)-Bhilai (khedamara) DEC-12

Commissioned 9/12.CSPTCL 70 SEP-12D/C2 MAR-10707047400 47LILO Korba (West)-Bhilai atRaipur (CSPTCL)

SEP-12

Commissioned 03/13 & 03/14. (ReportedLate)

CSPTCL 100 MAR-143 100100630400/220 100Raipur S/S (ICT I & II.) MAR-16

Remark:

Koteshwar HEP (4x100 MW),CS,UK, THDC,U3-1/12,U4-3/12.

Commissioned 3/11.PGCIL 9 MAR-11D/C1 JUN-08995400 5Koteshwar -Tehri Pooling Point APR-11

Commissioned 6/11.PGCIL 59 JUN-112xD/C2 JUN-08595913765 13LILO of Tehri - Meerut at TehriPooling Point (to be charged at400 KV)

JUN-11

Remark:

Kothagudem TPS St-VII (1x800), TPGenco, U12-07/18

Detailed survey profile for174.72 kms washanded over to contractor on 31.03.2017

TSTRANS 298 SEP-18D/C1 SEP-18166489360400 0Julurupadu - Jangaon

Ready for Commissioning 02/18.TSTRANS 119 FEB-18D/C2 MAR-1711911978400 78Julurupadu - KTPS (Stage-VII) FEB-18

land leveling is Under progress. euipmenterection Under progress .

TSTRANS 83 AUG-1801001500400 0Jangaon

TSTRANS4 SEP-170400Julurupadu 2nos 400kV bay

Remark:

Koyna Left Bank PSS (2x40MW), Maharashtra, WRD Maharashtra, 2019-20

Commissioned 02/2017MSETCL 170 FEB-17S/C onD/C

1 17017044220 44Koyna PSS - Karad(Loc. 8 - 144)line

FEB-17

Remark:

Kudgi TPS-I (3x800), NTPC Ltd., U1-12/16(C),U2-3/17(C),U3-11/17

Ready for Commissioning 08/15.KTCL 46 AUG-152xD/C1 FEB-15464636400 36Kudgi STPS - Narendra (KTL -TBCB)

AUG-15

Work is under progressKPTCL 107 JAN-18D/C2 FEB-1766277159220 0Kudgi UMPP(NTPC) - Vajramatti220kV s/s(Bagalkot Distt.)

Commissioned 08/16.KTCL 256 AUG-16D/C3 DEC-15256256185400 185Madhugiri - Bidadi (KTL - TBCB) AUG-16

Ready for Commissioning 09/16.KTCL 867 SEP-16D/C4 DEC-15867867758765 758Narendra (New) - Madhugiri(KTL - TBCB)

SEP-16

TL: Total Location 53Page 19 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 20: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 12/2017.KPTCL 99 DEC-17M/C5 JUN-17999980220 80LILO of B.Bagewadi - Bijapurline at Kudgi 400kV STPP

DEC-17

Remark: Transmission System required for evacuation of power from Kudgi TPS (3x800 MW in Phase-I) of NTPC Ltd. (TBCB) SPV/BPC - Kudgi Transmission Company Ltd. / REC

Kundankulam - APP Transmission System - PGCIL

Line commissioned in Nov'11.PGCIL 224 NOV-11D/C1 224224157400 157Muvattupuzha (PG) - NorthTrichur (PG)

NOV-11

Severe ROW problem (long pending).Problem being addressed progressively asper latest Revised G.O. of 30.07.15(compensation to be done on land value, tobe finalised by concerned DC with thesuport of State Govt.). Works underprogress. Site is getting police protectionas per requirement from State admn.

PGCIL 303 SEP-18D/C2 NOV-08242447297400 70Edamon (KSEB) - Muvattupuzha(PG)

Commissioned 03/09.PGCIL 199 MAR-09D/C3 199199145400 145Kudankulam-Tirunelveli (Quad)1st.

MAR-09

Commissioned 03/09.PGCIL 213 MAR-09D/C4 213213160400 160Kudankulam-Tirunelveli (Quad)2nd.

MAR-09

Commissioned 4/08.PGCIL 300 APR-08D/C5 300300213400 213LILO of Madurai - Trivandrum atTirunelveli 2 X D/C

APR-08

Commissioned 03/09.PGCIL 730 MAR-09D/C6 730730533400 533Tirunelveli - Udumaplet MAR-09

Commissioned 03/10.PGCIL 235 MAR-10M/C7 235235327400 327Tirunelveli - Edamon MAR-10

ICT-I Commissioned 4/08, ICT-IICommissioned 11/08.

PGCIL 100 APR-088 100100630400/220 100Tirunelveli S/S NOV-08

ICT-II commissioned in Nov'11.PGCIL 100 NOV-119 100100315400/220 100Muvattapuzha s/s (2 nd ICT) NOV-11

Commissioned 3/09PGCIL 100 MAR-0910 100100315400/200 100Udumalpet (PG) Ext. MAR-09

Commissioned 6/09.PGCIL 100 JUN-0911 100100315400/220 100Trivandrum JUN-09

Remark:

Lakhwar (300 MW) Yamuna river,UK,UJVNL - 2018-19

Route Survey has been completed. Towerschedule and profile of line has beenapproved. Principal approval obtained fromMOEF on dated 11/09/2017. Proposal fortransfer of land (73.36 Hect.) forcompensatory afforestation was submittedto DM, Dehradun on dated 14/09/2017.SDM directed to Tehsildar on 03/10/2017for further necessary action. Total Progress12%

PTCUL 0D/C1 0060220Lakhwar- Dehradun

NHPC D/C2 JAN-17220LILO of Lakhwar HEP-Muzaffarnagar at Vyasi HEP

Remark:

Lalitpur Ph-I (3x660MW), Ph-II (3x660 MW )PS,UP,BHL, U1-03/16 (C),U2-1/16(C),U3-04/16(C)

Commissioned 04/2017UPPTCL 119 APR-17D/C1 11911968220 68Maath (Mathura) -Chhata line APR-17

Commissioned 09/16.UPPTCL 219 SEP-16D/C2 AUG-16219219156400 156LILO of 400 kV Agra (UP) -Muradnagar 400 kV S/C line atAgra (UP) 765/400 kV S/S

SEP-16

TL: Total Location 53Page 20 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 21: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 06/2017.UPPTCL 88 JUL-17D/C3 AUG-16888864400 64LILO of Agra - Muradnagar atMathura

JUN-17

Commissioned 04/2017UPPTCL 382 APR-17S/C4 AUG-16382382142400 142Fatehabad (Agra (UP)) - Maath (Mathura) line

APR-17

Ready for commissioning 06/2017.UPPTCL 203 JUL-17D/C5 AUG-16203203139400 139Agra(UP) - Agra (South) JUN-17

Commissioned 04/2017UPPTCL 902 APR-17S/C6 AUG-16902902335765 335Lalitpur TPS - Fatehabad (Agra(UP)) Ckt-II

APR-17

Ready for commissioning 09/16.UPPTCL 955 SEP-16S/C7 AUG-16955955337765 337Lalitpur TPS - Agra (UP) Ckt-I SEP-16

Ready for Commissioning 09/16.UPPTCL 100 SEP-16D/C8 AUG-1610010073400 73LILO of one ckt of 400 kV Agra(UP) - Agra (PG) 400 kV D/C lineat Agra (UP) 765/400 kV S/S

SEP-16

Commissioned 05/2017.UPPTCL 100 MAY-179 100100315400/220 100Maath Mathura (New) (ICT-II) MAY-17

3x200 MVA, 400/132 KV ICTs energised on10/07/2017

UPPTCL 10010 AUG-16100100600400/132 100Agra (South) S/S JUN-17

Commissioned 09/16.UPPTCL 100 SEP-1611 AUG-161001001500765/400 100Agra (UP) S/S (ICT-I)(Fatehabad)

SEP-16

Commissioned 02/2017UPPTCL 100 FEB-1712 1001001500765/400 100Agra (UP) S/S (ICT-II)(Fatehabad)

FEB-17

Commissioned 04/2017UPPTCL 100 APR-1713 AUG-16100100315400/220 100Maath (Mathura) s/s (ICT-1) APR-17

Remark:

Lanco Amarkantak TPS -II, (2x660 MW), PS,Chg,LPT, U3 -11/18,U4-2/18

LEPP 96 JUN-16D/C1 1215895400 0Lanco Amarkantak - ChampaPooling Station

Remark:

LANCO Kondapalli (2x317 MW), PS, AP, LANCO Infra, Ua-8/15(c), U2-9/15(c)

Commissioned Oct-09APTRANS 0D/C1 0044400Kondapalli TPS- Nunna

Remark:

Lanco Vidarbha (Dhenkanal )TPS (2x660 MW), PS,LIL, U1-12/18,U2-3/19

LEPP MAR-17D/C1 1615765LILO of Seoni - Wardha at LancoVidarbha TPS

Remark:

Lara STPP-I (2x800 MW), CS, Chh, NTPC, U1-11/17,U2-6/18

Commissioned 04/16.PGCIL 50 APR-16D/C1 APR-17505036400 36Lara STPS - Raigarh (Kotra) line APR-16

Ready for commissioning 06/17PGCIL 306 JUL-17D/C2 APR-17306306224400 224Lara STPS - Champa PoolingStation line (Q)

JUN-17

Remark:

Lata Tapovan (3x57 MW),CS,UK,NTPC- 2021-22

TL: Total Location 53Page 21 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 22: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Contract has been terminated on23.01.2017 as per the stay order of Honble Supreme Court for Construction ofHydro electric project of Lata Tapovan HEP(171MW) after June 2013 Natural Disasterin Uttrakhand State and also nonavailability of Land at Pipalkoti forconstruction of 400KV Substation and hugeagitation of local public on prposed land.

PTCUL 0 DEC-17D/C1 0040220Joshimath - Kunwari Pass(Pipalkoti)

Contract has been terminated on23.01.2017 as per the stay order of Honble Supreme Court for Construction ofHydro electric project of Lata Tapovan HEP(171MW) after June 2013 Natural Disasterin Uttrakhand State and also nonavailability of Land at Joshimath forconstruction of 220 KV Substation.

PTCUL 0 DEC-17D/C2 03624220 0Lata Tapovan- Joshimath

Remark: Contract has been terminated on 23.01.2017 as per the stay order of hon'ble Supreme Court for construction of HEP of Lata Tapovan after June 2013 natural disaster in Uttarakhand.Currently work is stalled

Loharinagpala (NTPC),CS,UK,NTPC,Unit-14/15.

The work at Pala Maneri HEP stopped asper GOI order.

PTCUL 0D/C1 0010400 0LILO of Loharinagpala -Koteshwar at Pala - Maneri

The work at Loharinagpala HEP stopped asper GOI order.

PTCUL 0D/C2 00180400 0Loharinagpala-Koteshwar line

Remark:

Lower Jurala HEP (6x40MW) SS,TCTL,TSGENCO,U1-10/15(C),U2-9/15(C),U3-1/16 (C),U4-11/15,U5-8/16 (C),U6-9/16(C).

Commissioned 12/13.APTRANS 17 DEC-13D/C1 17179220 9LILO of Veltoor -Jurala at LowerJurala HEP

DEC-13

Commissioned 05/16. (Late Reported).TSTRANS 36 MAY-16D/C2 363621220 21Lower Jurala HEP - Upper Jurala AUG-16

Remark:

Lower Kalnai (2x24MW),J&K, JKSPDC, 2020-21

JKPDD D/C1 6132Lower Kalnai - Thathri S/s(existing) line

Remark:

Mahan TPP Ph-1(2x600 MW),PS, MP,ESSAR Power TCL, U1-2/13 (C), U2-9/17

Commissioned 3/12. (Interim)EPTCL 67 MAR-12D/C1 676744400 44LILO of Viindhyachal -Korba lineat Mahan S/S

MAR-13

Commissioned 3/13.EPTCL 287 MAR-13D/C2 287287208400 208Gandhar-Hazira MAR-13

The construction work is in full swing. 03Nos Tower erection gang and 07 Nosstringing gang is deployed and working atsite to achieve the desire completion.

EPTCL 939 MAR-18D/C3 921942670400 478Mahan -Sipat

commissioned in March 2013. Reported inJuly 2015.

