010 TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 OSING A 215 EXCAVATOR. TRENCH HO. l WAS POT DOWN ON A STRONG VLF CONDUCTOR. BEDROCK WAS NOT REACHED DDE TO HEAVY OVERBURDEN. THE CONDUCTOR IS UNEXPLAINED. TRENCH HO. 2 WAS PUT DOWN ON A STRONG VLF CONDUCTOR. UNSHEARED MAFIC VOLCANICS WERE UNCOVERED ON THE WEST SIDE OF THE CONDUCTOR. BEDROCK COULD NOT BE REACHED OVER THE TARGET DUE TO HEAVY CLAY OVERBURDEN. THE CONDUCTOR WAS NOT EXPLAINED. TRENCH HO. 3 WAS PUT ON A PREVIOUSLY FOUND OCCURRENCE LOCATED BY PROSPECTING. A WELL SILICIFIED SHEAR ZONE WAS UNCOVERED WITHIN THE MAFIC VOLCANICS. THE SHEAR ZONE CONSISTS OF FINELY DIS SEMINATED PYRITE AND CHALCOPYRITE. THE RUSTY PARTS OF THE SHEAR ZONE WERE PANNED IN DIFFERENT PLACES ALONG THE ZONE WITH POOR RESULTS. NO GOLD WAS RECOVERED. SAMPLES WERE TAKEN FOR ASSAY. 5 SAMPLES WERE SENT TO MNDM 6 l TO ACCURASSY WITH LOW VALUES OF *C . 001 TO ^.01 IN BOTH AU 6 AG. ANOTHER SAMPLE TAKEN BY MNDM AT A LATER DATE PRODUCED THE SAME RESULTS. (SAMPLE PAGES l, 2, St 3) TRENCH NO. 4 WAS PUT DOWN ACROSS THE FORMATION ON A FAVOURABLE PROSPECTED AREA. THIS TRENCH CUT ACROSS TWO QUARTZ CARBONATE ZONES WEAKLY MINERALIZED WITH FINE PYRITE, AS WELL AS A NARROW QUARTZ VEIN WITH FINE PYRITE. 2 SAMPLES WERE TAKEN FOR ASSAY. RESULTS WERE BOTH .003 AD OZ/T (SAMPLE PAGE 2). TRENCH NO. 5 BEDROCK WAS NOT REACHED DDE TO HEAVY OVERBURDEN. THE VLF CONDUCTOR WAS NOT EXPLAINED.

Upload: dotram

Post on 07-Oct-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

010TRENCHING PROGRAM

TRENCHING BEGAN ON AOG 30, 1993 OSING A 215 EXCAVATOR.

TRENCH HO. l WAS POT DOWN ON A STRONG VLF CONDUCTOR. BEDROCK

WAS NOT REACHED DDE TO HEAVY OVERBURDEN. THE CONDUCTOR IS

UNEXPLAINED.

TRENCH HO. 2 WAS PUT DOWN ON A STRONG VLF CONDUCTOR.

UNSHEARED MAFIC VOLCANICS WERE UNCOVERED ON THE WEST SIDE OF THE

CONDUCTOR. BEDROCK COULD NOT BE REACHED OVER THE TARGET DUE TO

HEAVY CLAY OVERBURDEN. THE CONDUCTOR WAS NOT EXPLAINED.

TRENCH HO. 3 WAS PUT ON A PREVIOUSLY FOUND OCCURRENCE LOCATED

BY PROSPECTING. A WELL SILICIFIED SHEAR ZONE WAS UNCOVERED WITHIN

THE MAFIC VOLCANICS. THE SHEAR ZONE CONSISTS OF FINELY DIS

SEMINATED PYRITE AND CHALCOPYRITE. THE RUSTY PARTS OF THE SHEAR

ZONE WERE PANNED IN DIFFERENT PLACES ALONG THE ZONE WITH POOR

RESULTS. NO GOLD WAS RECOVERED. SAMPLES WERE TAKEN FOR ASSAY. 5

SAMPLES WERE SENT TO MNDM 6 l TO ACCURASSY WITH LOW VALUES OF *C . 001

TO ^.01 IN BOTH AU 6 AG. ANOTHER SAMPLE TAKEN BY MNDM AT A LATER

DATE PRODUCED THE SAME RESULTS. (SAMPLE PAGES l, 2, St 3)

TRENCH NO. 4 WAS PUT DOWN ACROSS THE FORMATION ON A FAVOURABLE

PROSPECTED AREA. THIS TRENCH CUT ACROSS TWO QUARTZ CARBONATE

ZONES WEAKLY MINERALIZED WITH FINE PYRITE, AS WELL AS A NARROW

QUARTZ VEIN WITH FINE PYRITE. 2 SAMPLES WERE TAKEN FOR ASSAY.

