trenchless installations & unmarked sewer lines
DESCRIPTION
TRENCHLESS INSTALLATIONS & UNMARKED SEWER LINES. PRESENTATION TO NAPSR By: Dan Weaklend, NPL Construction Company. “NPL Quality – The Pipeline To Success”. AGENDA. WHO IS NPL? THE ISSUE STATUS TODAY: State Legislation LDC Policies and procedures Industry Association Involvement. - PowerPoint PPT PresentationTRANSCRIPT
TRENCHLESS INSTALLATIONSTRENCHLESS INSTALLATIONS&&
UNMARKED SEWER LINESUNMARKED SEWER LINES
PRESENTATION TO NAPSRBy: Dan Weaklend, NPL Construction Company
AGENDAAGENDA
• WHO IS NPL?
• THE ISSUE
• STATUS TODAY:– State Legislation– LDC Policies and procedures– Industry Association Involvement
“NPL Quality – The Pipeline To Success”
WHO IS NPL?WHO IS NPL?
Core Business:
• The safe installation & maintenance of reliable energy distribution systems
• Over 500 crews• Over 2600 employees • Operate in 20 states • One of the largest users of One Call
Centers in U.S.
“NPL Quality – The Pipeline To Success”
NEW AND REPLACEMENT NEW AND REPLACEMENT FOOTAGEFOOTAGE
4.36 4.31 4.09 3.96 4.55 5.46 5.73 5.83 5.28 5.54 5.82
5.45 5.56 5.62 5.466.05
6.056.96 6.86
6.307.25
8.34
0
2
4
6
8
10
12
14
16
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005
Mill
ions
New
Replaced
•CU
•CNP
•SWG
•NIPSCo
•SWG
•SWG•KGS
•KGS
•BGE
•SWG
•XCEL
•Nicor
•WGL
• KGS
•ATMOS
•DEA•GMG
•SWG
•AGL
•SWG
•APS
XCEL
SRP
ATMOS
•EE
•ONG
AQ
• CPS
BHC
•AGL
SO CAL
Peoples
“NPL Quality – The Pipeline To Success”
NPL CUSTOMER EXPERIENCENPL CUSTOMER EXPERIENCE
NPL LOCATION MAPNPL LOCATION MAP
AGENDAAGENDA
• WHO IS NPL?
• THE ISSUE
• STATUS TODAY:– State Legislation– LDC Policies and procedures– Industry Association Involvement
“NPL Quality – The Pipeline To Success”
““THE OFTEN FORGOTTEN THE OFTEN FORGOTTEN UNDERGROUND WORLDUNDERGROUND WORLD””
MANY MORE UTILITIES ARE INSTALLED MANY MORE UTILITIES ARE INSTALLED USING TRENCHLESS TECHNOLOGYUSING TRENCHLESS TECHNOLOGY
Sewer Main
Who’s responsible for marking?
Property line
Cit
y st
reet
House
Lateral to mains
connection
POSSIBLE SCENARIO?POSSIBLE SCENARIO?
New service Line
What could happen?
GAS LINE IN A 6” SEWERGAS LINE IN A 6” SEWER
GAS LINE + SEWER LINE + GAS LINE + SEWER LINE + ROTARY-ROOTER = DISASTERROTARY-ROOTER = DISASTER
LOW FREQUENCYHIGH SEVERITY
THE EXPOSURETHE EXPOSURE
THE BIG CONCERNSTHE BIG CONCERNS
1. Catastrophic human tragedy2. Huge costs
SEWER LINES NEED TO BE MARKED,SEWER LINES NEED TO BE MARKED,JUST LIKE ALL OTHER UTILITIESJUST LIKE ALL OTHER UTILITIES
SOLUTIONSSOLUTIONS• All underground
facilities, including sewer lines, should be marked by the entity that receives revenue from the facility.
• All new sewer laterals should be installed with a location device (i.e. tracer wire, marker balls, etc.).
AGENDAAGENDA
• WHO IS NPL?
• THE ISSUE
• STATUS TODAY:– State Legislation– LDC Policies and procedures– Industry Association Involvement
“NPL Quality – The Pipeline To Success”
STATES THAT HAVE UPDATED ONE STATES THAT HAVE UPDATED ONE CALL LAWSCALL LAWS
ARIZONAGEORGIA
MINNESOTANEVADAOREGONVIRGINIA
WISCONSIN
“NPL Quality – The Pipeline To Success”
STATES UPDATING LAWSSTATES UPDATING LAWS
ARIZONA
GEORGIA
KANSAS
NEVADA
“NPL Quality – The Pipeline To Success”
STATES WITH CHAMPIONS STATES WITH CHAMPIONS STARTING GRASS ROOTS EFFORTS STARTING GRASS ROOTS EFFORTS
NEED SUPPORTNEED SUPPORT
CALIFORNIA
COLORADO
INDIANA
TENNESSEE
TEXAS
WASHINGTON
“NPL Quality – The Pipeline To Success”
GOOD STATE PROSPECTSGOOD STATE PROSPECTSIN NEED OF A CHAMPIONIN NEED OF A CHAMPION
ILLINOISIOWA
MARYLANDOHIO
OKLAHOMA
“NPL Quality – The Pipeline To Success”
AGENDAAGENDA
• WHO IS NPL?