EPTCL 100 JUL-154 1001001000400/220 100Hazira S/S JUL-15

Remark:

Maheshwar HEP (10x40 MW),PS,MP,SMHPCL,U1 to U10-2018-19

Commissioned 2/12.MPPTCL 195 FEB-12D/C1 195195115220 115Maheshwar - Pithampur FEB-12

TL: Total Location 53Page 22 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 23: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 5/10.MPPTCL 90 MAY-10D/C2 APR-09909054220 54Maheshwar - Nimrani MAY-10

Remark:

Maithon RBTPP (2x525 MW),PS,JHA,DVC-JV TATA ,U1-6/11(C),U2-3/12 (C)

Commissioned 09/10PGCIL 94 SEP-10D/C1 APR-10949462400 62Maithon RB - Maithon (PG) SEP-10

Commissioned 12/11.PGCIL 534 DEC-11D/C2 534534376400 376Maithon (RB) - Ranchi DEC-11

Remark:

Malana - II HEP (2x50 MW)PS,HP,EPPL,U1-8/11(C),U2-8/11(C),

Commissioned 9/11.EPCL 51 SEP-11D/C1 515136132 36Malana - II HEP - Chhaur. SEP-11

Commissioned 9/11.EPCL 4 SEP-11D/C2 SEP-09442220 2LILO of Allain Duhangan-Nalagarh at Chhaur

SEP-11

Commissioned 9/11EPCL 0 SEP-113 0170230/132 0Chhaur SEP-11

Remark:

Malibrahmini (2x525MW),PS,Orissa, MPL,U1-3/18,U2-3/18

MPCL 100 JUL-16D/C1 8010862400 20Malibrahmani - Angul

Remark:

Malwa TPP(Shree Singaji), (2x600+2x600), SS,MP,MPPGCL, U1-11/13,U2-10/14,U3-07/18,U411/18

Commisioned 3/12MPPTCL 160 MAR-12D/C1 16016095220 95Malwa TPP - Chhegaon MAR-12

Commissioned 02/13MPPTCL 158 FEB-13D/C2 158158105400 105Malwa TPP - Chhegaon FEB-13

Commissioned 09/13.MPPTCL 9 SEP-13D/C3 996220 5LILO of both ckts of Nimrani-Julwania at Julwania

SEP-13

Commissioned 11/14.MPPTCL 340 NOV-14D/C4 340340225400 225Chhegaon - Julwania NOV-14

Commissioned 11/13.MPPTCL 397 NOV-13D/C5 397397272400 268Malwa TPP - Pithampur NOV-13

Commissioned 03/14.MPPTCL 193 MAR-14D/C6 193193128400 128Pithampur-Indore MAR-14

Commissioned 12/12.MPPTCL 100 DEC-127 100100315400/220 100Chhegaon S/S DEC-12

Commissioned 4/13.MPPTCL 100 APR-138 100100630400/220 100Pithampur S/S APR-13

Commissioned 11/14.MPPTCL 100 NOV-149 100100630400/220 100Julwania S/S NOV-14

Remark:

Mangaon CCPP(338 MW), PS, MH, PGPL, U1-2/13(C)

commissioned 03/16MSETCL 0D/C1 004220Mangaon CCPP(Vile)- Bhagad

Remark:

Marwa TPP (2x500 MW) SS,Chg,CSPGCL U1-3/14 (C), U2 -6/16

Commissioned 1/13. (Loc 39 to 51 chargedon 7.11.12)

CSPTCL 55 JAN-13D/C1 555528220 28Marwa - Banari (Start up power) JAN-13

Commissioned 06/13.CSPTCL 379 JUN-13D/C2 379379281400 281Marwa - Raipur (Raitha) JUN-13

Commissioned 05/15.CSPTCL 161 MAY-15D/C3 MAR-13161161116400 116LILO of One ckt of Korba (W) -Khedamara at Marwa

MAY-15

Remark:

Matrishri Usha TPP (Corporate Power) (4x270MW), U1-3/18,U2-3/19,U3,4-uncertain

TL: Total Location 53Page 23 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 24: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

CPL AUG-16D/C1 116400Corporate TPP - JharkhandPooling Station

CPL 293 AUG-16D/C2 274320216400 132Latehar - Namkum

Remark:

Mauda TPS (500 MW),Phase-II (2x660 MW) CS, Maha, NTPC, U1-4/12 (C), U2-3/13(C),U3-7/16,U4-03/17 (C)

Commisisoned 05/12PGCIL MAY-12S/C1 124400Mauda - Wardha (2nd Ckt) MAY-12

Commissioned 3/12.PGCIL 345 MAR-12S/C2 345345124400 124Mauda - Wardha line (Quad)(Ckt-1)

MAR-12

Remark:

Meja TPP Ph-I (2x660 MW)(UPPCL & NTPC), U1-12/17,U2-1/19

Commissioned 03/15.UPPTCL 83 MAR-15D/C1 838365400 65Bara - Meza line MAR-15

Commissioned 03/15.UPPTCL 91 MAR-15D/C2 919168400 68Rewa Road - Meza line MAR-15

Ready for Commissioning 08/16.PGCIL 81 AUG-16D/C3 JUL-15818156400 56Meja - Allahabad line AUG-16

Remark:

Mettur TPS Stage III (600 MW), SS,TN,U1-10/12(C)

MTPS III- Malco energised 2/11 for start uppower.

TANTRAN 9 FEB-11D/C1 993230 3LILO of MTPS -Malco at MTPSStage III

FEB-11

Commissioned 3/12TANTRAN 8 MAR-12S/C2 883230 3MTPS Stage-III - Gobi MAR-12

Commissioned 01/13.TANTRAN 325 JAN-13D/C3 325325220400 220MTPS St.III - Arasur JAN-13

To be deletedTANTRAN 0 JUN-16D/C4 00200400 0MTPS St.III - Singarpet

Remark:

Monarchak CCPP (101 MW), CS,Tripura, NEEPCO, GT - 3/15 (C), ST - 1/16(C).

Completed 9/13TSECL 13 SEP-13D/C1 13133132 3Surajmani Nagar - Rabindranagar

MAR-17

Work in progress.TSECL 49 SEP-16D/C2 3815042132 6Monarchak - Surajmani Nagar

Remark:

Moti Khavdi (500 MW), PS,Guj,RPL,U1

RPTL D/C1 400Moti Khavdi TPP - Jam Nagar

Remark:

M/s Sembcorp Gayatri Power Ltd. (SGPL) (Formerly NCC Power Project Ltd.) Super-critical TPP (2x660 MW),PS,AP,Nellore, U1-11/16 (C), U2-11/16

Commissioned 03/16.PGCIL 101 MAR-16D/C1 FEB-1710110166400 66NCC gen Sw Yd. - Nellore PS line(Q)

MAR-16

Remark:

Mundra TPP & Mundra UMPP (3x660&5x800),PS,Guj, Adani & TATA, both project commissioned by 03/13(c)

Commissioned 1/13.HVPNL 219 JAN-13D/C1 219219146400 146Daultabad -Dhanonda JAN-13

Commissioned. 7/12APL 15 JUL-12D/C2 APR-11151510400 10Mohindergarh HVDC-Mohindergarh HVPNl(Dhanonda)

JUL-12

Commissioned 3/12APL 2693 MAR-12BIPOLE3 269326931980500 1980+/- 500 kV Mundra - BipoleMohindergarh

MAR-12

Commissioned. 7/12APL 139 JUL-12D/C4 APR-11139139100400 100Mohindergarh HVDC - Bhiwani JUL-12

TL: Total Location 53Page 24 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.19 PMWednesday 14 March 2018

Page 25: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 4/12HVPNL 100 APR-125 100100315400/220 100Dhanoda (Mohindergarh) APR-12

Remark:

Mundra TPP Ph.II (2x660 MW) ,PS,GUJ,Adani ,U1-12/10(C),U2-7/11(C)

Commissioned 02/16. (One Circuit is viavarsana.)

GETCO 956 FEB-16D/C1 956956671400 671Mundra (Adani) - Zerda line 2 FEB-16

Severe RoW issueGETCO 453 MAR-18D/C2 275997640400 0Mundra (Adani) - Zerda line 1

Remark:

Mundra UMPP WR system Strengething

Commissioned 01/14.PGCIL JAN-14D/C1 102400 102Shifting of Ankola -Aurangabad(MSETCL) to Aurangabad (PG)

JAN-14

Commisisoned 7/12PGCIL 288 JUL-12D/C2 288288204400 204Gandhar - Navsari JUL-12

Commissioned 04/14.PGCIL APR-14D/C3 OCT-12118400 118Aurangabad (PG)-Aurangabad(MSETCL)

APR-14

Commissioned 5/12.GETCO 315 MAY-12D/C4 315315217220 217LILO of Halvad-Morbi I atBhachau

MAY-12

Commissioned 5/12.GETCO 333 MAY-12D/C5 333333216220 216LILO of Halvad-Morbi II atBhachau

MAY-12

Commissioned 12/2016. (Remainingportion was taken as commissioned asVapi-Navsari line in Mar'13)

PGCIL 567 DEC-16D/C6 OCT-12567567161400 161Navsari - Boisor line (Balanceportion )

DEC-16

Commisisoned 7/12.PGCIL 145 JUL-12D/C7 14514582220 82LILO of both ckts of Kawas-Navsari at Navsari.

JUL-12

Contract terminated 01 out of 02 packagesdue to unsatisfactory performance andfresh tender taken up. The packagesubsequently bifurcated into two part. Istpart awarded in Dec'14 and second part inFeb'15. The remaning 01 pkg. alsoterminated in Aug'15 due to poorperformance. However contract wasrevived in Feb'16. Severe ROW beingencountered.

PGCIL 960 SEP-18D/C8 OCT-129379616961200 536Wardha - Aurangabad (on 1200kV)

Remark:

Mutiara (Melamaruthur) (Coastal Energen) TPP (2x600 MW),PS,CEPL,U1-12/14 (C),U2-1/16(C)

Commissioned 10/2016CEPL 32 OCT-16D/C1 323224400 24Mutiara TPP(Coastal EnergenGen. Switchyard) - TuticorinPooling Station (Balanceportion)

OCT-16

commissioned 3/12. (Interim arrangement).CEPL MAR-12D/C2 52400 52LILO of Madurai - Tuticorin atCostal Energen

MAR-12

Remark:

Muzaffarpur TPP Exp, Kanti-II (2x195MW) CS, Bihar, JV-NTPC U3-03/15 (C), U4-3/17 (C)

Commissioned 03/16.BSPTCL MAR-16S/C1 101220 101Kanti - Gopalganj (2nd Ckt.) MAR-16

Commissioned 09/14.BSPTCL SEP-14S/C2 68220 68Kanti - Darbhanga (2nd Ckt) SEP-14

Remark:

Myntdu (Leshka) HEP (3x42 MW),SS,Meg,MeECL, U1&U2-3/13,U3-3/13 (C)

TL: Total Location 53Page 25 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 26: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

The Line was initially charged at 33 kVfrom 22.05.2010 and subsequently at 132kV on 25.11.2011.

MeECL 85 MAY-10D/C1 858553132 53Leshka Myntdu - Khliehriat MAY-10

Remark:

NABINAGAR -II STPS (3x660), CS, Bihar, NTPC, U1-1/18,U2-6/18,U3-12/18

Work under progress.PGCIL 340 JUN-19D/C1 306390278400 126Nabinagar-II - Patna (Q)

Ready for Commissioning 02/18.PGCIL 245 FEB-18D/C2 245245184400 184Nabinagar-II - Gaya (Q) FEB-18

Award placed in Mar'17. Engg. in progress.PGCIL 0 JUN-193 JUN-1901000400 0Bay Extn. at 765/400KV atPatna S/stn. for 400KV D/CNabinagar-II -Patna line (Q)

Remark: Associated Transmission System for NABINAGAR -II STPS (3 x 660) - PGCIL

Nabi Nagar TPP (4x250 MW), CS,Bihar, NTPC, U1-3/16(C),U2-3/17,U3-12/17,U4-05/18

Commissioned 05/12.PGCIL 216 MAY-12D/C1 216216164400 164Nabinagar - Sasaram line (Twinlapwing)

MAY-12

Remark:

Nagarjana Sagar TR HEP ( 2x25 MW),SS,AP,APGENCO,Unit-1&2-01/17(c)

Commissioned 27.03.2013APTRANS 58 MAR-13S/C1 585817132 17Rentachintala - Macherla S/S MAR-17

Commissioned 11/08APTRANS 0 NOV-08D/C2 002220 2LILO of VTS - Tallapally line atRentachintala

NOV-08

Commissioned 08/14.APTRANS 34 AUG-14S/C3 343416132 16Rentachintala - NagarjunaSagar Plant

MAR-17

Commissioned 11/08APTRANS 100 NOV-084 100100200220/132 100Rentachintala S/S NOV-08

Remark:

Namrup CCGT (100 MW),SS, Assam,GT/ST,U1-10/17,U2-11/17

Commissioned 01/16.AEGCL 448 JAN-16S/C1 DEC-13448448145220 145Namrup - Mariani JAN-16

Remark:

Nasik (5x270 + 5x270) TPS, PS, Maha, India Bulls, ph-II- uncertain

Ready for commissioning 08/15.IBPL 152 AUG-15D/C1 15215257400 57Nasik - Bobleshwar (2nd Ckt) AUG-15

Commissioned 03/14.IBPL 152 MAR-14D/C2 15215257400 57Nasik-Bableshwar (1st Ckt) MAR-14

Remark:

Navapura TPP (TRN ) (2x300 MW), Chhattisgarh Pvt. Sector , TRN Energy Pvt. Ltd. U1-08/16 (C)

Commissioned 01/16.TRNE JAN-16D/C1 30400 30TRN (TPP) - Raigarh PS(Tamnar)

JAN-16

Remark: Unit-1 Commissioned on 14.08.2016.

Navbharat TPP Ph-1 (2x525 MW), PS,Chh, U1&2

EPTCL D/C1 400Navbharat TPP - Angul P.S. (PG)

Remark:

New Umtru HEP (2x20 MW),SS,Meg,MeECL,U1-4/17(C), U2-6/17(C)

TL: Total Location 53Page 26 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 27: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

1. Date of award of contract is 05.02.2016.2. Schedule date of completion was05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm, 132kV S/C line - 1.07 ckm 7. The totalexpenditure incurred is Rs.448.76 Lakhsand is inclusive of 132 kV New Umtru -Umtru HEP line.

MeECL 7 MAR-17D/C1 771132 1New Umtru HEP - Norbong(EPIP-II)

1. Date of award of contract is 05.02.2016.2. Schedule date of completion work05.05.2016. 3. The 132 kV line wascompleted on 11.11.2016 andcommissioned on 25.03.2017. 4. Delay wasdue to delay in supply of conductor for lineby the vendor and also that the New UmtruHEP was not ready as this line is an ATS ofthe New Umtru HEP. 5. No issues of forestclearance. 6. Line parameter: one circuitonly of the 132 kV D/C line - 0.14 ckm and132 kV S/C line - 0.36 ckm 7. The totalexpenditure incurred is Rs. 448.76 Lakhsand is inclusive of the cost of 132 kV NewUmtru HEP - Norbong -EPIP-II line.

MeECL 1 MAR-17S/C2 110132 0New Umtru - Umtru HEP

Remark:

Neyveli New TPP (2x500MW),CS, Tamil Nadu, NLC,U1-04/18,U2-09/18

Award placed in May'17. Work underprogress.