RESULTS WERE BOTH .003 AD OZ/T (SAMPLE PAGE 2).

TRENCH NO. 5 BEDROCK WAS NOT REACHED DDE TO HEAVY OVERBURDEN.

THE VLF CONDUCTOR WAS NOT EXPLAINED.

Page 2: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

NO. 6 WAS PUT DOWN ON A FAVOURABLE PROSPECTED AREA ASP^^™^~™

AS A STRONG VLF CONDUCTOR. THERE IS HEAVY GOSSAN AT BEDROCK

/THE WESTERN SIDE OF THE TRENCH. SAMPLING WAS IMPOSSIBLE DUE TO

&VY INCOMING WATER. THERE IS A WELL SILICIFIED ZONE IN THE

CENTRAL PART OF THE TRENCH WITH NARROW QUARTZ VEINS THROUGHOUT. THE

RUSTY SECTIONS WERE PANNED BUT NO GOLD WAS RECOVERED.

TRENCH NO. 7 REVEALED MOSTLY MASSIVE MAFIC VOLCANICS. HEAVY

INCOMING WATER PREVENTED FURTHER EXPLORATION.

TRENCH HO. 8 WAS PUT DOWN ON A VLF CONDUCTOR. BEDROCK WAS

NOT REACHED DUE TO HEAVY OVERBURDEN. THE CONDUCTOR WAS NOT

EXPLAINED.

TRENCH NO. 9 WAS PUT DOWN TO TEST OVERBURDEN DEPTH ON STRIKE

OF A MINERALIZED SHEAR ZONE. HEAVY INCOMING WATER FORCED ME TO

ABANDON THIS TRENCH.

TRENCH NO. 10 WAS PUT DOWN ON STRIKE OF THE SHEAR ZONE IN

, TRENCH 4. ONLY MAFIC VOLCANICS WERE OBSERVED BEFORE WATER CAME IN.

TRENCH HO. 11 WAS PUT DOWN ACROSS THE FORMATION IN THE AREA OF

AIRBORNE CONDUCTIVITY. MOSTLY MASSIVE MAFIC VOLCANICS WERE

OBSERVED BEFORE WATER FILLED THE TRENCH.

TRENCH NO. 13 WAS PUT DOWN TO TEST THE OVERBURDEN IN THE AREA

WHERE WATER CAME INTO TRENCH NO. 11. MAFIC VOLCANICS WERE OBSERVED

BEFORE WATER FILLED THE TRENCH.

Page 3: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

:

TREHCH MO. 14 WAS POT DOWN ACROSS THE FORMATION IN A

FAVOURABLE AREA DOWN STRIKE OF THE MINERALIZED SHEAR ZONE IN TRENCH

NO. 4. LARGE PIECES OF QUARTZ CARBONATE WERE FOUND IN THE WEST

AREA OF THE TRENCH. WATER HAMPERED TRENCHING. A CARBONATE ZONE

COULD BE IN PLACE BELOW. ALSO A CARBONATE-ANKERITE ZONE IN THE

CENTRAL PART OF THE TRENCH WITH MINOR FINE PYRITE. LARGE ANGULAR

FLOATS WERE FOUND IN THE EAST END OF THE TRENCH. THESE FLOATS

CONSIST OF MASSIVE SULPHIDES. MOSTLY FINE PYRITE WITH MINOR FINE

SPECKS OF GALENA. WATER HAMPERED TRENCHING IN AN UP ICE DIRECTION.

