Delay study (Cost of delay) For 15 minutes, service flow rate = 329 PCU/hr Assuming same flow condition prevailed and 10-11 am was the peak hour For 1 hour total service flow rate = (329 * 4) = 1316 PCU/hr This 1 hour is 15% of total Average daily traffic. So, ADT = (1316/0.15) = 8773 PCU/hr 3 0.5%1% 42% 16% 12% 28% fig : PieChart for Vehicle Composition of traffic stream (per 15 minute) Bus Truck Light Vehicle Auto Rickshaw Small Public Transport Motorcycle Rickshaw From pie chart composition, it was found that light vehicle was 42% So average daily light vehicle = 8773*0.42= 3684.66 PCU/hr Travel Time Vehicle Type Vehicle No Duration (Seconds) Speed (m/s) Average Duration (Seconds), dT1 Car 1 140 7.14286 160.80 2 155 6.45161 3 150 6.66667 4 183 5.46448 5 176 5.68182 Bus 1 251 3.98406

Upload: ahmed-ferdous-ankon

Post on 12-Apr-2017

28 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: Transportation delay-study-ahmed ferdous-1004137-buet

Delay study (Cost of delay)

For 15 minutes, service flow rate = 329 PCU/hr

Assuming same flow condition prevailed and 10-11 am was the peak hour

For 1 hour total service flow rate = (329 * 4) = 1316 PCU/hr

This 1 hour is 15% of total Average daily traffic.

So, ADT = (1316/0.15) = 8773 PCU/hr

30.5%1%

42%

16%

12%

28%

fig : PieChart for Vehicle Composition of traffic stream (per 15 minute)

Bus

Truck

Light Vehicle

Auto Rickshaw

Small Public Transport

Motorcycle

Rickshaw

From pie chart composition, it was found that light vehicle was 42%

So average daily light vehicle = 8773*0.42= 3684.66 PCU/hr

Travel Time

Vehicle Type Vehicle No Duration (Seconds) Speed (m/s) Average Duration (Seconds), dT1

Car 1 140 7.14286

160.802 155 6.451613 150 6.666674 183 5.464485 176 5.68182

Bus 1 251 3.98406

241.752 228 4.385963 262 3.81679

Page 2: Transportation delay-study-ahmed ferdous-1004137-buet

4 226 4.42478CNG 1 217 4.60829

215.502 245 4.081633 197 5.076144 203 4.92611

Motorcycle 1 318 3.14465

289.202 223 4.48433 329 3.039514 297 3.3675 279 3.58423

Assuming Average duration in free flow condition for light vehicle =100 Seconds,

Bus= 150 seconds, CNG= 160 seconds and Motorcycle= 200 seconds

Delay time= dT1-dT2= 160.80-100=60.8 seconds/ light vehicle

Delay time of light vehicles per day= 60.8*3684.66=224027.328 seconds= 62.22 hours

From data provided, light vehicle occupancy= 2.1

Passenger time value (per passenger hour) = 62.22* 2.1* 20 = 2613.24 taka