PGCIL 6 JUL-19D/C1 JUL-1901012400LILO of existing Neyveli TS-II -Pondycherry at New Neyveli TPP

Work under progress.PGCIL 38 JUL-19D/C2 JUL-192205156400New Neyveli TPP - Ariyalur(Villupuram)

Remark:

Neyveli TPS-II Exp. (2x250MW) CS,TN, NLC, U1-1/12(C),U2-1/15 (C)

Commissioned 08/09NLC 17 AUG-092xS/C1 17173400 3Neyveli (Exp-II) - Neyveli TS-II AUG-09

Commissioned 08/09.NLC 576 AUG-09D/C2 576576398400 398Neyveli TS-II - Pugalur AUG-09

Remark:

Nigri TPP (2x660 MW), PS,MP, JPVL, U1-8/14 (C),U2-2/15 (C)

MPPTCL D/C1 400LILO of one ckt of Vindhychal -Satna at Nigrie

Commissioned 08/2014 (Late Reported)JAL FEB-17D/C2 322400 322JP Nigri TPP - Satna (PG) FEB-17

Remark:

Nilanchal TPP,(3x350MW), PS,Orissa, KVK, uncertain

TL: Total Location 53Page 27 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 28: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Work yet to Start.KVK 0 JUN-16D/C1 0016400 0LILO of Mendasal - Baripada atNilanchal TPP

Remark:

Nimoo Bazgo (NHPC) (3x15 MW),CS,J & K,NHPC,U1-11/13(C),U2-10/13(C),U3-10/13(C).

Commissioned 03/12.JKPDD 152 MAR-12S/C1 1521523166 31Nimoo S/S- Leh S/S MAR-12

Commissioned.JKPDD 140 JUN-14S/C2 1401403166 31Alachi - Khalsi S/S MAR-17

Slow progress.JKPDD 239 DEC-16S/C3 2042425166 36Kharu S/S - Himya S/S

Commissioned.JKPDD 107 SEP-14S/C4 1071072566 25Leh (C.P.) - Kharu S/S MAR-17

Commissioned 12/12.JKPDD 39 DEC-12S/C5 3939766 7Leh (C.P.) - Leh S/S DEC-12

Rerouting of line and ganglas s/s droped.Leh Army S/S shall be connected with LehS/S.

JKPDD 29 DEC-16S/C6 8531066 2Leh III - Ganglas

Commissioned 11/12.JKPDD 13 NOV-12S/C7 1313466 4Nimoo Bazgo HEP - Alachi NOV-11

Commissioned 09/12.JKPDD 77 SEP-12S/C8 77771766 17Nimoo S/S - Alachi S/S SEP-12

Rerouting of line and ganglas s/s droped.Leh Army S/S shall be connected with LehS/S.

JKPDD 22 DEC-16S/C9 046966 0Ganglas - Leh Army base

CommissionedJKPDD 100 DEC-1310 1001006066/11 100Kharu

Commissioned.JKPDD 100 JUL-1311 1001006066/11 100Nimoo S/S

CommissionedJKPDD 100 JUL-1312 1001006066/11 100Khalsi

Commissioned 11/12.JKPDD 100 NOV-1213 100100666/11 100Alchi. S/S

JKPDD 30 JUL-1314 01006066/11 0Himya

Commissioned 12/12.JKPDD 100 DEC-1215 1001001366/11 100Leh

Remark:

Niwari TPP (2x45MW), MP, BLA Power Ltd. , U2-uncertain

MPPTCL D/C1 0132BLA- Gadarwara line

Remark:

North Chennai TPS St.II (2x600 MW),SS,TN,U1-9/13(C),U2-3/13 (C).

Commissioned 01/14.TANTRAN 161 JAN-14D/C1 JUN-1016116198400 98Alamathy -Sunguvarchatram(1st Ckt)

JAN-14

Commissioned 03/14.TANTRAN MAR-14D/C2 100400 100Alamathy -Sunguvarchatram(2nd Ckt)

MAR-14

Commissioned 11/10.TANTRAN 2 NOV-10D/C3 DEC-10222230 2LILO of NCTPS- Mosur at NCTPSStage II (for startup power)

NOV-10

Commissioned 01/13.TANTRAN 114 JAN-13M/C4 114114136400 136NCTPS St.II- Alamathy 400 kVS/S

JAN-13

Remark:

North Karanpura (3x660MW), NTPC, Adani, U1-2/20,U2-8/20,U3-2/21

TL: Total Location 53Page 28 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 29: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

a) CCL & CMPDI disallowed construction onBPC route, hence work had to be stopped.CCL/CMPDI had suggested a route whichinvolved multi-circuit towers and requiredpile foundations having huge time and costoverrun implications on the project. Duringmeeting held by CEA on 12.05.2017;CMPDI/CCL had agreed to revaluate theREC routes if NKTL gives an undertakingthat line shall be decommissioned after 35years. Undertaking has been submitted toCMPDI / CCL. NOC still awaited continuingForce Majeure situation. b) NOC awaitedfrom Ministry of Coal / CCL which isaffecting survey and finalization of lineroute, Financial Closure, Forest Proposaland enabling works at site.

APL 31 SEP-19D/C1 SEP-190265185400North Karanpura - Gaya line(NKTL - TBCB)

a) CCL & CMPDI disallowed construction onBPC route, hence work had to be stopped.CCL/CMPDI had suggested a route whichinvolved multi-circuit towers and requiredpile foundations having huge time and costoverrun implications on the project. Duringmeeting held by CEA on 12.05.2017;CMPDI/CCL had agreed to revaluate theREC routes if NKTL gives an undertakingthat line shall be decommissioned after 35years. Undertaking has been submitted toCMPDI / CCL. NOC still awaited continuingForce Majeure situation. b) NOC awaitedfrom Ministry of Coal / CCL which isaffecting survey and finalization of lineroute, Financial Closure, Forest Proposaland enabling works at site.

APL 4 SEP-17D/C2 SEP-17011263400North Karanpura - Chandwa(Jharkhand) PS line (NKTL -TBCB)

a) Due to non-availability of NOC from MoC/ CCL for North Karanpura Chandwa andNorth Karanpura Gaya lines, work on theproject can not be initated.

APL 0 MAY-19D/C3 MAY-19002400LILO of both ckt. of Ranchi -Maithon-RB line at Dhanbad(NKTL-TBCB)

a) Due to non-availability of NOC from MoC/ CCL for North Karanpura Chandwa andNorth Karanpura Gaya lines, work on theproject can not be initated / continued. b)Petition filled in CERC for Extension ofTime.

APL 0 MAY-194 MAY-19001000400/220 0Dhanbad s/s (NKTL-TBCB)

Remark: SPV/BPC - North Karanpura Transco Ltd / REC

NSL TPP (2x660 MW), PS, Orrisa, NPPL,

Project Authority intimated that PGCIL yetto award construction of work.

NSLNPPL 0D/C1 0046400 0NSL TPP - Angul

Remark:

Obra-C STPP (1x660MW), UP, UPRVUNL , 2021

UPPTCL MAR-18S/C1 40765LILO of Anpara D-Unnao line atObra

TL: Total Location 53Page 29 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 30: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

UPPTCL MAR-19D/C2 30400LILO of one Ckt Obra C -Jaunpurat Obra

UPPTCL MAR-19D/C3 400400Obra-C-Jaunpur Line

UPPTCL4 3000765/400ICT at Obra C s/s

Remark:

OPGC TPS-II(2X660)& other projects in Odisha, Ib Valley, U3-8/18,U4-10/18

Ready for commissioned 08/2017.SGL 152 AUG-17D/C1 JUL-17152152103400 103OPGC - Jharsuguda (OGP-IITL -TBCB)

AUG-17

RoW issue: Yes - Facing Severe RoWIssue in various locations in District BalodaBazar, Bhatapara, Janjgir, Champa Raigarhand Sundargarh and in VillageBanjhikochhar (Jamkani Reserve ForestArea) in between Tower Location no AP128/0 to 129/0 (2.5 Km Approx). Changein Law- Govt. of Odisha vide their letterdated 21.09.2016 and Govt. ofChhattisgarh vide their letter dated01.06.2016 has issued the guidelines fordetermination of land compensationamount for area under Transmission linetowers and for area under whichtransmission line is drawn, same has beenintimated to LTTCs and CEA Introduction ofGST in place of Service Tax and it has beenincreased from 15% (Service Tax) to 18%(GST) w.e.f. 01st July 2017, same has beenintimated to all

SGL 726 MAY-18D/C2 AUG-19652778608765 284Jharsuguda - Raipur (OGP-IITL -TBCB)

Remark: SPV/BPPC - Orissa Generation Phase-II Transmission ltd. / PFC

Orissa UMPP (Bedabahal, Orissa), (5x800MW),(Orissa Integrated Power Ltd. (OPIL)

XYZ D/C1 765Orrisa UMPP - JharsugudaPooling Station

Remark:

Painampuram TPP (2x660MW),PS,AP,Thermal power tech Development Corp (India) ltd.,U1-2/15 (C),U2-9/15 (C)

Commissioned 08/13.PGCIL 92 AUG-13D/C1 929265400 65Thermal Powertech - NellorePooling Station

AUG-13

Remark:

Palatana CCGT (2x363.3),P S,Tri,OTPC, Module-1:1/13(c), Module 2 - 11/14 (C)

Commissioned 01/15.AEGCL 14 JAN-15D/C1 14147400 7LILO of Palatana - Bongaigaonat Azara S/S

JAN-15

commissioned 3/13MeECL 10 MAR-13D/C2 10109400 9LILO of Palatana - Bongaigaonat Killing (Byrnihat)

MAR-13

Commissioned 8/12NETC 680 AUG-12D/C3 680680495400 495Palatana -Silchar AUG-12

Commissioned.NETC 590 FEB-13D/C4 590590428400 428Silchar - Byrnihat FEB-13

Commissioned 01/15.NETC JAN-15D/C5 159400 159Azara - Bongaigaon (2nd Ckt) JAN-15

Commissioned 07/14.NETC JUL-14S/C6 42400 42Byrnihat - Azara (2nd Ckt) (Partof Silchar - Azara)

JUL-14

TL: Total Location 53Page 30 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 31: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 03/15.NETC 442 MAR-15D/C7 DEC-14442442201400 201Azara - Bongaigaon MAR-15

Commissioned 05/15.AEGCL 100 MAY-158 SEP-11100100630400/220 100Kukurmara (Azara) S/S MAY-15

Ist transformer commissioned.MeECL 100 FEB-139 100100315400/220 100Killing (Byrnihat) (Ist Trf.)S/S FEB-13

completedAEGCL 90 JUN-1610 100100100220/132 98Kukumara S/S (2x50)

Remark:

Pallivasal HEP (2x30MW),SS,Kerala,KSEB, U1 & 2-2020-21

ATS of Pallivasal Extension HEP. Work is yetto start.

KSEB 0 JUN-17D/C1 051220 0LILO of Idukki-Udumalpet atPallivasal HEP

Remark:

Panan HEP (4x75MW), PS, Sikkim, HHEPL, U1&U4-2020-21

HHEPL 2xD/C1 220Panan HEP - Mangan

Remark:

Parbati-II HEP (4x200), (PGCIL & JP) CS, HP, NHPC, U1 to 4-03/19

Commissioned 10/14.PKTCL 173 OCT-14S/C1 17317381400 81Parbati- II - Koldam line-I OCT-14

Commissioned 9/14.PKTCL 157 SEP-14S/C2 15715776400 76Parbati -II- Koldam line -II SEP-14

Remark:

Parbati-III HEP (4x130 MW),CS,HP,NHPC,U1-6/14 (C),U2-2/14 (C),U3-3/14 (C),U4-5/14 (C)

Commissioned 07/2013.PGCIL 5 JUL-13D/C1 JAN-10551400 1LILO of Parbati -II - Koldam atParbati Pooling Point.

JUL-13

Commissioned 07/2013.PGCIL 668 JUL-13D/C2 668668501400 501Parbati Pooling Point - Amritsar JUL-13

Commissioned 07/2013.PGCIL 7 JUL-13D/C3 774400 4LILO of Parbati -II - ParbatiPooling Point at Parbati -III

JUL-13

Remark:

Pare HEP (2x55MW)CS,ARP,NEEPCO,U1-3/18,U2-3/18

Construction of LILO of one circuit ofRanganadi-Itanagar 132 KV D/C line iscompleted except Jumpering work but onetower damaged due to land slide. Theractification work is under progress. Towererection has been sarted. Line is expectedto be test charged on 20.03.18. Terminalbay at Itanagar would be completed b yMar'18 the Ranganadi terminal bay iscompleted.

12 MAR-18D/C1 12125132 5LILO of Ranganadi - Itanagar atPare HEP

Line work completed. Test charged on03.03.2018.

PGCIL 10 FEB-18D/C2 10103132 3LILO of Ranganadi - Nirjuli atPare HEP

Remark:

Parichha Extn. TPS (2x250 MW),SS,UP,UPRVUNL,U5-5/12(C),U6-3/13 (C)

Commissioned 3/11UPPTCL MAR-10S/C1 220Parichha - Bhauti MAR-10

Commissioned 01/14.UPPTCL 402 JAN-14D/C2 402402259400 259Paricha - Mainpuri 2nd Ckt.) JAN-14

Commissioned 3/12UPPTCL 606 MAR-12S/C3 606606210220 210Parichha - Banda MAR-12

Commissioned 12/13.UPPTCL 301 DEC-13D/C4 DEC-10301301259400 259Parichha - Mainpuri (1st Ckt.) DEC-13

TL: Total Location 53Page 31 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 32: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 11/2016UPPTCL 100 NOV-165 100100315400/220 100Orai S/S (new) (ICT-I) NOV-16

Commissioned 11/2017.UPPTCL 100 NOV-176 100100315400/220 100Orai (New) (ICT-II) NOV-17

Remark:

Parli TPP Expn. (250 MW), SS,Maha,MSPGCL, U8-3/16(C)

Commissioned 10/12.MSETCL 300 OCT-12M/C1 APR-11300300181220 181Parli TPS-Nanded (waghala) OCT-12

Remark:

Part ATS for RAPP U-7&8 in Rajasthan (TBCB)

Ready for Commissioning 06/16. (RTCL).SGL 521 JUN-16D/C1 FEB-16521521402400 402RAPP - Shujalpur line (RAPPTCL -TBCB)

JUN-16

Remark: SPV/BPC - RAPP Transmission Company Ltd. / PFC

Petronet LNG (3x395 MW), PS,Guj,PLNGL, U1,U2,U3

XYZ D/C1 400PLNGL TPP - Vadodra

Remark:

Phata Byung HEP (2x38 MW),PS, UK, Lanco, U1,U2-2019-20

Principal approval of forest case has beenobtained. Compliance report for finalapproval of forest case has been submittedby DFO Pauri, Rudraprayag and Tehri toNodal officer on 12 Sept 2017. M/s LANCOhas been referred to NCLT by Banks andprogress of work is very slow at site. Notehas been issued to M/s LANCO & BankGuarantees of LANCO against mobilizationadvance has been encashed by PTCUL.Contract with LANCO was terminated on25.10.17 as per clause no 41 (Contractor'sdefault) of GCC & PBG encashed. BOQ forre tendering of line in tow equal packagesubmitted to Engineering on 21.09.2017.