• THE ISSUE
• STATUS TODAY:– State Legislation– LDC Policies and procedures– Industry Association Involvement
“NPL Quality – The Pipeline To Success”
LDC POLICIES AND PROCEDURESLDC POLICIES AND PROCEDURES
• LARGE WEST COAST LDC HAS POLICY OF REQUIRING AND ENFORCING THAT EVERY MAIN AND SEWER LATERAL BE DAYLIGHTED BEFORE EXCAVATING
• MIDWEST LDC HAS POLICY OF REQUIRING AND ENFORCING THAT All SEWERS ARE PRE-LOCATED (CAMERA’D) BEFORE GAS IS INTRODUCED
• SOUTHEAST LDC HAS COMPLETED A SYSTEM REVIEW USING CAMERAS
CAMERA IN ACTIONCAMERA IN ACTION
• LARGE SOUTHWEST LDC HAS:
– CAMERA PROGRAM TO IDENTIFY PAST INSTALLATION ISSUES
– POLICY REQUIRING AND ENFORCING THAT
EVERY SEWER MAIN AND LATERAL BE LOCATED BEFORE EXCAVATING
LDC POLICIES AND PROCEDURESLDC POLICIES AND PROCEDURES
AGENDAAGENDA
• WHO IS NPL?
• THE ISSUE
• STATUS TODAY:– State Legislation– LDC Policies and procedures– Industry Association Involvement
“NPL Quality – The Pipeline To Success”
INDUSTRY ORGANIZATION INDUSTRY ORGANIZATION INVOLVEMENTINVOLVEMENT
• AMERICAN GAS ASSOCIATION- BEST PRACTICES
• COMMON GROUND ALLIANCE- BEST PRACTICES
• DISTRIBUTION CONTRACTORS ASSOCIATION– POSITION PAPER– FINDING CHAMPIONS– SUPPORTING CHAMPIONS VIA INFORMATION SHARING
• NATIONAL UNDERGROUND CONTRACTORS ASSOCIATION– POSITION PAPER
• NORTH AMERICAN SOCIETY FOR TRENCHLESS TECHNOLOGY– BEST PRACTICES
“NPL Quality – The Pipeline To Success”
NUCA Position Paper – Locating and Marking Service Laterals The National Utility Contractors Association (NUCA) represents underground utility contractors, manufacturers and suppliers who provide the workforce and materials to build and maintain the nation’s network of water, sewer, gas, telecommunications and construction site development industries. As an active member of the Common Ground Alliance—an organization that works to promote best practices and shared responsibility by all stakeholders in damage prevention—NUCA strongly encourages its members do their part to prevent damage to underground facilities during construction activities. There is an ongoing debate in many states over who is responsible for the underground service laterals that run from the mains to buildings and residences that are in most cases on private property. It is unrealistic to expect property owners to fulfill the responsibility of locating and marking their service laterals. NUCA believes that effective damage prevention is ensured when both parties fill their respective responsibilities. Excavators are responsible for notifying their one-call centers prior to excavation and employing safe digging practices; underground facility owners/operators are responsible for accurately locating and marking the facilities according to their state one-call laws. As a member of the CGA’s Best Practices Committee, NUCA is currently working on developing a best practice that will address the issue, but the CGA is limiting the discussion to locating sewer laterals. While NUCA is prepared to support a CGA best practice that to some extent limits the facility operator’s responsibility to locate sewer laterals, our official position is that facility owners/operators should be required to locate all service laterals. Locating and marking underground facilities is a primary responsibility of the facility operator. Therefore, NUCA supports all efforts to change state damage prevention laws so that they require underground facility owners/operators to locate and mark all underground service laterals. This would be consistent with their responsibility to locate and mark all of their underground facilities prior to excavation activity.
WHAT IS NEEDEDWHAT IS NEEDED
• LOCAL CHAMPIONS TO CHANGE STATE LAWS • GOVERNMENT REGULATORY AGENCIES TO GET
INVOLVED IN LEGISLATIVE CHANGES AND ENFORCEMENT
• MORE LDC’S TO TAKE UP THE CAUSE
• FOR ALL TO UNDERSTAND THAT THIS IS NOT JUST A CONTRACTOR PROBLEM. IT IS AN INDUSTRY SAFETY PROBLEMINDUSTRY SAFETY PROBLEM.
“NPL Quality – The Pipeline To Success”
WE WILL WIN!WE WILL WIN!
“NPL Quality – The Pipeline To Success”
QUESTIONS?QUESTIONS?QUESTIONS?QUESTIONS?