THE SOURCE OF THE FLOATS WOULD UNDOUBTEDLY COME FROM A CONDUCTIVE

AREA A FEW HUNDRED FEET UP ICE. SAMPLES WERE TAKEN AND ASSAYED FOR

GOLD/SILVER/ZINC St COPPER. RESULTS WERE AU -.005 6 .010 OZ/T, CU -

1280, 826 SL 3744 PPM, ZN - 8500, 2688 ft 282 PPM, AG - 11 6 2 PPM

(SAMPLE PAGES 4, 5 St 6).

TREHCH NO. 15 WAS PUT DOWN ACROSS THE FORMATION WEST OF TRENCH

NO. 14. A VERY BRITTLE FELSIC ZONE WAS UNCOVERED IN THE CENTRAL

PART OF THE TRENCH ALONGSIDE A STRONG SHEARING IN THE MAFIC

VOLCANICS. SAMPLES RESEMBLING KYANITE WERE OBSERVED AFTER

BLASTING. WEAK MINERALIZATION CONSISTING OF VERY FINELY DISEM-

MINATED PYRITE WAS OBSERVED. 2 SAMPLES ASSAYED RAN ^001 Si .002 AU

OZ/T (SAMPLE PAGE 5)

TREHCH HO. 16 WAS PUT DOWN ON A STRONG VLF CONDUCTOR. A ZONE

OF MASSIVE SULPHIDES WAS UNCOVERED, MOSTLY PYRITE, VERY FINE

GRAINED CHALCOPYRITE AND A FEW SPECS OF SPHALERITE. THE ZONE WAS

BLASTED WITH MAGNAPACK FOR SAMPLE RECOVERY. SAMPLES WERE TAKEN.

ONE SAMPLE WAS ASSAYED FOR COPPER 6 ZINC. RESULTS WERE CU 3000PPM,

ZN 73PPM (SAMPLE PAGE 6).

Page 4: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

TRENCH NO. 17 WAS POT DOWN ALONG STRIKE OF TRENCH NO. 16. A

ZONE WAS UNCOVERED ALTHOUGH HEAVY WATER INFLOW MADE BEDROCK

SAMPLING IMPOSSIBLE. LARGE PIECES WERE RIPPED FROM THE ZONE WITH

THE EXCAVATOR. A BLUE QUARTZ MATERIAL WITH FAIRLY HEAVY PYRITE-

CHALCOPYRITE MINERALIZATION WAS RECOVERED. SAMPLES WERE TAKEN FOR

ASSAY. ONE SAMPLE WAS ASSAYED FOR GOLD/SILVER - .01 AU 6 .1 AG

OZ/T (SAMPLE PAGE 3). ONE SAMPLE WAS ASSAYED FOR COPPER fit ZINC - CU

510PPM, ZN 179.5PPM (SAMPLE PAGE 6).

TRENCH NO. 18 WAS PUT DOWN ACROSS THE FORMATION TO FURTHER

INVESTIGATE THE BEDROCK WEST OF TRENCH NO. 14. UNALTERED MAFIC

VOLCANICS THROUGHOUT THE TRENCH.

TRENCH NO. 19 WAS PUT DOWN ACROSS THE FORMATION AND IN AN AREA

OF AIRBORNE CONDUCTIVITY. THIS TRENCH IS ALSO UP ICE OF THE

MASSIVE SULPHIDE FLOATS FOUND IN TRENCH NO. 14. ONLY MASSIVE MAFIC

VOLCANICS WERE OBSERVED BEFORE HEAVY WATER FILLED THE TRENCH.

TRENCH HO. 20 WAS PUT DOWN ON STRIKE OF A WELL SILICIFIED ZONE

IN TRENCH NO 15. AN ALTERATION MINERAL RESEMBLING KYANITE WAS

AGAIN OBSERVED IN THE TRENCH. HEAVY WATER CAME IN BEFORE SAMPLING

COULD BE DONE.

TRENCH HO. 21 AGAIN PUT ON STRIKE OF TRENCH NO.S 15 AND 20.

THE TRENCH WAS ABANDONED BECAUSE OF WATER.

TRENCH HO. 22 WAS PUT DOWN ON STRIKE TO THE NORTH OF TRENCH

NO. 15. FAIRLY HEAVY SHEARING WAS OBSERVED BEFORE THE WATER CAME

IN. TRENCHING IN THIS AREA IS FUTILE AND WAS ABANDONED.