PTCUL 70 MAR-19D/C1 0260182220 0Rudrapur(Brahmwani) -Ghansali-Srinagar line

LEPP 0 DEC-16D/C2 0208220 0Phata HEP-Baramwari (Rudrpur)

Commissioned 07/16.PTCUL 100 JUL-163 DEC-12100100630400/220 100Srinagar S/S JUL-16

Revised Drawings has been submitted byM/s Siemens and has been approved.Totalprogress 4%.

PTCUL 0 DEC-184 00100220/132 0Baramwari (GIS)

contract terminated with M/S CGL,retendering is in progress

PTCUL 0 AUG-175 010060220/132 0Ghansali (GIS)

Remark:

Pipalkoti HEP (Vishnugad Pipalkoti) (THDC) ( Kuwari Pass ) (4x111 MW),SS,UK,PTCUL,U1,2,3,4-2020-21

Work has been awarded to Tata and routealignment & survey has been completed.Line is passing through forest land andforest proposal is under process.

PGCIL 0 SEP-19D/C1 SEP-190036400Pipalkoti HEP - Pipalkoti (THDC)(Kuwari Pass)

Acquisition of land for Pipalkoti substationis under process with THDC which would beresolved by Sep-17.

PTCUL 02 00630400/220 0Pipalkot (THDC)

TL: Total Location 53Page 32 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 33: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Pipavav CCPP(2x351MW),SS,Guj,GSECL,Block-1-2/14 (C), Block-2-3/13 (C).

Commissioned 3/12GETCO 149 MAR-12D/C1 AUG-1014914991220 91LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-1)

MAR-12

Ready for Commissioning 07/16.GETCO 152 JUL-16D/C2 MAR-1215215294220 94GPPC (Pipavav)- Dhokadva JUL-16

Commissioned 8/12GETCO 133 AUG-12D/C3 APR-1113313381220 81LILO of Savarkundla - Mahva(otha) at Pipavav (GPPC) (line-2)

AUG-12

Commissioned 06/13.GETCO 161 JUN-13D/C4 16116196220 96Otha (Mahuva) - Sagapara(Palitana)

JUN-13

Remark:

Polavaram HEP (12x80MW),SS,AP,PPA,U1-12 (2021/22)

APTRANS 0 AUG-20D/C1 AUG-1900140400Polavaram-Kamavarapukota(QM)

Remark:

Pragati CCGT Ph-III(4X250+2X250MW),SS,DEL,PPCL,GT1-10/10(C),GT2-2/11(C),GT3-6/12,(C)ST1-2/12(C),GT4-5/13(C),ST2-2/14 (C)

PPCL1 630400Extension of bus and connectionwith DTL Substation

Remark:

Pulichintala HEP (4x30MW),SS,TelanganA,TSGENCO,U1- 9/16 (C), U2-9/16,U 3-9/17,U4-10/17

Ready for commissioning 06/2017.TSTRANS 42 JUL-17D/C1 424224220 24LILO of Chillakallu S/S -Narketpally line at HuzurnagarS/S

JUN-17

Commissioned 10/2016 (Late Reported)TSTRANS 132 NOV-16D/C2 13213274220 74Pulichintala HEP - Huzurnagarline

NOV-16

TSTRANS 0 MAR-173 0100200220/132/33 0Huzumagar S/S

Remark:

RaghunathpurTPS (2x600 MW),CS,WB,DVC,U1-8/14 (C),U2-1/16(C).

Commissioned 08/2017(Late Reported).DVC 439 SEP-17D/C1 AUG-10439439311400 311Raghunathpur TPS -Ranchi (PG) SEP-17

Commissioned 3/11. (Interim arrangement)DVC 33 MAR-11D/C2 333321400 21LILO of Maithon-Ranchi (PG) atRaghunathpur

MAR-11

Remark:

Raikheda TPP (2x685 MW), PS,Chh, GMR, U1-2/15 (C), U2-3/16 (C),

Commissioned in February 2014. Reportedin July 2015.

GMR 181 JUL-15D/C1 181181131400 131Raikheda (GMR) - Raipur PoolingStation

JUL-15

Remark:

Rajasthan New Solar and Wind Power Plant

Commissioned 04/16.RVPNL 196 APR-16D/C1 196196118220 118Aau - Badisid APR-16

Line work completed on dated 04.12.2017.RVPNL 445 NOV-17D/C2 445445420400 420Bikaner -Sikar (PG)

Ready for Commissioning 08/16.RVPNL 146 AUG-16D/C3 14614690220 90Chatrail-Ramgarh AUG-16

KFW funded scheme. Scheme UnderReview as associated 220 kV GSS Kolayathas been dropped.

RVPNL 0 MAR-17D/C4 0030220Gajner -Kolayat

TL: Total Location 53Page 33 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 34: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

KFW funded scheme. W.O. awaded to M/sTATA Project Ltd. Work Under Progress.

RVPNL 251D/C5 195390260400 65Jaisalmer -2 -Barmer

KFW funded scheme. Scheme UnderReview as associated 220 kV GSS Pokaranhas been dropped.

RVPNL 0 MAR-17D/C6 0020220LILO of both ckts Ramgarh GTPP-Dechu line at Pokaran

Ready for commissioning 12/2016.RVPNL 1 DEC-16D/C7 111220 1LILO of both ckts Ramgarh GTPS-Dechu at Ramgarh

DEC-16

KFW funded scheme. PBG returned to thebidders, and Bid to be cancelled afterreceipt of NOC from KFW.

RVPNL 0 MAR-17D/C8 0020220LILO of Chandan- Pokaran atPokaran

ADB funded scheme. W.O. awarded to M/sTATA Project.,Aviation , NHAI & PTCCapproval pending. Work U.P. Line route isrealign near Kurja Village for approx 7 Km.,So final route length is revised detailscheck survey complted, due to re-routingof line new 25 locations are to be castedfor which soil investigation is complete.Also already 15 nos towers will bedismantelled due to route diversion. 3 nostubs out of 25 nos casted in revised route.

RVPNL 547 JAN-18D/C9 547557390400 386LILO of Jodhpur -Merta atPooling station Badla

under KFW. Scheme under reviewRVPNL 0 MAR-17D/C10 0020220LILO of Kolayat -Bajju at Kolayat

Commissioned 04/16.RVPNL 138 APR-16D/C11 138138102400 102LILO of one ckt Raj west -Jodhpur at Jodhpur (New)

APR-16

under KFWRVPNL MAR-17D/C12 20220LILO of PS 1- Bajju at PS 1/Bajju

W.O. awarded to M/s RS Infra. Line chargedon 33 KV on dt 08.02.16.

RVPNL 107 SEP-17D/C13 10710768220 68PS 1 /Bajju -Bhadla

W/O awarded to M/s SEW HyderabadAviation approval awaited.

RVPNL 437 MAR-18D/C14 412446320400 187Ramgarh -Bhadla

Ready for Commissioning 12/2017.RVPNL 278 DEC-17D/C15 278278198400 198Ramgarh (Jaisalmer)-Akal(Jaisalmer )

DEC-17

W/O awarded to M/S Moji Construction , Jpr.Forest involved. In principal approvalreceived on dated 12.02.2018.

RVPNL 65 SEP-17S/C16 6210625220 10Sirohi-Pindwara

Commissioned 06/16.RVPNL 105 JUN-16D/C17 10510563220 63Bhadla-Kanasar JUN-16

Commissioned 04/2017RVPNL 512 APR-17D/C18 512512379400 378Bhadla-Bikaner APR-17

KFW funded scheme .W.O. awarded to M/SMonte Carlo. Route approved, Forest:involved & approval pending. Railway &NHAI crossing approval pending

RVPNL 362 MAR-18D/C19 318444280400 91Barmer-Bhinmal (PG)

RVPNL MAR-17D/C20 30220Badisid-Bap

W. O. awarded to M/S TATA Project Ltd.Work execution permission received fromRailways on 08.03.2017. Work is underprogress. Aviation, PTCC & NHAI approvalpending.

RVPNL 618D/C21 617618480400 433Akal -Jodhpur (New)

KFW funded scheme. Scheme dropped NOCreceived from KFW.

RVPNL D/C22 50400Akal (1)- Jaisalmer -2

Commissioned 11/14.RVPNL 155 NOV-14D/C23 15515593220 93Aau-Baithwasia NOV-14

TL: Total Location 53Page 34 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 35: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

W.O. awarded to M/s Siemens. KFW fundedscheme. Work under progress.

RVPNL 80 MAR-1824 651001000400/220 20Jaisalmer -2 S/S

W.O. awarded to M/s Alstom. ADB fundedscheme. 500MVA Trf. Test Charge on18.03.17 & comm. on 22.07.17. 2 nos Trf.Charged on 18.08.17

RVPNL 9625 100100945400/220 100Bhadia Pooling Station

Under KFW. Bid is to be cancelled afterreceiving of NOC from KFW.

RVPNL 026 0100160220/132 0Kolayat S/S

RVPNL 0 MAR-1727 00480220/132 0Ramgarh S/S

Commissioned 12/15.RVPNL 100 DEC-1528 100100100220/132 100Kuchera S/S DEC-15

W.O awarded to M/s Techno Pvt Ltd. .3*500 MVA 400/220 KV X-Mers received.All three transformers charged from 220kVside .220/132 kv 160 MVA Transcommissioned. ICT 3 commissioned on21.09.17 & ICT 1 & 2 commissioned on10.10.17 . 3 Nos reactors installed. Trf.Third commissioned on 10.1.17 (220KVside). On 15.12.17 commisioned on 400KVlevel.

RVPNL 100 MAR-1829 1001001500400/220 100Ramgarh S/S

SBG of tenders received and tenderdropped.

RVPNL 030 0100160220/132 0Pokaran S/S

Commissioned 06/16.RVPNL 100 JUN-1631 100100160220/132 100Kanasar S/S JUN-16

RVPNL 032 00500400/220 0Akal (Aug.)

Under KFW. Bid is to be cancelled afterreceiving of NOC from KFW.

RVPNL 033 0100160220/132 0Bajju S/S

Commissioned 05/15.RVPNL 100 MAY-1534 100100160220/132 100Aau S/S MAY-15

commissionedRVPNL 9635 100100480220/132 100Bhadia Pooling Station

Under KFW. Bid to be cancelled afterreceiving NOC from KFW.

RVPNL 036 0100160220/132 0Chatrail S/S

Remark:

Rajpura (NABA) TPP, (2x700MW) U1-1/13 (C) ,& U2-7/14 (C)

Commissioned 05/13.PSTCL 242 MAY-13D/C1 242242171400 171Rajpura - Dhuri MAY-13

Commissioned 05/13.PSTCL 29 MAY-13D/C2 292918400 18Rajpura Thermal - Rajpura MAY-13

Commissioned 05/14.PSTCL 381 MAY-14D/C3 381381279400 279Rajpura Thermal - Nakodar MAY-14

Commissioned 06/16.PSTCL 100 JUN-164 100100500400/220 100Rajpura (New) (2x500) (ICT-I) JUN-16

Commissioned 03/2017PSTCL 100 MAR-175 DEC-16100100500400/220 100Rajpura (New) (2x500) (ICT-II) MAR-17

Remark:

Ramgarh CCPP Extn.-III, (110+50 MW), SS,Raj, RRVUNL, (GT-3/13(C),ST-5/14 (C)

Commissioned 11/14.RVPNL 309 NOV-14D/C1 309309194220 194Ramgarh (GTPP) - Chandan NOV-14

Commissioned 9/12.RVPNL 119 SEP-12D/C2 11911971220 71Dechu - Phalodi SEP-12

Commissioned 12/14.RVPNL 322 DEC-14D/C3 322322202220 202Chandan - Dechu DEC-14

Remark:

RAMMAM-III HEP (3x40 MW), NTPC, WBSTCL, 2020-21

TL: Total Location 53Page 35 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 36: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

WBSETCL D/C1 APR-19180132Rammam-III - New Jalpaiguri

WBSETCL D/C2 APR-1920132LILO of 132 kV One Ckt ofRammam-II - NBU at Rammam -III HEP

Remark: Onus of development of ATS for the project is pending as PPA for purchase of power from Rammam - III HEP by WBSEDCL is yet to be executed. NTPC may be requested to finalise theevacuation plan and its development mechanism in consultation with CEA/CTU/STU.

Rampur HEP (6x68.67 MW),CS,HP,SJVNL,U1-2/14 (C),U2-2/14 (C),U3-3/14 (C), U4-6/14(C), U5-3/14 (C), U6 - 12/14(C)

Commissioned 02/14.PGCIL 12 FEB-14D/C1 NOV-1112125400 5LILO of Nathpa Jhakri - Nalagarhat Rampur (Loop in portion)

FEB-14

Commissioned 10/14.PGCIL OCT-14D/C2 2400 2LILO of Nathpa Jhakri - Nalagarhat Rampur (2nd Ckt balance)

OCT-14

Commissioned 9/11.PGCIL 217 SEP-11D/C3 NOV-11217217156400 156Patiala - Ludhiana SEP-11

Commissioned 8/11.PGCIL 90 AUG-11D/C4 NOV-11909066400 66LILO of Patiala - Hissar atKaithal

AUG-11

Remark:

Ranghit-IV HEP (3x40MW),PS,Sikkim,JPCL,U1,2,&3-2021-22

Work in generation project is stopped forsince 2013.

