transnordestina railroad
TRANSCRIPT
WITH OPPORTUNITIES IN
DIFFERENT SECTORS OF THE ECONOMY
All of that with the goal of contributing to the
generation of jobs , income and wealth in the
region and in the country
To that end, we are creating a logistic structure
that links business opportunities to exports
enablers
WE MUST CONNECT
GROWTH OPPORTUNITIES
WITH PRODUCTION AND EXPORTS
ENABLERS
DEVELOPMENT
TRANSPORTING
MAIN CLIENTS
5 thousand employees in
different work sites
A MAJOR PROJECT
IN BIG NUMBERS
~ 900 thousand ties already
produced
4 ,800 ties produced/day: largest
factory in the world
13 km will be the continuous length
of bridges built
1.728 km connecting Eliseu Martins to the Ports of Suape and Pecém
Mixed and large gauges
Ramps : exports direction : maximum of 1.0%
imports direction : maximum of 1.5%
Minimum curves of 400 meters
Speeds of up to 80 km/h and 32.5 t/axle
World - Class
Railway
PROJECT DETAILS
Terminals
Port Terminals 2 – Suape and Pecém
for exports (solid bulk cargoes )
Strategically located in relation to the big
consumer markets and ports of compatible operation.
Cape size Ships
Operational Capacity
Up to 30 million tons a year , in the project maturity,
that is, five years after the project starts operating
FOTOS
Superstructure from Salgueiro to Missão Velha
From Salgueiro to M. Velha Industrial site in Salgueiro
Rio Formiga Bridge: from Salgueiro to Suape Port