Page 5: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

TRENCH MO. 23 WAS PUT DOWN ON STRIKE OF THE MASSIVE SULPHIDE

ZONE IN TRENCH NO. 16. THE SULPHIDE ZONE WAS UNCOVERED AND IS

APPROXIMATELY 4* WIDE. THE EASTERN CONTACT IS HEAVILY SHEARED

MAFIC VOLCANICS; THE WESTERN CONTACT, BLOCKY AND BROKEN UP.

MINERALIZATION IS MAINLY FINE PYRITE WITH SOME VISIBLE MINOR

CHALCOPYRITE. BLACKJACK AND GALENA ARE VISIBLE BUT HARD TO

IDENTIFY BECAUSE OF THE NATURE OF THE FINE GRAINED MASSIVE

SULPHIDES. 5 SAMPLES WERE ASSAYED. RESULTS RANGED FROM: AU - 0.002

TO 0.015 OZ/T, AG - .08 TO .21 OZ/T, CU - 0.03 TO .14%, ZN - .14

TO 2.(m (SAMPLE PAGE 7).

TRENCH NO. 24 WAS PUT DOWN ON STRIKE OF THE SULPHIDE ZONE IN

THE NORTH TRENCHES. THERE IS SHEARED MAFIC VOLCANICS IN THE

EASTERN PORTION OF THE TRENCH. WATER FILLED THE WESTERN PORTION

AND THE TARGET COULD NOT BE REACHED.

TRENCH NO. 25 WAS PUT DOWN ON A STRONG VLF CONDUCTOR AND

UNCOVERED A WIDE RUSTY QUARTZ CARBONATE ZONE MINERALIZED WITH MINOR

FINE PYRITE. OVERBURDEN IS APPROXIMATELY 8* DEEP. ONE MAGNAPACK

BLAST WAS POSSIBLE BEFORE THE WATER CAME IN. A SMALL PIECE OF

QUARTZ CARBONATE WAS RECOVERED FROM THE DRIFT ON THE WEST SIDE OF

THE TRENCH. THIS SAMPLE HAD CONSIDERABLE FINE GALENA. THIS WOULD

INDICATE A WELL MINERALIZED SECTION ALONG THIS ZONE IS YET TO BE

UNCOVERED. THIS AREA WILL HAVE TO BE TRENCHED IN A DRYER SEASON OR

WHEN THE WATER TABLE IS LOWER. FURTHER TRENCHING AT THIS TIME WAS

FUTILE BECAUSE OF THE HIGH WATER TABLE AND WOULD RUIN THE AREA FOR

FUTURE TRENCHING.

TRENCH HO. 26 WAS PUT DOWN IN BETWEEN TRENCH NO.S 16 AND 23

WITH THE HOPE THAT BEDROCK WOULD BE HIGHER UP AND OUT OF THE WATER.

THIS WAS NOT THE CASE AND WATER FILLED THE TRENCH IMMEDIATELY.

Page 6: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

lJOHN MASON, BEARDMORE-GERALDTON DISTRICT GEOLOGIST, M.N.D.M.

AND GARY GERBOSKI, OPAP REPRESENTATIVE, WERE ACCOMPANIED ON A FIELD

TRIP OF SOME OF THE TRENCHES ON OCT. 5/93.

Page 7: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

-J-\722

1194723

1725 1194726

-----H—— ---.

727 1194728

^

--j r———

Page 8: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor
Page 9: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

——f. nil ft-* M* fc flf,v4ttM**.r l

CI Oil* J-***

o-too S cn-oof

1

\flaps h

T5 33C384-

7-t-StS

*n.

BACKHOE TRENCH LOCATION

MAP

By : P ADate'. Oc,t.ot,M3

L

Page 10: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

l '

*

lii

S' 1

T, *,,k *l

'61**y over** d* p rk

l

- ; ..:.

.- .. -.:—L - ;-

r.- . ---- : - '

iW^'

. - ...:- --. , •\' - \ - - : i.: .;

/i ^ 5 3U d!