LEPP MAR-19D/C1 220Routing of one circuit ofJorthong - New Melli via Rangit -IV

Work of 220kV line has been awarded toM/s. Ashish Infratech and completionperiod is 8 months from start of work.Generation project will take about 2? yearsfor completion as against 8 months forcompletion of associated transmission line,there will be no mismatch for evacuation ofpower. It may also be mentioned that routesurvey of transmission line has beencompleted and design work of transmissionsystem including towers (15 nos.) has alsobeen completed. 220kV GIS bays at PGCILsubstation at New Melli have also beenawarded to M/s. PGCIL as deposit work.Line length is 3.3 KM. Associatedtransmission system comprises of 220kVGIS in PH building, 3.3 km long 220kV D/Cline from PH to PGCIL pooling station atNew Melli. Work for 220kV GIS substationat PH has been awarded to M/s. Siemensand GIS equipment has already beendelivered at site.

JPCL MAR-19D/C2 157220Rangit IV - New Melli line

Remark:

Rangit-II HEP (2x33MW)PS,Sikkim, SHPL,U1&2-2021-22

SHPL D/C1 220LILO of one ckt of Legship - NewMelli at Rangit-II

Remark:

Ratija ( 1x50 MW) TPS,P.S.,Spectrum Coal & Power ltd.,Chh, U1-2/13(C)

Commissioned.SCPL D/C1 24132 24Ratija - Kasiapalli MAR-17

TL: Total Location 53Page 36 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 37: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Ratle HEP, (4x205+1x30 MW), PS, J&K, GVK, U-I to U-5 2019-20

PGCIL 0S/C1 00400Kishenpur - Ratle, (Dulhasti-Kishenpur Second Ckt stringingextending up to Ratle HP)

PGCIL D/C2 400LILO of one circuit of Dulhasti -Kishenpur at Ratle HEP.

Remark: Work yet to be award.

Rayalseema ( Stage-IV) (600 MW), SS,AP,BHEL,U6-08/17

Ready for commissioning 06/2017.APTRANS 321 JUL-17D/C1 MAY-15321321429400 429Rayalaseema TPP - Chittoor line JUN-17

Remark:

Reliable TPP (RTPL), (2x660 MW), PS, MP, RTPL,U1-6/16 (Tentative), U2-12/16 (Tentative)

XYZ D/C1 765Reliable TPP - VindhyachalPooling Station

Remark:

Rewa TPP, Khandwa (2x800 MW), SS,MP

MPPTCL D/C1 20400LILO of Khandwa (PGCIL) -Rajgarh at Chhegaon

MPPTCL 12 MAR-19D/C2 014953400Nagda - Ujjain line (GEC-I)

MPPTCL D/C3 40220LILO of Ratlam - Badnagar atBadnawar

MPPTCL D/C4 40220LILO of Handia - Barwaha atHandia

MPPTCL D/C5 180400Handia - Ashta(2nd stage)

Remark:

Rongnichu HEP (2x48MW) PS,Sikkim, MBPCL,U1&2-2019-20

MBPC D/C1 220Rongnichu - Rangpo PoolingStation

Remark:

Rosa TPP Extn Ph-II (2x300), PS, UP, Reliance, Northern Region, U3-12/11 (C), U4-3/12 (C)

Commissioned 04/16. (Late Reported.)UPPTCL 340 APR-16D/C1 340340216220 216Roza - Dohna AUG-16

Commissioned in March 2012. reported injuly 2015.(Line Charged by passingShahjehanpur S/S).

RPTL JUL-15D/C2 16400 16Rosa - Shahjehanpur (PG) JUL-15

Commissioned 3/12RPTL MAR-12D/C3 15400 15LILO of Lucknow - Bareilly atShahjahanpur

MAR-12

Remark:

Sagardighi TPP (2x300 MW) Phase-II(2x660 MW),SS,WBPDCL U1-12/07(C),U2-7/08(C), U3-12/15(C), U4-12/16

Commissioned 4/11.WBSETCL 340 APR-11S/C onD/C

1 DEC-08340340255400 255Sagardighi - Parulia (PGCIL) APR-11

Work Delayed due to poor performance ofthe vendor (Jyoti Structures Ltd.).

WBSETCL 153 FEB-18D/C2 JUL-1515215482400 83Sagardighi - Gokarna

Remark:

TL: Total Location 53Page 37 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 38: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Sainj HEP (2x50 MW) on Sainj river,SS,HP,HPPCL,U-08/17

line successfully chargedHPPTCL 1 APR-17D/C1 111400 1LILO of Parbati II HEP - Parbati-III Pooling station at Sainj

Remark:

Salaya (Essar Power ) (2x600 MW),PS, Guj, Essar Power U1-2/12(C),U2-6/12 (C)

Price Bid opened on 22.01.2018 and tenderunder scrutiny.

GETCO 309 DEC-18D/C1 NOV-09267365180400 118Vadinar(Essar)- Amreli(Balance)

Ready for Commissioning 09/16. (Due todelay in Essar Generation Project & nonfinalization of gentry 6 ckm work is pendingbalance 446 ckm has been test charged.

PGCIL 606 SEP-16D/C2 FEB-14606606446400 446Essar Gujarat TPS - Bachau(Tripal)

SEP-16

Commissioned 5/11.GETCO 353 MAY-11D/C3 NOV-09353353226400 226Vadinar (Essar)-Hadala MAY-11

Commissioned 01/14.GETCO 294 JAN-14D/C4 294294117400 117Vadinar - Amreli (Part line) JAN-14

Remark:

Salaya Phase -II (3240MW),PS, Guj,

Will be in line with generation project whichis delayed

GETCO 0 MAR-17D/C1 0350400 0Salaya (EPGCL generatingstation )-Halvad

Remark:

Salora TPS (M/s Vandana Vidyut ) (2x135 MW), U2- uncertain

Commissioned. 7/12. (Interim )VVL JUL-12D/C1 6400 6LILO of one ckt Korba-Birsinghpur at Vandana

JUL-12

Target Commissioning date will beprovided after approval/receipet of loanfrom lenders.

VVL MAR-17D/C2 8460400Salora TPS - Dharamjaigarh(Korba) (PGCIL) Pooling Station

Remark:

Sandila TPP (2x660 MW), PS,UP,TPL,

TOR. D/C1 400Sandila TPP - ATS not defind

UPPTCL S/C2 400Sandila - Lucknow Hardoi Road

UPPTCL S/C3 400Sandila - Farrukhabad

UPPTCL D/C4 765LILO of Ghatampur - Mbd atSandila

Remark: Status Not Reported (UP share 1188 MW)

Santaldih TPP (250 MW),SS,WB,WBPDCL,U6-6/11(C)

Commissioned 4/08WBSETCL 11 APR-08D/C1 11114220 4LILO of STPS - Arambagh atBishnupur

APR-08

Commissioned 12/07WBSETCL 152 DEC-07D/C2 15215280220 80LILO of Santaldih - Durgapur (ICkt) at Asansol

DEC-07

Remark:

Sasan UMPP (6x660 MW),PS,MP,Reliance,U1-5/14 (C),U2-12/13 (C),U3-5/13 (C),U4-3/14 (C),U5-8/14 (C),U6-3/15 (C)

Commissioned 3/12.PGCIL 26 MAR-122xD/C1 262613400 13LILO of both ckt Vindhyachal -Jabalpur at Sasan

MAR-12

Commissioned 4/13.PGCIL 670 APR-13S/C2 670670242765 242Sasan - Satna line -II APR-13

Commisisoned 03/12PGCIL 139 MAR-12D/C3 13913950400 98Indore - Indore (MPPTL)(Partly) MAR-12

TL: Total Location 53Page 38 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 39: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 05/13.PGCIL 954 MAY-13S/C4 954954355765 355Sasaram - Fatehpur line-II MAY-13

Line commissioned in Jan'12(charged at400 KV)

PGCIL 738 MAR-12S/C5 738738274765 274Satna - Bina line -I JAN-12

Commissioned 6/12PGCIL 737 JUN-12S/C6 737737276765 276Satna - Bina line -II JUN-12

Commissioned 09/13.PGCIL 896 SEP-13S/C7 DEC-12896896334765 334Fatehpur- Agra line-II SEP-13

2nd Ckt Commissioned 06/13.PGCIL 139 JUN-13D/C8 13913950400 50Indore - Indore Ckt-II JUN-13

Commissioned 12/12.PGCIL 689 DEC-12S/C9 DEC-12689689241765 241Sasan - Satna line -I DEC-12

Commissioned 01/13.PGCIL 6 JAN-13D/C10 DEC-12661400 1Bina - Bina (MPPTCL) JAN-13

ICT-I Commissioned 6/12.PGCIL 100 JUN-1211 1001001000765/400 100Satna (1st ICT) JUN-12

Commissioned 8/12.PGCIL 100 AUG-1212 1001001000765/400 100Satna (2nd ICT) AUG-12

Commissioned 03/13.PGCIL 100 MAR-1313 1001003000765/400 100Gwalior MAR-13

Commissioned 09/13.PGCIL 100 SEP-1314 1001001500765/400 100Indore (2nd Trf.) SEP-13

Commissioned 06/13.PGCIL 100 JUN-1315 1001001500765/400 100Indore (1st Trf.) JUN-13

Commissioned 8/12.PGCIL 100 AUG-1216 1001001000765/400 100Bina. S/S AUG-12

Commissioned 03/13.PGCIL 100 MAR-1317 1001001000765/400 100Bina (ICT-II) S/S MAR-13

Remark:

Satpura Ext TPS (250 MW),SS, MP,MPPGCL, U10-3/13 (C), U11-12/13(C)

Commissioned 02/15.MPPTCL 317 FEB-15S/C onD/C

1 317317199220 199Ashta - Indore - II (Jetpura) FEB-15

Commissioned 03/15.KPTL 651 MAR-15D/C2 651651482400 482Satpura - Ashta MAR-15

Commissioned 01/15.MPPTCL 100 JAN-153 100100315400/220 100Ashta New (2nd Trf.) JAN-15

Commissioned 09/13.MPPTCL 100 SEP-134 100100315400/220 100Ashta New S/S SEP-13

Commissioned 10/11MPPTCL 100 OCT-115 100100160220/132 100Ashta (Add.) Trf. S/S OCT-11

Remark:

Shahpurkandi Dam(3x33+3x33+1x8), Punjab, Ravi river, PSPCL,2020-21

Amount not yet deposited by Punjab StatePower Corporation Limited.

PSTCL 0D/C1 0010220Shahpur Kandi PH-I - ShahpurKandi PH-II

Amount not yet deposited by Punjab StatePower Corporation Limited.

PSTCL 0D/C2 0018220LILO of 1ckt RSP - Sarna atShahpur Kandi PH-I and PH-II

Remark:

Shapoorji Pallonji,Kodinar,(2x660),PS,Guj, SPEPL. U1-5/15,U2-8/15

Generation not comingGETCO 0 DEC-16D/C1 00220400 0Shapoorji Pallonji generatingstation

SPPCL 330D/C2 292339107400 59Shapporji Pallonji TPS - Amreli

SPPCL D/C3 400SPEL - Pirana (PG)

Remark:

Shirpur TPP (2x150MW), Maharashtra, Shripur power, U1&2-11/17

Commissioned 01/2017 (Late Reported).MSETCL 0 OCT-17D/C1 0070220 70Shirpur Power Plant - Amalnerline

OCT-17

Remark:

TL: Total Location 53Page 39 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 40: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Shongtong Karcham HEP (3x150 MW) on Satluj river, U1,U2&U3-09/21

The contract is to be awarded throughTBCB route and BPC is yet to placeRFQ/RFP.

HPPTCL 0D/C1 0018400Shongtong Karcham HEP -Wangtoo (Quad)

HPPTCL 25 DEC-172 0100630400/220 0Wangtoo (GIS) S/S

Remark:

Sikka TPP Extn, (2x250 MW) SS, Gujarat, GSECL, U3 -3/15 (C),U4-9/15 (C)

Commissioned 08/15.GETCO 259 AUG-15D/C1 259259157220 157Sikka - Moti Paneli line AUG-15

WIPGETCO 187 MAR-18D/C2 185189120220 84LILO of Jamnagar - Jetpur line-IIat Sikka

Remark:

Simhapuri PH-I,(150 MW),PS,U2-7/12(C)

Commissioned 3/12MAR-12S/C1 26400 26Simhapuri-Nellore MAR-12

Remark:

Singareni Colleries Generation Project (2x 600 MW), Telangana,U1-3/16 (C),U2-11/16(C)

Commissioned 11/15.TSTRANS 459 NOV-15D/C1 459459325400 325Singareni TPS (Jaipur TPP) -Gajwel

NOV-15

Remark:

Singhitarai TPP (2x600 MW),PS,Chg,, Athena Chhg Power Ltd.,U1,U2-uncertain

Commissioned 4/16 (Late Reported)ACPLT 75 MAY-16D/C1 757550400 50Athena Singhitarai - RaigarhPooling Station (near Kotra)

MAY-16

Remark:

Singoli Bhatwari HEP (3x33MW)PS,UK,L&T,U1,2 &3-03/19

Contractual issue. PTCUL was requested byCEA to resolve the contractual issue ofBaramwari Srinagar 220 KV D/C line andcomplete it matching with thecommissioning of Singoli Bhatwari HEP toavoid power evacuation from the project.

PTCUL 70 MAR-19D/C1 02605220 0LILO of Baramwari - Srinagar atSingoli Bhatwari

Remark:

SJK Powergen TPP (2x660 MW),PS, MP GMR, U1-12/14,U2-6/14

XYZ 330D/C1 292339107400 59SJK TPS - Jabalpur PoolingStation

Remark:

Solapur TPP (2x660 MW),CS, Maha, TPL, U1-4/17(c) & U2-10/18

Ready for commissioning 04/15.PGCIL 35 APR-15D/C1 OCT-15353522400 22Sholapur STPP - Sholapur line-I APR-15

Line commissioned in Sep'17.PGCIL 40 SEP-17D/C2 MAR-17404025400 25Sholapur STPP - Sholapur line -II

Award placed in Jun'15. Work underprogress.

