transportation delay-study-ahmed ferdous-1004137-buet
TRANSCRIPT
Delay study (Cost of delay)
For 15 minutes, service flow rate = 329 PCU/hr
Assuming same flow condition prevailed and 10-11 am was the peak hour
For 1 hour total service flow rate = (329 * 4) = 1316 PCU/hr
This 1 hour is 15% of total Average daily traffic.
So, ADT = (1316/0.15) = 8773 PCU/hr
30.5%1%
42%
16%
12%
28%
fig : PieChart for Vehicle Composition of traffic stream (per 15 minute)
Bus
Truck
Light Vehicle
Auto Rickshaw
Small Public Transport
Motorcycle
Rickshaw
From pie chart composition, it was found that light vehicle was 42%
So average daily light vehicle = 8773*0.42= 3684.66 PCU/hr
Travel Time
Vehicle Type Vehicle No Duration (Seconds) Speed (m/s) Average Duration (Seconds), dT1
Car 1 140 7.14286
160.802 155 6.451613 150 6.666674 183 5.464485 176 5.68182
Bus 1 251 3.98406
241.752 228 4.385963 262 3.81679
4 226 4.42478CNG 1 217 4.60829
215.502 245 4.081633 197 5.076144 203 4.92611
Motorcycle 1 318 3.14465
289.202 223 4.48433 329 3.039514 297 3.3675 279 3.58423
Assuming Average duration in free flow condition for light vehicle =100 Seconds,
Bus= 150 seconds, CNG= 160 seconds and Motorcycle= 200 seconds
Delay time= dT1-dT2= 160.80-100=60.8 seconds/ light vehicle
Delay time of light vehicles per day= 60.8*3684.66=224027.328 seconds= 62.22 hours
From data provided, light vehicle occupancy= 2.1
Passenger time value (per passenger hour) = 62.22* 2.1* 20 = 2613.24 taka