La Are Hap 6 -

SKETCHES TRENCHES

Page 11: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

-. x 5m X 31

& 386310

S"!

li

||

5 4-

/Q m

PE7AILED SKETCH BACKHOE TRENCH

P.

Page 12: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

t ' C ,

T B 386110

(f^Jft!..jrf:U.O-i.QJr Sca\c\ \

N. O-

L

{le a c^h c p*r~t -Go l la'!'col

,'

N

r -

K.

f

t -i

PET/AILEDBACKHOE TRENCHES

A/ CO/

Dote/ s*fL&U ! P, L o JT j . IQ

Page 13: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

h 8

VLF C**J.

*i x

TB 386

***in o track

N

O

Size! J* X

390

liteof

tkptJi

rj

5 I

/Q

* Z t* x- X l O y*

Sea le i / clw o

1*15- -l

li

5:*-i

i•i

O f-

lo m

11

DETAILED SKETCHES BACKHOE TRENCHES

N COX

Sept,1 7 7^

Page 14: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

13SVze .' 3 ** x o-i **

J B 390

lie ne h

\

cAc/hJCs

c70.se p r oAr i'r

ls

II

4 wes

1-

DETAILED SKETCHES &ACKHOE TRENCHES

P. Loss- 1 lei

L-akc Map

Page 15: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

2Z t* 30* ,

S p hoi t

Se, p le i !\——lil*

-f. i

II

SKETCHESSACK HOE TRENCHES

: P.C os W* wood to k* Mop

Page 16: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

3&6310

++70S

)

N

Carlaaho'te. 5ulfid*S

X 11*9

o-

25

Note.,'

hot.

* \1

e* M c ^o Ir&sp

9*** p f* -4 J

li

TRENCHES

/.oke MC./O

Page 17: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

Ministry of "Northern Development

Ontario

Report of Work Conducted After Recording Claim

UMngAct

anthiafcmnboiiWnadimdfrtoauMiorttyoflhaMMngActTWi should to dkvctsd toll"'

Sudbury. Ontario. P3E SA5, l

wMbe ~-' Mhws. Fourth Floor. 159 Cedar Straat.

typ*Refer to the

tOnt work or consult the

f-

Mining

Technical reports and maps must accompany nw nrm HI uutmA sketch, showing the daima the work is assigned to. must accompany this form.

atom No.C.01C H - H

Rom: Toc Se?Vork Performed (Check One Work Group Only)

WorkGroup Type

Geotachnfcal Survey

Physical Work, Including Drilling

GIS-ASSESSMENT RLES

MAR 2 4 7994OllHii Aullmrlzed Work

Amgnmant hoin

Total Asaesomont Work Claimed on the Attached Statement of Costs

tote: The Minister may reject for assessment work credit aH or part of the assessment work submitted if the recordedS- — ggj g, — — .a — -B g.m •^M^XlVa a* a aa* m* ^ Jtta B^*k** AAdfel^^uh^J la* AiWdk d^rihAdb^^ufe^b* 4*f ^^M^MAo* AJStWb* AA ^J**B^M 4^C 4h m***mm m^*^^ sVtt*noioer cannot verny expenonuree CHwneo in me suuomoni or wMo wiiiHn ju oays or a request lor

eraona and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address

Co, OO-r-

x?*//

—- - ^Mj n —ai M — —* nm———mm^m—a^VlUIICfllKHI Of DVfWndaV

m- m— 4 MMno. i on^t^ 4Sk^ B^H^ia* ^^^^ tfk^M*Wtf^^^hdi 4c? utv wont w penorrneia, n^K M^K 4M^^^^^ BH^^^^^ ^^^^-^ --— K^^gjfl m^m^^f ——n nw curani moer v lawnv or iwn inoer B

by Hw cu

*- M aiiii ai Bieli a ai ^*4 taV^k*4V^6IUIICeiUCNI Off WOVK

l IMM s psnoml hnoMtodlpjB off tti0 mport la trua.

t forth hi thte Work report, taring partormad tt* work or i during andtor aftw

NeflW 4Vtf M

NtfH.,

ro

or Offfce Use Only

NOISIAIQ ONi::iriAVB

Q3M3C":