PGCIL 60 SEP-173 MAR-17501000400 20Bay Extn. at 400/220KVSholapur S/stn.

SEP-17

Remark:

Sorang HEP (2x50 MW),PS,HP,HSPCL,U1,U2-2018-19

TL: Total Location 53Page 40 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 41: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 10/15.HSPPL 11 OCT-15D/C1 11117400 7LILO of one ckt Karcham wangto- Abdullapur at Sorang HEP

OCT-15

Remark: Generation project not working

Srinagar HEP, (4x82.5 MW),PS,UK,AHPC Ltd.,U1-4/15 (C) ,U2-6/15 (C), U3-4/15 (C)U4-6/15 (C)

Commissioned 11/14.UPPTCL 20 NOV-14D/C1 20207400 7LILO of Muzaffarnagar -Vishnuprayag at Srinagar

NOV-14

Commissioned 07/16.PTCUL 39 JUL-16D/C2 393928400 28Srinagar HEP - Sringar 400 kVS/S.

JUL-16

Remark:

Subansiri Lower (HEP) (8x250 MW) ,CS, ArP, NHPC, Unit 1 to 8 -2020-21

Completion matching with Gen. (Sch.uncertain). Works stand still on a/c oflocalm disturbance /agitation against bigdam. Generation sch. uncertain.

PGCIL 329 MAR-18D/C1 AUG-13228444335400 64Lower Subhansiri - BiswanathChariyali line -I

Completion matching with Gen. (Sch.uncertaion).Works stand still on a/c of localdisturbancec /agitation against big dam.Gen. schedule uncertain.

PGCIL 327 MAR-18D/C2 AUG-13196465348400 35Lower Subhansiri - BiswanathChariyali line -II

Remark:

Suratgarh Super Critical TPS (2x660 MW),SS, Raj,RRVUNL U7-11/17,U8-3/18

a) Approval of forest clearance (3.45 Ha) isawaited. b) PTCC approval awaited. c) Asper TSA, unitary charges are payable to theConcessionaire only from 28-Apr-2018.

APL 351 APR-18D/C1 JUL-18346351280400 254Suratgarh TPS- Bikaner

Work order awarded to M/s Aster Chennai.work under progress PTCC: Pending withBSNL for details.

RVPNL 676 JUN-18D/C2 JAN-13670676480400 386Suratgarh TPS - Babai (Jhunjhunu)

Commissioned 11/15.RVPNL 465 NOV-15S/C3 MAR-14465465172400 172Bikaner- Merta NOV-15

315 MVA, 400/220/33 ICT-I have beencharged at no load on 22.02.2018 & loadtaken on 26.02.2018.

RVPNL 100 JUN-174 100100630400/220 100Babai S/S

Remark:

Suzlon wind farm (100 MW), PS,Kutch, GETCO, U1-5/13

XYZ D/C1 220Suzlon wind farm - Bhachau(PG)

Remark:

S V Power TPP (63 MW),PS,Cha,KVK,U1-12/11(C),

Commissioned 11/11.SVPPL NOV-11D/C1 12132 12LILO of Korba-Mopaka line at S.V. Power

NOV-11

Remark:

Swara Kuddu HPPCL (3x37MW), U1,U2,U3-3/19

HPPTCL 10 DEC-17D/C1 MAR-1704127220Snail(Swara Kudu) -Hatkoti

HPPTCL 66 DEC-18D/C2 458052220Hatkoti - Gumma

Delay FAC approval pending for the lastthree year. Stage -I clearance in July 2015.Work has started

HPPTCL 0 MAR-17D/C3 MAR-17006400LILO of one ckt of Nathpa Jhakri- Abdullapur at Gumma

TL: Total Location 53Page 41 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 42: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

HPPTCL 504 0100315400/220 0Gumma S/S

HPPTCL 05 000220 0Hatkoti Switching Station

Remark:

Swastik TPP, (25 MW), PS,Chg, ACB, U1-12/13

CommissionedAPL D/C1 132 132LILO of Korba-Mopka at SwasticTPP

MAR-17

Remark:

System Strengthening

Erection completed. Testing underprogress. Commissioning matching withupstream Silchar-Melriat link.

PGCIL 20 JUN-18D/C1 DEC-12202012132 12Melriat (New) - Sihmui line

Part of the work awarded and is beingtaken up. For balance portion tender is tobe floated.

TANTRAN 0 JAN-19D/C2 SEP-170018400ETPS to Tondiarpet point ATS

One ckt radially energised from Kavanoorend. Muthuramalingapuram to Kamudhi, alength of 68.84 Ckm energised on20.02.17.

TANTRAN 229 MAR-17D/C3 22922969230 55Kamudhi s/s - Tiruchulis/s(Muthuramlingapuram) - Ckt-II

1. Date of award of contract is 18.03.2011.2. Schedule date of completion was18.03.2012. 3. The line was completed on11.02.2016 and commissioned on12.05.2017. 4. Delay was due to RoWissue, all of which have been resolved andalso due to delay in commissioning of SASat 400/220/132 kV Killing sub-station.

MeECL 19 MAY-17M/C4 191917132 22Killing (Byrnihat)-EPIP-I

Check survey done. Profile drawingapproved.

AEGCL MAR-16S/C onD/C

5 DEC-110245132 0Kukurmara - Azara line

Commissioned 9/12.AEGCL 8 SEP-12D/C6 884220 4LILO of Agia - Sarusajai line atKukurmara S/S

SEP-12

Erection completed. Testing underprogress. Commissioning matching withupstream Silchar-Melriat link.

PGCIL 17 JUL-18D/C7 DEC-12171730132 10LILO of Aizwol (PG) - Zemabawkat Melriat (PG)

Commissioned 03/13.PGCIL 4 MAR-13D/C8 441400 1LILO of Kaithalguri - Misa line atMariani (New) (Charged at220KV)

MAR-13

Commissioned 09/15.TANTRAN SEP-15D/C9 23220 23LILO of Korattur - Koyambedu atAlamathy (Balance Portion)

SEP-15

Commissioned 03/13.PGCIL 5 MAR-13D/C10 DEC-12551132 1LILO of Loktak - Imphal atImphal (New) line

MAR-17

UPPTCL MAR-20D/C11 400LILO of Vishnu Prayag-Srinagar-Muzaffaarnagar

Approval from State Govt. obtainedP&ED 0 DEC-13S/C12 005132 0LILO of Zemabawk - W.Phailengat Sihhmui

Ready for Commissioning 06/15.PGCIL 163 JUN-15D/C13 DEC-1216316397220 97Mariani (New) - Mokikchung(PG)

JUN-15

Line commissioned in Jul'15.PGCIL 11 JUL-15D/C14 DEC-1211112132 2Mokokchung (PG) - Mokokchung(Nagaland) line

MAR-17

TL: Total Location 53Page 42 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 43: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 6/12PGCIL 118 JUN-12D/C15 11811874400 74Palatana - Surajmaninagar line(Charged at 132 KV)

JUN-12

Line commissioned in Jun'17.PGCIL 347 JUN-17S/C onD/C

16 DEC-12347347102132 104Pasighat - Roing line.

Line commissioned in Jun'17.PGCIL 244 JUN-17S/C onD/C

17 APR-1224424473132 72Roing - Tezu line

Commissioned 4/12.PGCIL 69 APR-12D/C18 696938132 38Silchar - Badarpur (PG) line. APR-12

Part line commissioned (35Ckm) throughcontingency in Jun'12. Balance linecommissioned in Nov'17.

PGCIL 110 NOV-17D/C19 11011060132 60Silchar - Hailakandi(Contingency arrangement)

Commissioned 03/15.PGCIL 479 MAR-15D/C20 DEC-12479479334400 334Silchar - Imphal (New) line (tobe charged at 132KV)

MAR-15

Major portion of line is in forest (60%).Delay in tree cutting affecting siteprogress.

PGCIL 433 JUN-18D/C21 DEC-12408451288400 207Silchar - Melriat (New) line(charged at 132KV)

Commissioned 07/15.PGCIL 373 JUL-15D/C22 DEC-12373373254400 254Silchar - Purba Kanchan Bariline (charged at 132KV)

JUL-15

Line commissioned in Mar'12.PGCIL 7 MAR-12D/C23 772132 2Silchar - Srikona line MAR-12

Completed 9/13TSECL 71 SEP-13D/C24 717118132 18Surajmani Nagar - Agartala 79Tilla Grid S/S

MAR-17

Fund proposed in World Bank.TSECL 0 AUG-16D/C25 006132 0Surajmani Nagar - Badarghat

Commissioned 08/12.TSECL 63 AUG-12D/C26 636336132 36Surajmani Nagar -Budhujngnagar

AUG-12

Fund not yet tied up. Proposed under WorldBank Financing /SPA/NEC.

TSECL 0 MAR-17D/C27 00260400 0Surajmani nagar-P.K.Bari

3.598 KM line in forest land for whichTSECL will apply for forest clearance. LOAissued

TSECL 32 DEC-14D/C28 58020132 0Surajmani Nagar - Rokhia

Proposed under NEC.TSECL 0 JUN-15D/C29 05050132 0Surajmani Nagar - Udaipur

Progress affected due to ROW problem andgeographical condition. Tree cuttingaffecting progress.

PGCIL 330 MAR-18S/C onD/C

30 DEC-1233033296132 86Tezu - Namsai line.

Line test charged on 21.08.2011.TSECL 41 AUG-11D/C31 4134112132 12Udaipur - Palatana AUG-11

Commissioned 12/12TSECL 100 DEC-1232 100100100132/33 100Surajmaninagar S/S (Upgrdableto 400 kV)

DEC-12

400KV infrastructure is ready and its 220KVinfrastructure is under construction.

DVC 100 DEC-1833 50100315400/220 50DSTPS ICT-II S/s

Work under progress. Completion matchingwith associated lines. Critical.

PGCIL 80 MAR-1834 10010030132/33 50Namsai S/S

ED, 0 MAR-1335 010090132/33 0Yurembam (Aug.) S/S

Commissioned 03/2017MSETCL 100 MAR-1736 10010050220/33 100Wathar (Addl.) MAR-17

Charged in Jun'17.PGCIL 100 SEP-1737 10010030132/33 100Tezu S/S

Commissioned 12/11AEGCL 100 DEC-1138 10010050132/33 100Panchgram (Aug.) S/S DEC-11

Commissioned in Jun'17.PGCIL 100 JUN-1739 10010030132/33 100Roing S/S

Remark:

Talwandi Sabo TPP (3x660MW),PS,Punjab, Sterlite, U1-6/14 (C),U2-10/15 (C),U3-03/16 (C)

TL: Total Location 53Page 43 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 44: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 03/13.PSTCL 287 MAR-13D/C1 287287204400 204Talwandi Sabo - Moga MAR-13

Commissioned 04/14.PSTCL 178 APR-14D/C2 178178128400 128Moga- Nakodar APR-14

Commissioned 01/13. (Line energised on21.8.12 but intimated in Jan 2013)

PSTCL 250 JAN-13D/C3 250250175400 175Talwandi Sabo - Dhuri JAN-13

Commissioned 09/14.PSTCL 277 SEP-14D/C4 277277201400 201Talwandi Sabo-Mukatsar SEP-14

Commissioned 09/14.PSTCL 100 SEP-145 JAN-13100100630400/220 100Mukatsar (2x315) SEP-14

Commissioned 04/14.PSTCL 100 APR-146 100100315400/220 100Nakodar (1st Trf.) APR-14

Remark:

Tamnar TPP (4x600 MW),PS,Chatt,JPL, U1-3/14 (C),U2-3/14 (C),U3-1/15 (C),U4-3/15 (C)

Commissioned 01/15.JPL 67 JAN-152xD/C1 676744400 44Tamnar TPP - Raigarh (Tamnar)Pooling Station

JAN-15

Remark:

Tanda TPP (2x660 MW), CS,UP, NTPC,U1-9/18,U2-3/19

Work is held up.UPPTCL 97D/C1 54241200400 0Tanda - Gonda

Work is held up.UPPTCL 296D/C2 140543460400 0Gonda - Shahjehanpur (PG)

UPPTCL D/C3 120400LILO of Azamgarh - Sultanpur atTanda

Remark:

Tangnu Romai-I HEP (2x22MW)PS,HP,U1,U2-3/19

Delay FCA approval.HPPTCL 16 AUG-18D/C1 MAR-1706550220Sunda-Hatkoti

Line is being constructed by HPPTCL underGreen Energy Corridor Scheme. Lineawarded.

HPPTCL 0 AUG-18D/C2 04124132Tangnu Romai-I HEP - 220/132kV Sunda S/S

Substation is being constructed with fundssourced from ADB.

HPPTCL 0 DEC-163 MAR-1700100220/132 0Sunda S/S

Remark: Project work stopped due to fund issue.

Tapovan Vishnugad HEP (4x130MW), CS,UK,NTPC,U1-3/19,U2-3/19,U3-3/19,U4-3/19

Route alignment and forest proposalpreparation is in progress.

PGCIL 0 AUG-19D/C1 0036400Tapovan Vishnugadh - KunwariPass (Pipalkoti)

contract had been awarded to M/s Cobrabut due to poor financial condition ofcompany, M/s Cobra had abandoned theproject. Bank Guarantees of M/s Cobra hasbeen encashed on 16.06.2017 due tononperformance of contract andtermination/re-tendering/other parallelactivities are being taken up. NTPCrepresentative intimated that this line isvery important element of UITP scheme forpower evacuation from Hydro Projects inAlaknanada and Mandakini river basin andit would be difficult to evacuate power ofHydro Projects under construction.