Page 18: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

s*

ODr

CAJ OB-c

OD6^ IV -0 D

oA*

U/ K*Ox si ON

O Kj s

Ox OX

Claim Numbt (MO Note 2)

i l! o

41-t M

Valuo Work Dn this

lto

KJ-c- c

-C 0

rsj< o

M-C C

ro -r0

M,r0

tv(f

liiX J) o

rsi

Credits you are claiming in this report may be cut back. In order to minimize the adverse effectsofsuchdeletions.plJiinii MIMSBMA UMMB ---^-*- a™ •EaSoal am MM* ri nlaa Hn aa -i* Mini ijSIai *^*— — — — MtMBtV / ^1 4MBM rj ii-jiwnicn cuums you wisn 10 pnorue me donnon or creoHS. rniimo mant (*^) one or me

1. D Credits are to be cut back starting wNh the claim2. HI fVoHit. aK. t.^K, M ^ frafiH BnimlY pygr ^ ̂ .i.t^r.Tnnlain.^l hi Hite mpnrt n* nmrir

3. DCredte

In the event that you have no|.

i, wlili raapec

l certify ttMt theor

mtod hottar tad i ttw woffc w

inlorest in ths paftanted Tr '

Page 19: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

c e- *. r ir. " k*

^Ministry of Northern Development and Mines

'isteredu uevoloppBment ou Nofd et des mines

Statement of Costs for Assessment Creditittat des coOts aux fins du credit devaluation

Mining Acl/Loi sur les mines

Transaction NoJN* da transaction l

l

^eraonal information coVactad on this form to obtained under the authority f the MMng Act This information wM ba used to maMain a record and ngoing status of the mining ctaimfa). Questions about 1MB cotoctton should e directed to the Provincial Manager. MMngs Lands. MMstry of Northern

development and Mhws. 4th Floor. 159 Cedar Street. Sudbury. Ontario •3E GAS. telephone (705) 670-7264.

^ pOfBonnotB oonlonus itans ta pfteontB fomiuls sont rocueiWs on vertu de to Lol our too ntnaasenwrt&toriT&farunTQystn des concessions tiitnleres. Adresser toute ojuosHon sur to oollece de ces renseioneinents en chef pravinciel des teriBins mlfuofs, iramstere dy DevetoDpement du Nord et des Mines. 159. rue Cedar. 4* etage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.

'. Direct Costs/Coots directs

Type

Conbi

Drottade

Main-d'oeuvreField Supervision Superviann sur to terrain

Type

Type

Type

Amount

Total Direct Total daa coota

Totals Total global

3WI

2. Indirect Costs/Gouts Indirects* * Note: When claiming Rehabittation work Indirect costs are not

Pour to remboursement das travaux de rehabiilation. les couts indracts ne sort pas admtosibtos en tant qua travaux d'evaluation.

Type

rOOO BH0J

Description

30*

Amount

s^/.

Sub ToM of Total partM dM t

TeMVahwef (ToM of Direct

Totals Total global

SO.

ote: The recorded holder wH ba required to verify expenditures claimed in thto statement of coals within 30 days of a request for verlflcalion. H verification to not made, the Mbitotar may rated for i aH or part of the aiaonmont work submNted.

NOB* : La ttiMreenregMre sera tenu da verifier les dapenses cto present tot des couts dans tos 30 jours suivant una damanda a eel effet.Sitavafm^tenn'eBtrjasehiBCluee,toinlnWraDaiJtrejetertout ou una partto das travaux d'evaluation onjhentes.

Work filed within two years of completion is claimed at 100* of the above Total Value of Assessment Credit.

pour depot

1. Las travaux deposes dans tos deux ara i

: :. :-f . *...5t-!^.'.'- tsonl

Work filed three, four or five years after SOtt of the above Total Value of calculations bekmr

is claimed at Credit. See

susmeiitlo^^ 30 *Z

2. Les travaux deposes trois. quatreou cinq

dial Value of ittCWmadx 0.50 -

sont rambourses a SO 4b de la vatour b*Ma d^rtttt d'evaluationsusrnentionne. Vok tos i ro

du Cffctt d'evaluationx 0.50

demandte

jrtificatlon Verifying Statement of Costs Attestation de I'etat des couts

dreby certify: jt the amounts are incurred

the

i are as accurate as possible and these costs iducting assessment work on the lands shown

l am authorized

make this certification

J'atteste par la presente :quo tos monlants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer toe travaux d'evaluation sur tos terrains indiques dans la tamuile de rapport de travail ci-joint.