PTCUL 0 MAR-19D/C2 00304400 0Srinagar - Kashipur

TL: Total Location 53Page 44 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 45: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

PTCUL representative requested CEA toallow LILO of 400 KV DC Vishnuprayag-Muzaffarnagar line at Pipalkoti as analternate arrangement for powerevacuation of Tapovan Vishnugad (NTPC).PTCUL representative was advised to takeup matter with UPPTCL alongwith detailSystem Study report as UPPTCL is theowner of 400 KV DC Vishnuprayag-Muzaffarnagar Line and subsequently takeup with CEA for approval of StandingCommittee of power system in NR. TheSystem Study Report may also besubmitted to CEA and PGCIL.

PTCUL 0D/C3 002400LILO of Vishnu Prayag -Muzaffarnagar at TapovanVishnugarh HEP

price bids of all 3 packages has beenopened and finalized . Tender shall beawarded in the month of Aug 2017 aftergetting approval of PTCUL Board.

PTCUL 0 DEC-18D/C4 00184400 0Kuwari Pass (Pipalkoti)-Karanprayag -Srinagar

Remark:

Tashiding HEP (2x48.5MW)PS,Sikkim,Shiga Energy,U1-11/17,U2-11/17

Work CompletedSEPL 23 DEC-16D/C1 232317220 17Tashiding - Legship

Work completed. Tashiding HEP expectedto commission by Nov-17.

PGCIL 35 OCT-17D/C2 353520220 20Legship - New Malli

PGCIL 03 00100220/132 0Legship S/S

Remark:

Teesta-III(6x200 MW),PS,Sikkim,TUL,U1to6- 2/17 (C)

LILO-Out was deferred due to involvementof reserve forest. Award placed in Dec'17.Engg. & survey under progress.

PGCIL 0 JUN-20D/C1 JUN-2002015400LILO OUT of Teesta-III -Kishanganj at Rangpo

TL: Total Location 53Page 45 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 46: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Teesta III Rangpo (CKT-II) and Teesta III Dikchu (Ckt 1(a)) Lines are in commercialoperation from 16.01.2017 & 13.04.2017respectively. Dikchu- Rangpo (Ckt 1 (b))line section is complete but could not becharged due to ROW near tower no. AP 36Ain vicinity of church. Due to theunavailability of statutory electricalclearance, some part of the Elim Church inEast Sikkim at tower no. 36A needs to bedismantled. An agreement has beenreached with Church authorities fordemolition of part of church on 18.11.2017with the help of GoS. Based on Demandnote issued by District Collector - EastSikkim, TPTL has deposited compensationamount on 24.01.2018 with DC- EastSikkim. Demolition of the Church hascommenced ROW in Bihar is being resolvedwith the help of District Authority. AP 311 AP 322 : line charged successfully of 10.8Kms on 13.11.2017, 18:36 hrs for antitheft purpose.  AP 302 AP 311 : linecharged successfully of 7.66 Kms on13.02.2018, for anti theft purpose.

TUL 565 MAR-18D/C2 548590430400 342Teesta III - Kishanganj

Commissioned 03/16..(Late Reported).PGCIL 36 JUL-16MC+D/C

3 NOV-13363621400 21LILO IN of Both Ckt Teesta-III -Kishanganj at Rangpo

JUL-16

Remark:

Teesta LD IV HEP (4x40 MW),CS,WB,NHPC,U1:03/16, U2:03/16(C), U3-7/16 (C),U4-8/16 (C)

Work is almost stalled due to acute ROWproblem.

WBSETCL 94 DEC-17S/C1 SEP-08939421220 19Teesta LDP -III - Teesta LDP-IV

Commissioned 02/16.WBSETCL 250 FEB-16D/C2 SEP-08250250145220 145Teesta LDP - IV - New Jalpaiguri(NJP)

FEB-16

Remark: Unit-4 (40MW) commissioned on 11.08.2016.

Teesta Low Dam III (4x33 MW),CS,WB,NHPC, U1-1/13(C) ,(C) U2-1/13(C), U3-2/13(C), U4/13(C)

Commissioned 01/13.WBSETCL 282 JAN-13S/C1 DEC-0928228281220 81Teesta LD III-New Jalpaiguri JAN-13

Remark:

Teesta VI HEP (4x125 MW), PS, M/S LANCO Urja, SIKKIM,U1-4 -2021-22

Detail survey completed section 164approval received. Work yet to started.

LEPP D/C1 25220Teesta VI HEP - Rangpo PoolingStation

Remark:

Tehri PSP (THDC) (4x250 MW) U1-4: 09/19

Work slowed-down to the extent possibleto match generation.

PGCIL 8 JUN-18D/C1 NOV-17682765Tehri Pooling Station - Meerut(Remaining part)

Work slowed-down to the extent possibleto match generation.

PGCIL 34 JUN-18D/C2 NOV-17323814400 7Tehri Gen. - Tehri PoolingStation (Q)

Award placed in Mar'15. Engg., civil workand supply under progress.

PGCIL 88 JUN-183 MAR-18651003200765/400 0Tehri PS (GIS)

Work under progress.PGCIL 96 JUN-184 MAR-18921001500765/400 80Meerut (Aug.)

TL: Total Location 53Page 46 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 47: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Telangana STPP (2x800 MW), Telangana, NTPC, U1-01/20, U2-01/20

TSTRANS D/C1 DEC-19110400Telangana STPP - Ramadugu

TSTRANS D/C2 DEC-19360400Telangana STPP - Narsapur

Remark:

Thamminapatnam (Meenakshi) (2x150, MW ),PS, Ph-II (U3-12/17,U4-3/18)

Commissioned 3/12MAR-12D/C1 2400 2Meenakshi - Simhapuri MAR-12

Commissioned 3/12MAR-12S/C2 26400 26Thamminapatnam (Meenakshi) -Nellore

MAR-12

Remark:

Thottiyar HEP (1x30+1x10MW)SS,Kerala, KSEB, U1, & 2 2020-21

ATS of Thottiar HEP. May be deleted, as thework is not targeted in the Annual Plan of2015-16.

KSEB MAR-17D/C1 0220Thottiyar - Kodakpara

ATS of Thottiar HEP. May be deleted, as thework is not targeted in the Annual Plan of2015-16.

KSEB D/C2 0220LILO of Ldukki - Kozikode atKodakpara

Remark:

Tidong-I HEP (2x50MW)PS,HP,NSL,U1,U2- 2018-19

St-I FC received, St-II under progressNSLNPPL 0 DEC-17D/C1 05732220LILO of Kasang - Bhbaba atTidong-I

Remark: LTA has been surrendered by generating company. generation project has not been dropped from the generation program of CEA and construction activity is in progress at site andprogress has also been discussed recently in review meeting held in CEA.

Tilaiya UMPP

PGCIL D/C1 765LILO of Tilaiya - Balia line atGaya

Remark:

Tiroda TPP (Gondia ) PH-I (2x660 MW),PS,MAHA,ADANI,U1-9/12, (C),U2-11/12 ,PH II (3x660 MW) U1-6/13(C), U2- 3/14(C),U3-9/14 (C)

Commissioned 02/14.APL 90 FEB-14D/C1 909061400 61Akola- I - Akola-II FEB-14

Commissioned 03/15.APL 1582 MAR-15S/C2 AUG-1215821582575765 575Tiroda - Koradi - Akola -Aurangabad line ckt-II

MAR-15

Commissioned 02/14.APL 1011 FEB-14S/C3 10111011361765 361Tiroda - Akola-II FEB-14

PGCIL 2xS/C4 765Aurangabad - III - Aurangabad(PG)

218 Ckm Commissioned 8/12APL 587 AUG-12D/C5 587587218400 218Tiroda TPP - Warora (2nd ckt) AUG-12

Commissioned 3/13.APL 587 MAR-13S/C6 587587218400 218Tiroda TPP -Warora (1st ckt) MAR-13

Commissioned 03/13.MSETCL 100 MAR-137 SEP-12100100500400/220 100Warora S/S MAR-13

Commissioned 02/14.APL 100 FEB-148 1001001500765/400 100Tiroda S/S FEB-14

Commissioned 02/14.APL 100 FEB-149 1001001500765/400 100Akola -II S/S FEB-14

Commissioned 03/16.MSETCL 100 MAR-1610 1001001500765/400 100Aurangabad - III (Ektuni) S/S(ICT-II)

MAR-16

Commissioned 03/15.APL 100 MAR-1511 1001003000765/400 100Koradi - III S/S MAR-15

TL: Total Location 53Page 47 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 48: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.Remark:

Tori TPP (2x600 MW),PS,Jhh, Essar, Uncertain

EPTCL D/C1 400Tori - Jhharkhand PoolingStation

Remark: Delay in grant of mega power project status, cancellation of coal block & non-availability tapering/long term coal linkage etc.

Transmission system associated with IPPs of Nagapattinam / Cuddalore Area- Package A (TBCB)

Severe ROW problem being faced inKarnataka. Issue highlight to PMO lavel,issues remain unsolved.

PGCIL 568 MAR-18S/C1 DEC-15560575219765 145Salem - Madhugiri (PNMTL-TBCB)

Commissioned 10/2016.PGCIL 543 OCT-16D/C2 MAR-15543543406765 406Nagapattinam PS - Salem(PNMTL-TBCB)

OCT-16

Remark: SPV/BPC - Powergrid Nagapattinam Transmission Ltd. / PFC

Transmission System Associated with Mauda Stage-II (2x660MW) Gen. Proj. - PGCIL

Ready for Commissioning 08/16.PGCIL 479 AUG-16D/C1 MAY-16479479344400 344Khandwa - Indore line AUG-16

Ready for Commissioning 08/16.PGCIL 435 AUG-16D/C2 MAY-16435435338400 338Betul - Khandwa (Quad) line AUG-16

Commissioned 07/2017.PGCIL 551 JUL-17D/C3 MAY-16551551393400 393Mauda-II - Betul (Quad) line JUL-17

Remark:

Transmission System Associated with Mundra Ultra Mega Power Project - PGCIL

Commissioned 12/12.PGCIL 918 DEC-12S/C1 918918358400 358Mundra - Jetpur (Balanceportion)

DEC-12

Commissioned 8/11PGCIL 285 AUG-11D/C2 285285198400 198Mundra - Bachchau AUG-11

Commissioned 9/11.PGCIL 755 SEP-11D/C3 755755566400 566Bachchau - Ranchodpura SEP-11

Commissioned 02/12.PGCIL 863 FEB-12D/C4 863863244400 244Mundra - Limbdi FEB-12

192 Ckm part line commissioned 11/11.PGCIL NOV-11S/C5 384400 192Mundra -Limbdi ( part Line) NOV-11

Commissioned 8/12.PGCIL 424 AUG-12S/C6 424424314400 314Mundra - Jetpur (Part line) AUG-12

Commisisoned 7/12PGCIL 100 JUL-127 100100630400/220 100Navsari GIS JUL-12

commissioned 3/12.PGCIL 100 MAR-128 1001001500765/400 100Wardha 3rdTrf MAR-12

Commissioned.PGCIL 100 AUG-119 100100630400/220 100Bachchau S/S AUG-11

Commissioned 02/12.PGCIL 100 FEB-1210 1001003000765/400 100Wardha FEB-12

Remark:

Transmission System associated with Pallatana gas Based Power Project and Bongaigaon Thermal Power Station (BTPS) - PGCIL

Commissioned 07/15.PGCIL 100 JUL-151 DEC-1210010030220/132 100Mokokchung (New) JUL-15

Commissioned 3/12.PGCIL 100 MAR-122 100100400400/220 100Silchar (New) MAR-12

Supply, civil works and erection underprogress. Completion matching with line.

PGCIL 90 MAR-183 85100100132/33 70Melriat S/S (Upgadable to 400kV)

ICT-I (50MVA) commissioned in Mar'13 &ICT-II commissioned in Apr'13.

PGCIL 100 APR-134 100100100132/33 100Imphal S/S

Commissioned 08/15.PGCIL 100 AUG-155 10010030220/132 100Mokokchung (ICT-II) AUG-15

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKIM to NR/WR Part-A

TL: Total Location 53Page 48 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 49: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

PGCIL S/C1 19132LILO of Gangtok - Melli atRangpo

Remark:

Transmission System for Transfer of Power from Generation Project in SIKKM to NR/WR Part-B

Commissioned 11/14.PGCIL 21 NOV-14S/C1 NOV-1421217132 7LILO of Gangtok - Rangit atRangpo

MAR-17

Remark:

Transmission System for Ultra mega Solar Park in Rewa District, Madhya Pradesh - PGCIL

Ready for Commissioning 02/18.PGCIL 169 FEB-18D/C1 169169116400 116LILO of Vindhyachal - Jabalpurline (Q) (II Ckt.) at Rewa PS

FEB-18

Remark:

Transmission System of Phase-I Generation Projects in Orissa-Part-A

Commissioned 05/13.PGCIL 120 MAY-13D/C1 12012044400 44LILO of Rourkela - Raigarh atJharsuguda Pooling Stn. Ckt-II

MAY-13

Remark:

Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhatisgsrh - part-D - PGCIL

Commissioned 01/14.PGCIL 100 JAN-141 100100630400/220 100Aurangabad S/S JAN-14

Remark:

Tuirial HEP (2x30MW),CS,Miz,NEEPCO, U1-10/17,U2-10/17

The 132KV Sihhmui substation wasconstructed by P&E, Govt. of Manipur andcompleted on 31.03.2016. Line hascompleted.

P&ED 135 DEC-16D/C1 13513571132 47Bawktlang (Kolasib) S/S -Sihhmui S/S

Line completed on Mar-17.P&ED 85 FEB-17S/C2 858542132 42Tuirial HEP - Bawktlang(Kolasib) S/S

Remark:

Tuticorin TPP (Ind Barath), (660MW),TN, U1-10/18

IBPIL D/C1 200400Ind Barath TPP - Tuticorin (PS)

Remark:

Tuticorin TPS (JV) (2x500 MW), U1-3/14,U2-7/15 (C)

Commissioned 01/12.PGCIL 423 JAN-12D/C1 423423304400 304Tuticorin JV - Madurai JAN-12

Remark:

Uchpinda TPP, (4x360MW), PS,Chg, RKMPPL, U1-10/15(C),U2-1/16(C),U3-9/17,U4-12/17

Commissioned (Interim Arrangement). De-LILO activity completed.