Et qu'a titre de -——(SUanenragMr*.

Je suis autorise-Tie)

"l daslyne des porsonnss. le msnciihn est i Una au12(04*1) Note: Dans cotte netW.

Page 20: TRENCHING PROGRAM TRENCHING BEGAN ON AOG 30, 1993 …€¦010 trenching program trenching began on aog 30, 1993 osing a 215 excavator. trench ho. l was pot down on a strong vlf conductor

NOTE-}AREAS WITHDRAWN FROM DISPOSITION

M.R.O -MINING RIGHTS ONLY

S.R.Q. - SURFACE RIGHTS ONLY

II.* t. - MINING AND SURFACE RIGHTS

CMarN*. DM Oivwttlten f tt*

60*00'

^

COUGH G-2S

r-—i U ;.\

O N A

K E

7 \ -50M

* lozzfu 'Sio

,, c7 .II8BIG3

42E1 200

iO

UJ

'Zoh-GC UJ

u.

KABY L \Kc G-6. i

MOTES

TOPOGRAPHY

LAKES. RIVERS ETC.. TROM FOREST RESOURCES INVENTORY SHtET No 49B&73

5IJPVEY5

MERIDIAN LINE SURVEYED BY PHILLIPS AND BENNER, OL.S'3., 1916. FIELD NOTE BOOK No. 2474.

l HI INFORMATION IHAI APPLAUD ON .THIS MAC HAS RF FN COMPII f [i FROM VARIOUS SOURCE 1 , AND ACCURACY IS NO1 GUARANTEED THOSI WISHING TO STAKP WIN ING CLAIMS SHOUl O CON bULT WITH THf MINING HtCOHWR MINIS l HY Ol NORTHERN Df VI l Of MENT AND MINI S F OR AD DITIONAL INFORMATIONON THF STATUS or THIl ANDS SHOWN H[ Mf ON

DISPOSITION m CROWN LANU5

TYPE OF DOCUMENTPATENT, SURF ACE ft MINING RIGHTS.

-' .SURFACE RIGHTS ONLY^^.- .MINING MIGHTS ONLY-^^.

SYMBOL

e e

LEASE. SURFACE ft MINING MIGHTS — - . - - ———— R- .SURFACE RIGHTS OWL Y ______ _ ̂ __ E5" .MINING BIGHTS ONLY — r- . ———— . ——— ^

LICENCt: OF OCCUTAVION ____ i. __________ TORDtR-IN-COUNCIL _ .... ______ __RESERVATION _____________________ _CANCEL! CO __________ ,.,.,.^..,. SAND ft GRAVEC ______ ] ____ .' __ ̂

NOTI MINING **tO* r* IN r*MCf U r*TfNTfUrailLiM TO M*V t, ItU. VMTKO IN OHIOMAL *ATBHT(B W TH* "Utl.*C LAND* ACT. **JO. t*M. CHA*. MO. MC. '4. VUMti. t.

L E G E N D

PAVED ROAD GRAVFL I'CAD

OTHER ROADS

TRAIL OR P*THv nOUTE N.

T PO'ATR LINE. TELEPHONE: LII.FKAILK AO f. RIC.HT Or V.'M

RAP ". r "' -

f ON Pfi-t '.f.l.'.L f'REAM

t uv.it or C.. E ' i''*i 7

T T T T T T

LAND USf I'H'MI M lA t luiiHI'jM, OUTPOST CAMI ^.

SCALE: 1 INCH * 40 CHAINS

O 1000 700B •000

O 900 M TMtC 11 KM)

700041 KMt

UIIA CASTLEWOOD LAKE

M.N.R. ADMINISTRATIVE DISTRICT

NIP!MINING DIVISION

THUNDER BAYLAND TITLES/ REGISTRY DIVISION

1 THUNDER BAY:

IGON8 ^ft

Itx ^J. rf/'U, APRIL^..1^

0 *" JUI Y, 1966lUwaar

r^J

t.

r