RKMPPL 73D/C1 7373400 39LILO of Raigarh (Kotra) - Raipurat Uchpinda (InterimArrangement)

Commissioned 10/2016 (41.42 CKm on D/C& 11 CKm on M/C)

RKMPPL 88 OCT-16D/C2 888853400 53Uchpinda (RKM PowergenPrivate Ltd.) - Kotra s/s(Raigarh) line

OCT-16

Remark:

Udupi TPP (2x600 MW),PS,KAR,UPCL,U1-7/10(C),U2-4/11(C)

TL: Total Location 53Page 49 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 50: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 10/09. (For start up power)KPTCL 91 OCT-09D/C1 9191948220 48UTPS-Nandikur - Khemar (partlyon Multi-ckt Multi - Voltagetowers & partly on D/C towers)

OCT-09

Commissioned 8/12KPTCL 529 AUG-12D/C2 529529358400 319Nandikur (UTPS) - Shantigrama(Hassan)

AUG-12

Remark:

Ugo-Sugen (382.5MW), PS, Guj, Torrent Energy, Module1: 1/13(c)

XYZ D/C1 1400LILO of Sugen TPS- Pirana atUno-Sugen GPP

Remark:

Uhl-III BVPCL HEP, (3x33.3MW),SS,HP, HPSEB,U1,2, & 3- 3/18

completed on Mar-14HPSEBL 0D/C1 0071132Uhl-III - Hamir Pur (By BVPCL)

Remark:

Ukai Extn. (2x490 MW),PS,Guj,GSECL, U6-3/13(C),U7-3/13

Commissioned 08/14.GETCO 641 AUG-14D/C1 JUL-11641641460400 460Kosamba-Chorania line AUG-14

Commissioned 03/13.GETCO 300 MAR-13D/C2 300300178220 178Kosamba-Mobha line MAR-13

Commissioned 1/12.GETCO 96 JAN-12D/C3 969664400 64LILO of Asoj - Ukai at Kosamba JAN-12

Commissioned 03/13.GETCO 215 MAR-13D/C4 215215145400 145UKai-Kosamba MAR-13

Remark:

Unchahar TPS (500 MW), PS,UP,NTPC, U6-03/17(C)

Ready for Commissioning 09/2016.PGCIL 145 SEP-16D/C1 SEP-16145145107400 107Unchahar - Fatehpur line (PUTL-TBCB)

SEP-16

Remark:

Uppur SCTPP, (2x800MW), Tamilnadu, TANGENDCO, U1-3/21,U2-9/21

Estimate is under preparationTANTRAN 0D/C1 MAR-2100114400Virudhnagar - Kamuthi

TANTRAN D/C2 MAR-21204765Uppur SCTPP - Virudhunagar

Estimate is under preparationTANTRAN 0D/C3 MAR-2100160400Virudhnagar - Thappagundu

Estimate is under preparationTANTRAN 0D/C4 MAR-2100158400Virudhnagar - Kayathar

Estimate is under preparationTANTRAN 0D/C5 MAR-2100498765Virudhnagar - Coimbatore

Standing committee approval accorded.Administrative approval is to be received.

TANTRAN 0 MAR-226 MAR-21003000765/400 0Virudhunagar

Remark:

URI-II HEP (4x60 MW), CS,J&K,NHPC,U1-9/13(C),U2-11/13(C),U3-9/13(C),U4-2/14 (C)

Commissioned 12/11.PGCIL 288 DEC-11S/C1 MAY-11288288105400 105URI II -Wagoora DEC-11

Commissioned 08/11.PGCIL 32 AUG-11S/C2 323211400 11URI I - URI II AUG-11

Remark:

Utraula IIPP (2x45 MW),PS,UP,BAJAJ,U1-2/12 (C),U2-3/12(C)

Existing line.BEPL D/C1 132Balrampur-Utraula line

Remark:

Utraula TPP, (2x45 MW), PS, UP, Bajaj

TL: Total Location 53Page 50 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 51: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

60 mtr. Strg. Pending due to nonavailability of Bay at Dumariaganj S/S

UPPTCL 114 JUN-17S/C1 114114132 39Dumariaganj- - Utraula

Charged on 31.10.11. May pl be deletedfrom the list.

UPPTCL 56S/C2 565619132 19Balrampur - Utraula

Remark:

VallureTPS. (3x500 MW),CS,TN,NTPC,U1-2/12(C), U2-2/13(c), U3-2/14

Commissioned 03/13.PGCIL 104 MAR-13D/C1 10410471400 71Vallure TPS - Melakottaiyur line MAR-13

Commissioned 8/12.TANTRAN 14 AUG-12D/C2 MAR-1114147400 7Vallur JV Project-NCTPS St.II AUG-12

Commissioned 7/11PGCIL 129 JUL-11D/C onM/C

3 JUL-10129129131400 131LILO of Alamathy -Sriperumbdur at Vallure TPS

JUL-11

Commissioned 03/14.PGCIL 59 MAR-14D/C4 595942400 42Tiruvelam (PG) - Chitoor MAR-14

Remark:

Vijayawada TPS (Extn. -IV),500 MW,SS,AP,APGENCO, -10/09 (C )

Commisioned 7/09APTRANS 22 JUL-09M/C1 222224400 24LILO of Srisaliam -Nunaa atVijayawada TPS

JUL-09

Commissioned 02/13.APTRANS 316 FEB-13D/C2 JUN-11316316226400 226Vijayawada TPS-Suryapeta FEB-13

Commissioned 02/13.APTRANS 209 FEB-13D/C3 209209147400 147Malkaram-Narsapur FEB-13

Commissioned 8/11.APTRANS 411 AUG-11D/C4 JAN-11411411266220 266Vijayawada TPS-Tallapally AUG-11

Commissioned 02/13.APTRANS 199 FEB-13D/C5 199199149400 149Narsapur-Suryapet FEB-13

Remark:

Vindhyachal-IV ,CS,MP,NTPC, U11-6/12(C) C), U12-3/13(C), U13-08/15 (C) Rihand - III,(1000MW each) Gen. U5- U6-11/13(C)

Commissioned 02/14.PGCIL 901 FEB-14S/C1 901901337765 337Satna - Gwalior line (Ckt-I) FEB-14

Ready for commissioning 12/12.PGCIL 84 DEC-12D/C2 848458400 58Vindhyachal-IV - VindhyachalPooling Station line (Q)

DEC-12

Commissioned 08/15.PGCIL 586 AUG-15S/C3 586586271765 271Vindhyachal Pooling Station -Satna Ckt-II

AUG-15

Commissioned 03/15.PGCIL 586 MAR-15D/C+S/C

4 NOV-11586586271765 271Vindhyachal Pooling Station -Satna line (2 Km D/C Portion)Ckt-I

MAR-15

Commissioned 12/13.PGCIL 138 DEC-13D/C5 13813897400 97Bassi (PG)- Jaipur (RVPN) 765KV line (Q)

DEC-13

Commissioned 12/12.PGCIL 18 DEC-12D/C6 181812400 12Sasan - Vindhyachal Poolingstation

DEC-12

Ready for Commissioning in 08/15.PGCIL 91 AUG-15D/C7 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (2nd Ckt)

AUG-15

Commissioned 12/12PGCIL 19 DEC-12S/C8 NOV-12191912765 12Sasan - Vindhyachal PoolingStation line

DEC-12

Commissioned 06/14.PGCIL 91 JUN-14S/C9 NOV-12919131765 31Rihand - Vindhyachal PoolingStation (1st Ckt)

JUN-14

Commissioned 08/15.PGCIL 834 AUG-15S/C10 MAR-14834834305765 305Gwalior - Jaipur (Ckt 1) AUG-15

Commissioned 08/14.PGCIL 782 AUG-14D/C+S/C

11 NOV-12782782300765 300Satna - Gwalior line (60 Km D/CPortion) Ckt-II

AUG-14

Commissioned 08/15.PGCIL 100 AUG-1512 1001001500765/400 100Vindhyachal Pooling Station(ICT-II)

AUG-15

TL: Total Location 53Page 51 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 52: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

Commissioned 03/15.PGCIL 100 MAR-1513 NOV-121001001500765/400 100Vindhyachal Pooling Station(ICT-I)

MAR-15

Remark:

Visa Power TPP (2x600 MW) PS, Chh, VPL, U1 & U2-uncertain

Work is under Construction.VISA 33 JUN-15D/C1 263726400 0Visa Power TPP - RaigarhPooling Station

Remark:

Vizag (Hinduja National Power) (2x520MW),PS,AP,U1-12/15 (C), U2-3/16 (C)

Commissioned 07/15.APTRANS JUL-15D/C1 14400 14Vizag TPP - Kalpaka JUL-15

Ready for Commissioning 06/2017. (Earlierthe line was of 712 ckm now the length isrevised to 485 ckm ).

APTRANS 697 JUL-17D/C2 NOV-15697697486400 486Vizag TPP(HNPCL) -Kamavarapukota

JUN-17

Commissioned 05/14. for startup power.25 MAY-14D/C3 252515400 15Vizag ( Hinduja) TPP - Kalpaka

Ready for Commissioning 10/2016.APTRANS 242 OCT-16D/C4 SEP-15242242179400 179Kamavarapukota - Surypet(Kamavarrapukota -Chinnakorukondi)

OCT-16

Ready for Commissioning 10/2016TSTRANS 234 OCT-16D/C5 SEP-15234234170400 170Kamavarapukota - Surypet (Chinnakorukondi - Suryapet)

OCT-16

Commissioned 03/16.TSTRANS 100 MAR-166 MAR-15100100630400/220 100Suryapet S/S MAR-16

Commissioned 02/2017APTRANS 100 FEB-177 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-1) FEB-17

Commissioned 03/2017APTRANS 100 MAR-178 MAR-16100100315400/220 100Kamavarapukota s/s (ICT-2) MAR-17

Works completed.Bays charged on04.02.2017

TSTRANS 100 FEB-179 1000630400/220 100Shankarpally (Extn.)

Remark:

Vyasi HEP(120 MW), Yamuna river,UK,UJVNL,3/19

Route Survey has been completed. Towerschedule and profile of line has beenapproved. Principal approval obtained fromMOEF on dated 11/09/2017. Proposal fortransfer of land (73.36 Hect.) forcompensatory afforestation was submittedto DM, Dehradun on dated 14/09/2017.SDM directed to Tehsildar on 03/10/2017for further necessary action. Total Progress12%

PTCUL 0D/C1 DEC-180016220LILO of Lakhwar- Dehradun atVyasi

Remark:

Wanakbori TPS(1x800), SS, Guj,GSECL,U8-10/18

WIPGETCO 16 APR-18D/C1 62314400 0LILO of Wanakbori -Soja line atDehgam (PG) S/S

WIPGETCO 240 MAY-18D/C2 239343212400 100Wanakbori TPS-Soja

Line work completed.GETCO 5 MAR-17D/C3 552400 3Wanakbori S/y -Wanakbori S/y(existing)

WIPGETCO 348 NOV-18D/C4 325447268400 95Soja-Zerda Line

Remark:

Welspun Energy Annupur,( 2x660 MW), PS,Annupur,MB Power, U1-4/15(C),U2-3/15

TL: Total Location 53Page 52 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018

Page 53: TRANSMISSION SCHEMES (TRANSMISSION LINES & SUB … · transmission schemes (transmission lines & sub-stations) for evacuation of power from the generation projects 2017-18 28-february-2018

AssociatedTransmission

Lines and Substations

STG(Ckm)/Erection

State/Agency

ExecutingAsociated

Trans.

TE(Nos)/Recp.Ma

teria

VoltageLevel(KV)

TL(Nos)/Land

Acq. (%)

STC(Nos)/CivilWork

RevisedTargetDate

OriginalTargetDate

Remark

(Status of all statutory clearences particularlyforest clearence and ROW problem, if any needs

to be mentioned here.)

Ckts(S/C)

&(D/C)

Construction progress Status

Ckm/MVA

Monthof

Completion

6. 5. 1. 12. 4. 8. 3. 11. 9. 2. 7. 10. 13.

XYZ D/C1 400Welspun Anuppur TPS -Vindhyachal Pooling Station

Remark:

Yermarus TPS (2 x 800 MW), Karnataka, KPCL, U1-3/16 (C), U2-6/16

Last span stringing is pending due to LocalROW between locations 54 and 55 which isbeing resolved.

KPTCL 392 FEB-18D/C1 AUG-17392392285400 276Yermarus TPS - Bellary PoolingStation (BPS)

Ready for commissioning 06/2017.JPL 39 JUL-17D/C2 393919400 19JSW TPS - Bellary (PS) JUN-17

This work is not in planned works.KPTCL 0 MAR-18D/C3 005400Bellary (TPS) - Bellary (PS)

DPR approved. To be tenderedKPTCL 0 MAR-18D/C4 00400Bellary (PS) - C.N. Hally

Detailed survey completed. Estimate isbeing prepared.

KPTCL MAR-18D/C5 400Yermarus TPS - Gulbarga

Ready for commissioning 06/2017.KPTCL 520 JUL-17D/C6 DEC-16520520450400 450Bellary (PS) - New Madhugiri(near Tumakur)

JUN-17

Not in planned work for FY 16-17KPTCL MAR-18D/C7 400LILO of Both ckt of Nelamangala- Talaguppa at CN Halli

Not in planned work for FY 16-17KPTCL MAR-18D/C8 SEP-17400Termination of Nelamangala -Talaguppa at CN Halli

Land is in pocession of KPTCL. Preliminarysurvey work of 400kV line is completed.Estimate to be prepared.

KPTCL 09 SEP-1901001000400/220 0Gulbarga S/S

Remark:

TL: Total Location 53Page 53 ofSTG: Stringing CompletedSTC: Stubs Cast

Legends

TE: Towers Erected

Report generated through 4.38.20 PMWednesday 14 March 2018